SlideShare a Scribd company logo
1 of 5
Download to read offline
CURRICULUM VITAE
GEORGES SHALABI
Phone ++ 33 7 68 37 37 88 E mail georges.shalabi@gmail.com
INDEPENDENT CONSULTANT ENGINEER, ELECTRICAL
PERSONAL INFORMATION
Marital status Married
Nationality Palestinian / Syrian
Place & date of birth Damascus, 05 / 1957
LANGUAGES
Arabic Mother language
French Very Good
English Good
EDUCATION
School Name Certificates Degrees obtained Date
Frères Maristes College (Damascus) Preparatory school / General/Science 1972
Laïque College (Damascus) High school / General/Science 1975
University Name Qualifications Date
Damascus University, Syria B.Sc. in electrical engineering 1981
COMPUTER EXPERIENCE
AutoCAD
Excel ,Word (Microsoft Office)
DIALux 4… (Lighting Calculation software)
Pegasys (Gathering data and Communication with Power Meters _ Analyzers)
Many software for electrical network calculation like Ecodial, DOC,.
PROFESSIONAL MEMBERSHIP
Order of Syrian Engineers titled as private consultant office
ACTIVE PARTICIPATION IN CONFERENCES / WORKSHOPS
1983 The first International Lighting Symposium Damascus Syria
1996
The National Technical Days “ Transportation & Distribution of
Electricity in Syria” Damascus Syria
2000
Comprehensive course concerning design and calculation of
different electrical networks
1986 - 2012 Different courses/seminar concerning Lightning protection,
UPS, Surge Arrestors, Lighting, Automation…
PROFESSIONAL EXPERIENCE
1981 – 1986
Project Electrical Engineer, General Company for
Engineering & Consultation, G.C.E.C. Damascus – Syria
1986 – Date Private Engineering Office (Consultant Engineer)
Key qualifications:
(Relevant to the
project)
 Extensive experience in electrical design, execution
supervision for wide range of projects including hospitals,
factories, office building, residential and commercial projects.
 Engineering design and construction supervision for Heavy
and Low Current Systems.
 The preparation of unbiased specifications for the electrical
equipment/installation (mostly in English).
 The preparation of tendering documents (bill of quantities,
legal and technical conditions, cost estimations, etc.) and
technical evaluation for bidding offers.
 Ability to establish and to maintain effective professional
relations with colleagues from different national and cultural
backgrounds and to work in a team.
 Energy audits concerning energy saving and energy
conservation for exist large buildings (Hospitals, factory,
large office building….)
 Functional & technological studies
 Very good knowledge in the EN-IEC (European Norm-
International Electromechanical Committee), which is the
Applicable Standard in Syria for electrical works.
 preparing specifications according to the new Master Format
style, depending on client’s demand.
Very good experience in using computer software (CAD software,
Office software and other special software).
LIST OF PROJECTS
HOTELS, RESORTS, RESIDENTIAL & PUBLIC BUILDINGS
Main Projects 2012- 2013 All the electrical, lighting, and Low Currents studies for M2- M8
eight Gate. Damascus suburb.
More than 130000 sq.m of built - area. Seven tower residential buildings and
more than three hundred flats, duplex flats and penthouses.
Our services is provided to “OSOS Engineering", The Employer was "EMAAR "
(the Emirate Properties) and IGO (International Group Overseas) .
2011-2012 PETRO CANADA offices at eight gate Damascus suburb.
Supervision of all works especially electrical and extra low voltage works. Our
services were provided to Powis architectural office London.
2008 – 2009 All the electrical, lighting, and Low Currents studies for
TRANSMALL . Near Homs (Homs – Damascus Highway)
More than 100000 sq.m and 37000 sq.m of building areas The project consists
of:
6000 sq.m Hyper market, 105 Stores, VIP Restaurant and Child areas (Ice
skating, Bowling, …)
2005-2007 All the electrical, lighting, and Low Currents studies for ALAKMAR
resorts – al Maara . Near Damascus
More than 22000 sq. m of building areas The project consists of:
