PROJECT   :   Eskom Renewable Energy Project
                                   Sere Wind Farm
Country   :   Republic of South Africa




                                   Sarjeevan Sainbhi
                                           20104006
___________LOCATION

               Western Cape Province,
                    2 km off the coastline of
                         the Atlantic Ocean




Sarjeevan Sainbhi                               2
About Eskom____________________
• Eskom is a South African electricity public utility,
  established in 1923 as the Electricity Supply Commission
  by the government of South Africa.

• Eskom generates approximately 95% of the electricity
  used in South Africa and approximately 45% of the
  electricity used in Africa.
                           Sarjeevan Sainbhi                 3
Sere Wind Project Objective_______________
           Increased renewable energy supply 

       Avoidance of greenhouse gas emissions 

CTF-leverage investments in renewable projects 

                                            Job creation 
                        Sarjeevan Sainbhi                    4
Project Description
TARGETS:
• 700 MW by 2013 & 3100 MW by 2019

• Job Opportunities: 140 direct jobs and 1371 indirect jobs
  during construction and additional 10 jobs during operation.

• Reduction in 0.44 million tons of CO2.

• Increased Renewable Energy supply to 219 GWh
                           Sarjeevan Sainbhi                     5
Project Schedule




     Sarjeevan Sainbhi   6
Sarjeevan Sainbhi   7
The estimated cost of the Sere wind project does not
include the forward cover. Sarjeevan Sainbhi           8
1 UA = 1.5619 US Dollar

           Unit of Account
           Unit by which value of a thing is
           accounted and compared.


         Sarjeevan Sainbhi                     9
Project Funding
African Development Bank (AfDB)                    : USD 45million
CTF through AfDB                                   : USD 50 million
World bank (WB)                                    : USD 90 million
CTF through WB                                     : USD 50million
Agence Française de Développement (AFD)            : USD 130 million
Eskom                                              : USD 10 million
Total Cost                                         : USD 375 million
                               Sarjeevan Sainbhi                       10
Funds Approval Process
         Due Diligence report by AfDB & IBRD in 2010


        Application to CTF for Funding Approval in 2010


Committee Approval of CTF Allocation of USD 350 Million in 2011

The Agence Française de Développement (AFD) driven by CTF to
                     leverage financing.

 Late June 2011, AfDB will co-host the Climate Investment Funds
2011 Partnership Forum & showcasing Sere wind farm as flagship
                             projects
                          Sarjeevan Sainbhi                       11
BORROWER               : Eskom Holdings SOC Ltd.

EXECUTING AGENCY       : Eskom Holdings SOC Ltd

Project type           : Investment loan.


                   Sarjeevan Sainbhi               12
Sarjeevan Sainbhi   13
Sarjeevan Sainbhi   14
CONTRACTUAL PLANS

Implementation arrangements :
• Eskom, a wholly-owned government entity, will be solely
  responsible for implementing all components of the
  project.

• Eskom will the sole beneficiary of the loan, which will be
  guaranteed by the Government of South Africa.

                         Sarjeevan Sainbhi                15
CONTRACTUAL PLANS
Procurement arrangements
• Works, goods and consulting services will be procured in
  accordance with the Bank's Rules.
• Jointly financed components and activities will be
  procured in accordance with the IBRD’s procurement
  guidelines and the IBRD’s standard bidding documents
  will be used.


                       Sarjeevan Sainbhi               16
CONTRACTUAL PLANS
The EPC contracts proposed for joint financing
are as follows:
– AfDB, jointly with the IBRD & the AFD will finance the
  procurement of an EPC contract for the Sere Wind
  Facility, consisting of the supply and installation of wind
  turbines and generators, a tower and other equipment.
  Procurement will be carried out through
  prequalification under International Competitive
  Bidding.

                        Sarjeevan Sainbhi                  17
CONTRACTUAL PLANS
Financial management, audit , reporting &
monitering :
– The project’s financial transactions will be managed
  by the project implementing agency (Eskom) within its
  existing set-up: namely, the Finance Division and the
  Group Capital Division, under the overall management
  of Eskom’s Board of Directors


                     Sarjeevan Sainbhi               18
Recommendations________________

• Waiver of the rule for Procurement of Goods &
  services as per Bank’s Rules and Procedures in
  connection with the EPC contract that are subject to
  joint financing arrangements.
• The estimated cost of the Sere wind project should
  include the forward cover.

