 Maintenance Definition
 Maintenance Management Objectives.

 Maintenance History
 Maintenance Procedures
 Maintenance Policies & Strategies.
 Maintenance Planning & Scheduling.
 Nature and General classification of
maintenance problem
 Maintenance Cost Control.
 Work Order System.
 Spare Part Control.

 Reliability Centered Maintenance
 Total Productive Maintenance.
 Performance Keys Indicators.
BITS Pilani, Pilani Campus
• http://ieeexplore.ieee.org/xpl/login.jsp?tp=&arnumber=971357&url=http
%3A%2F%2Fieeexplore.ieee.org%2Fstamp%2Fstamp.jsp%3Ftp%3D%26arnu
mber%3D971357
• http://ieeexplore.ieee.org/xpl/login.jsp?tp=&arnumber=54479
64&url=http%3A%2F%2Fieeexplore.ieee.org%2Fxpls%2Fabs_all
.jsp%3Farnumber%3D5447964
• http://inderscience.metapress.com/content/71940v3221p55115/
• http://www.palgravejournals.com/jors/journal/v55/n9/full/2601756a.html?file=/jors/journal/v55/n9/f
ull/2601756a.html

• http://en.cnki.com.cn/Article_en/CJFDTOTAL-XXGY200506044.htm

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
 British Standard Glossary of terms (3811:1993) defined
maintenance as:
“The combination of all technical and administrative
actions, including supervision actions, intended to retain
an item in, or restore it to, a state in which it can
perform a required function”.
 Maintenance is a set of organised activities that are
carried out in order to keep an item in its best
operational condition with minimum cost acquired.
BITS Pilani, Pilani Campus
Why Maintenance Management
 Modern maintenance management is not to repair broken equipment rapidly.
Modern maintenance management is to keep the equipment running at high
capacity and produce quality products at lowest cost possible.
 There are many reasons why maintenance is becoming more and more important.
In developing countries , where many old machines are operating, the spare part
problem are arising. Some times it is difficult to find spare parts for equipment
and if it is possible to find them, they are usually very expensive and must be paid
on foreign currency.
 Due to long lead times of supply of spares, it is common that the spare part
inventory is growing bigger than necessary. A very essential part in maintenance
management is developing countries to reduce the need of spare parts, as well as
to maintain the minimum level of shock to save foreign currency, but still keeping
the productivity high.

BITS Pilani, Pilani Campus
Basic functions of a maintenance
management system
1.
2.
3.
4.
5.
6.

Preventive maintenance
Plant and unit record(Equipment)
Inventory and spare parts control system, Purchasing system
Document record
Planning system for maintenance and work order routines
Technical/economic analysis of plant history, maintenance and machine
availability

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Organizing the Maintenance
Function
 Centralized maintenance department
 Does all maintenance (PM & breakdown)

 Decentralized Maintenance department
 Useful if different equipment used in different areas of company

 Contract maintenance
 Used if little equipment or expertise

 Operator ownership approach

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Operator-Ownership
Approach
 Operator does preventive maintenance





Equipment condition is their responsibility
Learns equipment better
Increases worker’s pride
Reduces repair time & PM costs

 Maintenance department is backup
 Handles non-routine problems
 Provides maintenance training
 Has plant-wide responsibilities

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
PLANNING

ANALYSIS

PERFORMANCE

RECORDING

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Planning & Scheduling
Planning:
•
•

Management surveys show that the average productivity of
maintenance employees is between 25 and 35%.
This means that a craftsman has less than 4 hours of productive
time per 8-hour day due to poor maintenance management.

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Planning & Scheduling
The following are some of the most common wastes of
productive time:•
•
•
•
•
•
•
•
•
•
•

Waiting for instructions
Looking for supervisors
Checking out the job
Multiple trips to the stores
No special tools
Waiting for approval
Too many craft workers per job
Insufficient workers scheduled for the job.
Incomplete planning & communications
Waiting for equipment to be shutdown
Waiting for drawings from engineering
BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Planning & Scheduling
 On the average, 2 hours are lost every time worker is pulled off a job for any reason.
 To prevent this major loss of productivity, it is necessary to implement some form of job
planning function.
 The concept of job planning is to determine what is to be done and how it is to be done.
 Job planning consists of two main areas:
1. Craft skills
2. Material required for the job.
 These labor and material requirements may be converted to dollars to give an estimate
of the cost of completing the work order.

