URBAN TRAFFIC
CHALLENGES
A study for Urban Traffic Problems in
Surat City , its Identification &
Solution .
Bhagwan Mahavir College Of Engineering & Technology
The project is done under the guidance of Mr.
RamGopal Sahu
• Group Members :
 Sahil Baviskar “090060106063”
 Prashant Patel “090060106066”
 Jimmi Patel “090060106047”
 Meet Patel “090060106020”
 Vishal Patel “090060106055”

2/22/2014

URBAN TRAFFIC CHALLENGES

2
Content
•
•
•
•
•

Introduction
Basic Transportation In City
Area to be Surveyed
Problems
Solution/Conclusion

2/22/2014

URBAN TRAFFIC CHALLENGES

3
Introduction
• Surat is among the fastest developing city in
the world .
• It has ranked 4th developing city of the world .
• Surat city is well-known for its Diamond
Polishing Business , Textile Market and
recently Real-Estate Business .

2/22/2014

URBAN TRAFFIC CHALLENGES

4
• As a city develops it attracts many people
around the city as well as far away from the
city .
• Due to this population Increases ; And one can
say that increase in population is directly
proportional to the increase in traffic density .
• Here, the study of various Traffic congested
areas is done and on completion of the whole
analysis suitable conclusions will be given .
2/22/2014

URBAN TRAFFIC CHALLENGES

5
Growth of Surat City (1494-2004)

2/22/2014

URBAN TRAFFIC CHALLENGES

6
Basic Transportation Facilities
Available
• Air
• Rail
• Road
May come into existence
• Water

2/22/2014

URBAN TRAFFIC CHALLENGES

7
Area to be Surveyed
•
•
•
•
•
•
•

Udhana Darwaja *
Bhagal Char Rasta *
Gujarat Gas Circle (Sardar Bridge) *
Station Road
Sahara Darwaja
U.M. Road
Sardar Bridge

2/22/2014

URBAN TRAFFIC CHALLENGES

8
GUJARAT GAS CIRCLE (Sardar Bridge)
Junction: Gujarat Gas Circle
Route: Gujarat Gas Circle to Athwa Gate

Date: 30-08-2013
Time: 9:00 A.M. TO 11:00 A.M.

TIME

2W

3W

4W

LCW

HCV

9:00 TO 9:10 A.M.

145

56

73

2

5

9:10 TO 9:20 A.M.

175

67

71

1

0

9:20 TO 9:30 A.M.

235

78

55

9

6

9:30 TO 9:40 A.M.

280

24

89

2

9

9:40 TO 9:50 A.M.

305

70

84

0

8

9:50 TO 10:00 A.M.

234

75

123

3

2

10:00 TO 10:10 A.M.

256

47

88

6

3

10:10 TO 10:20 A.M.

228

89

91

0

0

10:20 TO 10:30 A.M.

340

105

99

1

2

10:30 TO 10:40 A.M.

278

108

244

2

2

10:40 TO 10:50 A.M.

358

135

210

2

1

10:50 TO 11:00 A.M.

355

159

225

2

1

TOTAL

3189

1313

1452

30

39

9
GUJARAT GAS CIRCLE (Sardar Bridge)
Junction: Gujarat Gas Circle
Route: Gujarat Gas Circle to Athwa Gate

Date: 30-08-2013
Time: 5:00 P.M. TO 07:00 P.M.

TIME

2W

3W

4W

LCW

HCV

5:00 TO 5:10 P.M.

125

80

116

6

3

5:10 TO 5:20 P.M.

145

96

66

2

4

5:20 TO 5:30 P.M.

178

104

100

9

12

5:30 TO 5:40 P.M.

106

87

36

9

11

5:40 TO 5:50 P.M.

286

100

64

2

0

5:50 TO 6:00 P.M.

235

86

130

5

3

6:00 TO 6:10 P.M.

274

98

135

15

8

6:10 TO 6:20 P.M.

210

86

136

8

3

6:20 TO 6:30 P.M.

301

109

162

7

5

6:30 TO 6:40 P.M.

250

106

138

5

1

6:40 TO 6:50 P.M.

241

121

109

8

1

6:50 TO 7:00 P.M.

289

123

125

19

13

TOTAL

2640

1196

1317

94

64

10
GUJARAT GAS CIRCLE (Sardar Bridge)
Junction: Gujarat Gas Circle
Route: Gujarat Gas Circle to Athwa Gate

Date: 31-08-2013
Time: 9:00 A.M. TO 11:00 A.M.

TIME

2W

3W

4W

LCW

HCV

9:00 TO 9:10 A.M.