                        Sarjeevan Sainbhi                19
Thank you


   Sarjeevan Sainbhi   20

Contenu connexe

Similaire à Exe mba pf-sarjeevan

TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"seleven
 
Africa Green Corporation
Africa Green CorporationAfrica Green Corporation
Africa Green CorporationGrafic.guru
 
N__Libya_RE_National_Plan.pdf
N__Libya_RE_National_Plan.pdfN__Libya_RE_National_Plan.pdf
N__Libya_RE_National_Plan.pdfOmar30468
 
Results of lebanon’s national energy efficiency and renewable energy action (...
Results of lebanon’s national energy efficiency and renewable energy action (...Results of lebanon’s national energy efficiency and renewable energy action (...
Results of lebanon’s national energy efficiency and renewable energy action (...RCREEE
 
African deverop bank compress ca-93-en
African deverop bank compress ca-93-enAfrican deverop bank compress ca-93-en
African deverop bank compress ca-93-enTapio Mustonen
 
African deverop bank compress ca-93-en
African deverop bank compress ca-93-enAfrican deverop bank compress ca-93-en
African deverop bank compress ca-93-enTapio Mustonen
 
Presentation_Gambia SE4ALL AA and IP_v2
Presentation_Gambia SE4ALL AA and IP_v2Presentation_Gambia SE4ALL AA and IP_v2
Presentation_Gambia SE4ALL AA and IP_v2Dr. Edward Saja Sanneh
 
BOI - INTERVENTION FUNDS: THE JOURNEY SO FAR” PRESENTED BY MR. WAHEED OLAG...
BOI - INTERVENTION FUNDS: THE JOURNEY SO FAR”   PRESENTED BY  MR. WAHEED OLAG...BOI - INTERVENTION FUNDS: THE JOURNEY SO FAR”   PRESENTED BY  MR. WAHEED OLAG...
BOI - INTERVENTION FUNDS: THE JOURNEY SO FAR” PRESENTED BY MR. WAHEED OLAG...Daniel Chinagozi
 
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, KenyaB4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, KenyaIceland Geothermal
 
ISA presentation at Meeting with Resident Diplomatic Mission of ISA countries...
ISA presentation at Meeting with Resident Diplomatic Mission of ISA countries...ISA presentation at Meeting with Resident Diplomatic Mission of ISA countries...
ISA presentation at Meeting with Resident Diplomatic Mission of ISA countries...International solar alliiance
 
Keppel Corporation's 1H22 Financial Results
Keppel Corporation's 1H22 Financial ResultsKeppel Corporation's 1H22 Financial Results
Keppel Corporation's 1H22 Financial ResultsKeppelCorporation
 
Development Finance Lunch | Glen Wilson, Lloyds Bank
Development Finance Lunch | Glen Wilson, Lloyds BankDevelopment Finance Lunch | Glen Wilson, Lloyds Bank
Development Finance Lunch | Glen Wilson, Lloyds BankPlace North West
 
Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...ACX
 
New base 501 special 21 december 2014
New base 501 special  21 december  2014New base 501 special  21 december  2014
New base 501 special 21 december 2014Khaled Al Awadi
 
New base 809 special 16 march 2016
New base 809 special 16 march 2016New base 809 special 16 march 2016
New base 809 special 16 march 2016Khaled Al Awadi
 
Pawan Kumar Bharti, SIDBI - Green Climate & Sustainable Development Initiatives
Pawan Kumar Bharti, SIDBI - Green Climate & Sustainable Development InitiativesPawan Kumar Bharti, SIDBI - Green Climate & Sustainable Development Initiatives
Pawan Kumar Bharti, SIDBI - Green Climate & Sustainable Development InitiativesOECD Environment
 

Similaire à Exe mba pf-sarjeevan (20)

GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_ValahuGIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
 
Africa Green Corporation
Africa Green CorporationAfrica Green Corporation
Africa Green Corporation
 
N__Libya_RE_National_Plan.pdf
N__Libya_RE_National_Plan.pdfN__Libya_RE_National_Plan.pdf
N__Libya_RE_National_Plan.pdf
 
Results of lebanon’s national energy efficiency and renewable energy action (...
Results of lebanon’s national energy efficiency and renewable energy action (...Results of lebanon’s national energy efficiency and renewable energy action (...
Results of lebanon’s national energy efficiency and renewable energy action (...
 