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Planning & Scheduling

Planning
 Planning can be accomplished by the supervisor if there are relatively few maintenance
personnel.
 If there are more than 20 craftsmen, planning is best done by separate maintenance
planners, otherwise the foremen have a tendency to do paperwork when they could

more profitably spend their time in supervising and directing the work of the craftsmen.

BITS Pilani, Pilani Campus
Maintenance Planning & Scheduling
Type of Work to be planned:
– Emergency maintenance and critical maintenance (work needed
immediately or within 24 hours) is seldom planned.
– These request are of short duration and are performed so quickly that there
is no time to plan them.
– These types of work orders should not be considered in planning functions
– Normal corrective or routine work orders should be the primary consideration
of the planning function.
– These work orders are received and placed in work backlog.
– As the workforce and materials become available to carry out the work, it is
scheduled.
– Included in this type of work are preventive and predictive maintenance work
orders.

BITS Pilani, Pilani Campus
Maintenance Planning & Scheduling
Type of Work to be planned:
• The other group of work requests that can be planned are the
shutdown, turnaround, or the outage work orders.
• For this type of work, it is important that the equipment be shut down and
overhauled in the shortest possible time.
• Only by accurate estimating and scheduling of these work requests can the
shutdown be successful.

BITS Pilani, Pilani Campus
Maintenance Planning & Scheduling
How to Plan Maintenance Work :
– Effective planning requires the planners to be skilled and knowledgeable in the craft area they

are planning; therefore, supervisors or top craftsmen will make the best planners.
– If an inexperienced individual is promoted to planner, the results of the planning program will
not be satisfactory. Instead of increasing productivity, you may find productivity decreasing.
– The planning begins once the work order is approved by management.

– It is then assigned to the planner, who carefully studies the job.
– The planner must decide the following: The crafts required,
 The time required,
 The materials required, and
 Whether outside help in the form specialists, contractors, or special rental equipment is
required.
BITS Pilani, Pilani Campus
Maintenance Planning & Scheduling
How to Plan Maintenance Work :
–
–

–
–

–
–

–

When the planner is deciding on the required crafts, he must also decide not only the
number of craftsmen, but also the skill level required.
The time estimate for work order is important. If there is no time estimate, you will never
know the man-hours of work that is in the crafts backlog. Without this information, you
can never accurately determine the proper staffing levels for your plant.
The material required for the work order will determine whether it can be scheduled.
If the necessary materials are not available and the work order is scheduled, the
craftsmen will lose productivity looking for the spare parts and waiting for supervisor to
find them work that can be performed.
It is also necessary to plan the materials so that an accurate estimate of the cost of the
work order can be obtained.
The miscellaneous items to be planned are important to proper completion of the work
order.
If special skills are required from outside source, the in-house craftsmen may not be
able to complete the work order quickly or with necessary quality.

BITS Pilani, Pilani Campus
Maintenance Planning & Scheduling
Scheduling Indicators:
Within a maintenance strategy, you can use different
scheduling indicators to specify the type of scheduling you
require or to define a cycle set:
 Time-based (for example, every 30 days)
 Time-based by key date (for example, every 30 days on the
30th day of the month)
 Time-based by factory calendar (for example, every 30
working days)
 Performance-based (for example, every 50 operating
hours)
BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Benefits of Planning Maintenance
 Long term plans insight
 Decision making support
 Optimizing connectivity among operation and maintenance
departments
 Figuring out areas of cost reduction
 Training areas and needs

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Nature of maintenance problem
 Maintenance can be classifies as follow
1. General classification of maintenance problems
1.
2.
3.

2.

Mechanical Failure
Thermal Failure
Chemical Failure

Classification of maintenance problem based on
time span
1. Short Run Maintenance Problem
2. Long Run Maintenance Problem

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
General classification
Maintenance problem
Mechanical Failure






Worn out bushes and bearings and other moving parts.
Fatigue of machine members
Creep of material at high temp
Excessive forced vibration, misalignments etc.