Open area restaurant with gardens, multipurpose hall, anniversary halls, bar,
children facilities, panoramic restaurant, outdoor swimming pools, health club
and 40 chalets. We have carefully considered the environmental conditions
when designing this project.
1995-2001 -Design and execution supervision of all the electrical works for
MONTE-ROSA tourism complex (hotel & country club) near Damascus.
Project includes the following:
Four stars’ hotel (80 beds), 18 chalets, four open air restaurants (600 seats
approx.), four inside restaurants and night clubs (1000 seats approx.) 30 private
villas, sports facilities (indoor and outdoor swimming pools, health club, squash
racket, tennis courts, basketball, mini-golf and other), entertainment/cultural
facilities including outdoors amphitheater cinema/video projection hall, etc.
children playground, supper market, etc.
The project is equipped with all the required modern facilities such as satellite T.V
network, extensive computer network (including outlets in the hotel bedrooms), etc.
We have carefully considered the environmental conditions when designing this
project.
2001 All the electrical, lighting, and Low Currents studies for Mashta Al Houlo
Hotel –. Near Homs.
The project consist of 52 Rooms and Suites With all facilities for modern hotels
2000 - 2001Supervision of ISIS (Information System Infrastructures and
Services) Project for CBOS (Central Bank Of Syria)
The project consists of erection of data network and telephone network for the
whole building (450 access points) with power network via UPS for the U-Shape
building (150 access points from the whole 450 access points).
The project consists of replacing of the PABX (Private Automatic Branch
eXchange) and supplying, installation and putting into service of the server and
the workstations in addition of software and training courses.
The project is financed by the European Community and erected by NEXUS
1997-2000 -All the electrical, lighting, and Low Currents studies for Damascus
Modern Art Museum. In coordination with Belgian Architects CERAU (the first
prize winner of the International conceptual designs competition for the project).
Project includes the following:
All up-to-date environmental conditions for proper exhibition and storage of the
different types of artifacts have carefully been foreseen in our designs. Total built
area more than 13000 square meters, approx. indoor exhibition areas (permanent,
temporarily, and visiting collections) 5000 square meters; project contains several
technical, cultural, and entertainment facilities such as lecture hall, evaluation/
preservation laboratories, art archives and library, etc. The Museums security and
control systems are part of our tasks.
2008-2007 Dar Said Koraish near Damascus
The project 18000 sq.m lands with approx. 20000 sq.m built area, is an orphanage.
Five buildings Teaching (40 classes & Lab.) Residence for 450 students, Clubs,
amphitheater, Sport & swimming pool halls and administration building.
HEALTH CARE PROJECTS
Main Projects 2011- Date Consultancy supervision made for the Expansion of Al Assad
University Teaching Hospital – Damascus
Scrutiny and acceptance of all the electrical, lighting, and Low Currents shop
drawings and as-built drawings, supervision of all the electrical and low currents
works including factory inspection visits inside and outside Syria.
The Contractor is the Joint Venture Makiber- Yacoubian JV
Our services is provided to “Al Farra Consulting Office.
2011- 2013 All the electrical and Low Currents studies for
Dar Al Shifaa Hospital: (220 beds -– Damascus).
Development and renovation studies for an existing hospital.
Project includes the following:
Two additional levels, Imaging department, Catheter department, OR
department and ICUs with all facilities existing in modern heart hospitals.
Our services are being provided to “Al Farra Consulting Office.
2008-2010 Support to Syria’s national cancer strategy Feasibility studies
for the Aleppo and Homs cancer centers
Assessment of skeleton existing two comprehensive cancer centers first one in