African deverop bank compress ca-93-en
African deverop bank compress ca-93-enAfrican deverop bank compress ca-93-en
African deverop bank compress ca-93-en
 
African deverop bank compress ca-93-en
African deverop bank compress ca-93-enAfrican deverop bank compress ca-93-en
African deverop bank compress ca-93-en
 
Presentation_Gambia SE4ALL AA and IP_v2
Presentation_Gambia SE4ALL AA and IP_v2Presentation_Gambia SE4ALL AA and IP_v2
Presentation_Gambia SE4ALL AA and IP_v2
 
BOI - INTERVENTION FUNDS: THE JOURNEY SO FAR” PRESENTED BY MR. WAHEED OLAG...
BOI - INTERVENTION FUNDS: THE JOURNEY SO FAR”   PRESENTED BY  MR. WAHEED OLAG...BOI - INTERVENTION FUNDS: THE JOURNEY SO FAR”   PRESENTED BY  MR. WAHEED OLAG...
BOI - INTERVENTION FUNDS: THE JOURNEY SO FAR” PRESENTED BY MR. WAHEED OLAG...
 
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, KenyaB4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
 
ISA presentation at Meeting with Resident Diplomatic Mission of ISA countries...
ISA presentation at Meeting with Resident Diplomatic Mission of ISA countries...ISA presentation at Meeting with Resident Diplomatic Mission of ISA countries...
ISA presentation at Meeting with Resident Diplomatic Mission of ISA countries...
 
Keppel Corporation's 1H22 Financial Results
Keppel Corporation's 1H22 Financial ResultsKeppel Corporation's 1H22 Financial Results
Keppel Corporation's 1H22 Financial Results
 
Development Finance Lunch | Glen Wilson, Lloyds Bank
Development Finance Lunch | Glen Wilson, Lloyds BankDevelopment Finance Lunch | Glen Wilson, Lloyds Bank
Development Finance Lunch | Glen Wilson, Lloyds Bank
 
Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...
 
Bangladesh Country Presentation at ACEF 2014
Bangladesh Country Presentation at ACEF 2014Bangladesh Country Presentation at ACEF 2014
Bangladesh Country Presentation at ACEF 2014
 
Solar Power
Solar PowerSolar Power
Solar Power
 
New base 501 special 21 december 2014
New base 501 special  21 december  2014New base 501 special  21 december  2014
New base 501 special 21 december 2014
 
National Solar Mission Status (July'17)
National Solar Mission Status (July'17)National Solar Mission Status (July'17)
National Solar Mission Status (July'17)
 
New base 809 special 16 march 2016
New base 809 special 16 march 2016New base 809 special 16 march 2016
New base 809 special 16 march 2016
 
Pawan Kumar Bharti, SIDBI - Green Climate & Sustainable Development Initiatives
Pawan Kumar Bharti, SIDBI - Green Climate & Sustainable Development InitiativesPawan Kumar Bharti, SIDBI - Green Climate & Sustainable Development Initiatives
Pawan Kumar Bharti, SIDBI - Green Climate & Sustainable Development Initiatives
 

Plus de Sarjeevan Sainbhi

Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9Sarjeevan Sainbhi
 
Exe mba10 uncitral-gbm_sarjeevan_20104006
Exe mba10 uncitral-gbm_sarjeevan_20104006Exe mba10 uncitral-gbm_sarjeevan_20104006
Exe mba10 uncitral-gbm_sarjeevan_20104006Sarjeevan Sainbhi
 
Exe mba10 uncitral-gbm_sarjeevan_20104006_16-9
Exe mba10 uncitral-gbm_sarjeevan_20104006_16-9Exe mba10 uncitral-gbm_sarjeevan_20104006_16-9
Exe mba10 uncitral-gbm_sarjeevan_20104006_16-9Sarjeevan Sainbhi
 
Consultancy practice sarjeevan
Consultancy practice sarjeevanConsultancy practice sarjeevan
Consultancy practice sarjeevanSarjeevan Sainbhi
 
Exe mba ee-nuclear energy_sarjeevan
Exe mba ee-nuclear energy_sarjeevanExe mba ee-nuclear energy_sarjeevan
Exe mba ee-nuclear energy_sarjeevanSarjeevan Sainbhi
 
Q2 exe mba10-qm_quality associates_20104004-05-06
Q2 exe mba10-qm_quality associates_20104004-05-06Q2 exe mba10-qm_quality associates_20104004-05-06
Q2 exe mba10-qm_quality associates_20104004-05-06Sarjeevan Sainbhi
 
