SlideShare une entreprise Scribd logo
1  sur  23
Facility Layout
          Chapter 10
pages 345-349, 359-360, 367-368
MGMT 326

Foundations     Products &      Quality                    Planning
                                              Facilities
of Operations   Processes      Assuranc                    & Control
                                    e
                 Managing      Managing        Capacit
 Introduction                                     y
                 Projects       Quality
                                                 and
  Strategy        Product       Statistical    Location
                  Design         Process        Facility
                                 Control        Layout
                 Process
                 Design


                    Just-in-Time & Lean
                          Systems
Presentation Outline
   Importance of layout planning
   Process and product layouts
   Office layouts
   Designing cellular layouts
What Is Layout Planning?
   Layout planning is determining the best
    physical arrangement of resources
    within a facility
Why is layout planning important?
   Eliminates unnecessary costs for space and
    materials handling
   Reduces work-in-process inventory
   Produces goods and services faster
   Reduces distances that workers must travel
    in the workplace
   Improves communication and morale
   Increases retail sales
   Improves brand image
Types of Layouts
   Process layouts: Group similar resources together
   Product layouts: Designed to produce a specific product,
    or a small number of products efficiently
   Hybrid layouts: Combine aspects of both process and
    product layouts
      Example: cellular layout

   Fixed-Position layouts: Product is too large to move
      Examples: building construction, shipyard

      Resources must be brought to where they are needed
Process and Product Layouts
Process Layouts
   Used in project and batch manufacturing
    (intermittent processes)
   Also used in department stores, offices,
    hospitals, and universities
   Able to make or sell a variety of products
   Use general purpose resources
   Less automation than in product layouts
Process Layouts (2)
   Material handling costs per unit are higher
    than in product layouts
   Scheduling production is more complex than
    in product layouts
Product Layouts
   Used in assembly lines and continuous
    manufacturing (repetitive processes)
   A cafeteria line is a product layout
   In manufacturing, product layouts are used to
    produce one product, or a small group of
    products, efficiently
   Uses special purpose resources
   More automation than in process layouts
Product Layouts (2)
   Material handling costs per unit are lower
    than in process layouts
   Scheduling production is simpler than in
    process layouts
Designing Process Layouts
   Step 1: Gather information:
       Space needed, space available, importance of proximity
        between various units
   Step 2: Develop alternative block plans:
       Using trial-and-error or decision support tools
       2 approaches
            Relationship (REL) chart
            From-to matrix
       Can use both
       Decision support systems are heuristic methods
         
           Usually give a "good" solution
         
           Solution may not be optimal (best solution)
Designing Process Layouts (2)
   Step 3: Develop a detailed layout
     Consider exact sizes and shapes of

      departments and work centers including
      aisles and stairways
     Tools like drawings, 3-D models, and

      computer-assisted design (CAD) software
      are often used
Process Layout Example
 Block layout for a sports medicine clinic

     A               B               C
  Radiology      Laboratory      Lobby &
                                 Waiting


     D               E               F
  Examining      Surgery &       Physical
   Rooms         Recovery        Therapy
Process Layout Example (2)
Process Layout Example (3)
Process Layout Example (4)
             Proposed Layout
    A              B           C
 Radiology     Examining    Lobby &
                Rooms       Waiting


    D              E           F
 Surgery &     Laboratory   Physical
 Recovery                   Therapy
Process Layout Example (5)
Designing Product Layouts
   Objectives
       Produce the required number of units to
        meet demand
       Use workers and equipment efficiently
         