Aleppo and the second one in Homs.
Our TOR includes preparing complete tender document with drawings, master
and special specifications and BOQ. For all heavy and low current systems.
The project was financed by the EIB (European Investment Bank).
Our services are being provided to the consortium “EPOS Health Consultants
GmbH, Al Jidara and Khalil Al-Farra & Associates".
2006-2009 All the electrical and Low Currents studies for
Al MOUASAT Heart Center Hospital: (180 beds -– Damascus).
Development and renovation studies for an existing hospital.
Project includes the following:
Ten levels, Imaging department, Catheter department, OR department and ICUs
with all facilities existing in modern heart hospitals.
Our services are being provided to “Al Farra Consulting Office.
2006-2007 All the electrical and Low Currents studies for
Al MOUASAT Emergency Hospital: (180 beds -– Damascus). In coordination
with BEMARSTAN Project includes the following:
Twelve levels, Emergency department, Imaging department, endoscopy, 500
persons lecture hall, OR department and ICUs with all facilities existing in
modern general hospitals.
2005-2007 Scrutiny and acceptance of the studies made for the Al Andaluss
Teaching Hospital – Homs in coordination with BEMARSTAN
The Plans and the Specifications was made by ACADEMIC CON. ENG. Inc. -
DAMASCUS – SYRIA Project includes the following:
100 patient beds, with all facilities existing in modern general hospitals
2005-2006 All the electrical and Low Currents studies for
Jaramana Charity Hospital: (80 beds General Hospital -– Damascus). In
coordination with BEMARSTAN & MEBEX. Five levels with 8.000 sq. m of total
built area approximately, with all facilities existing in modern general hospitals.
2000-2002 All the electrical and Low Currents studies for Three 100 Beds
Hospitals in Iraq. In coordination with BEMARSTAN & MEBEX.
The hospitals will be built in Deala, Wassit and Shaab, three locations near
Baghdad. Project includes the following:
Three levels with more than 3000 square meters each, with all facilities existing
in modern general hospitals.
The project is financed under the "Oil for Food Program" of the United Nation.
2000-2001 - All the electrical and Low Currents studies for Radiotherapy
Center (extension for the SHAM Cancer Hospital at al Mazzeh. In
coordination with BEMARSTAN Project includes the following:
Four levels (two underground floors, Ground and first floor).
Two Linear Accelerator therapy units, Simulator, CT scanner, MRI…….
1990-1991 The Medico-Surgical Hospital:
In coordination with BEMARSTAN (60 beds-private hospital Damascus).
Development and renovation studies. Tasks included the addition of I.C.U, outpatient
department, relocation of the central services, the addition of elevators, the
installation of the first MRI unit in Syria (site planning, technical, electrical,
mechanical, sanitary, air-conditioning, equipment layout, execution and installation
supervision, acceptance tests, provisional.
1983-1986 The Police Hospital
400 beds general hospital (Ministry of Interior). Our services were provided to GCEC.
1982-1984 Tartous Hospital
450 beds general hospital, Tartous/Syria (Ministry of Health).
Our services were provided to GCEC ..
INDUSTRIAL AND OTHER PROJECTS
Main Projects 2012 – Evaluation and Assessment of electrical installation and power sources
for ADAMCO pharmacutical
2003-2005 - All the electrical and Low Currents studies and supervision for the "
Fromageries Bel Production" bel_SYRIA processed cheese factory near
Damascus. In coordination with CHATTA studies and contractors.
Project includes the following:
Nine buildings one and two levels with more than 7000 square of build area.
2008 Cham Bank ( Islamic Bank) - All the electrical, Low Currents and security
studies for Alep, Homs and Hamah Branches
1998-2005 Energy Saving Studies for large establishments:
Audits concerning the electrical consumption and made the right solutions for
saving power consumption
Our services were provided to AFI & NEC
Name & Signature
Georges SHALABI
Paris June 2016