Q1 smm project_iocl&ttml_sarjeevan_20104006
Q1 smm project_iocl&ttml_sarjeevan_20104006Q1 smm project_iocl&ttml_sarjeevan_20104006
Q1 smm project_iocl&ttml_sarjeevan_20104006Sarjeevan Sainbhi
 
Exe mba10 q1-mis_netw.& comm. tech._sarjeevan&sudeep
Exe mba10 q1-mis_netw.& comm. tech._sarjeevan&sudeepExe mba10 q1-mis_netw.& comm. tech._sarjeevan&sudeep
Exe mba10 q1-mis_netw.& comm. tech._sarjeevan&sudeepSarjeevan Sainbhi
 
Exe mba10 q1-mis_netw. & comm. tech._sarjeevan&sudeep
Exe mba10 q1-mis_netw. & comm. tech._sarjeevan&sudeepExe mba10 q1-mis_netw. & comm. tech._sarjeevan&sudeep
Exe mba10 q1-mis_netw. & comm. tech._sarjeevan&sudeepSarjeevan Sainbhi
 
Exe mba10 ee-nuclear energy_sarjeevan_20104006
Exe mba10 ee-nuclear energy_sarjeevan_20104006Exe mba10 ee-nuclear energy_sarjeevan_20104006
Exe mba10 ee-nuclear energy_sarjeevan_20104006Sarjeevan Sainbhi
 
Q2 exe mba10-shrm_pms @ icici_20104004-5-6
Q2 exe mba10-shrm_pms @ icici_20104004-5-6Q2 exe mba10-shrm_pms @ icici_20104004-5-6
Q2 exe mba10-shrm_pms @ icici_20104004-5-6Sarjeevan Sainbhi
 

Plus de Sarjeevan Sainbhi (12)

Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
Emba hsem ppt hazard id.ev.sg_20104006-8-9_16-9
 
Exe mba10 uncitral-gbm_sarjeevan_20104006
Exe mba10 uncitral-gbm_sarjeevan_20104006Exe mba10 uncitral-gbm_sarjeevan_20104006
Exe mba10 uncitral-gbm_sarjeevan_20104006
 
Exe mba10 uncitral-gbm_sarjeevan_20104006_16-9
Exe mba10 uncitral-gbm_sarjeevan_20104006_16-9Exe mba10 uncitral-gbm_sarjeevan_20104006_16-9
Exe mba10 uncitral-gbm_sarjeevan_20104006_16-9
 
Consultancy practice sarjeevan
Consultancy practice sarjeevanConsultancy practice sarjeevan
Consultancy practice sarjeevan
 
Exe mba ee-nuclear energy_sarjeevan
Exe mba ee-nuclear energy_sarjeevanExe mba ee-nuclear energy_sarjeevan
Exe mba ee-nuclear energy_sarjeevan
 
Q2 exe mba10-qm_quality associates_20104004-05-06
Q2 exe mba10-qm_quality associates_20104004-05-06Q2 exe mba10-qm_quality associates_20104004-05-06
Q2 exe mba10-qm_quality associates_20104004-05-06
 
Q1 smm project_iocl&ttml_sarjeevan_20104006
Q1 smm project_iocl&ttml_sarjeevan_20104006Q1 smm project_iocl&ttml_sarjeevan_20104006
Q1 smm project_iocl&ttml_sarjeevan_20104006
 
Ims if sarjeevan
Ims if sarjeevanIms if sarjeevan
Ims if sarjeevan
 
Exe mba10 q1-mis_netw.& comm. tech._sarjeevan&sudeep
Exe mba10 q1-mis_netw.& comm. tech._sarjeevan&sudeepExe mba10 q1-mis_netw.& comm. tech._sarjeevan&sudeep
Exe mba10 q1-mis_netw.& comm. tech._sarjeevan&sudeep
 
Exe mba10 q1-mis_netw. & comm. tech._sarjeevan&sudeep
Exe mba10 q1-mis_netw. & comm. tech._sarjeevan&sudeepExe mba10 q1-mis_netw. & comm. tech._sarjeevan&sudeep
Exe mba10 q1-mis_netw. & comm. tech._sarjeevan&sudeep
 
Exe mba10 ee-nuclear energy_sarjeevan_20104006
Exe mba10 ee-nuclear energy_sarjeevan_20104006Exe mba10 ee-nuclear energy_sarjeevan_20104006
Exe mba10 ee-nuclear energy_sarjeevan_20104006
 
