EPA Regional Groundwater and
   Vapor Intrusion Update


          NAS Moffett Field
 Restoration Advisory Board Meeting
           February 7, 2013
TCE Plume and
Estimated Capture
Zone – A/A1 Aquifer
(0 - 45 feet below ground surface)
TCE Plume and
Estimated Capture
Zone - B1/A2 Zone
(50 - 75 feet bgs)
TCE Plume
Estimated Capture
Zone – B2 Aquifer
(75 - 110 feet bgs)
Hydraulic Containment Work
        Completed

• Advanced cone-penetrometers to evaluate
  types of soil in specific areas

• Collected grab groundwater samples from
  boreholes to select well locations to define
  plume margins and characterize B2 Aquifer

• Sampled wells at toe of plume in A/A1 Aquifer
  Zone to evaluate plume stability
Areas of
Investigation –
A/A1 Aquifer
Zone
Areas of
Investigation –
B1/A2 Aquifer Zone
Areas of Investigation
B2 Aquifer Zone
Preliminary Findings

• Plume margins confirmed in each area with
  the exception of residential area south of 101
• High trichloroethene (TCE) in shallow
  groundwater beyond estimated plume
  boundary in residential area south of 101
• Plume area characterized in B2 Aquifer
• Soil is heterogeneous with discrete layers of
  contamination
TCE Groundwater
Results Along Western
Margins – North of
Highway 101
Maximum TCE Groundwater Results Western Margins –
       South of Highway 101 (A/A1 Aquifer)
Maximum TCE Groundwater Results Western Margins –
       South of Highway 101 (B1/A2 Aquifer)
High Priority Areas for Indoor Air
Sampling
Groundwater – Next Steps


  • Determine extent of hot spots with further step-outs
    in residential area south of 101
  • Install extraction wells to clean up hotspot areas
  • Finalize report summarizing data
  • Install and sample monitoring wells near plume
    boundaries (western, eastern, toe of plume)
  • Continue monitoring existing wells at toe of plume
  • Review plume boundaries
  • Conduct modeling to evaluate capture in B2 Aquifer
Questions
Groundwater Update


    Sitewide Groundwater Supplemental
              Feasibility Study

• Stakeholder Comments on Preliminary Draft
  (July 2012)
• National Remedy Review Board Meeting
  (July 24, 2012)
• National Remedy Review Board Comments
  (January 14, 2013)
Stakeholder and Remedy Review
          Board Comments
• In situ redox technologies (comments related
  to safety, support, implementation, cost)
• Integrate groundwater and vapor intrusion
  (VI) remedy; provide metric for VI risk
  reduction related to groundwater
• Address role of vadose zone contamination
Stakeholder and Remedy Review
          Board Comments
• Evaluate improvements to slurry walls
• Better explain approach to using monitored
  natural attenuation (MNA)
• Areas of cleanup should also focus on
  sensitive populations and future development
EPA Next Steps


• Meetings with stakeholders to discuss
  concerns and path forward for the Site-wide
  groundwater remedy
Questions
EPA Contact Information

Penny Reddy
EPA Groundwater Project Manager
415.972.3108
Reddy.Penny@epa.gov


Alana Lee
EPA Vapor Intrusion Project Manager
415.972.3141
Lee.Alana@epa.gov

                        For More Information
                        www.epa.gov/region9/mew
                        www.epa.gov/region9/moffettfield
Additional Slides
Remedy Review Board Comments on
      Groundwater Feasibility Study
•   Provide a metric for measuring vapor intrusion risk reduction related to
    accelerated groundwater cleanup
•   Assess potential presence of dense non-aqueous phase liquid
•   Compile results of all in-situ redox technologies and provide more
    details on how the technologies would be applied and when
•   Address the role of vadose zone contamination
•   Evaluate improvements to slurry walls
•   Better explain approach to using monitored natural attenuation as
    component of remedy
Community Advisory Board
                Comments
•   Support for Alternative 4 (in situ redox plus optimized system and
    monitored natural attenuation)
•   Groundwater feasibility study should be integrated with vapor intrusion
    remedy
•   Areas for cleanup should not just include those with high
    concentrations but all areas of sensitive populations and future
    development
•   Monitored natural attenuation should not be considered until more
    active treatment is completed and concentrations fall below 50 ppb
•   Deployment of Permeable Reactive Barriers reconsidered
Community Advisory Board
         Comments (Continued)
• Model should be relied upon only for comparative
  analysis
• Concerns with safety to building occupants using
  in situ technologies beneath buildings and end
  results if only partial treatment
• FS needs more discussion on difficulties
  implementing in situ treatment technologies
  beneath buildings and associated disruptions to
  properties
Projected VOC Plume – A Aquifer
           (0 to 45 feet bgs)