More Related Content

What's hot

What's hot (6)

Osama Hozien (Mechanicl Engineer 2008)
Osama Hozien (Mechanicl Engineer 2008)Osama Hozien (Mechanicl Engineer 2008)
Osama Hozien (Mechanicl Engineer 2008)
 
CV Seppo Matias Viio
CV  Seppo Matias ViioCV  Seppo Matias Viio
CV Seppo Matias Viio
 
Amid sahyoun cv(updated 2016)
Amid sahyoun cv(updated 2016)Amid sahyoun cv(updated 2016)
Amid sahyoun cv(updated 2016)
 
CV_Kotsona D
CV_Kotsona DCV_Kotsona D
CV_Kotsona D
 
Arch. Abed Alwahab Antar
Arch. Abed Alwahab AntarArch. Abed Alwahab Antar
Arch. Abed Alwahab Antar
 
Andrew James Hobbs cv
Andrew James Hobbs cvAndrew James Hobbs cv
Andrew James Hobbs cv
 

Viewers also liked

Qd fast track first thing first and dress code
Qd fast track first thing first and dress codeQd fast track first thing first and dress code
Qd fast track first thing first and dress codeAhmad Wibawa
 
Alex hornak slide_deck
Alex hornak slide_deckAlex hornak slide_deck
Alex hornak slide_deckAlex_Hornak
 
せと・しごと塾第6期総括(PDF)
せと・しごと塾第6期総括(PDF)せと・しごと塾第6期総括(PDF)
せと・しごと塾第6期総括(PDF)Kosaka Hideo
 
My trip to india нефидов демьян 8 класс
My trip to india нефидов демьян 8 классMy trip to india нефидов демьян 8 класс
My trip to india нефидов демьян 8 классxeniaz
 
أزمة الإسلام السياسي حيدر إبراهيم علي
أزمة الإسلام السياسي   حيدر إبراهيم عليأزمة الإسلام السياسي   حيدر إبراهيم علي
أزمة الإسلام السياسي حيدر إبراهيم عليShymaa Alhaj
 
Qd fast track qualified diamond strategi
Qd fast track qualified diamond strategiQd fast track qualified diamond strategi
Qd fast track qualified diamond strategiAhmad Wibawa
 
Qd fast track training
Qd fast track trainingQd fast track training
Qd fast track trainingAhmad Wibawa
 
Ho_so_nang_luc_Manh_Dat
Ho_so_nang_luc_Manh_DatHo_so_nang_luc_Manh_Dat
Ho_so_nang_luc_Manh_DatLe Hung Manh
 
إشكاليات الفكر العربي المعاصر
إشكاليات الفكر العربي المعاصرإشكاليات الفكر العربي المعاصر
إشكاليات الفكر العربي المعاصرShymaa Alhaj
 
Livro virtual elizia
Livro virtual eliziaLivro virtual elizia
Livro virtual eliziamirandaelizia
 
животные друзья человека фадеев владислав и евзиков константин 6 класс
животные   друзья человека фадеев владислав и евзиков константин 6 классживотные   друзья человека фадеев владислав и евзиков константин 6 класс
животные друзья человека фадеев владислав и евзиков константин 6 классxeniaz
 
Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure structerreci
 
военное дело эпохи средневековья фадеев владислав 6 класс
военное дело эпохи средневековья фадеев владислав 6 классвоенное дело эпохи средневековья фадеев владислав 6 класс
военное дело эпохи средневековья фадеев владислав 6 классxeniaz
 
Qd fast track tantangan seorang qualified diamond
Qd fast track tantangan seorang qualified diamondQd fast track tantangan seorang qualified diamond
Qd fast track tantangan seorang qualified diamondAhmad Wibawa
 
Compendial testing by ketan mishra
Compendial testing by ketan mishraCompendial testing by ketan mishra
Compendial testing by ketan mishraRXKETANMISHRA
 
Rule of law: Political Science
Rule of law: Political ScienceRule of law: Political Science
Rule of law: Political ScienceRyan Allen
 

Viewers also liked (17)