156

59

61

6

4

9:10 TO 9:20 A.M.

179

51

72

1

1

9:20 TO 9:30 A.M.

210

49

71

3

3

9:30 TO 9:40 A.M.

220

41

66

5

7

9:40 TO 9:50 A.M.

241

62

99

0

5

9:50 TO 10:00 A.M.

274

63

111

3

0

10:00 TO 10:10 A.M.

276

67

64

5

3

10:10 TO 10:20 A.M.

209

81

83

1

0

10:20 TO 10:30 A.M.

291

110

101

1

1

10:30 TO 10:40 A.M.

299

109

230

2

0

10:40 TO 10:50 A.M.

320

124

201

1

1

10:50 TO 11:00 A.M.

342

121

237

2

1

TOTAL

3011

957

1396

30

25

11
GUJARAT GAS CIRCLE (Sardar Bridge)
Junction: Gujarat Gas Circle
Route: Gujarat Gas Circle to Athwa Gate

Date: 31-08-2013
Time: 5:00 P.M. TO 07:00 P.M.

TIME

2W

3W

4W

LCW

HCV

5:00 TO 5:10 P.M.

115

90

117

4

2

5:10 TO 5:20 P.M.

135

89

65

0

2

5:20 TO 5:30 P.M.

167

105

120

7

10

5:30 TO 5:40 P.M.

155

54

86

9

8

5:40 TO 5:50 P.M.

244

64

92

3

13

5:50 TO 6:00 P.M.

247

85

129

1

4

6:00 TO 6:10 P.M.

278

93

122

12

9

6:10 TO 6:20 P.M.

190

96

126

3

2

6:20 TO 6:30 P.M.

280

140

178

4

5

6:30 TO 6:40 P.M.

244

106

122

3

10

6:40 TO 6:50 P.M.

262

116

117

6

11

6:50 TO 7:00 P.M.

270

113

127

12

16

TOTAL

2587

1151

1293

64

92

12
B.R. CIRCLE (Surat Station)
Junction: B.R. Circle
Route: Station To B.R. Circle

Date: 04-09-2013
Time: 7:00 A.M. TO 9:00 A.M.

TIME

2W

3W

4W

LCW

HCV

7:00 TO 7:10 A.M.

180

111

89

10

12

7:10 TO 7:20 A.M.

245

132

112

8

15

7:20 TO 7:30 A.M.

279

158

123

21

10

7:30 TO 7:40 A.M.

282

164

82

25

16

7:40 TO 7:50 A.M.

315

182

97

29

8

7:50 TO 8:00 A.M.

310

195

79

18

13

8:00 TO 8:10 A.M.

327

187

72

19

13

8:10 TO 8:20 A.M.

380

192

65

22

4

8:20 TO 8:30 A.M.

291

110

101

1

1

8:30 TO 8:40 A.M.

299

109

230

2

0

8:40 TO 8:50 A.M.

320

124

201

1

1

8:50 TO 9:00 A.M.

342

121

237

2

1

TOTAL

3570

1785

1488

158

94

13
B.R. CIRCLE (Surat Station)
Junction: B.R. Circle
Route: Station To B.R. Circle

Date: 04-09-2013
Time: 5:00 P.M. TO 07:00 P.M.

TIME

2W

3W

4W

LCW

HCV

5:00 TO 5:10 P.M.

218

87

55

9

3

5:10 TO 5:20 P.M.

324

121

111

8

11

5:20 TO 5:30 P.M.

250

169

98

12

9

5:30 TO 5:40 P.M.

356

154

75

16

8

5:40 TO 5:50 P.M.

325

174

82

13

3

5:50 TO 6:00 P.M.

314

168

65

12

10

6:00 TO 6:10 P.M.

321

118

69

6

6

6:10 TO 6:20 P.M.

384

153

33

14

5

6:20 TO 6:30 P.M.

381

86

113

6

7

6:30 TO 6:40 P.M.

266

105

221

0

1

6:40 TO 6:50 P.M.

298

131

200

3

1

6:50 TO 7:00 P.M.

351

132

285

0

1

TOTAL

3788

1598

1407

99

65

14
B.R. CIRCLE (Surat Station)
Junction: B.R. Circle
Route: B.R. Circle to Suryapur Road

Date: 04-09-2013
Time: 7:00 A.M. TO 9:00 A.M.

TIME

2W

3W

4W

LCW

HCV

7:00 TO 7:10 A.M.

373

74

39

8

6

7:10 TO 7:20 A.M.

321

78

41

5

3

7:20 TO 7:30 A.M.