    1992        2009            2019
Projected VOC Plume – B1/A2 Aquifer
             (50 to 75 feet bgs)


      1992         2009            2019
Projected VOC Plume- B2 Aquifer
          (75 to 110 feet bgs)

Contenu connexe

Tendances

2011 12 13 Periconi Day Cle Powerpoint
2011 12 13 Periconi Day Cle Powerpoint2011 12 13 Periconi Day Cle Powerpoint
2011 12 13 Periconi Day Cle PowerpointAndrewDLent
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
20191113 jbfs presentation final
20191113 jbfs presentation final20191113 jbfs presentation final
20191113 jbfs presentation finalecowatchers
 
Combining Solar Technology with Sustained and Controlled Release Reactants - ...
Combining Solar Technology with Sustained and Controlled Release Reactants - ...Combining Solar Technology with Sustained and Controlled Release Reactants - ...
Combining Solar Technology with Sustained and Controlled Release Reactants - ...Lindsay Swearingen
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesSteve Williams
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1Theodore McNeal
 
Media release niagara falls water board - september 1, 2017
Media release   niagara falls water board - september 1, 2017Media release   niagara falls water board - september 1, 2017
Media release niagara falls water board - september 1, 2017Fatima Bangura
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Felgate, Stacey: Pan-European monitoring of land-ocean-atmosphere carbon flux...
Felgate, Stacey: Pan-European monitoring of land-ocean-atmosphere carbon flux...Felgate, Stacey: Pan-European monitoring of land-ocean-atmosphere carbon flux...
Felgate, Stacey: Pan-European monitoring of land-ocean-atmosphere carbon flux...Integrated Carbon Observation System (ICOS)
 

Tendances (20)

2011 12 13 Periconi Day Cle Powerpoint
2011 12 13 Periconi Day Cle Powerpoint2011 12 13 Periconi Day Cle Powerpoint
2011 12 13 Periconi Day Cle Powerpoint
 
Area 38 pic 1 final presentation
Area 38 pic 1   final presentationArea 38 pic 1   final presentation
Area 38 pic 1 final presentation
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Advocating Water Quality Improvement in Detroit
Advocating Water Quality Improvement in DetroitAdvocating Water Quality Improvement in Detroit
Advocating Water Quality Improvement in Detroit
 
Area36 final pic1 boards
Area36 final pic1 boardsArea36 final pic1 boards
Area36 final pic1 boards
 
20191113 jbfs presentation final
20191113 jbfs presentation final20191113 jbfs presentation final
20191113 jbfs presentation final
 
Gopal K - UEI Day 1 - Kochi Jan18
Gopal K - UEI Day 1 - Kochi Jan18Gopal K - UEI Day 1 - Kochi Jan18
Gopal K - UEI Day 1 - Kochi Jan18
 
Combining Solar Technology with Sustained and Controlled Release Reactants - ...
Combining Solar Technology with Sustained and Controlled Release Reactants - ...Combining Solar Technology with Sustained and Controlled Release Reactants - ...
Combining Solar Technology with Sustained and Controlled Release Reactants - ...
 
BF Area 35 PIC 1 Boards_final
BF Area 35 PIC 1 Boards_finalBF Area 35 PIC 1 Boards_final
BF Area 35 PIC 1 Boards_final
 
Area 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panelsArea 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panels
 
City of Toronto Basement Flooding Area 37 Display Boards
City of Toronto Basement Flooding Area 37 Display Boards City of Toronto Basement Flooding Area 37 Display Boards
City of Toronto Basement Flooding Area 37 Display Boards
 
Area39 pic 1 panels final
Area39 pic 1 panels finalArea39 pic 1 panels final
Area39 pic 1 panels final
 
3 WUL appendices
3 WUL appendices 3 WUL appendices
3 WUL appendices
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
 
Policy for Malad and Bear River Drainages
Policy for Malad and Bear River DrainagesPolicy for Malad and Bear River Drainages
Policy for Malad and Bear River Drainages
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
 
Media release niagara falls water board - september 1, 2017
Media release   niagara falls water board - september 1, 2017Media release   niagara falls water board - september 1, 2017
Media release niagara falls water board - september 1, 2017
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Areas2123 pic2boards
Areas2123 pic2boardsAreas2123 pic2boards
Areas2123 pic2boards
 
Felgate, Stacey: Pan-European monitoring of land-ocean-atmosphere carbon flux...
Felgate, Stacey: Pan-European monitoring of land-ocean-atmosphere carbon flux...Felgate, Stacey: Pan-European monitoring of land-ocean-atmosphere carbon flux...
Felgate, Stacey: Pan-European monitoring of land-ocean-atmosphere carbon flux...
 