Qd fast track first thing first and dress code
Qd fast track first thing first and dress codeQd fast track first thing first and dress code
Qd fast track first thing first and dress code
 
Alex hornak slide_deck
Alex hornak slide_deckAlex hornak slide_deck
Alex hornak slide_deck
 
せと・しごと塾第6期総括(PDF)
せと・しごと塾第6期総括(PDF)せと・しごと塾第6期総括(PDF)
せと・しごと塾第6期総括(PDF)
 
My trip to india нефидов демьян 8 класс
My trip to india нефидов демьян 8 классMy trip to india нефидов демьян 8 класс
My trip to india нефидов демьян 8 класс
 
أزمة الإسلام السياسي حيدر إبراهيم علي
أزمة الإسلام السياسي   حيدر إبراهيم عليأزمة الإسلام السياسي   حيدر إبراهيم علي
أزمة الإسلام السياسي حيدر إبراهيم علي
 
Qd fast track qualified diamond strategi
Qd fast track qualified diamond strategiQd fast track qualified diamond strategi
Qd fast track qualified diamond strategi
 
Qd fast track training
Qd fast track trainingQd fast track training
Qd fast track training
 
Aantibioticos
AantibioticosAantibioticos
Aantibioticos
 
Ho_so_nang_luc_Manh_Dat
Ho_so_nang_luc_Manh_DatHo_so_nang_luc_Manh_Dat
Ho_so_nang_luc_Manh_Dat
 
إشكاليات الفكر العربي المعاصر
إشكاليات الفكر العربي المعاصرإشكاليات الفكر العربي المعاصر
إشكاليات الفكر العربي المعاصر
 
Livro virtual elizia
Livro virtual eliziaLivro virtual elizia
Livro virtual elizia
 
животные друзья человека фадеев владислав и евзиков константин 6 класс
животные   друзья человека фадеев владислав и евзиков константин 6 классживотные   друзья человека фадеев владислав и евзиков константин 6 класс
животные друзья человека фадеев владислав и евзиков константин 6 класс
 
Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure
 
военное дело эпохи средневековья фадеев владислав 6 класс
военное дело эпохи средневековья фадеев владислав 6 классвоенное дело эпохи средневековья фадеев владислав 6 класс
военное дело эпохи средневековья фадеев владислав 6 класс
 
Qd fast track tantangan seorang qualified diamond
Qd fast track tantangan seorang qualified diamondQd fast track tantangan seorang qualified diamond
Qd fast track tantangan seorang qualified diamond
 
Compendial testing by ketan mishra
Compendial testing by ketan mishraCompendial testing by ketan mishra
Compendial testing by ketan mishra
 
Rule of law: Political Science
Rule of law: Political ScienceRule of law: Political Science
Rule of law: Political Science
 

Similar to CV: Georges Shalabi, Electrical Engineer

Similar to CV: Georges Shalabi, Electrical Engineer (20)

Hossam resume 12 2016
Hossam resume 12 2016Hossam resume 12 2016
Hossam resume 12 2016
 
Ahmed mahmoud reda
Ahmed mahmoud redaAhmed mahmoud reda
Ahmed mahmoud reda
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
cv resume
cv resumecv resume
cv resume
 
Ashraf cv
Ashraf cvAshraf cv
Ashraf cv
 
Electrical Team Leader
Electrical Team LeaderElectrical Team Leader
Electrical Team Leader
 
Khalid-Wageh-cv last
Khalid-Wageh-cv lastKhalid-Wageh-cv last
Khalid-Wageh-cv last
 
amr cv
amr cvamr cv
amr cv
 
Eng.Yahya Ayesh C.V
Eng.Yahya Ayesh C.VEng.Yahya Ayesh C.V
Eng.Yahya Ayesh C.V
 
Amr Said_CV_2017cn
Amr Said_CV_2017cnAmr Said_CV_2017cn
Amr Said_CV_2017cn
 
Ahmed Zahran C.V
Ahmed Zahran C.VAhmed Zahran C.V
Ahmed Zahran C.V
 
CV 10-5-2014
CV 10-5-2014CV 10-5-2014
CV 10-5-2014
 
Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016
 
C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)
 
Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016
Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016
Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016
 
CV Joris Van Den Bosch
CV Joris Van Den BoschCV Joris Van Den Bosch
CV Joris Van Den Bosch
 
M.Ashraf
M.AshrafM.Ashraf
M.Ashraf
 
EidResume1214
EidResume1214EidResume1214
EidResume1214
 
CV
CVCV
CV
 

CV: Georges Shalabi, Electrical Engineer

  • 1. CURRICULUM VITAE GEORGES SHALABI Phone ++ 33 7 68 37 37 88 E mail georges.shalabi@gmail.com INDEPENDENT CONSULTANT ENGINEER, ELECTRICAL PERSONAL INFORMATION Marital status Married Nationality Palestinian / Syrian Place & date of birth Damascus, 05 / 1957 LANGUAGES Arabic Mother language French Very Good English Good EDUCATION School Name Certificates Degrees obtained Date Frères Maristes College (Damascus) Preparatory school / General/Science 1972 Laïque College (Damascus) High school / General/Science 1975 University Name Qualifications Date Damascus University, Syria B.Sc. in electrical engineering 1981 COMPUTER EXPERIENCE AutoCAD Excel ,Word (Microsoft Office) DIALux 4… (Lighting Calculation software) Pegasys (Gathering data and Communication with Power Meters _ Analyzers) Many software for electrical network calculation like Ecodial, DOC,. PROFESSIONAL MEMBERSHIP Order of Syrian Engineers titled as private consultant office
  • 2. ACTIVE PARTICIPATION IN CONFERENCES / WORKSHOPS 1983 The first International Lighting Symposium Damascus Syria 1996 The National Technical Days “ Transportation & Distribution of Electricity in Syria” Damascus Syria 2000 Comprehensive course concerning design and calculation of different electrical networks 1986 - 2012 Different courses/seminar concerning Lightning protection, UPS, Surge Arrestors, Lighting, Automation… PROFESSIONAL EXPERIENCE 1981 – 1986 Project Electrical Engineer, General Company for Engineering & Consultation, G.C.E.C. Damascus – Syria 1986 – Date Private Engineering Office (Consultant Engineer) Key qualifications: (Relevant to the project)  Extensive experience in electrical design, execution supervision for wide range of projects including hospitals, factories, office building, residential and commercial projects.  Engineering design and construction supervision for Heavy and Low Current Systems.  The preparation of unbiased specifications for the electrical equipment/installation (mostly in English).  The preparation of tendering documents (bill of quantities, legal and technical conditions, cost estimations, etc.) and technical evaluation for bidding offers.  Ability to establish and to maintain effective professional relations with colleagues from different national and cultural backgrounds and to work in a team.  Energy audits concerning energy saving and energy conservation for exist large buildings (Hospitals, factory, large office building….)  Functional & technological studies  Very good knowledge in the EN-IEC (European Norm- International Electromechanical Committee), which is the Applicable Standard in Syria for electrical works.  preparing specifications according to the new Master Format style, depending on client’s demand. Very good experience in using computer software (CAD software, Office software and other special software).
  • 3. LIST OF PROJECTS HOTELS, RESORTS, RESIDENTIAL & PUBLIC BUILDINGS Main Projects 2012- 2013 All the electrical, lighting, and Low Currents studies for M2- M8 eight Gate. Damascus suburb. More than 130000 sq.m of built - area. Seven tower residential buildings and more than three hundred flats, duplex flats and penthouses. Our services is provided to “OSOS Engineering", The Employer was "EMAAR " (the Emirate Properties) and IGO (International Group Overseas) . 2011-2012 PETRO CANADA offices at eight gate Damascus suburb. Supervision of all works especially electrical and extra low voltage works. Our services were provided to Powis architectural office London. 