Onondaga County’s Green
 Infrastructure “Project 50”
 I f            “P j
 Construction
Joanne M. Mahoney, County Executive
Joanne M Mahoney County Executive
Onondaga Lake Amended Consent Judgment (ACJ) Compliance Program



                     New York Water Environment Association
                              84th Annual Meeting

                       Tom Rhoads, Commissioner, OCDWEP

                            Matthew Marko, Rita Fordiani
                                    CH2M HILL
2/6/12

Onondaga County,
      g       y,                               City f Syracuse
                                               Cit of S
                                                                           2

   New York                                           Onondaga Lake




                                                      Onondaga Creek
• 7,660 acres
• 49 CSOs
• ~1 Billion gallons/year CSO   Harbor Brook
2/6/12
• 1988 – Atlantic States Legal Foundation
                                                    History
                                                                             3
  files lawsuit against County
• 1989 – Litigation settled through
  METRO consent judgment                       Onondaga Lake Facts
• 1998 – METRO consent judgment
  replaced with Amended Consent              Watershed: 285 Square Miles
  Judgment (ACJ)
                                             1 Mile Wide – 4.6 Miles Long
•   1st   ACJ amendment May 1998
• 2006 ACJ Amended to include                   Average Depth: 35 feet
                                                     g    p
  consolidation of ammonia and
  phosphorus treatment and Harbor                Max Depth: 63 feet
  Brook conveyances and RTF
              y
                                              1940 – Swimming Banned
•   3rd   Amendment April 2008 (Extension)
• 2009 ACJ amended to authorize use of         1970 – Fishing Banned
  Gray and Green infrastructure
4th
     ACJ Amendment Authorized a
                                                                        2/6/12
                                                                            4

Balanced Approach to CSO Abatement
      Regulatory Goals               Community Impacts/Goals
• Capture and Treat 95% of the      • Improve quality of life through
  Annual CSO Volume via               environmental responsibility
  Gray & Green Infrastructure       • Promote sustainability
• Achieve water quality             • Ensure cost effectiveness in
  standards in tributaries            compliance with ACJ milestones
                                         p
  and lake                          • Community revitalization


                             Major Milestones
              • 89.5% capture/elimination by 12/31/2013
               • 95% capture/elimination by 12/31/2018
                       p    /             y / /
County Executive Mahoney Announces “Project 50!”
                                                                            2/6/12
                                                                                5
  “Onondaga County will construct fifty distinct green
  infrastructure projects to return rain water and snow
  melt to the ground instead of our sewer system.”
                                            system.
                          Joanne M. Mahoney, State of the County Address,
                                                            March 1, 2011

              Syracuse
          becomes one
          of ten Green
                 Cities



                             Paradigm shifts from
                             planning to construction
Green (and Gray) Infrastructure Program Management
                                                                  2/6/12
                                                                      6
Need Increases with Approval of 4th Stipulation
 • Green Infrastructure (GI) is an emerging technology and 
   mostly new to Onondaga County Departments
   ▫ Need for a trusted advisor on program implementation
   ▫DDepartment can focus on existing operations, and Gray 
           t    t     f          i ti        ti       dG
     Program projects, while learning to integrate with GI
 • Role of the Green Program Manager
   Role of the Green Program Manager
   ▫ Develop strategy that meets ACJ milestones
   ▫ Provide GI expertise on applications, design standards, 
                   p           pp         ,    g           ,
     construction, and maintenance
   ▫ Prioritize opportunities based on diverse, dynamic factors
   ▫ Transition to a fully County operated GI Program by 2018
2/6/12
                   7




 Project 50!
 P j
Construction
Onondaga County              2/6/12
                                 8
Civic Strip
  OnCenter Convention Center
 66,000 Square Foot Green Roof
2/6/12
    9
2/6/12
  10
Onondaga County            2/6/12
                             12
Civic Strip
        War Memorial
    Cistern Reuse System
War Memorial Cistern Reuse System




Reusing rainwater appears to allow the ice making to occur one to two degrees
warmer than using potable water resulting in energy savings
2/6/12

First Commercial Green Street: Harrison Street                                14




BEFORE: Stormwater enters catch       AFTER: Stormwater is diverted to
basins and is directly connected to   Green Streets and only overflows to
sewer                                 sewer when necessary
2/6/12

OnCenter Surface Parking Lot: 290 green spaces
                       g          g      p                  16

                                    GI Technology:
                                    Perimeter porous 
                                    asphalt and tree
                                        h l   d 
                                    infiltration trench
                                    Project Owner:
                                    County
                                    Capture Area:
                                     34,     q
                                    134,000 square feet
                                    Runoff Reduction:
                                    2,360,000 gallons/year
                                    Construction Cost: 
                                    C        i  C      
                                    $812,000 (bid)
                                    $/gallon: $0.48
Installation of Stone Storage Bed
2/6/12

OnCenter Surface Parking Lot
                       g               18




                               Porous
                               Asphalt
                               Perimeter
                               P i
2/6/12


OnCenter Municipal Parking Garage                    19



                             GI Technology:
                             Roof leaders to rain 
                             R f l d     i  
                             gardens
                             Project Owner:
                             County
                             Capture Area:
                             7 ,5
                             72,500 square feet
                                     q
                             Runoff Reduction:
                             1,277,000 gallons/year
                             Construction Cost: 
                             C        i  C      
                             $234,000 (bid)
                             $/gallon:  $0.26
2/6/12
                       20

OnCenter
Municipal Parking
      p         g
Garage



  Bio-Infiltration
2/6/12
                                            21




Before
         Townsend Parking Lot (“Lot B”)
             and Townsend Median
2/6/12
                                 22

Vegetated Infiltration Beds,
     90 Trees Planted
Base Course Asphalt Installed prior to winter shutdown
Volume capture: 975,000 gallons/year
2/6/12
                            25




     Project 50!
     P j
Beyond the Civic Strip:
  y                  p
    Green Streets
2/6/12