285

110

35

3

1

7:30 TO 7:40 A.M.

295

64

56

2

0

7:40 TO 7:50 A.M.

341

121

65

9

8

7:50 TO 8:00 A.M.

321

156

79

1

3

8:00 TO 8:10 A.M.

273

178

82

9

1

8:10 TO 8:20 A.M.

360

150

31

2

4

8:20 TO 8:30 A.M.

355

141

99

4

3

8:30 TO 8:40 A.M.

298

145

42

9

3

8:40 TO 8:50 A.M.

382

164

102

0

1

8:50 TO 9:00 A.M.

269

131

107

2

1

TOTAL

3873

1512

778

44

34

15
B.R. CIRCLE (Surat Station)
Junction: B.R. Circle
Route: B.R. Circle to Suryapur Road

Date: 04-09-2013
Time: 5:00 P.M. TO 07:00 P.M.

TIME

2W

3W

4W

LCW

HCV

5:00 TO 5:10 P.M.

373

74

39

9

6

5:10 TO 5:20 P.M.

324

121

111

8

11

5:20 TO 5:30 P.M.

250

169

98

12

9

5:30 TO 5:40 P.M.

356

154

75

16

8

5:40 TO 5:50 P.M.

325

174

82

13

3

5:50 TO 6:00 P.M.

314

168

65

12

10

6:00 TO 6:10 P.M.

321

118

69

6

6

6:10 TO 6:20 P.M.

384

153

33

14

5

6:20 TO 6:30 P.M.

381

86

113

6

7

6:30 TO 6:40 P.M.

266

105

221

0

1

6:40 TO 6:50 P.M.

298

131

200

3

1

6:50 TO 7:00 P.M.

351

132

285

0

1

TOTAL

3788

1598

1407

99

68

16
Problems
•
•
•
•
•
•
•

Traffic Congestion
Parking Difficulties
Longer Commuting
Difficulties in Non-Motorized Transports
Loss of public space
Environmental impacts
Accidents & Safety

2/22/2014

URBAN TRAFFIC CHALLENGES

17
Conclusion
• To provide a suitable conclusion to above
problems after the completion of the Traffic
data analysis of proposed location .
• Conclusion would contain an alternate route to
the location , change in traffic island or
propose a new one , suitable construction of
F.O.B or propose a fly-over where-ever the
area is in need of .
2/22/2014

URBAN TRAFFIC CHALLENGES

18
Thank You !

• Refrances
• http://en.wikipedia.org/wiki/Surat#Transportation
• http://www.suratmuncipalcorporation.com

2/22/2014

URBAN TRAFFIC CHALLENGES

19

Contenu connexe

En vedette

Markets of karachi
Markets of karachiMarkets of karachi
Markets of karachiArsalanAijaz
 
Final traffic presentation
Final traffic presentationFinal traffic presentation
Final traffic presentationgiap0083
 
The Future of Mobility: Is Personal Car Ownership a Thing of the Past?
The Future of Mobility: Is Personal Car Ownership a Thing of the Past?The Future of Mobility: Is Personal Car Ownership a Thing of the Past?
The Future of Mobility: Is Personal Car Ownership a Thing of the Past?Social Media Today
 
Sustainable Cities: Urban Transportation
Sustainable Cities: Urban TransportationSustainable Cities: Urban Transportation
Sustainable Cities: Urban TransportationAnuradha Mukherji
 
Sustainable Urban Mobility Planning in the Greater Florianópolis Metropolitan...
Sustainable Urban Mobility Planning in the Greater Florianópolis Metropolitan...Sustainable Urban Mobility Planning in the Greater Florianópolis Metropolitan...
Sustainable Urban Mobility Planning in the Greater Florianópolis Metropolitan...WRI Ross Center for Sustainable Cities
 
intelligent transport system bgsbu coet
intelligent transport system bgsbu coetintelligent transport system bgsbu coet
intelligent transport system bgsbu coetjunaid bashir
 
Traffic Problems in Pune
Traffic Problems in PuneTraffic Problems in Pune
Traffic Problems in Punenishanth23
 
The Historical City as the Sustainable Compact City Model_2001
The Historical City as the Sustainable Compact City Model_2001The Historical City as the Sustainable Compact City Model_2001
The Historical City as the Sustainable Compact City Model_2001Joaquim Flores
 
AICP Prep Course - Transportation Planning
AICP Prep Course - Transportation PlanningAICP Prep Course - Transportation Planning
AICP Prep Course - Transportation Planningguestd509af
 
Traffic in urban areas
Traffic in  urban  areasTraffic in  urban  areas
Traffic in urban areasGines García
 