2008 – 2009 All the electrical, lighting, and Low Currents studies for TRANSMALL . Near Homs (Homs – Damascus Highway) More than 100000 sq.m and 37000 sq.m of building areas The project consists of: 6000 sq.m Hyper market, 105 Stores, VIP Restaurant and Child areas (Ice skating, Bowling, …) 2005-2007 All the electrical, lighting, and Low Currents studies for ALAKMAR resorts – al Maara . Near Damascus More than 22000 sq. m of building areas The project consists of: Open area restaurant with gardens, multipurpose hall, anniversary halls, bar, children facilities, panoramic restaurant, outdoor swimming pools, health club and 40 chalets. We have carefully considered the environmental conditions when designing this project. 1995-2001 -Design and execution supervision of all the electrical works for MONTE-ROSA tourism complex (hotel & country club) near Damascus. Project includes the following: Four stars’ hotel (80 beds), 18 chalets, four open air restaurants (600 seats approx.), four inside restaurants and night clubs (1000 seats approx.) 30 private villas, sports facilities (indoor and outdoor swimming pools, health club, squash racket, tennis courts, basketball, mini-golf and other), entertainment/cultural facilities including outdoors amphitheater cinema/video projection hall, etc. children playground, supper market, etc. The project is equipped with all the required modern facilities such as satellite T.V network, extensive computer network (including outlets in the hotel bedrooms), etc. We have carefully considered the environmental conditions when designing this project. 2001 All the electrical, lighting, and Low Currents studies for Mashta Al Houlo Hotel –. Near Homs. The project consist of 52 Rooms and Suites With all facilities for modern hotels 2000 - 2001Supervision of ISIS (Information System Infrastructures and Services) Project for CBOS (Central Bank Of Syria) The project consists of erection of data network and telephone network for the whole building (450 access points) with power network via UPS for the U-Shape building (150 access points from the whole 450 access points). The project consists of replacing of the PABX (Private Automatic Branch eXchange) and supplying, installation and putting into service of the server and the workstations in addition of software and training courses. The project is financed by the European Community and erected by NEXUS 1997-2000 -All the electrical, lighting, and Low Currents studies for Damascus Modern Art Museum. In coordination with Belgian Architects CERAU (the first prize winner of the International conceptual designs competition for the project). Project includes the following: All up-to-date environmental conditions for proper exhibition and storage of the different types of artifacts have carefully been foreseen in our designs. Total built area more than 13000 square meters, approx. indoor exhibition areas (permanent, temporarily, and visiting collections) 5000 square meters; project contains several technical, cultural, and entertainment facilities such as lecture hall, evaluation/
  • 4. preservation laboratories, art archives and library, etc. The Museums security and control systems are part of our tasks. 2008-2007 Dar Said Koraish near Damascus The project 18000 sq.m lands with approx. 20000 sq.m built area, is an orphanage. Five buildings Teaching (40 classes & Lab.) Residence for 450 students, Clubs, amphitheater, Sport & swimming pool halls and administration building. HEALTH CARE PROJECTS Main Projects 2011- Date Consultancy supervision made for the Expansion of Al Assad University Teaching Hospital – Damascus Scrutiny and acceptance of all the electrical, lighting, and Low Currents shop drawings and as-built drawings, supervision of all the electrical and low currents works including factory inspection visits inside and outside Syria. The Contractor is the Joint Venture Makiber- Yacoubian JV Our services is provided to “Al Farra Consulting Office. 2011- 2013 All the electrical and Low Currents studies for Dar Al Shifaa Hospital: (220 beds -– Damascus). Development and renovation studies for an existing hospital. Project includes the following: Two additional levels, Imaging department, Catheter department, OR department and ICUs with all facilities existing in modern heart hospitals. Our services are being provided to “Al Farra Consulting Office. 