  Linking with Major Transportation
        g        j        p                                26

  Reconstruction Creates Green Progress
                                 Phase 1: Contracts 1 and 2
                                 Ph    1 C t     t      d




Image – Barton & Loguidice
Connective Corridor
                                                             2/6/12
                                                               27




                  Capture Area:             6.75 ac
                  Run‐off Reduction:        5.16  MG/Year
                  Construction Cost:        $948,700 (bid)
                  $/gallon Runoff Capture   $0.18
                  $/gallon CSO Reduction    $0.26
                                            $0 26
Connective Corridor
                                                   2/6/12
                                                     28




                      Image – Barton & Loguidice
2/6/12

City Road Reconstruction: Pavement Removal     29

at Geddes Street




GI Technology:       Bioretention
Project Owner:       City of Syracuse
Capture Area:        29,700 square feet
Run‐off Reduction:   523,000 gallons/year
Construction Cost:       3,    ( )
                     $203,000 (bid)
$/gallon:            $0.55
Status:              completed
2/6/12
                           30




      Project 50!
      P j
CSO Treatment Wetlands
CSO Treatment Wetland Project
Compensatory Storage Project Completed in 2011
                                          CSO 018


                                          Proposed
                                          Constructed
                                          Wetland


                                          Harbor
                                          Brook
Treatment Wetland Eliminates CSO 018
                                                                       2/6/12
                                                                           32
                                 (up to design storm)
•   144 Acre CSO basin
•   40 overflows / year
•   Significant Nutrient Removal
•   Partner with SUNY ESF




                                                        Stay tuned for 
                                                        presentation 
                                                        presentation
                                                        on this project 
                                                        in 2013
                                                        in 2013
2/6/12
                33




Project 50!
P j
Green Parks
Rosamond Gifford Zoo
               Elephant Exhibit, 2011
                  p            ,
                                        GI T h l
                                        GI Technology:
6,000 sq.ft.                            Green roof
Green Roof                              Project Owner:
                                        County
                                        Capture Area:
Porous                                   ,     q
                                        6,000 square feet
pavement,                               Runoff Reduction:
and rain                                114,000 gallons/year
barrels for
stormwater                              Construction Cost: 
                                        C        i  C      
reuse                                   $183,900
                                        $/gallon: $2.27
Creekwalk Project Greening: Jefferson to Walton
                                                      Porous Asphalt
                                                      Strip in Parking Lot




Before


   Bioretention
   Bi       i
   Rain Garden

Flexi-pave
Flexi pave
Porous Walkway

  Porous Asphalt     Volume capture: 135,000 gallons/year
  Parking Lot
Creekwalk Project Greening: Walton to Fayette
                          Porous Concrete
                                                       Porous Asphalt
                                                       Strip in
                                                       Parking Lot



Before




Re-established
Natural Stream Bank
                      Volume capture: 119,000 gallons/year
2/6/12

Rosamond Gifford Zoo Entrance Enhancement                                              37



                                                               •GI Technology:
                                                                Rain gardens
                                                                R i   d
                                                               •Project Owner:
                                                                County/City
                                                               •Capture Area:
                                                                39,000 square feet
                                                               •Run off Reduction  
                                                               •Run‐off Reduction: 
                                                                680,000 gallons/year
                                                               •Construction Cost:
                                                                $300,000 (bid)
                                                               •$/gallon: $0.62
          Green Infrastructure Concept for the Zoo Entrance 
                                    p
2/6/12

Rosamond Gifford Zoo Entrance Enhancement          38




                                     Bio-infiltration
                                       Systems
                                       capture
                                       runoff from
                                       surrounding
                                       streets
2/6/12
                  39




 Project 50!
 P j
Green Schools
2/6/12

Hughes Magnet School
  g      g                          40




                       New Parking
                       Lot captures
                       runoff from
                       school roof
                         h l     f
                       and upper lot
2/6/12
                       41




   Project 50!
   P j
Green Parking Lots
            g
2/6/12

Sunnycrest Park Arena Parking Lot                                                     42

                                                                GI Technology:
                                                                Porous pavement
                                                                Rain garden
                                                                R i   d
                                                                Project Owner:
                                                                Syracuse Parks 
                                                                Dept.
                                                                Capture Area:
                                                                  7,     q
                                                                107,000 square feet
                                                                Run‐off Reduction:
                                                                1,876,000 
                                                                gallons/year
                                                                Construction Cost: 
                                                                $303,000 (bid)
         Map of Proposed Sunnycrest Arena Parking Lot Project   $/gallon: $0.22
Installation of Storage and Infiltration Systems
2/6/12
              44


Combination of
 bio-retention,
 bio retention
 porous
 asphalt, and
 subsurface
 storage and
 infiltration
 systems
2/6/12
Sunnycrest Park Golf Parking Lot
    y                      g                                   45

                           •GI Technology:
                                   Stream Inflow Removal
                                   Rain garden
                                   Pavement Removal
                           •Project Owner:
                                    City of Syracuse Parks Dept.
                                    City of Syracuse Parks Dept
                           •Capture Area:
                                   48,000 square feet
                           •Run‐off Reduction: 
                                    843,000 gallons/yr
                            Construction Cost:
                           •Construction Cost:
                                   $363,000 (bid)
                           •$/gallon: $0.52
2/6/12
Sunnycrest Park Golf Parking Lot
    y                      g                             46




                            Bio-retention
                            Bio retention and
                              Infiltration System
                              (Standard Asphalt
                              Parking Lot re-graded)
2/6/12


Project 50: Shifting the Paradigm
                                                                     47