Thermal Failure





Overheating of the component
Lack of lubrication
Inadequate of cooling
Electrical insulation failure

Chemical Failure



Highly corrosive fluids containing abrasive particles
Failure of protective linings like glass , rubber etc.
BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Classification maintenance
problem based on time span
Short run production problem
Maintenance problem which are carried out in a sort period of
time are known as short run production system. It may be
hourly, daily ,weekly and monthly.
Example:Hourly- inspection of correct lubricant, level of
coolant, sharpness of cutting tool.
Daily- cleaning of m/c, tightening of nuts, correct
cooling, inspection of various indicators, minor adjustment of
parts.
Weekly- Major adjustment, lubrication, tightening of parts.
Monthly- checking for insulation, corrosion, safety
guards, checking of worn-out and distorted parts.
BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Cost Control
Objectives of Maintenance and Maintenance Cost
During the years the maintenance function has not been seen as a
condition for production output. The previous approach has been
that maintenance is the necessary evil, one among the cost
generators in the organization. Very often the maintenance strategy
in plants has been to reduce the maintenance cost as much as
possible without thinking of the consequences.
Objective of the maintenance is , as priority one , to create an
availability performance which is suitable for production demands in
the organization. No mechanized/atomized company has yet
succeeded to produce with stopped equipment. Production buy
availability performance from maintenance.

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Cost Control

All enterprises and organizations are interested in lowering
maintenance costs. A very common delusion is that
• The product gives the income
• Maintenance costs money

Note: Maintenance which is not carried out ,will cost even more
than money .

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Cost Control
There are two ways of managing the maintenance
costs
1.
2.

Cost Controlled Maintenance
Result Controlled Maintenance

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Cost Control
Contd…

The cost controlled maintenance is not considered as modern
maintenance management, The reason why maintenance has been
treated as a cost controlled activity, Is often that engineers and
technical staff have had some dilemma to measure the results of
investments in maintenance in total economical terms. It is simple
to find the direct cost for maintenance but it could be difficult to
see the results.
 The upper priority in the objectives of maintenance is to “keep
up planned availability performance at the lowest cost possible” .
This means that the long term results are important. The
maintenance cost must be put in relationship with overall results
achieved by maintenance in production facility.
BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Cost Control

The maintenance cost can be split up in two different categories.
 Direct maintenance costs -The costs are directly related to the performance

of the maintenance works
Indirect maintenance costs -Losses due to maintenance

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Cost Control
Direct maintenance costs
• Wages & Salaries
• Material Costs
• Administration Costs
• Costs for training
• Spare parts costs
• Contracted work forces
• Modification Costs

Indirect Costs
• Loss of revenue or other losses as a result of interruption to production as a
result of maintenance.

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
Maintenance Cost Control
Measurement of Maintenance Efficiency
Many times there are needs to measure the maintenance efficiency.
However, maintenance can not be measured by the cost it creates. There must be an
connection to the production out put some way. It is naturally impossible to
determine anything about the size of the direct costs. One method to control the
direct maintenance is to use the PM-factor. “P” stands for prime product produce and
“M” stands for maintenance cost. When using the PM-factor, the result of the
maintenance impact on the production is measured. How many products are
produced per a 1000 units of “maintenance money”.

Prime Production

PM – Factor

=

X

1000

Maintenance Cost

BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956

Contenu connexe

Tendances (20)

Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenance
 
Tpmjishu
TpmjishuTpmjishu
Tpmjishu
 
Tpm
TpmTpm
Tpm
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
OEE
OEEOEE
OEE
 
Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes)
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineering
 
RCM
RCMRCM
RCM
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Introduction to maintenance strategy
Introduction to maintenance strategyIntroduction to maintenance strategy
Introduction to maintenance strategy
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
 
PM PRESENTATION
PM PRESENTATIONPM PRESENTATION
PM PRESENTATION
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
TPM Overview and AM Workshop
TPM Overview and AM WorkshopTPM Overview and AM Workshop
TPM Overview and AM Workshop
 
INTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptxINTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptx
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Maintanance management
Maintanance managementMaintanance management
Maintanance management
 

En vedette

Maintaining equipment
Maintaining equipmentMaintaining equipment
Maintaining equipmentNc Das
 
Managed Service Overview
Managed Service OverviewManaged Service Overview
Managed Service Overviewanwarizal
 
S6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition NoteS6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition Noteno suhaila
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementawantika diwan
 
Maintenance types
Maintenance typesMaintenance types
Maintenance typesMotasem Ash
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenanceAbhik Rathod
 