             High utilization of workers and equipment
       Balance workload among employees
Designing Product Layouts (2)
   Based on a precedence diagram
   Assign tasks to work stations
   Assign work stations to locations
Office Layouts
   Almost half the U. S. work force works in an
    office
   Human interaction and communication are
    the primary considerations in office layouts
   People who need to interact frequently should
    be close to each other
   One key layout tradeoff is between closeness
    and privacy
Office Layouts (2)
   Open concept offices promote understanding
    and trust.
   A few closed rooms are needed for private
    discussions, such as personnel matters.
   Moveable walls provide flexibility to change
    the layout when needed.
Office Layout Example
                    3D Systems
   Hi-tech company – provides equipment and
    materials for rapid product design and
    manufacturing
   Rock Hill headquarters handles product design,
    sales, training, and administration
   Open office plan
   Conference room
   Areas for informal meetings
   Product showroom for customers
   Cyber café and fitness center for employees

Contenu connexe

Tendances

1c mukund kamdar-resume rel-6 p
1c mukund kamdar-resume rel-6 p1c mukund kamdar-resume rel-6 p
1c mukund kamdar-resume rel-6 pMukund Kamdar
 
Technology and design (a brief overview)
Technology and design (a brief overview)Technology and design (a brief overview)
Technology and design (a brief overview)NGO Etnika
 
Resurrect Manufacturing 2009 DFMA Forum
Resurrect Manufacturing 2009 DFMA ForumResurrect Manufacturing 2009 DFMA Forum
Resurrect Manufacturing 2009 DFMA ForumMike Shipulski
 
Process Strategies and Capacity Planning
Process Strategies and Capacity PlanningProcess Strategies and Capacity Planning
Process Strategies and Capacity PlanningJaisa Gapuz
 
Unit no 6_plm&pdm
Unit no 6_plm&pdmUnit no 6_plm&pdm
Unit no 6_plm&pdmAtul Joshi
 
DFM Design Principles
DFM Design PrinciplesDFM Design Principles
DFM Design PrinciplesNIELITA
 
Design for x : Design for Manufacturing,Design for Assembly
Design for x : Design for Manufacturing,Design for Assembly  Design for x : Design for Manufacturing,Design for Assembly
Design for x : Design for Manufacturing,Design for Assembly Naseel Ibnu Azeez
 
Design for manufacture_and_assembly
Design for manufacture_and_assemblyDesign for manufacture_and_assembly
Design for manufacture_and_assemblyR PANNEER
 
Flexible and modular software framework as a solution for operational excelle...
Flexible and modular software framework as a solution for operational excelle...Flexible and modular software framework as a solution for operational excelle...
Flexible and modular software framework as a solution for operational excelle...Thomas Schulz
 
Design For Manufacturing, (DFM)
Design For Manufacturing, (DFM)Design For Manufacturing, (DFM)
Design For Manufacturing, (DFM)Ali Karandish
 

Tendances (17)

1c mukund kamdar-resume rel-6 p
1c mukund kamdar-resume rel-6 p1c mukund kamdar-resume rel-6 p
1c mukund kamdar-resume rel-6 p
 
Paper ncta
Paper nctaPaper ncta
Paper ncta
 
Integration of process planning and scheduling comparison of models approach
Integration of process planning and scheduling comparison of models approachIntegration of process planning and scheduling comparison of models approach
Integration of process planning and scheduling comparison of models approach
 
Technology and design (a brief overview)
Technology and design (a brief overview)Technology and design (a brief overview)
Technology and design (a brief overview)
 
Dfx design for_cost
Dfx design for_costDfx design for_cost
Dfx design for_cost
 
Resurrect Manufacturing 2009 DFMA Forum
Resurrect Manufacturing 2009 DFMA ForumResurrect Manufacturing 2009 DFMA Forum
Resurrect Manufacturing 2009 DFMA Forum
 
Process Strategies and Capacity Planning
Process Strategies and Capacity PlanningProcess Strategies and Capacity Planning
Process Strategies and Capacity Planning
 
DFMA of Folding Chair
DFMA of Folding ChairDFMA of Folding Chair
DFMA of Folding Chair
 
Unit no 6_plm&pdm
Unit no 6_plm&pdmUnit no 6_plm&pdm
Unit no 6_plm&pdm
 
DFM Design Principles
DFM Design PrinciplesDFM Design Principles
DFM Design Principles
 