Planning for Widespread Implementation of GI
Planning for Widespread Implementation of GI
 ▫ Opportunity/Idea Coordination
    New Project Form
              j
    Database and GIS Management
   Projects include: Parking Lots, Parking Garages, Schools, 
     Libraries, Parks, Firehouses, Post Offices, Streets (commercial 
     Lib i P k Fi h                P t Offi      St t (          i l
     and residential), Water Reuse, Wetlands, Roofs, Vacant Lots
 ▫ Concept Development
        p        p
    Site Visit, watershed identification, BMP Identification
    Calculator (capture and preliminary cost estimate)
2/6/12


Project 50: Shifting the Paradigm
                                                                     48



Planning for Widespread Implementation of GI
Planning for Widespread Implementation of GI
 ▫ Landowner Endorsement
    Bi‐weekly City‐County Coordination Meeting
               y y         y                       g
     (if you think you can do this without a lot of coordination and 
     meetings ‐ you can not)
 ▫ Field Work and Permitting
   Field Work and Permitting
      Survey (including utility identification)
      Soils Testing (infiltration)
                   g(             )
      Environmental Analysis (Phase 1, Analytic Testing, etc.)
      SERP (SEQR, SHPO, SWPPP/NEPA/Landmark Preservation, etc.)
2/6/12


Project 50: Shifting the Paradigm
                                                                49



Designing 50+ Projects
 ▫ 50% Plans
    Design Guidance Manual
    Design Workflow (flow chart)
                kfl (fl     h )
 ▫ 90% Plans and Specifications
 ▫ Final (for Construction) Plans Specifications and Bid Forms
   Final (for Construction) Plans, Specifications, and Bid Forms
    Comment Adjudication/
     Quality Assurance
 ▫ Cost Estimating
    At Concept and 90%
 ▫ D i C di ti
   Design Coordination
    WEEKLY Design and Construction Review Meeting
2/6/12
                                           50
East Water Street Gateway: Case Study
Project Features:
  ▫   Bike Boulevard
  ▫   Traffic Calming
  ▫   Private/Commercial collaboration
  ▫   Porous Paver Parking Lanes
  ▫   Curb Extensions
      Curb Extensions
  ▫   Robust Tree Planter systems
• Challenges Include:
  Challenges Include:
  ▫ Mid‐street pedestrian crossing
  ▫ Snow plow considerations
          p
  ▫ Turning radii for tractor trailers
2/6/12
                                                        51
Water Street Gateway Project Concept

                               GI Technology:
                               Infiltration trench 
                               and porous pavers
                               Project Owner:
                               City of Syracuse
                               Capture Area:
                               53,000 square feet
                                              f t
                               Runoff Reduction:
                               924,000 gallons/yr
                               Construction Cost: 
                               $920,000 (bid)
                               $/gallon: $1.00
                               $/gallon: $1 00
Water Street Gateway Project
                   y    j
                               2/6/12
                                 52




       Before
Water Street Gateway Project
                   y    j
                               2/6/12
                                 53




         During
2/6/12
          54




After
2/6/12


Project 50: Shifting the Paradigm
                                                                  55



• Procurement
 ▫ Contract Documents: Bundling projects as appropriate
 ▫ Advertisement: Pre‐Bid Meeting, Addendum, Bid
• Construction
 ▫ Services During Construction
    Clarifications, RFIs, Modifications, Change Orders, etc.
 ▫ Construction Inspection
    PrimaVera Construction Manager
               Construction Manager
 ▫ Project Completion Reports
    $/gallon accounting
    Post‐project communication on challenges/successes
2/6/12


Other Program Elements
                                                          56



• Legislative Agenda
  ▫ Existing City Ordinances (Stormwater, Tree, Sidewalk)
  ▫ New and Innovative City Ordinances: Permission
• Enhanced Street Tree Program: 8500 new street trees
  Enhanced Street Tree Program: 8500 new street trees
• Rain Barrel Program: 650 and counting (Goal: 3600)
• Vacant Lot Program
  Vacant Lot Program
• Grant Funding: Federal/State successes
• Green Improvement Fund: Onondaga County’s
  Green Improvement Fund: Onondaga County s
 Public‐Private‐Partnership for Incentivizing GI
  ▫ Grants up to $200,000
  ▫ Stay tuned for a presentation on this, next year!
GIF: Porous Pavers at Hotel Skyler
                              y
                                          2/6/12
                                            57




                                     Porous
                                     Paver
                                     Parking
                                     Lot
2/6/12

Public Education and Outreach                                     58

• STR Website: www.SaveTheRain.us
• Monthly Report: for ACJ Parties County Legislature
  Monthly Report: for ACJ Parties, County Legislature
• Coalition Partners / Stakeholders
  City of Syracuse (DPW, Engineering, Law, School District, 
      y     y       (        g       g
   Parks, Zoning, Codes, etc.)
  ACJ Parties (NYS DEC, ASLF): Policy Committee
  Academic Community (SU SUNY ESF)
   Academic Community (SU, SUNY ESF)
  Community Groups / NFPs
  Business Community, Large Landowners (hospitals)
  General Public
  Manufacturers / Vendors / Suppliers
  Engineering Community
   Engineering Community
  Construction Community (M/WBEs), Bidders Wanted!
2/6/12


Maintenance
                                    59



• Asset Management
 ▫ Asset Definition: Location, 
   quantity, etc.
 ▫ Standard Maintenance 
       d d
   Procedures (SMPs)
 ▫ Computerized Maintenance
   Computerized Maintenance 
   Management System 
   (Maximo)
2/6/12
                      60




Case S d
C     Study:
C y
City Lot #3
Project Description
p
provides overview
of constructed GI
for field crew
Engineered Stormwater Plan provides detail   2/6/12
                                               61
on the system as constructed
Educating the Maintenance Staff with   2/6/12
                                         62
GI Technology Fact Sheets
2/6/12
                                                        63

Maximo as CMMS tool for WEP Green
Infrastructure Program
• Work orders include:
 ▫   Maintenance activities/step by step directions
     M i             i ii /       b      di    i
 ▫   Tools/equipment (including costs)
 ▫   Planned time to complete
     Planned time to complete
 ▫   Actual maintenance info is loaded back into 
     Maximo after completion
     Maximo after completion
• Example maintenance task for E‐06 Porous 
  Pavement Vacuuming follows…
  Pavement Vacuuming follows
2/6/12