Q2 exe mba10-shrm_pms @ icici_20104004-5-6
Q2 exe mba10-shrm_pms @ icici_20104004-5-6Q2 exe mba10-shrm_pms @ icici_20104004-5-6
Q2 exe mba10-shrm_pms @ icici_20104004-5-6
 

Dernier

GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Associazione Digital Days
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 

Dernier (20)

GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 

Exe mba pf-sarjeevan

  • 1. PROJECT : Eskom Renewable Energy Project Sere Wind Farm Country : Republic of South Africa Sarjeevan Sainbhi 20104006
  • 2. ___________LOCATION Western Cape Province, 2 km off the coastline of the Atlantic Ocean Sarjeevan Sainbhi 2
  • 3. About Eskom____________________ • Eskom is a South African electricity public utility, established in 1923 as the Electricity Supply Commission by the government of South Africa. • Eskom generates approximately 95% of the electricity used in South Africa and approximately 45% of the electricity used in Africa. Sarjeevan Sainbhi 3
  • 4. Sere Wind Project Objective_______________ Increased renewable energy supply  Avoidance of greenhouse gas emissions  CTF-leverage investments in renewable projects  Job creation  Sarjeevan Sainbhi 4
  • 5. Project Description TARGETS: • 700 MW by 2013 & 3100 MW by 2019 • Job Opportunities: 140 direct jobs and 1371 indirect jobs during construction and additional 10 jobs during operation. • Reduction in 0.44 million tons of CO2. • Increased Renewable Energy supply to 219 GWh Sarjeevan Sainbhi 5
  • 6. Project Schedule Sarjeevan Sainbhi 6
  • 8. The estimated cost of the Sere wind project does not include the forward cover. Sarjeevan Sainbhi 8
  • 9. 1 UA = 1.5619 US Dollar Unit of Account Unit by which value of a thing is accounted and compared. Sarjeevan Sainbhi 9
  • 10. Project Funding African Development Bank (AfDB) : USD 45million CTF through AfDB : USD 50 million World bank (WB) : USD 90 million CTF through WB : USD 50million Agence Française de Développement (AFD) : USD 130 million Eskom : USD 10 million Total Cost : USD 375 million Sarjeevan Sainbhi 10
  • 11. Funds Approval Process Due Diligence report by AfDB & IBRD in 2010 Application to CTF for Funding Approval in 2010 Committee Approval of CTF Allocation of USD 350 Million in 2011 The Agence Française de Développement (AFD) driven by CTF to leverage financing. Late June 2011, AfDB will co-host the Climate Investment Funds 2011 Partnership Forum & showcasing Sere wind farm as flagship projects Sarjeevan Sainbhi 11
  • 12. BORROWER : Eskom Holdings SOC Ltd. EXECUTING AGENCY : Eskom Holdings SOC Ltd Project type : Investment loan. Sarjeevan Sainbhi 12
  • 15. CONTRACTUAL PLANS Implementation arrangements : • Eskom, a wholly-owned government entity, will be solely responsible for implementing all components of the project. • Eskom will the sole beneficiary of the loan, which will be guaranteed by the Government of South Africa. Sarjeevan Sainbhi 15
  • 16. CONTRACTUAL PLANS Procurement arrangements • Works, goods and consulting services will be procured in accordance with the Bank's Rules. • Jointly financed components and activities will be procured in accordance with the IBRD’s procurement guidelines and the IBRD’s standard bidding documents will be used. Sarjeevan Sainbhi 16
  • 17. CONTRACTUAL PLANS The EPC contracts proposed for joint financing are as follows: – AfDB, jointly with the IBRD & the AFD will finance the procurement of an EPC contract for the Sere Wind Facility, consisting of the supply and installation of wind turbines and generators, a tower and other equipment. Procurement will be carried out through prequalification under International Competitive Bidding. Sarjeevan Sainbhi 17
  • 18. CONTRACTUAL PLANS Financial management, audit , reporting & monitering : – The project’s financial transactions will be managed by the project implementing agency (Eskom) within its existing set-up: namely, the Finance Division and the Group Capital Division, under the overall management of Eskom’s Board of Directors Sarjeevan Sainbhi 18
  • 19. Recommendations________________ • Waiver of the rule for Procurement of Goods & services as per Bank’s Rules and Procedures in connection with the EPC contract that are subject to joint financing arrangements. • The estimated cost of the Sere wind project should include the forward cover. Sarjeevan Sainbhi 19
  • 20. Thank you Sarjeevan Sainbhi 20