Dfma
DfmaDfma
Dfma
 
Design For X Guidelines
Design For X GuidelinesDesign For X Guidelines
Design For X Guidelines
 
Design for x : Design for Manufacturing,Design for Assembly
Design for x : Design for Manufacturing,Design for Assembly  Design for x : Design for Manufacturing,Design for Assembly
Design for x : Design for Manufacturing,Design for Assembly
 
Process design
Process designProcess design
Process design
 
Design for manufacture_and_assembly
Design for manufacture_and_assemblyDesign for manufacture_and_assembly
Design for manufacture_and_assembly
 
Flexible and modular software framework as a solution for operational excelle...
Flexible and modular software framework as a solution for operational excelle...Flexible and modular software framework as a solution for operational excelle...
Flexible and modular software framework as a solution for operational excelle...
 
Design For Manufacturing, (DFM)
Design For Manufacturing, (DFM)Design For Manufacturing, (DFM)
Design For Manufacturing, (DFM)
 

En vedette

Project update.29.04
Project update.29.04Project update.29.04
Project update.29.04osxri
 
Apresentação teleconferência - estaleiro...
Apresentação   teleconferência - estaleiro...Apresentação   teleconferência - estaleiro...
Apresentação teleconferência - estaleiro...LLX
 
World's biggest crane installs drilling rig topsides
World's biggest crane installs drilling rig topsidesWorld's biggest crane installs drilling rig topsides
World's biggest crane installs drilling rig topsidesNiels Haakman
 
Osx project update september 2011
Osx project update september 2011Osx project update september 2011
Osx project update september 2011osxri
 
Asia Days 2013 - Vietnam, Dung Quat Shipyard
Asia Days 2013 - Vietnam, Dung Quat Shipyard Asia Days 2013 - Vietnam, Dung Quat Shipyard
Asia Days 2013 - Vietnam, Dung Quat Shipyard Innovation Norway
 
Asia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardAsia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardInnovation Norway
 
Loksa Shipyard presentation
Loksa Shipyard presentationLoksa Shipyard presentation
Loksa Shipyard presentationLoksaShipyard
 
Shipyard one 사용자 교육 1. 프로그램 소개 및 기본 사용법
Shipyard one 사용자 교육   1. 프로그램 소개 및 기본 사용법Shipyard one 사용자 교육   1. 프로그램 소개 및 기본 사용법
Shipyard one 사용자 교육 1. 프로그램 소개 및 기본 사용법Byoungik Moon
 
Marine Production Technology
Marine Production TechnologyMarine Production Technology
Marine Production Technologykmsu
 
The Shipyard Local SEO
The Shipyard Local SEOThe Shipyard Local SEO
The Shipyard Local SEODFWSEM
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileMitchell Mantiri
 
Project management standards for shipyard projects
Project management standards for shipyard projectsProject management standards for shipyard projects
Project management standards for shipyard projectsFernando Remolina, PMP
 
Shipyard one 사용자 교육
Shipyard one 사용자 교육Shipyard one 사용자 교육
Shipyard one 사용자 교육Byoungik Moon
 

En vedette (13)

Project update.29.04
Project update.29.04Project update.29.04
Project update.29.04
 
Apresentação teleconferência - estaleiro...
Apresentação   teleconferência - estaleiro...Apresentação   teleconferência - estaleiro...
Apresentação teleconferência - estaleiro...
 