Measuring Progress: Monitoring               65


• ACJ Compliance
 ▫ Annual Report: April
        l             l
    SWMM : Volume Capture
    Goal: 246 MG/Yr by 2018
     Goal: 246 MG/Yr by 2018
   Ambient Monitoring Program
    (AMP): Water Quality
    Goal: Wet Weather Standards
• Net Environmental Benefit Analysis
• Funding Sources and Financial Tracking
2/6/12


Save the Rain: 2012
                                                        66



• Focus on Efficiency over Quantity
 ▫ Improved Constructability
 ▫ Lower Maintenance
• Unit Price ‐ Quantity Based
  Construction Procurements 
 ▫ Civil Site Work Contract
 ▫ Landscape Installation and Maintenance Contract
 ▫P tW
   Post‐Warranty Maintenance Contract, conducted by
                t M i t        C t t       d t db
   Conservation Corps (Community Based Green Jobs)
Thank You!
             Questions?

          Please Visit us at
        www.SaveTheRain.us

Contenu connexe

Tendances

Syracuse COE Symposium Transforming Urban Vacant Land
Syracuse COE Symposium Transforming Urban Vacant LandSyracuse COE Symposium Transforming Urban Vacant Land
Syracuse COE Symposium Transforming Urban Vacant Land
aslfadmin
 
ICEA-LHCCD conference fishkill2012-presentation
ICEA-LHCCD conference fishkill2012-presentationICEA-LHCCD conference fishkill2012-presentation
ICEA-LHCCD conference fishkill2012-presentation
aslfadmin
 
IWRM Evaluation Result_Singapore
IWRM Evaluation Result_SingaporeIWRM Evaluation Result_Singapore
IWRM Evaluation Result_Singapore
GWP SOUTHEAST ASIA
 
Alamo Heights CCM 09.09.19 - Item #12 PPT AH Pool Engineer
Alamo Heights CCM 09.09.19 - Item #12 PPT AH Pool EngineerAlamo Heights CCM 09.09.19 - Item #12 PPT AH Pool Engineer
Alamo Heights CCM 09.09.19 - Item #12 PPT AH Pool Engineer
ahcitycouncil
 
Growing Power
Growing PowerGrowing Power
Growing Power
aslfadmin
 
Environmental Programs Status Update 02 18 10
Environmental Programs Status Update 02 18 10Environmental Programs Status Update 02 18 10
Environmental Programs Status Update 02 18 10
ckrout
 

Tendances (20)

Syracuse COE Symposium Transforming Urban Vacant Land
Syracuse COE Symposium Transforming Urban Vacant LandSyracuse COE Symposium Transforming Urban Vacant Land
Syracuse COE Symposium Transforming Urban Vacant Land
 
John Nemeth, Richmond Hill - Water & Cities
John Nemeth, Richmond Hill - Water & CitiesJohn Nemeth, Richmond Hill - Water & Cities
John Nemeth, Richmond Hill - Water & Cities
 
Greening vacant lots in syracuse final
Greening vacant lots in syracuse finalGreening vacant lots in syracuse final
Greening vacant lots in syracuse final
 
Renewing natural processes_in_an_urban_area
Renewing natural processes_in_an_urban_areaRenewing natural processes_in_an_urban_area
Renewing natural processes_in_an_urban_area
 
ICEA-LHCCD conference fishkill2012-presentation
ICEA-LHCCD conference fishkill2012-presentationICEA-LHCCD conference fishkill2012-presentation
ICEA-LHCCD conference fishkill2012-presentation
 
IWRM Evaluation Result_Singapore
IWRM Evaluation Result_SingaporeIWRM Evaluation Result_Singapore
IWRM Evaluation Result_Singapore
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case Descriptions
 
Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008
 
Alamo Heights CCM 09.09.19 - Item #12 PPT AH Pool Engineer
Alamo Heights CCM 09.09.19 - Item #12 PPT AH Pool EngineerAlamo Heights CCM 09.09.19 - Item #12 PPT AH Pool Engineer
Alamo Heights CCM 09.09.19 - Item #12 PPT AH Pool Engineer
 
Australia And Singapore - How are they dealing with water problems?
Australia And Singapore - How are they dealing with water problems?Australia And Singapore - How are they dealing with water problems?
Australia And Singapore - How are they dealing with water problems?
 
May 1 Water Talks - Halla Razak, P.E.
May 1 Water Talks - Halla Razak, P.E. May 1 Water Talks - Halla Razak, P.E.
May 1 Water Talks - Halla Razak, P.E.
 
Nsc Gi Talk Nov 2007
Nsc Gi Talk Nov 2007Nsc Gi Talk Nov 2007
Nsc Gi Talk Nov 2007
 
2013.dec.1314 318 e-green alleys grant program
2013.dec.1314 318 e-green alleys grant program2013.dec.1314 318 e-green alleys grant program
2013.dec.1314 318 e-green alleys grant program
 
Carlsbad Desalination Project Report o October 2012 Public Workshops - Oct. 2...
Carlsbad Desalination Project Report o October 2012 Public Workshops - Oct. 2...Carlsbad Desalination Project Report o October 2012 Public Workshops - Oct. 2...
Carlsbad Desalination Project Report o October 2012 Public Workshops - Oct. 2...
 