2008-2010 Support to Syria’s national cancer strategy Feasibility studies for the Aleppo and Homs cancer centers Assessment of skeleton existing two comprehensive cancer centers first one in Aleppo and the second one in Homs. Our TOR includes preparing complete tender document with drawings, master and special specifications and BOQ. For all heavy and low current systems. The project was financed by the EIB (European Investment Bank). Our services are being provided to the consortium “EPOS Health Consultants GmbH, Al Jidara and Khalil Al-Farra & Associates". 2006-2009 All the electrical and Low Currents studies for Al MOUASAT Heart Center Hospital: (180 beds -– Damascus). Development and renovation studies for an existing hospital. Project includes the following: Ten levels, Imaging department, Catheter department, OR department and ICUs with all facilities existing in modern heart hospitals. Our services are being provided to “Al Farra Consulting Office. 2006-2007 All the electrical and Low Currents studies for Al MOUASAT Emergency Hospital: (180 beds -– Damascus). In coordination with BEMARSTAN Project includes the following: Twelve levels, Emergency department, Imaging department, endoscopy, 500 persons lecture hall, OR department and ICUs with all facilities existing in modern general hospitals. 2005-2007 Scrutiny and acceptance of the studies made for the Al Andaluss Teaching Hospital – Homs in coordination with BEMARSTAN The Plans and the Specifications was made by ACADEMIC CON. ENG. Inc. - DAMASCUS – SYRIA Project includes the following: 100 patient beds, with all facilities existing in modern general hospitals 2005-2006 All the electrical and Low Currents studies for Jaramana Charity Hospital: (80 beds General Hospital -– Damascus). In coordination with BEMARSTAN & MEBEX. Five levels with 8.000 sq. m of total built area approximately, with all facilities existing in modern general hospitals. 2000-2002 All the electrical and Low Currents studies for Three 100 Beds Hospitals in Iraq. In coordination with BEMARSTAN & MEBEX. The hospitals will be built in Deala, Wassit and Shaab, three locations near Baghdad. Project includes the following: Three levels with more than 3000 square meters each, with all facilities existing in modern general hospitals.
  • 5. The project is financed under the "Oil for Food Program" of the United Nation. 2000-2001 - All the electrical and Low Currents studies for Radiotherapy Center (extension for the SHAM Cancer Hospital at al Mazzeh. In coordination with BEMARSTAN Project includes the following: Four levels (two underground floors, Ground and first floor). Two Linear Accelerator therapy units, Simulator, CT scanner, MRI……. 1990-1991 The Medico-Surgical Hospital: In coordination with BEMARSTAN (60 beds-private hospital Damascus). Development and renovation studies. Tasks included the addition of I.C.U, outpatient department, relocation of the central services, the addition of elevators, the installation of the first MRI unit in Syria (site planning, technical, electrical, mechanical, sanitary, air-conditioning, equipment layout, execution and installation supervision, acceptance tests, provisional. 1983-1986 The Police Hospital 400 beds general hospital (Ministry of Interior). Our services were provided to GCEC. 1982-1984 Tartous Hospital 450 beds general hospital, Tartous/Syria (Ministry of Health). Our services were provided to GCEC .. INDUSTRIAL AND OTHER PROJECTS Main Projects 2012 – Evaluation and Assessment of electrical installation and power sources for ADAMCO pharmacutical 2003-2005 - All the electrical and Low Currents studies and supervision for the " Fromageries Bel Production" bel_SYRIA processed cheese factory near Damascus. In coordination with CHATTA studies and contractors. Project includes the following: Nine buildings one and two levels with more than 7000 square of build area. 2008 Cham Bank ( Islamic Bank) - All the electrical, Low Currents and security studies for Alep, Homs and Hamah Branches 1998-2005 Energy Saving Studies for large establishments: Audits concerning the electrical consumption and made the right solutions for saving power consumption Our services were provided to AFI & NEC Name & Signature Georges SHALABI Paris June 2016