World's biggest crane installs drilling rig topsides
World's biggest crane installs drilling rig topsidesWorld's biggest crane installs drilling rig topsides
World's biggest crane installs drilling rig topsides
 
Osx project update september 2011
Osx project update september 2011Osx project update september 2011
Osx project update september 2011
 
Asia Days 2013 - Vietnam, Dung Quat Shipyard
Asia Days 2013 - Vietnam, Dung Quat Shipyard Asia Days 2013 - Vietnam, Dung Quat Shipyard
Asia Days 2013 - Vietnam, Dung Quat Shipyard
 
Asia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardAsia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin Shipyard
 
Loksa Shipyard presentation
Loksa Shipyard presentationLoksa Shipyard presentation
Loksa Shipyard presentation
 
Shipyard one 사용자 교육 1. 프로그램 소개 및 기본 사용법
Shipyard one 사용자 교육   1. 프로그램 소개 및 기본 사용법Shipyard one 사용자 교육   1. 프로그램 소개 및 기본 사용법
Shipyard one 사용자 교육 1. 프로그램 소개 및 기본 사용법
 
Marine Production Technology
Marine Production TechnologyMarine Production Technology
Marine Production Technology
 
The Shipyard Local SEO
The Shipyard Local SEOThe Shipyard Local SEO
The Shipyard Local SEO
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company Profile
 
Project management standards for shipyard projects
Project management standards for shipyard projectsProject management standards for shipyard projects
Project management standards for shipyard projects
 
Shipyard one 사용자 교육
Shipyard one 사용자 교육Shipyard one 사용자 교육
Shipyard one 사용자 교육
 

Similaire à Reid10 s08

facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
 
Product design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introductionProduct design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introductionChirag Patel
 
Product service -profiling
Product service -profilingProduct service -profiling
Product service -profilingMeenakshi Singh
 
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...CyrilAlbertMercado
 
Group technology ppt @ bec doms
Group technology ppt @ bec domsGroup technology ppt @ bec doms
Group technology ppt @ bec domsBabasab Patil
 
Production & opeartions management
Production & opeartions managementProduction & opeartions management
Production & opeartions managementShimelis Mutera
 
Layout strategy ppt @ bec doms
Layout strategy ppt @ bec domsLayout strategy ppt @ bec doms
Layout strategy ppt @ bec domsBabasab Patil
 
Design Procedure
Design ProcedureDesign Procedure
Design ProcedureAkash Patel
 
System analysis and design
System analysis and designSystem analysis and design
System analysis and designRobinsonObura
 
Facility layout-material-handling
Facility layout-material-handlingFacility layout-material-handling
Facility layout-material-handlingAjit Kumar
 
2. scope of operations management
2.  scope of operations management2.  scope of operations management
2. scope of operations managementAkash Bakshi
 

Similaire à Reid10 s08 (20)

facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
 
Product design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introductionProduct design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introduction
 
Product service -profiling
Product service -profilingProduct service -profiling
Product service -profiling
 
GEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUTGEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUT
 
Facility layout
Facility  layoutFacility  layout
Facility layout
 
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
 
Group technology ppt @ bec doms
Group technology ppt @ bec domsGroup technology ppt @ bec doms
Group technology ppt @ bec doms
 
Production & opeartions management
Production & opeartions managementProduction & opeartions management
Production & opeartions management
 
Layout strategy ppt @ bec doms
Layout strategy ppt @ bec domsLayout strategy ppt @ bec doms
Layout strategy ppt @ bec doms
 
UNIT VI-3.pptx
UNIT VI-3.pptxUNIT VI-3.pptx
UNIT VI-3.pptx
 
Design Procedure
Design ProcedureDesign Procedure
Design Procedure
 
Feasible
FeasibleFeasible
Feasible
 
CELLULAR MANUFACTURING
CELLULAR MANUFACTURINGCELLULAR MANUFACTURING
CELLULAR MANUFACTURING
 
Aviana-Nrit BI.ppt
Aviana-Nrit BI.pptAviana-Nrit BI.ppt
Aviana-Nrit BI.ppt
 
System analysis and design
System analysis and designSystem analysis and design
System analysis and design
 
Process selection
Process selectionProcess selection
Process selection
 
Facility layout-material-handling
Facility layout-material-handlingFacility layout-material-handling
Facility layout-material-handling
 
Layout processing final
Layout processing finalLayout processing final
Layout processing final
 