Growing Power
Growing PowerGrowing Power
Growing Power
 
Stormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsStormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving Funds
 
San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21
San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21
San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21
 
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
 
Environmental Programs Status Update 02 18 10
Environmental Programs Status Update 02 18 10Environmental Programs Status Update 02 18 10
Environmental Programs Status Update 02 18 10
 
Sustainable Planning Fundamentals
Sustainable Planning FundamentalsSustainable Planning Fundamentals
Sustainable Planning Fundamentals
 

Similaire à NYWEA 2012

Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25
retzcanter
 
Challenges with implementing_gi_in_onondaga_county_nycom-pws_oct2011
Challenges with implementing_gi_in_onondaga_county_nycom-pws_oct2011Challenges with implementing_gi_in_onondaga_county_nycom-pws_oct2011
Challenges with implementing_gi_in_onondaga_county_nycom-pws_oct2011
Onondaga County Save the Rain
 
DesalinationPresentation
DesalinationPresentationDesalinationPresentation
DesalinationPresentation
Zacary Richards
 
Green infrastructure on the fair
Green infrastructure on the fairGreen infrastructure on the fair
Green infrastructure on the fair
aslfadmin
 
Construction And The Built Environment
Construction And The Built EnvironmentConstruction And The Built Environment
Construction And The Built Environment
Jennifer Wood
 
Innovative Water Recycling
Innovative Water RecyclingInnovative Water Recycling
Innovative Water Recycling
PERCWater
 
Himkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW ReportHimkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW Report
Himkaar Singh
 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Bappy114
 
Lecture 7 3 gd (1 may 12)
Lecture 7 3 gd (1 may 12)Lecture 7 3 gd (1 may 12)
Lecture 7 3 gd (1 may 12)
Moutaz Moh
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
cathexis123
 

Similaire à NYWEA 2012 (20)

Green Infrastructure Maintenance Workshop
Green Infrastructure Maintenance WorkshopGreen Infrastructure Maintenance Workshop
Green Infrastructure Maintenance Workshop
 
Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25
 
Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25
 
OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1
 
Challenges with implementing_gi_in_onondaga_county_nycom-pws_oct2011
Challenges with implementing_gi_in_onondaga_county_nycom-pws_oct2011Challenges with implementing_gi_in_onondaga_county_nycom-pws_oct2011
Challenges with implementing_gi_in_onondaga_county_nycom-pws_oct2011
 
NY: A Green Infrastructure Approach - Onondaga Creek Water Quality
NY: A Green Infrastructure Approach - Onondaga Creek Water QualityNY: A Green Infrastructure Approach - Onondaga Creek Water Quality
NY: A Green Infrastructure Approach - Onondaga Creek Water Quality
 
DesalinationPresentation
DesalinationPresentationDesalinationPresentation
DesalinationPresentation
 
Green infrastructure on the fair
Green infrastructure on the fairGreen infrastructure on the fair
Green infrastructure on the fair
 
Construction And The Built Environment
Construction And The Built EnvironmentConstruction And The Built Environment
Construction And The Built Environment
 
Steve Nadeau, Honigman, Sediment Cleanup and Great Lakes Legacy Act, Midwest ...
Steve Nadeau, Honigman, Sediment Cleanup and Great Lakes Legacy Act, Midwest ...Steve Nadeau, Honigman, Sediment Cleanup and Great Lakes Legacy Act, Midwest ...
Steve Nadeau, Honigman, Sediment Cleanup and Great Lakes Legacy Act, Midwest ...
 
Innovative Water Recycling
Innovative Water RecyclingInnovative Water Recycling
Innovative Water Recycling
 
Himkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW ReportHimkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW Report
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakesh
 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
 
Lecture 7 3 gd (1 may 12)
Lecture 7 3 gd (1 may 12)Lecture 7 3 gd (1 may 12)
Lecture 7 3 gd (1 may 12)
 
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIRENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination study
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
 
Setawwa 2010, 1-29 choules
Setawwa   2010, 1-29 choulesSetawwa   2010, 1-29 choules
Setawwa 2010, 1-29 choules
 

Plus de Onondaga County Save the Rain

Onondaga Earth Corps - Green Infrastructure Maintenance
Onondaga Earth Corps - Green Infrastructure MaintenanceOnondaga Earth Corps - Green Infrastructure Maintenance
Onondaga Earth Corps - Green Infrastructure Maintenance
Onondaga County Save the Rain
 
Harbor Brook Treatment Wetlands Design Status - Feb 2012
Harbor Brook Treatment Wetlands Design Status - Feb 2012Harbor Brook Treatment Wetlands Design Status - Feb 2012
Harbor Brook Treatment Wetlands Design Status - Feb 2012
Onondaga County Save the Rain
 
Clinton Storage Facility Construction Activity 12/19/11
Clinton Storage Facility Construction Activity 12/19/11Clinton Storage Facility Construction Activity 12/19/11
Clinton Storage Facility Construction Activity 12/19/11
Onondaga County Save the Rain
 
Use of gi to reduce stormwater runoff squier - sept 2011
Use of gi to reduce stormwater runoff   squier - sept 2011Use of gi to reduce stormwater runoff   squier - sept 2011
Use of gi to reduce stormwater runoff squier - sept 2011
Onondaga County Save the Rain
 

Plus de Onondaga County Save the Rain (11)

Onondaga Earth Corps - Green Infrastructure Maintenance
Onondaga Earth Corps - Green Infrastructure MaintenanceOnondaga Earth Corps - Green Infrastructure Maintenance
Onondaga Earth Corps - Green Infrastructure Maintenance
 
Legnetto GI Maintenance Presentation 2014
Legnetto GI Maintenance Presentation 2014Legnetto GI Maintenance Presentation 2014
Legnetto GI Maintenance Presentation 2014
 
Education & Outreach CSO044 - NYWEA 2012
Education & Outreach   CSO044 - NYWEA 2012Education & Outreach   CSO044 - NYWEA 2012
Education & Outreach CSO044 - NYWEA 2012
 
Harbor Brook Treatment Wetlands Design Status - Feb 2012
Harbor Brook Treatment Wetlands Design Status - Feb 2012Harbor Brook Treatment Wetlands Design Status - Feb 2012
Harbor Brook Treatment Wetlands Design Status - Feb 2012
 
Using Porous Pavements and Other Green Technologies to Reduce Urban Runoff & ...
Using Porous Pavements and Other Green Technologies to Reduce Urban Runoff & ...Using Porous Pavements and Other Green Technologies to Reduce Urban Runoff & ...
Using Porous Pavements and Other Green Technologies to Reduce Urban Runoff & ...
 