Transportation problems
Transportation problemsTransportation problems
Transportation problemsguru raja
 
Contribution of compact city to urban sustainability
Contribution of compact city to urban sustainabilityContribution of compact city to urban sustainability
Contribution of compact city to urban sustainabilityNaina Gupta
 
Transport System in Pakistan - (( Rail Transport))
Transport System in Pakistan  - (( Rail Transport))Transport System in Pakistan  - (( Rail Transport))
Transport System in Pakistan - (( Rail Transport))Nabeel Ahmed Khan
 
Introduction to Urban Transportation Planning and History
Introduction to Urban Transportation Planning and HistoryIntroduction to Urban Transportation Planning and History
Introduction to Urban Transportation Planning and HistorySitesh Kumar Singh
 
Residential function
Residential  functionResidential  function
Residential functionGines García
 
Intelligent transport system (ITS)
Intelligent transport system (ITS)Intelligent transport system (ITS)
Intelligent transport system (ITS)Aravind Samala
 

En vedette (20)

Level of Service F for Grade A Streets
Level of Service F for Grade A StreetsLevel of Service F for Grade A Streets
Level of Service F for Grade A Streets
 
Markets of karachi
Markets of karachiMarkets of karachi
Markets of karachi
 
Transportation Studies in the 21st Century: Incorporating all Modes
Transportation Studies in the 21st Century: Incorporating all ModesTransportation Studies in the 21st Century: Incorporating all Modes
Transportation Studies in the 21st Century: Incorporating all Modes
 
Final traffic presentation
Final traffic presentationFinal traffic presentation
Final traffic presentation
 
The Future of Mobility: Is Personal Car Ownership a Thing of the Past?
The Future of Mobility: Is Personal Car Ownership a Thing of the Past?The Future of Mobility: Is Personal Car Ownership a Thing of the Past?
The Future of Mobility: Is Personal Car Ownership a Thing of the Past?
 
Sustainable Cities: Urban Transportation
Sustainable Cities: Urban TransportationSustainable Cities: Urban Transportation
Sustainable Cities: Urban Transportation
 
Transportation Studies in the 21st Century: Incorporating all Modes-SFMTA Urb...
Transportation Studies in the 21st Century: Incorporating all Modes-SFMTA Urb...Transportation Studies in the 21st Century: Incorporating all Modes-SFMTA Urb...
Transportation Studies in the 21st Century: Incorporating all Modes-SFMTA Urb...
 
Sustainable Urban Mobility Planning in the Greater Florianópolis Metropolitan...
Sustainable Urban Mobility Planning in the Greater Florianópolis Metropolitan...Sustainable Urban Mobility Planning in the Greater Florianópolis Metropolitan...
Sustainable Urban Mobility Planning in the Greater Florianópolis Metropolitan...
 
intelligent transport system bgsbu coet
intelligent transport system bgsbu coetintelligent transport system bgsbu coet
intelligent transport system bgsbu coet
 
Traffic Problems in Pune
Traffic Problems in PuneTraffic Problems in Pune
Traffic Problems in Pune
 
The Historical City as the Sustainable Compact City Model_2001
The Historical City as the Sustainable Compact City Model_2001The Historical City as the Sustainable Compact City Model_2001
The Historical City as the Sustainable Compact City Model_2001
 
Utp
UtpUtp
Utp
 
AICP Prep Course - Transportation Planning
AICP Prep Course - Transportation PlanningAICP Prep Course - Transportation Planning
AICP Prep Course - Transportation Planning
 
Traffic in urban areas
Traffic in  urban  areasTraffic in  urban  areas
Traffic in urban areas
 
Transportation problems
Transportation problemsTransportation problems
Transportation problems
 
Contribution of compact city to urban sustainability
Contribution of compact city to urban sustainabilityContribution of compact city to urban sustainability
Contribution of compact city to urban sustainability
 
Transport System in Pakistan - (( Rail Transport))
Transport System in Pakistan  - (( Rail Transport))Transport System in Pakistan  - (( Rail Transport))
Transport System in Pakistan - (( Rail Transport))
 
Introduction to Urban Transportation Planning and History
Introduction to Urban Transportation Planning and HistoryIntroduction to Urban Transportation Planning and History
Introduction to Urban Transportation Planning and History
 
Residential function
Residential  functionResidential  function
Residential function
 
Intelligent transport system (ITS)
Intelligent transport system (ITS)Intelligent transport system (ITS)
Intelligent transport system (ITS)
 