COMPLETE MEDICAL EQUIPMENTS- HBOT PRESENTATION -SECHRIST
COMPLETE MEDICAL EQUIPMENTS- HBOT PRESENTATION -SECHRISTCOMPLETE MEDICAL EQUIPMENTS- HBOT PRESENTATION -SECHRIST
COMPLETE MEDICAL EQUIPMENTS- HBOT PRESENTATION -SECHRISTatulforcomplete
 
Biomedical Engineering (Medical Equipment's) - Mathankumar.S - VMKVC, SALEM,...
Biomedical Engineering (Medical Equipment's)  - Mathankumar.S - VMKVC, SALEM,...Biomedical Engineering (Medical Equipment's)  - Mathankumar.S - VMKVC, SALEM,...
Biomedical Engineering (Medical Equipment's) - Mathankumar.S - VMKVC, SALEM,...Mathankumar S
 
ONES-After Sales Service Design
ONES-After Sales Service DesignONES-After Sales Service Design
ONES-After Sales Service DesignJoy Shao
 
Project 3 - Maintenance Plan
Project 3 - Maintenance PlanProject 3 - Maintenance Plan
Project 3 - Maintenance PlanKai Yun Pang
 
Measurement & calibration of medical equipments
Measurement & calibration of medical equipmentsMeasurement & calibration of medical equipments
Measurement & calibration of medical equipmentsJumaan AlAmri
 
5 SIMPLYCITY: Granlund Manager (CMMS = Computerized Maintenance Management Sy...
5 SIMPLYCITY: Granlund Manager (CMMS = Computerized Maintenance Management Sy...5 SIMPLYCITY: Granlund Manager (CMMS = Computerized Maintenance Management Sy...
5 SIMPLYCITY: Granlund Manager (CMMS = Computerized Maintenance Management Sy...Mikko Kämäräinen
 
Hospital & Healthcare - IKON ERP
Hospital & Healthcare - IKON ERP Hospital & Healthcare - IKON ERP
Hospital & Healthcare - IKON ERP Dr. Syed Masrur
 
Types of Maintenance Evaluation
Types of Maintenance EvaluationTypes of Maintenance Evaluation
Types of Maintenance EvaluationRohit Arora
 
Service After the Sale
Service After the SaleService After the Sale
Service After the SaleJustin Harris
 
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...Cognizant
 

En vedette (20)

Maintenance
MaintenanceMaintenance
Maintenance
 
Maintaining equipment
Maintaining equipmentMaintaining equipment
Maintaining equipment
 
3..maintenance management
3..maintenance management3..maintenance management
3..maintenance management
 
Managed Service Overview
Managed Service OverviewManaged Service Overview
Managed Service Overview
 
S6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition NoteS6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition Note
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Maintenance types
Maintenance typesMaintenance types
Maintenance types
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 
COMPLETE MEDICAL EQUIPMENTS- HBOT PRESENTATION -SECHRIST
COMPLETE MEDICAL EQUIPMENTS- HBOT PRESENTATION -SECHRISTCOMPLETE MEDICAL EQUIPMENTS- HBOT PRESENTATION -SECHRIST
COMPLETE MEDICAL EQUIPMENTS- HBOT PRESENTATION -SECHRIST
 
Biomedical Engineering (Medical Equipment's) - Mathankumar.S - VMKVC, SALEM,...
Biomedical Engineering (Medical Equipment's)  - Mathankumar.S - VMKVC, SALEM,...Biomedical Engineering (Medical Equipment's)  - Mathankumar.S - VMKVC, SALEM,...
Biomedical Engineering (Medical Equipment's) - Mathankumar.S - VMKVC, SALEM,...
 
ONES-After Sales Service Design
ONES-After Sales Service DesignONES-After Sales Service Design
ONES-After Sales Service Design
 
Project 3 - Maintenance Plan
Project 3 - Maintenance PlanProject 3 - Maintenance Plan
Project 3 - Maintenance Plan
 
Measurement & calibration of medical equipments
Measurement & calibration of medical equipmentsMeasurement & calibration of medical equipments
Measurement & calibration of medical equipments
 
5 SIMPLYCITY: Granlund Manager (CMMS = Computerized Maintenance Management Sy...
5 SIMPLYCITY: Granlund Manager (CMMS = Computerized Maintenance Management Sy...5 SIMPLYCITY: Granlund Manager (CMMS = Computerized Maintenance Management Sy...
5 SIMPLYCITY: Granlund Manager (CMMS = Computerized Maintenance Management Sy...
 