Porous Pavement in Cold Climates Part 2
Porous Pavement in Cold Climates Part 2Porous Pavement in Cold Climates Part 2
Porous Pavement in Cold Climates Part 2
 
Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1
 
Clinton Storage Facility Construction Activity 12/19/11
Clinton Storage Facility Construction Activity 12/19/11Clinton Storage Facility Construction Activity 12/19/11
Clinton Storage Facility Construction Activity 12/19/11
 
Use of gi to reduce stormwater runoff squier - sept 2011
Use of gi to reduce stormwater runoff   squier - sept 2011Use of gi to reduce stormwater runoff   squier - sept 2011
Use of gi to reduce stormwater runoff squier - sept 2011
 
Sept 2011 monthly report
Sept 2011 monthly reportSept 2011 monthly report
Sept 2011 monthly report
 
Dodson 2011 09-26
Dodson 2011 09-26Dodson 2011 09-26
Dodson 2011 09-26
 

Dernier

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 

Dernier (20)

Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

NYWEA 2012

  • 1. Onondaga County’s Green Infrastructure “Project 50” I f “P j Construction Joanne M. Mahoney, County Executive Joanne M Mahoney County Executive Onondaga Lake Amended Consent Judgment (ACJ) Compliance Program New York Water Environment Association 84th Annual Meeting Tom Rhoads, Commissioner, OCDWEP Matthew Marko, Rita Fordiani CH2M HILL
  • 2. 2/6/12 Onondaga County, g y, City f Syracuse Cit of S 2 New York Onondaga Lake Onondaga Creek • 7,660 acres • 49 CSOs • ~1 Billion gallons/year CSO Harbor Brook
  • 3. 2/6/12 • 1988 – Atlantic States Legal Foundation History 3 files lawsuit against County • 1989 – Litigation settled through METRO consent judgment Onondaga Lake Facts • 1998 – METRO consent judgment replaced with Amended Consent Watershed: 285 Square Miles Judgment (ACJ) 1 Mile Wide – 4.6 Miles Long • 1st ACJ amendment May 1998 • 2006 ACJ Amended to include Average Depth: 35 feet g p consolidation of ammonia and phosphorus treatment and Harbor Max Depth: 63 feet Brook conveyances and RTF y 1940 – Swimming Banned • 3rd Amendment April 2008 (Extension) • 2009 ACJ amended to authorize use of 1970 – Fishing Banned Gray and Green infrastructure
  • 4. 4th ACJ Amendment Authorized a 2/6/12 4 Balanced Approach to CSO Abatement Regulatory Goals Community Impacts/Goals • Capture and Treat 95% of the • Improve quality of life through Annual CSO Volume via environmental responsibility Gray & Green Infrastructure • Promote sustainability • Achieve water quality • Ensure cost effectiveness in standards in tributaries compliance with ACJ milestones p and lake • Community revitalization Major Milestones • 89.5% capture/elimination by 12/31/2013 • 95% capture/elimination by 12/31/2018 p / y / /
  • 5. County Executive Mahoney Announces “Project 50!” 2/6/12 5 “Onondaga County will construct fifty distinct green infrastructure projects to return rain water and snow melt to the ground instead of our sewer system.” system. Joanne M. Mahoney, State of the County Address, March 1, 2011 Syracuse becomes one of ten Green Cities Paradigm shifts from planning to construction
  • 6. Green (and Gray) Infrastructure Program Management 2/6/12 6 Need Increases with Approval of 4th Stipulation • Green Infrastructure (GI) is an emerging technology and  mostly new to Onondaga County Departments ▫ Need for a trusted advisor on program implementation ▫DDepartment can focus on existing operations, and Gray  t t f i ti ti dG Program projects, while learning to integrate with GI • Role of the Green Program Manager Role of the Green Program Manager ▫ Develop strategy that meets ACJ milestones ▫ Provide GI expertise on applications, design standards,  p pp , g , construction, and maintenance ▫ Prioritize opportunities based on diverse, dynamic factors ▫ Transition to a fully County operated GI Program by 2018
  • 7. 2/6/12 7 Project 50! P j Construction
  • 8. Onondaga County 2/6/12 8 Civic Strip OnCenter Convention Center 66,000 Square Foot Green Roof
  • 9. 2/6/12 9
  • 11.
  • 12. Onondaga County 2/6/12 12 Civic Strip War Memorial Cistern Reuse System
  • 13. War Memorial Cistern Reuse System Reusing rainwater appears to allow the ice making to occur one to two degrees warmer than using potable water resulting in energy savings
  • 14. 2/6/12 First Commercial Green Street: Harrison Street 14 BEFORE: Stormwater enters catch AFTER: Stormwater is diverted to basins and is directly connected to Green Streets and only overflows to sewer sewer when necessary
  • 15.
  • 16. 2/6/12 OnCenter Surface Parking Lot: 290 green spaces g g p 16 GI Technology: Perimeter porous  asphalt and tree h l   d  infiltration trench Project Owner: County Capture Area: 34, q 134,000 square feet Runoff Reduction: 2,360,000 gallons/year Construction Cost:  C i  C   $812,000 (bid) $/gallon: $0.48
  • 17. Installation of Stone Storage Bed
  • 18. 2/6/12 OnCenter Surface Parking Lot g 18 Porous Asphalt Perimeter P i