Similaire à Urban traffic challenges

Vividh bharati akashvani sangeet all india radio (air) digital radio mondiale...
Vividh bharati akashvani sangeet all india radio (air) digital radio mondiale...Vividh bharati akashvani sangeet all india radio (air) digital radio mondiale...
Vividh bharati akashvani sangeet all india radio (air) digital radio mondiale...Total Project Solutions
 
Fastest terminal in Europe?
Fastest terminal in Europe?Fastest terminal in Europe?
Fastest terminal in Europe?Stefan Blaas
 
2014 University Transportation Center for Railway Safety REU Program: Roxxie ...
2014 University Transportation Center for Railway Safety REU Program: Roxxie ...2014 University Transportation Center for Railway Safety REU Program: Roxxie ...
2014 University Transportation Center for Railway Safety REU Program: Roxxie ...Mid-America Transportation Center
 
LRT Line 3 Hishamuddin's concept design briefing for Underground Tunnel
LRT Line 3 Hishamuddin's  concept design briefing for Underground Tunnel LRT Line 3 Hishamuddin's  concept design briefing for Underground Tunnel
LRT Line 3 Hishamuddin's concept design briefing for Underground Tunnel Asiff Razif
 
Traffic Engineering survey Analysis
Traffic Engineering survey AnalysisTraffic Engineering survey Analysis
Traffic Engineering survey AnalysisBhavya Patel
 
Jadwal SMAN 8 BGR Tp 2023-2024.pdf
Jadwal SMAN 8 BGR Tp 2023-2024.pdfJadwal SMAN 8 BGR Tp 2023-2024.pdf
Jadwal SMAN 8 BGR Tp 2023-2024.pdfImamMuhamad3
 
Field Travels Transportations rev 010714
Field Travels Transportations rev 010714Field Travels Transportations rev 010714
Field Travels Transportations rev 010714Mahmudul Hassan
 
(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1Juliana Hincapié Rojo
 
Traffic Characteristics
Traffic CharacteristicsTraffic Characteristics
Traffic CharacteristicsAnkiSingh8
 
Kalahandi Review Meeting.ppt
Kalahandi Review Meeting.pptKalahandi Review Meeting.ppt
Kalahandi Review Meeting.pptSekhNisar
 
MielingVictorActivity2 (1) (1) 2
MielingVictorActivity2 (1) (1) 2MielingVictorActivity2 (1) (1) 2
MielingVictorActivity2 (1) (1) 2Victor Mieling
 
Tiempos de paso 2013 15 km
Tiempos de paso 2013 15 kmTiempos de paso 2013 15 km
Tiempos de paso 2013 15 kmjulian57
 
Pantau sop bau maret 14 (3)
Pantau sop bau maret  14 (3)Pantau sop bau maret  14 (3)
Pantau sop bau maret 14 (3)abdulah_hubai
 
Vayuvajra Form-3 (23.06.2022).pdf
Vayuvajra Form-3 (23.06.2022).pdfVayuvajra Form-3 (23.06.2022).pdf
Vayuvajra Form-3 (23.06.2022).pdfAmoghA13
 
transportation impact study in city of toronto
transportation impact study in city of  torontotransportation impact study in city of  toronto
transportation impact study in city of torontok9048520328
 
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTATRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTAIRJET Journal
 

Similaire à Urban traffic challenges (20)

Vividh bharati akashvani sangeet all india radio (air) digital radio mondiale...
Vividh bharati akashvani sangeet all india radio (air) digital radio mondiale...Vividh bharati akashvani sangeet all india radio (air) digital radio mondiale...
Vividh bharati akashvani sangeet all india radio (air) digital radio mondiale...
 
Fastest terminal in Europe?
Fastest terminal in Europe?Fastest terminal in Europe?
Fastest terminal in Europe?
 
2014 University Transportation Center for Railway Safety REU Program: Roxxie ...
2014 University Transportation Center for Railway Safety REU Program: Roxxie ...2014 University Transportation Center for Railway Safety REU Program: Roxxie ...
2014 University Transportation Center for Railway Safety REU Program: Roxxie ...
 