Hospital & Healthcare - IKON ERP
Hospital & Healthcare - IKON ERP Hospital & Healthcare - IKON ERP
Hospital & Healthcare - IKON ERP
 
Types of Maintenance Evaluation
Types of Maintenance EvaluationTypes of Maintenance Evaluation
Types of Maintenance Evaluation
 
Service After the Sale
Service After the SaleService After the Sale
Service After the Sale
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
 

Similaire à Assessment of maintenance management system

JIT, Production Planning, TQM, ERP
JIT, Production Planning, TQM, ERPJIT, Production Planning, TQM, ERP
JIT, Production Planning, TQM, ERPDr. Mohit Sahu
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceJames Fitzgerald
 
Presentationresume minggu 1
Presentationresume minggu 1Presentationresume minggu 1
Presentationresume minggu 1giriscoots
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity MaintenanceGohelYash1
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptxMargi Shah
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aRai University
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 
Jump Start your PM Program
Jump Start your PM ProgramJump Start your PM Program
Jump Start your PM ProgramSchoolDude
 
Maintenance Director JD updated
Maintenance Director JD updatedMaintenance Director JD updated
Maintenance Director JD updatedMohammad Al-Nemer
 
Production and Operation Management (Capacity Planning )
Production and Operation Management (Capacity Planning )Production and Operation Management (Capacity Planning )
Production and Operation Management (Capacity Planning )Dr. Mohit Sahu
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
Maintenance Management Process
Maintenance Management ProcessMaintenance Management Process
Maintenance Management ProcessPIPINAZRIN
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraDurga Prasad Mishra
 
production management, meaning, nature, function, PPC, production planning & ...
production management, meaning, nature, function, PPC, production planning & ...production management, meaning, nature, function, PPC, production planning & ...
production management, meaning, nature, function, PPC, production planning & ...Prashant Ranjan
 

Similaire à Assessment of maintenance management system (20)

JIT, Production Planning, TQM, ERP
JIT, Production Planning, TQM, ERPJIT, Production Planning, TQM, ERP
JIT, Production Planning, TQM, ERP
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
 
Viziya
Viziya Viziya
Viziya
 
Presentationresume minggu 1
Presentationresume minggu 1Presentationresume minggu 1
Presentationresume minggu 1
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control a
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Ba03303280331
Ba03303280331Ba03303280331
Ba03303280331
 
TPM.pptx
TPM.pptxTPM.pptx
TPM.pptx
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Jump Start your PM Program
Jump Start your PM ProgramJump Start your PM Program
Jump Start your PM Program
 
Maintenance Director JD updated
Maintenance Director JD updatedMaintenance Director JD updated
Maintenance Director JD updated
 
TQM-Module 5.pptx
TQM-Module 5.pptxTQM-Module 5.pptx
TQM-Module 5.pptx
 
Production and Operation Management (Capacity Planning )
Production and Operation Management (Capacity Planning )Production and Operation Management (Capacity Planning )
Production and Operation Management (Capacity Planning )
 
Mishal AlDelaigan_CV
Mishal AlDelaigan_CVMishal AlDelaigan_CV
Mishal AlDelaigan_CV
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Maintenance Management Process
Maintenance Management ProcessMaintenance Management Process
Maintenance Management Process
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishra
 
production management, meaning, nature, function, PPC, production planning & ...
production management, meaning, nature, function, PPC, production planning & ...production management, meaning, nature, function, PPC, production planning & ...
production management, meaning, nature, function, PPC, production planning & ...
 