  • 19. 2/6/12 OnCenter Municipal Parking Garage 19 GI Technology: Roof leaders to rain  R f l d     i   gardens Project Owner: County Capture Area: 7 ,5 72,500 square feet q Runoff Reduction: 1,277,000 gallons/year Construction Cost:  C i  C   $234,000 (bid) $/gallon:  $0.26
  • 20. 2/6/12 20 OnCenter Municipal Parking p g Garage Bio-Infiltration
  • 21. 2/6/12 21 Before Townsend Parking Lot (“Lot B”) and Townsend Median
  • 22. 2/6/12 22 Vegetated Infiltration Beds, 90 Trees Planted
  • 23. Base Course Asphalt Installed prior to winter shutdown
  • 24. Volume capture: 975,000 gallons/year
  • 25. 2/6/12 25 Project 50! P j Beyond the Civic Strip: y p Green Streets
  • 26. 2/6/12 Linking with Major Transportation g j p 26 Reconstruction Creates Green Progress Phase 1: Contracts 1 and 2 Ph 1 C t t d Image – Barton & Loguidice
  • 27. Connective Corridor 2/6/12 27 Capture Area: 6.75 ac Run‐off Reduction: 5.16  MG/Year Construction Cost: $948,700 (bid) $/gallon Runoff Capture $0.18 $/gallon CSO Reduction $0.26 $0 26
  • 28. Connective Corridor 2/6/12 28 Image – Barton & Loguidice
  • 29. 2/6/12 City Road Reconstruction: Pavement Removal 29 at Geddes Street GI Technology: Bioretention Project Owner: City of Syracuse Capture Area: 29,700 square feet Run‐off Reduction: 523,000 gallons/year Construction Cost: 3, ( ) $203,000 (bid) $/gallon: $0.55 Status: completed
  • 30. 2/6/12 30 Project 50! P j CSO Treatment Wetlands
  • 31. CSO Treatment Wetland Project Compensatory Storage Project Completed in 2011 CSO 018 Proposed Constructed Wetland Harbor Brook
  • 32. Treatment Wetland Eliminates CSO 018 2/6/12 32 (up to design storm) • 144 Acre CSO basin • 40 overflows / year • Significant Nutrient Removal • Partner with SUNY ESF Stay tuned for  presentation  presentation on this project  in 2013 in 2013
  • 33. 2/6/12 33 Project 50! P j Green Parks
  • 34. Rosamond Gifford Zoo Elephant Exhibit, 2011 p , GI T h l GI Technology: 6,000 sq.ft. Green roof Green Roof Project Owner: County Capture Area: Porous , q 6,000 square feet pavement, Runoff Reduction: and rain 114,000 gallons/year barrels for stormwater Construction Cost:  C i  C   reuse $183,900 $/gallon: $2.27
  • 35. Creekwalk Project Greening: Jefferson to Walton Porous Asphalt Strip in Parking Lot Before Bioretention Bi i Rain Garden Flexi-pave Flexi pave Porous Walkway Porous Asphalt Volume capture: 135,000 gallons/year Parking Lot
  • 36. Creekwalk Project Greening: Walton to Fayette Porous Concrete Porous Asphalt Strip in Parking Lot Before Re-established Natural Stream Bank Volume capture: 119,000 gallons/year
  • 37. 2/6/12 Rosamond Gifford Zoo Entrance Enhancement 37 •GI Technology: Rain gardens R i   d •Project Owner: County/City •Capture Area: 39,000 square feet •Run off Reduction   •Run‐off Reduction:  680,000 gallons/year •Construction Cost: $300,000 (bid) •$/gallon: $0.62 Green Infrastructure Concept for the Zoo Entrance  p
  • 38. 2/6/12 Rosamond Gifford Zoo Entrance Enhancement 38 Bio-infiltration Systems capture runoff from surrounding streets
  • 39. 2/6/12 39 Project 50! P j Green Schools
  • 40. 2/6/12 Hughes Magnet School g g 40 New Parking Lot captures runoff from school roof h l f and upper lot
  • 41. 2/6/12 41 Project 50! P j Green Parking Lots g
  • 42. 2/6/12 Sunnycrest Park Arena Parking Lot 42 GI Technology: Porous pavement Rain garden R i   d Project Owner: Syracuse Parks  Dept. Capture Area: 7, q 107,000 square feet Run‐off Reduction: 1,876,000  gallons/year Construction Cost:  $303,000 (bid) Map of Proposed Sunnycrest Arena Parking Lot Project $/gallon: $0.22
  • 43. Installation of Storage and Infiltration Systems
  • 44. 2/6/12 44 Combination of bio-retention, bio retention porous asphalt, and subsurface storage and infiltration systems
  • 45. 2/6/12 Sunnycrest Park Golf Parking Lot y g 45 •GI Technology: Stream Inflow Removal Rain garden Pavement Removal •Project Owner: City of Syracuse Parks Dept. City of Syracuse Parks Dept •Capture Area: 48,000 square feet •Run‐off Reduction:  843,000 gallons/yr Construction Cost: •Construction Cost: $363,000 (bid) •$/gallon: $0.52
  • 46. 2/6/12 Sunnycrest Park Golf Parking Lot y g 46 Bio-retention Bio retention and Infiltration System (Standard Asphalt Parking Lot re-graded)
  • 47. 2/6/12 Project 50: Shifting the Paradigm 47 Planning for Widespread Implementation of GI Planning for Widespread Implementation of GI ▫ Opportunity/Idea Coordination  New Project Form j  Database and GIS Management Projects include: Parking Lots, Parking Garages, Schools,  Libraries, Parks, Firehouses, Post Offices, Streets (commercial  Lib i P k Fi h P t Offi St t ( i l and residential), Water Reuse, Wetlands, Roofs, Vacant Lots ▫ Concept Development p p  Site Visit, watershed identification, BMP Identification  Calculator (capture and preliminary cost estimate)
  • 48. 2/6/12 Project 50: Shifting the Paradigm 48 Planning for Widespread Implementation of GI Planning for Widespread Implementation of GI ▫ Landowner Endorsement  Bi‐weekly City‐County Coordination Meeting y y y g (if you think you can do this without a lot of coordination and  meetings ‐ you can not) ▫ Field Work and Permitting Field Work and Permitting  Survey (including utility identification)  Soils Testing (infiltration) g( )  Environmental Analysis (Phase 1, Analytic Testing, etc.)  SERP (SEQR, SHPO, SWPPP/NEPA/Landmark Preservation, etc.)