2. scope of operations management
2.  scope of operations management2.  scope of operations management
2. scope of operations management
 

Reid10 s08

  • 1. Facility Layout Chapter 10 pages 345-349, 359-360, 367-368
  • 2. MGMT 326 Foundations Products & Quality Planning Facilities of Operations Processes Assuranc & Control e Managing Managing Capacit Introduction y Projects Quality and Strategy Product Statistical Location Design Process Facility Control Layout Process Design Just-in-Time & Lean Systems
  • 3. Presentation Outline  Importance of layout planning  Process and product layouts  Office layouts  Designing cellular layouts
  • 4. What Is Layout Planning?  Layout planning is determining the best physical arrangement of resources within a facility
  • 5. Why is layout planning important?  Eliminates unnecessary costs for space and materials handling  Reduces work-in-process inventory  Produces goods and services faster  Reduces distances that workers must travel in the workplace  Improves communication and morale  Increases retail sales  Improves brand image
  • 6. Types of Layouts  Process layouts: Group similar resources together  Product layouts: Designed to produce a specific product, or a small number of products efficiently  Hybrid layouts: Combine aspects of both process and product layouts  Example: cellular layout  Fixed-Position layouts: Product is too large to move  Examples: building construction, shipyard  Resources must be brought to where they are needed
  • 8. Process Layouts  Used in project and batch manufacturing (intermittent processes)  Also used in department stores, offices, hospitals, and universities  Able to make or sell a variety of products  Use general purpose resources  Less automation than in product layouts
  • 9. Process Layouts (2)  Material handling costs per unit are higher than in product layouts  Scheduling production is more complex than in product layouts
  • 10. Product Layouts  Used in assembly lines and continuous manufacturing (repetitive processes)  A cafeteria line is a product layout  In manufacturing, product layouts are used to produce one product, or a small group of products, efficiently  Uses special purpose resources  More automation than in process layouts
  • 11. Product Layouts (2)  Material handling costs per unit are lower than in process layouts  Scheduling production is simpler than in process layouts
  • 12. Designing Process Layouts  Step 1: Gather information:  Space needed, space available, importance of proximity between various units  Step 2: Develop alternative block plans:  Using trial-and-error or decision support tools  2 approaches  Relationship (REL) chart  From-to matrix  Can use both  Decision support systems are heuristic methods  Usually give a "good" solution  Solution may not be optimal (best solution)
  • 13. Designing Process Layouts (2)  Step 3: Develop a detailed layout  Consider exact sizes and shapes of departments and work centers including aisles and stairways  Tools like drawings, 3-D models, and computer-assisted design (CAD) software are often used
  • 14. Process Layout Example Block layout for a sports medicine clinic A B C Radiology Laboratory Lobby & Waiting D E F Examining Surgery & Physical Rooms Recovery Therapy
  • 17. Process Layout Example (4) Proposed Layout A B C Radiology Examining Lobby & Rooms Waiting D E F Surgery & Laboratory Physical Recovery Therapy
  • 19. Designing Product Layouts  Objectives  Produce the required number of units to meet demand  Use workers and equipment efficiently  High utilization of workers and equipment  Balance workload among employees
  • 20. Designing Product Layouts (2)  Based on a precedence diagram  Assign tasks to work stations  Assign work stations to locations
  • 21. Office Layouts  Almost half the U. S. work force works in an office  Human interaction and communication are the primary considerations in office layouts  People who need to interact frequently should be close to each other  One key layout tradeoff is between closeness and privacy
  • 22. Office Layouts (2)  Open concept offices promote understanding and trust.  A few closed rooms are needed for private discussions, such as personnel matters.  Moveable walls provide flexibility to change the layout when needed.
  • 23. Office Layout Example 3D Systems  Hi-tech company – provides equipment and materials for rapid product design and manufacturing  Rock Hill headquarters handles product design, sales, training, and administration  Open office plan  Conference room  Areas for informal meetings  Product showroom for customers  Cyber café and fitness center for employees