Plus de Sagar Sharma

FMCG: SWOT Analysis
FMCG: SWOT AnalysisFMCG: SWOT Analysis
FMCG: SWOT AnalysisSagar Sharma
 
Configurations of Agriculture Supply Chain
Configurations of Agriculture Supply ChainConfigurations of Agriculture Supply Chain
Configurations of Agriculture Supply ChainSagar Sharma
 
Quality Function Deployment
Quality Function DeploymentQuality Function Deployment
Quality Function DeploymentSagar Sharma
 
SURATGARH SUPER THERMAL POWER STATION
SURATGARH  SUPER  THERMAL POWER    STATION SURATGARH  SUPER  THERMAL POWER    STATION
SURATGARH SUPER THERMAL POWER STATION Sagar Sharma
 
Hybrid synergy drive
Hybrid synergy driveHybrid synergy drive
Hybrid synergy driveSagar Sharma
 

Plus de Sagar Sharma (6)

FMCG: SWOT Analysis
FMCG: SWOT AnalysisFMCG: SWOT Analysis
FMCG: SWOT Analysis
 
Configurations of Agriculture Supply Chain
Configurations of Agriculture Supply ChainConfigurations of Agriculture Supply Chain
Configurations of Agriculture Supply Chain
 
Quality Function Deployment
Quality Function DeploymentQuality Function Deployment
Quality Function Deployment
 
Expert system
Expert systemExpert system
Expert system
 
SURATGARH SUPER THERMAL POWER STATION
SURATGARH  SUPER  THERMAL POWER    STATION SURATGARH  SUPER  THERMAL POWER    STATION
SURATGARH SUPER THERMAL POWER STATION
 
Hybrid synergy drive
Hybrid synergy driveHybrid synergy drive
Hybrid synergy drive
 

Dernier

Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 

Dernier (20)

TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 

Assessment of maintenance management system

  • 1. Assessment Of Maintenance Management System BITS Pilani Pilani Campus Submitted by: Sagar Kumar sharma
  • 2.  Maintenance Definition  Maintenance Management Objectives.  Maintenance History  Maintenance Procedures  Maintenance Policies & Strategies.  Maintenance Planning & Scheduling.  Nature and General classification of maintenance problem  Maintenance Cost Control.  Work Order System.  Spare Part Control.  Reliability Centered Maintenance  Total Productive Maintenance.  Performance Keys Indicators. BITS Pilani, Pilani Campus
  • 3. • http://ieeexplore.ieee.org/xpl/login.jsp?tp=&arnumber=971357&url=http %3A%2F%2Fieeexplore.ieee.org%2Fstamp%2Fstamp.jsp%3Ftp%3D%26arnu mber%3D971357 • http://ieeexplore.ieee.org/xpl/login.jsp?tp=&arnumber=54479 64&url=http%3A%2F%2Fieeexplore.ieee.org%2Fxpls%2Fabs_all .jsp%3Farnumber%3D5447964 • http://inderscience.metapress.com/content/71940v3221p55115/ • http://www.palgravejournals.com/jors/journal/v55/n9/full/2601756a.html?file=/jors/journal/v55/n9/f ull/2601756a.html • http://en.cnki.com.cn/Article_en/CJFDTOTAL-XXGY200506044.htm BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 4.  British Standard Glossary of terms (3811:1993) defined maintenance as: “The combination of all technical and administrative actions, including supervision actions, intended to retain an item in, or restore it to, a state in which it can perform a required function”.  Maintenance is a set of organised activities that are carried out in order to keep an item in its best operational condition with minimum cost acquired. BITS Pilani, Pilani Campus
  • 5. Why Maintenance Management  Modern maintenance management is not to repair broken equipment rapidly. Modern maintenance management is to keep the equipment running at high capacity and produce quality products at lowest cost possible.  There are many reasons why maintenance is becoming more and more important. In developing countries , where many old machines are operating, the spare part problem are arising. Some times it is difficult to find spare parts for equipment and if it is possible to find them, they are usually very expensive and must be paid on foreign currency.  Due to long lead times of supply of spares, it is common that the spare part inventory is growing bigger than necessary. A very essential part in maintenance management is developing countries to reduce the need of spare parts, as well as to maintain the minimum level of shock to save foreign currency, but still keeping the productivity high. BITS Pilani, Pilani Campus
  • 6. Basic functions of a maintenance management system 1. 2. 3. 4. 5. 6. Preventive maintenance Plant and unit record(Equipment) Inventory and spare parts control system, Purchasing system Document record Planning system for maintenance and work order routines Technical/economic analysis of plant history, maintenance and machine availability BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 7. Organizing the Maintenance Function  Centralized maintenance department  Does all maintenance (PM & breakdown)  Decentralized Maintenance department  Useful if different equipment used in different areas of company  Contract maintenance  Used if little equipment or expertise  Operator ownership approach BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 8. Operator-Ownership Approach  Operator does preventive maintenance     Equipment condition is their responsibility Learns equipment better Increases worker’s pride Reduces repair time & PM costs  Maintenance department is backup  Handles non-routine problems  Provides maintenance training  Has plant-wide responsibilities BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 9. PLANNING ANALYSIS PERFORMANCE RECORDING BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 10. Maintenance Planning & Scheduling Planning: • • Management surveys show that the average productivity of maintenance employees is between 25 and 35%. This means that a craftsman has less than 4 hours of productive time per 8-hour day due to poor maintenance management. BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 11. Maintenance Planning & Scheduling The following are some of the most common wastes of productive time:• • • • • • • • • • • Waiting for instructions Looking for supervisors Checking out the job Multiple trips to the stores No special tools Waiting for approval Too many craft workers per job Insufficient workers scheduled for the job. Incomplete planning & communications Waiting for equipment to be shutdown Waiting for drawings from engineering BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 12. Maintenance Planning & Scheduling  On the average, 2 hours are lost every time worker is pulled off a job for any reason.  To prevent this major loss of productivity, it is necessary to implement some form of job planning function.  The concept of job planning is to determine what is to be done and how it is to be done.  Job planning consists of two main areas: 1. Craft skills 2. Material required for the job.  These labor and material requirements may be converted to dollars to give an estimate of the cost of completing the work order. BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 13. Maintenance Planning & Scheduling Planning  Planning can be accomplished by the supervisor if there are relatively few maintenance personnel.  If there are more than 20 craftsmen, planning is best done by separate maintenance planners, otherwise the foremen have a tendency to do paperwork when they could more profitably spend their time in supervising and directing the work of the craftsmen. BITS Pilani, Pilani Campus
  • 14. Maintenance Planning & Scheduling Type of Work to be planned: – Emergency maintenance and critical maintenance (work needed immediately or within 24 hours) is seldom planned. – These request are of short duration and are performed so quickly that there is no time to plan them. – These types of work orders should not be considered in planning functions – Normal corrective or routine work orders should be the primary consideration of the planning function. – These work orders are received and placed in work backlog. – As the workforce and materials become available to carry out the work, it is scheduled. – Included in this type of work are preventive and predictive maintenance work orders. BITS Pilani, Pilani Campus
  • 15. Maintenance Planning & Scheduling Type of Work to be planned: • The other group of work requests that can be planned are the shutdown, turnaround, or the outage work orders. • For this type of work, it is important that the equipment be shut down and overhauled in the shortest possible time. • Only by accurate estimating and scheduling of these work requests can the shutdown be successful. BITS Pilani, Pilani Campus
  • 16. Maintenance Planning & Scheduling How to Plan Maintenance Work : – Effective planning requires the planners to be skilled and knowledgeable in the craft area they are planning; therefore, supervisors or top craftsmen will make the best planners. – If an inexperienced individual is promoted to planner, the results of the planning program will not be satisfactory. Instead of increasing productivity, you may find productivity decreasing. – The planning begins once the work order is approved by management. – It is then assigned to the planner, who carefully studies the job. – The planner must decide the following: The crafts required,  The time required,  The materials required, and  Whether outside help in the form specialists, contractors, or special rental equipment is required. BITS Pilani, Pilani Campus