  • 49. 2/6/12 Project 50: Shifting the Paradigm 49 Designing 50+ Projects ▫ 50% Plans  Design Guidance Manual  Design Workflow (flow chart) kfl (fl h ) ▫ 90% Plans and Specifications ▫ Final (for Construction) Plans Specifications and Bid Forms Final (for Construction) Plans, Specifications, and Bid Forms  Comment Adjudication/ Quality Assurance ▫ Cost Estimating  At Concept and 90% ▫ D i C di ti Design Coordination  WEEKLY Design and Construction Review Meeting
  • 50. 2/6/12 50 East Water Street Gateway: Case Study Project Features: ▫ Bike Boulevard ▫ Traffic Calming ▫ Private/Commercial collaboration ▫ Porous Paver Parking Lanes ▫ Curb Extensions Curb Extensions ▫ Robust Tree Planter systems • Challenges Include: Challenges Include: ▫ Mid‐street pedestrian crossing ▫ Snow plow considerations p ▫ Turning radii for tractor trailers
  • 51. 2/6/12 51 Water Street Gateway Project Concept GI Technology: Infiltration trench  and porous pavers Project Owner: City of Syracuse Capture Area: 53,000 square feet    f t Runoff Reduction: 924,000 gallons/yr Construction Cost:  $920,000 (bid) $/gallon: $1.00 $/gallon: $1 00
  • 52. Water Street Gateway Project y j 2/6/12 52 Before
  • 53. Water Street Gateway Project y j 2/6/12 53 During
  • 54. 2/6/12 54 After
  • 55. 2/6/12 Project 50: Shifting the Paradigm 55 • Procurement ▫ Contract Documents: Bundling projects as appropriate ▫ Advertisement: Pre‐Bid Meeting, Addendum, Bid • Construction ▫ Services During Construction  Clarifications, RFIs, Modifications, Change Orders, etc. ▫ Construction Inspection  PrimaVera Construction Manager Construction Manager ▫ Project Completion Reports  $/gallon accounting  Post‐project communication on challenges/successes
  • 56. 2/6/12 Other Program Elements 56 • Legislative Agenda ▫ Existing City Ordinances (Stormwater, Tree, Sidewalk) ▫ New and Innovative City Ordinances: Permission • Enhanced Street Tree Program: 8500 new street trees Enhanced Street Tree Program: 8500 new street trees • Rain Barrel Program: 650 and counting (Goal: 3600) • Vacant Lot Program Vacant Lot Program • Grant Funding: Federal/State successes • Green Improvement Fund: Onondaga County’s Green Improvement Fund: Onondaga County s Public‐Private‐Partnership for Incentivizing GI ▫ Grants up to $200,000 ▫ Stay tuned for a presentation on this, next year!
  • 57. GIF: Porous Pavers at Hotel Skyler y 2/6/12 57 Porous Paver Parking Lot
  • 58. 2/6/12 Public Education and Outreach 58 • STR Website: www.SaveTheRain.us • Monthly Report: for ACJ Parties County Legislature Monthly Report: for ACJ Parties, County Legislature • Coalition Partners / Stakeholders  City of Syracuse (DPW, Engineering, Law, School District,  y y ( g g Parks, Zoning, Codes, etc.)  ACJ Parties (NYS DEC, ASLF): Policy Committee  Academic Community (SU SUNY ESF) Academic Community (SU, SUNY ESF)  Community Groups / NFPs  Business Community, Large Landowners (hospitals)  General Public  Manufacturers / Vendors / Suppliers  Engineering Community Engineering Community  Construction Community (M/WBEs), Bidders Wanted!
  • 59. 2/6/12 Maintenance 59 • Asset Management ▫ Asset Definition: Location,  quantity, etc. ▫ Standard Maintenance  d d Procedures (SMPs) ▫ Computerized Maintenance Computerized Maintenance  Management System  (Maximo)
  • 60. 2/6/12 60 Case S d C Study: C y City Lot #3 Project Description p provides overview of constructed GI for field crew
  • 61. Engineered Stormwater Plan provides detail 2/6/12 61 on the system as constructed
  • 62. Educating the Maintenance Staff with 2/6/12 62 GI Technology Fact Sheets
  • 63. 2/6/12 63 Maximo as CMMS tool for WEP Green Infrastructure Program • Work orders include: ▫ Maintenance activities/step by step directions M i i ii / b di i ▫ Tools/equipment (including costs) ▫ Planned time to complete Planned time to complete ▫ Actual maintenance info is loaded back into  Maximo after completion Maximo after completion • Example maintenance task for E‐06 Porous  Pavement Vacuuming follows… Pavement Vacuuming follows
  • 64.
  • 65. 2/6/12 Measuring Progress: Monitoring 65 • ACJ Compliance ▫ Annual Report: April l l  SWMM : Volume Capture  Goal: 246 MG/Yr by 2018 Goal: 246 MG/Yr by 2018  Ambient Monitoring Program (AMP): Water Quality  Goal: Wet Weather Standards • Net Environmental Benefit Analysis • Funding Sources and Financial Tracking
  • 66. 2/6/12 Save the Rain: 2012 66 • Focus on Efficiency over Quantity ▫ Improved Constructability ▫ Lower Maintenance • Unit Price ‐ Quantity Based Construction Procurements  ▫ Civil Site Work Contract ▫ Landscape Installation and Maintenance Contract ▫P tW Post‐Warranty Maintenance Contract, conducted by t M i t C t t d t db Conservation Corps (Community Based Green Jobs)
  • 67. Thank You! Questions? Please Visit us at www.SaveTheRain.us