Similaire à EPA Groundwater Update at NAS Moffett Field

[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...Good Earthkeeping Organization Inc (GEO)
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateSteve Williams
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Fu Michael Justin
 
Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Finalaearles
 
MEW Update to Moffett RAB
MEW Update to Moffett RABMEW Update to Moffett RAB
MEW Update to Moffett RABSteve Williams
 
Moffett/Ellis/Whisman Presentation to the Moffett RAB
Moffett/Ellis/Whisman Presentation to the Moffett RABMoffett/Ellis/Whisman Presentation to the Moffett RAB
Moffett/Ellis/Whisman Presentation to the Moffett RABSteve Williams
 
Land Subdivisions University Course
Land Subdivisions University CourseLand Subdivisions University Course
Land Subdivisions University CourseNettlemanU
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxssuser65cc68
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_riverRavi Naid Gorle
 
IPWEA Groundwater Separation Distances - Jun 17 - UrbAqua
IPWEA Groundwater Separation Distances - Jun 17 - UrbAquaIPWEA Groundwater Separation Distances - Jun 17 - UrbAqua
IPWEA Groundwater Separation Distances - Jun 17 - UrbAquaRichard Connell
 
TH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICETH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICECharles Ice
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiihydrologyproject001
 
12.15 Wendy Furgusson.pdf
12.15 Wendy Furgusson.pdf12.15 Wendy Furgusson.pdf
12.15 Wendy Furgusson.pdfIES / IAQM
 

Similaire à EPA Groundwater Update at NAS Moffett Field (20)

[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Final
 
Kestrel pres feb 13, 13
Kestrel pres feb 13, 13Kestrel pres feb 13, 13
Kestrel pres feb 13, 13
 
MEW Update to Moffett RAB
MEW Update to Moffett RABMEW Update to Moffett RAB
MEW Update to Moffett RAB
 
Moffett/Ellis/Whisman Presentation to the Moffett RAB
Moffett/Ellis/Whisman Presentation to the Moffett RABMoffett/Ellis/Whisman Presentation to the Moffett RAB
Moffett/Ellis/Whisman Presentation to the Moffett RAB
 
Stormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in MarylandStormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in Maryland
 
Current Issues in Stormwater Management
Current Issues in Stormwater ManagementCurrent Issues in Stormwater Management
Current Issues in Stormwater Management
 
Stormwater Regulation
Stormwater RegulationStormwater Regulation
Stormwater Regulation
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
Land Subdivisions University Course
Land Subdivisions University CourseLand Subdivisions University Course
Land Subdivisions University Course
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river
 
IPWEA Groundwater Separation Distances - Jun 17 - UrbAqua
IPWEA Groundwater Separation Distances - Jun 17 - UrbAquaIPWEA Groundwater Separation Distances - Jun 17 - UrbAqua
IPWEA Groundwater Separation Distances - Jun 17 - UrbAqua
 
File287
File287File287
File287
 
TH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICETH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICE
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
 
12.15 Wendy Furgusson.pdf
12.15 Wendy Furgusson.pdf12.15 Wendy Furgusson.pdf
12.15 Wendy Furgusson.pdf
 
Natural gas
Natural gasNatural gas
Natural gas
 

Plus de Steve Williams

RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationSteve Williams
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28Steve Williams
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community PresentationSteve Williams
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Steve Williams
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardSteve Williams
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanSteve Williams
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldSteve Williams
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1Steve Williams
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateSteve Williams
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateSteve Williams
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013Steve Williams
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Steve Williams
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...Steve Williams
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesSteve Williams
 
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...Steve Williams
 
Site 28 Supplemental Investigation
Site 28 Supplemental InvestigationSite 28 Supplemental Investigation
Site 28 Supplemental InvestigationSteve Williams
 
Laser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs MonitoringLaser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs MonitoringSteve Williams
 
Site 25 rab nov 29 2012
Site 25 rab nov 29 2012Site 25 rab nov 29 2012
Site 25 rab nov 29 2012Steve Williams
 
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012Steve Williams
 

Plus de Steve Williams (20)

RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community Presentation
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory Board
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management Plan
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
 
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
 
Site 28 Supplemental Investigation
Site 28 Supplemental InvestigationSite 28 Supplemental Investigation
Site 28 Supplemental Investigation
 
Laser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs MonitoringLaser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs Monitoring
 
Site 25 rab nov 29 2012
Site 25 rab nov 29 2012Site 25 rab nov 29 2012
Site 25 rab nov 29 2012
 