LRT Line 3 Hishamuddin's concept design briefing for Underground Tunnel
LRT Line 3 Hishamuddin's  concept design briefing for Underground Tunnel LRT Line 3 Hishamuddin's  concept design briefing for Underground Tunnel
LRT Line 3 Hishamuddin's concept design briefing for Underground Tunnel
 
Traffic Engineering survey Analysis
Traffic Engineering survey AnalysisTraffic Engineering survey Analysis
Traffic Engineering survey Analysis
 
Jadwal SMAN 8 BGR Tp 2023-2024.pdf
Jadwal SMAN 8 BGR Tp 2023-2024.pdfJadwal SMAN 8 BGR Tp 2023-2024.pdf
Jadwal SMAN 8 BGR Tp 2023-2024.pdf
 
Field Travels Transportations rev 010714
Field Travels Transportations rev 010714Field Travels Transportations rev 010714
Field Travels Transportations rev 010714
 
Kirala kalea scheme
Kirala kalea schemeKirala kalea scheme
Kirala kalea scheme
 
(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1
 
Apartment_Red
Apartment_RedApartment_Red
Apartment_Red
 
Accident animation
Accident animationAccident animation
Accident animation
 
Traffic Characteristics
Traffic CharacteristicsTraffic Characteristics
Traffic Characteristics
 
Kalahandi Review Meeting.ppt
Kalahandi Review Meeting.pptKalahandi Review Meeting.ppt
Kalahandi Review Meeting.ppt
 
MielingVictorActivity2 (1) (1) 2
MielingVictorActivity2 (1) (1) 2MielingVictorActivity2 (1) (1) 2
MielingVictorActivity2 (1) (1) 2
 
Tiempos de paso 2013 15 km
Tiempos de paso 2013 15 kmTiempos de paso 2013 15 km
Tiempos de paso 2013 15 km
 
Pantau sop bau maret 14 (3)
Pantau sop bau maret  14 (3)Pantau sop bau maret  14 (3)
Pantau sop bau maret 14 (3)
 
Vayuvajra Form-3 (23.06.2022).pdf
Vayuvajra Form-3 (23.06.2022).pdfVayuvajra Form-3 (23.06.2022).pdf
Vayuvajra Form-3 (23.06.2022).pdf
 
transportation impact study in city of toronto
transportation impact study in city of  torontotransportation impact study in city of  toronto
transportation impact study in city of toronto
 
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTATRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
 
Horario eleições 2014 - Primeiro Turno
Horario eleições 2014 - Primeiro TurnoHorario eleições 2014 - Primeiro Turno
Horario eleições 2014 - Primeiro Turno
 

Dernier

GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 

Dernier (20)

GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 

Urban traffic challenges

  • 1. URBAN TRAFFIC CHALLENGES A study for Urban Traffic Problems in Surat City , its Identification & Solution .
  • 2. Bhagwan Mahavir College Of Engineering & Technology The project is done under the guidance of Mr. RamGopal Sahu • Group Members :  Sahil Baviskar “090060106063”  Prashant Patel “090060106066”  Jimmi Patel “090060106047”  Meet Patel “090060106020”  Vishal Patel “090060106055” 2/22/2014 URBAN TRAFFIC CHALLENGES 2
  • 3. Content • • • • • Introduction Basic Transportation In City Area to be Surveyed Problems Solution/Conclusion 2/22/2014 URBAN TRAFFIC CHALLENGES 3
  • 4. Introduction • Surat is among the fastest developing city in the world . • It has ranked 4th developing city of the world . • Surat city is well-known for its Diamond Polishing Business , Textile Market and recently Real-Estate Business . 2/22/2014 URBAN TRAFFIC CHALLENGES 4
  • 5. • As a city develops it attracts many people around the city as well as far away from the city . • Due to this population Increases ; And one can say that increase in population is directly proportional to the increase in traffic density . • Here, the study of various Traffic congested areas is done and on completion of the whole analysis suitable conclusions will be given . 2/22/2014 URBAN TRAFFIC CHALLENGES 5
  • 6. Growth of Surat City (1494-2004) 2/22/2014 URBAN TRAFFIC CHALLENGES 6
  • 7. Basic Transportation Facilities Available • Air • Rail • Road May come into existence • Water 2/22/2014 URBAN TRAFFIC CHALLENGES 7
  • 8. Area to be Surveyed • • • • • • • Udhana Darwaja * Bhagal Char Rasta * Gujarat Gas Circle (Sardar Bridge) * Station Road Sahara Darwaja U.M. Road Sardar Bridge 2/22/2014 URBAN TRAFFIC CHALLENGES 8
  • 9. GUJARAT GAS CIRCLE (Sardar Bridge) Junction: Gujarat Gas Circle Route: Gujarat Gas Circle to Athwa Gate Date: 30-08-2013 Time: 9:00 A.M. TO 11:00 A.M. TIME 2W 3W 4W LCW HCV 9:00 TO 9:10 A.M. 145 56 73 2 5 9:10 TO 9:20 A.M. 175 67 71 1 0 9:20 TO 9:30 A.M. 235 78 55 9 6 9:30 TO 9:40 A.M. 280 24 89 2 9 9:40 TO 9:50 A.M. 305 70 84 0 8 9:50 TO 10:00 A.M. 234 75 123 3 2 10:00 TO 10:10 A.M. 256 47 88 6 3 10:10 TO 10:20 A.M. 228 89 91 0 0 10:20 TO 10:30 A.M. 340 105 99 1 2 10:30 TO 10:40 A.M. 278 108 244 2 2 10:40 TO 10:50 A.M. 358 135 210 2 1 10:50 TO 11:00 A.M. 355 159 225 2 1 TOTAL 3189 1313 1452 30 39 9
  • 10. GUJARAT GAS CIRCLE (Sardar Bridge) Junction: Gujarat Gas Circle Route: Gujarat Gas Circle to Athwa Gate Date: 30-08-2013 Time: 5:00 P.M. TO 07:00 P.M. TIME 2W 3W 4W LCW HCV 5:00 TO 5:10 P.M. 125 80 116 6 3 5:10 TO 5:20 P.M. 145 96 66 2 4 5:20 TO 5:30 P.M. 178 104 100 9 12 5:30 TO 5:40 P.M. 106 87 36 9 11 5:40 TO 5:50 P.M. 286 100 64 2 0 5:50 TO 6:00 P.M. 235 86 130 5 3 6:00 TO 6:10 P.M. 274 98 135 15 8 6:10 TO 6:20 P.M. 210 86 136 8 3 6:20 TO 6:30 P.M. 301 109 162 7 5 6:30 TO 6:40 P.M. 250 106 138 5 1 6:40 TO 6:50 P.M. 241 121 109 8 1 6:50 TO 7:00 P.M. 289 123 125 19 13 TOTAL 2640 1196 1317 94 64 10
  • 11. GUJARAT GAS CIRCLE (Sardar Bridge) Junction: Gujarat Gas Circle Route: Gujarat Gas Circle to Athwa Gate Date: 31-08-2013 Time: 9:00 A.M. TO 11:00 A.M. TIME 2W 3W 4W LCW HCV 9:00 TO 9:10 A.M. 156 59 61 6 4 9:10 TO 9:20 A.M. 179 51 72 1 1 9:20 TO 9:30 A.M. 210 49 71 3 3 9:30 TO 9:40 A.M. 220 41 66 5 7 9:40 TO 9:50 A.M. 241 62 99 0 5 9:50 TO 10:00 A.M. 274 63 111 3 0 10:00 TO 10:10 A.M. 276 67 64 5 3 10:10 TO 10:20 A.M. 209 81 83 1 0 10:20 TO 10:30 A.M. 291 110 101 1 1 10:30 TO 10:40 A.M. 299 109 230 2 0 10:40 TO 10:50 A.M. 320 124 201 1 1 10:50 TO 11:00 A.M. 342 121 237 2 1 TOTAL 3011 957 1396 30 25 11