  • 17. Maintenance Planning & Scheduling How to Plan Maintenance Work : – – – – – – – When the planner is deciding on the required crafts, he must also decide not only the number of craftsmen, but also the skill level required. The time estimate for work order is important. If there is no time estimate, you will never know the man-hours of work that is in the crafts backlog. Without this information, you can never accurately determine the proper staffing levels for your plant. The material required for the work order will determine whether it can be scheduled. If the necessary materials are not available and the work order is scheduled, the craftsmen will lose productivity looking for the spare parts and waiting for supervisor to find them work that can be performed. It is also necessary to plan the materials so that an accurate estimate of the cost of the work order can be obtained. The miscellaneous items to be planned are important to proper completion of the work order. If special skills are required from outside source, the in-house craftsmen may not be able to complete the work order quickly or with necessary quality. BITS Pilani, Pilani Campus
  • 18. Maintenance Planning & Scheduling Scheduling Indicators: Within a maintenance strategy, you can use different scheduling indicators to specify the type of scheduling you require or to define a cycle set:  Time-based (for example, every 30 days)  Time-based by key date (for example, every 30 days on the 30th day of the month)  Time-based by factory calendar (for example, every 30 working days)  Performance-based (for example, every 50 operating hours) BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 19. Benefits of Planning Maintenance  Long term plans insight  Decision making support  Optimizing connectivity among operation and maintenance departments  Figuring out areas of cost reduction  Training areas and needs BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 20. Nature of maintenance problem  Maintenance can be classifies as follow 1. General classification of maintenance problems 1. 2. 3. 2. Mechanical Failure Thermal Failure Chemical Failure Classification of maintenance problem based on time span 1. Short Run Maintenance Problem 2. Long Run Maintenance Problem BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 21. General classification Maintenance problem Mechanical Failure     Worn out bushes and bearings and other moving parts. Fatigue of machine members Creep of material at high temp Excessive forced vibration, misalignments etc. Thermal Failure     Overheating of the component Lack of lubrication Inadequate of cooling Electrical insulation failure Chemical Failure   Highly corrosive fluids containing abrasive particles Failure of protective linings like glass , rubber etc. BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 22. Classification maintenance problem based on time span Short run production problem Maintenance problem which are carried out in a sort period of time are known as short run production system. It may be hourly, daily ,weekly and monthly. Example:Hourly- inspection of correct lubricant, level of coolant, sharpness of cutting tool. Daily- cleaning of m/c, tightening of nuts, correct cooling, inspection of various indicators, minor adjustment of parts. Weekly- Major adjustment, lubrication, tightening of parts. Monthly- checking for insulation, corrosion, safety guards, checking of worn-out and distorted parts. BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 23. Maintenance Cost Control Objectives of Maintenance and Maintenance Cost During the years the maintenance function has not been seen as a condition for production output. The previous approach has been that maintenance is the necessary evil, one among the cost generators in the organization. Very often the maintenance strategy in plants has been to reduce the maintenance cost as much as possible without thinking of the consequences. Objective of the maintenance is , as priority one , to create an availability performance which is suitable for production demands in the organization. No mechanized/atomized company has yet succeeded to produce with stopped equipment. Production buy availability performance from maintenance. BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 24. Maintenance Cost Control All enterprises and organizations are interested in lowering maintenance costs. A very common delusion is that • The product gives the income • Maintenance costs money Note: Maintenance which is not carried out ,will cost even more than money . BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 25. Maintenance Cost Control There are two ways of managing the maintenance costs 1. 2. Cost Controlled Maintenance Result Controlled Maintenance BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 26. Maintenance Cost Control Contd… The cost controlled maintenance is not considered as modern maintenance management, The reason why maintenance has been treated as a cost controlled activity, Is often that engineers and technical staff have had some dilemma to measure the results of investments in maintenance in total economical terms. It is simple to find the direct cost for maintenance but it could be difficult to see the results.  The upper priority in the objectives of maintenance is to “keep up planned availability performance at the lowest cost possible” . This means that the long term results are important. The maintenance cost must be put in relationship with overall results achieved by maintenance in production facility. BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 27. Maintenance Cost Control The maintenance cost can be split up in two different categories.  Direct maintenance costs -The costs are directly related to the performance of the maintenance works Indirect maintenance costs -Losses due to maintenance BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 28. Maintenance Cost Control Direct maintenance costs • Wages & Salaries • Material Costs • Administration Costs • Costs for training • Spare parts costs • Contracted work forces • Modification Costs Indirect Costs • Loss of revenue or other losses as a result of interruption to production as a result of maintenance. BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956
  • 29. Maintenance Cost Control Measurement of Maintenance Efficiency Many times there are needs to measure the maintenance efficiency. However, maintenance can not be measured by the cost it creates. There must be an connection to the production out put some way. It is naturally impossible to determine anything about the size of the direct costs. One method to control the direct maintenance is to use the PM-factor. “P” stands for prime product produce and “M” stands for maintenance cost. When using the PM-factor, the result of the maintenance impact on the production is measured. How many products are produced per a 1000 units of “maintenance money”. Prime Production PM – Factor = X 1000 Maintenance Cost BITS Pilani, Deemed to be University under Section 3 of UGC Act, 1956