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
 

EPA Groundwater Update at NAS Moffett Field

  • 1. EPA Regional Groundwater and Vapor Intrusion Update NAS Moffett Field Restoration Advisory Board Meeting February 7, 2013
  • 2.
  • 3. TCE Plume and Estimated Capture Zone – A/A1 Aquifer (0 - 45 feet below ground surface)
  • 4. TCE Plume and Estimated Capture Zone - B1/A2 Zone (50 - 75 feet bgs)
  • 5. TCE Plume Estimated Capture Zone – B2 Aquifer (75 - 110 feet bgs)
  • 6. Hydraulic Containment Work Completed • Advanced cone-penetrometers to evaluate types of soil in specific areas • Collected grab groundwater samples from boreholes to select well locations to define plume margins and characterize B2 Aquifer • Sampled wells at toe of plume in A/A1 Aquifer Zone to evaluate plume stability
  • 10. Preliminary Findings • Plume margins confirmed in each area with the exception of residential area south of 101 • High trichloroethene (TCE) in shallow groundwater beyond estimated plume boundary in residential area south of 101 • Plume area characterized in B2 Aquifer • Soil is heterogeneous with discrete layers of contamination
  • 11. TCE Groundwater Results Along Western Margins – North of Highway 101
  • 12. Maximum TCE Groundwater Results Western Margins – South of Highway 101 (A/A1 Aquifer)
  • 13. Maximum TCE Groundwater Results Western Margins – South of Highway 101 (B1/A2 Aquifer)
  • 14. High Priority Areas for Indoor Air Sampling
  • 15. Groundwater – Next Steps • Determine extent of hot spots with further step-outs in residential area south of 101 • Install extraction wells to clean up hotspot areas • Finalize report summarizing data • Install and sample monitoring wells near plume boundaries (western, eastern, toe of plume) • Continue monitoring existing wells at toe of plume • Review plume boundaries • Conduct modeling to evaluate capture in B2 Aquifer
  • 17.
  • 18. Groundwater Update Sitewide Groundwater Supplemental Feasibility Study • Stakeholder Comments on Preliminary Draft (July 2012) • National Remedy Review Board Meeting (July 24, 2012) • National Remedy Review Board Comments (January 14, 2013)
  • 19. Stakeholder and Remedy Review Board Comments • In situ redox technologies (comments related to safety, support, implementation, cost) • Integrate groundwater and vapor intrusion (VI) remedy; provide metric for VI risk reduction related to groundwater • Address role of vadose zone contamination
  • 20. Stakeholder and Remedy Review Board Comments • Evaluate improvements to slurry walls • Better explain approach to using monitored natural attenuation (MNA) • Areas of cleanup should also focus on sensitive populations and future development
  • 21. EPA Next Steps • Meetings with stakeholders to discuss concerns and path forward for the Site-wide groundwater remedy
  • 23. EPA Contact Information Penny Reddy EPA Groundwater Project Manager 415.972.3108 Reddy.Penny@epa.gov Alana Lee EPA Vapor Intrusion Project Manager 415.972.3141 Lee.Alana@epa.gov For More Information www.epa.gov/region9/mew www.epa.gov/region9/moffettfield
  • 25. Remedy Review Board Comments on Groundwater Feasibility Study • Provide a metric for measuring vapor intrusion risk reduction related to accelerated groundwater cleanup • Assess potential presence of dense non-aqueous phase liquid • Compile results of all in-situ redox technologies and provide more details on how the technologies would be applied and when • Address the role of vadose zone contamination • Evaluate improvements to slurry walls • Better explain approach to using monitored natural attenuation as component of remedy
  • 26. Community Advisory Board Comments • Support for Alternative 4 (in situ redox plus optimized system and monitored natural attenuation) • Groundwater feasibility study should be integrated with vapor intrusion remedy • Areas for cleanup should not just include those with high concentrations but all areas of sensitive populations and future development • Monitored natural attenuation should not be considered until more active treatment is completed and concentrations fall below 50 ppb • Deployment of Permeable Reactive Barriers reconsidered
  • 27. Community Advisory Board Comments (Continued) • Model should be relied upon only for comparative analysis • Concerns with safety to building occupants using in situ technologies beneath buildings and end results if only partial treatment • FS needs more discussion on difficulties implementing in situ treatment technologies beneath buildings and associated disruptions to properties
  • 28. Projected VOC Plume – A Aquifer (0 to 45 feet bgs) 1992 2009 2019
  • 29. Projected VOC Plume – B1/A2 Aquifer (50 to 75 feet bgs) 1992 2009 2019
  • 30. Projected VOC Plume- B2 Aquifer (75 to 110 feet bgs)