  • 12. GUJARAT GAS CIRCLE (Sardar Bridge) Junction: Gujarat Gas Circle Route: Gujarat Gas Circle to Athwa Gate Date: 31-08-2013 Time: 5:00 P.M. TO 07:00 P.M. TIME 2W 3W 4W LCW HCV 5:00 TO 5:10 P.M. 115 90 117 4 2 5:10 TO 5:20 P.M. 135 89 65 0 2 5:20 TO 5:30 P.M. 167 105 120 7 10 5:30 TO 5:40 P.M. 155 54 86 9 8 5:40 TO 5:50 P.M. 244 64 92 3 13 5:50 TO 6:00 P.M. 247 85 129 1 4 6:00 TO 6:10 P.M. 278 93 122 12 9 6:10 TO 6:20 P.M. 190 96 126 3 2 6:20 TO 6:30 P.M. 280 140 178 4 5 6:30 TO 6:40 P.M. 244 106 122 3 10 6:40 TO 6:50 P.M. 262 116 117 6 11 6:50 TO 7:00 P.M. 270 113 127 12 16 TOTAL 2587 1151 1293 64 92 12
  • 13. B.R. CIRCLE (Surat Station) Junction: B.R. Circle Route: Station To B.R. Circle Date: 04-09-2013 Time: 7:00 A.M. TO 9:00 A.M. TIME 2W 3W 4W LCW HCV 7:00 TO 7:10 A.M. 180 111 89 10 12 7:10 TO 7:20 A.M. 245 132 112 8 15 7:20 TO 7:30 A.M. 279 158 123 21 10 7:30 TO 7:40 A.M. 282 164 82 25 16 7:40 TO 7:50 A.M. 315 182 97 29 8 7:50 TO 8:00 A.M. 310 195 79 18 13 8:00 TO 8:10 A.M. 327 187 72 19 13 8:10 TO 8:20 A.M. 380 192 65 22 4 8:20 TO 8:30 A.M. 291 110 101 1 1 8:30 TO 8:40 A.M. 299 109 230 2 0 8:40 TO 8:50 A.M. 320 124 201 1 1 8:50 TO 9:00 A.M. 342 121 237 2 1 TOTAL 3570 1785 1488 158 94 13
  • 14. B.R. CIRCLE (Surat Station) Junction: B.R. Circle Route: Station To B.R. Circle Date: 04-09-2013 Time: 5:00 P.M. TO 07:00 P.M. TIME 2W 3W 4W LCW HCV 5:00 TO 5:10 P.M. 218 87 55 9 3 5:10 TO 5:20 P.M. 324 121 111 8 11 5:20 TO 5:30 P.M. 250 169 98 12 9 5:30 TO 5:40 P.M. 356 154 75 16 8 5:40 TO 5:50 P.M. 325 174 82 13 3 5:50 TO 6:00 P.M. 314 168 65 12 10 6:00 TO 6:10 P.M. 321 118 69 6 6 6:10 TO 6:20 P.M. 384 153 33 14 5 6:20 TO 6:30 P.M. 381 86 113 6 7 6:30 TO 6:40 P.M. 266 105 221 0 1 6:40 TO 6:50 P.M. 298 131 200 3 1 6:50 TO 7:00 P.M. 351 132 285 0 1 TOTAL 3788 1598 1407 99 65 14
  • 15. B.R. CIRCLE (Surat Station) Junction: B.R. Circle Route: B.R. Circle to Suryapur Road Date: 04-09-2013 Time: 7:00 A.M. TO 9:00 A.M. TIME 2W 3W 4W LCW HCV 7:00 TO 7:10 A.M. 373 74 39 8 6 7:10 TO 7:20 A.M. 321 78 41 5 3 7:20 TO 7:30 A.M. 285 110 35 3 1 7:30 TO 7:40 A.M. 295 64 56 2 0 7:40 TO 7:50 A.M. 341 121 65 9 8 7:50 TO 8:00 A.M. 321 156 79 1 3 8:00 TO 8:10 A.M. 273 178 82 9 1 8:10 TO 8:20 A.M. 360 150 31 2 4 8:20 TO 8:30 A.M. 355 141 99 4 3 8:30 TO 8:40 A.M. 298 145 42 9 3 8:40 TO 8:50 A.M. 382 164 102 0 1 8:50 TO 9:00 A.M. 269 131 107 2 1 TOTAL 3873 1512 778 44 34 15
  • 16. B.R. CIRCLE (Surat Station) Junction: B.R. Circle Route: B.R. Circle to Suryapur Road Date: 04-09-2013 Time: 5:00 P.M. TO 07:00 P.M. TIME 2W 3W 4W LCW HCV 5:00 TO 5:10 P.M. 373 74 39 9 6 5:10 TO 5:20 P.M. 324 121 111 8 11 5:20 TO 5:30 P.M. 250 169 98 12 9 5:30 TO 5:40 P.M. 356 154 75 16 8 5:40 TO 5:50 P.M. 325 174 82 13 3 5:50 TO 6:00 P.M. 314 168 65 12 10 6:00 TO 6:10 P.M. 321 118 69 6 6 6:10 TO 6:20 P.M. 384 153 33 14 5 6:20 TO 6:30 P.M. 381 86 113 6 7 6:30 TO 6:40 P.M. 266 105 221 0 1 6:40 TO 6:50 P.M. 298 131 200 3 1 6:50 TO 7:00 P.M. 351 132 285 0 1 TOTAL 3788 1598 1407 99 68 16
  • 17. Problems • • • • • • • Traffic Congestion Parking Difficulties Longer Commuting Difficulties in Non-Motorized Transports Loss of public space Environmental impacts Accidents & Safety 2/22/2014 URBAN TRAFFIC CHALLENGES 17
  • 18. Conclusion • To provide a suitable conclusion to above problems after the completion of the Traffic data analysis of proposed location . • Conclusion would contain an alternate route to the location , change in traffic island or propose a new one , suitable construction of F.O.B or propose a fly-over where-ever the area is in need of . 2/22/2014 URBAN TRAFFIC CHALLENGES 18
  • 19. Thank You ! • Refrances • http://en.wikipedia.org/wiki/Surat#Transportation • http://www.suratmuncipalcorporation.com 2/22/2014 URBAN TRAFFIC CHALLENGES 19