SlideShare une entreprise Scribd logo
1  sur  37
Télécharger pour lire hors ligne
Building the Next Major Iron Ore
Mine in the Labrador Trough
Corporate Presentation
September 2012




              www.championironmines.com   FSE: P02; OTCQX: CPMNF
FORWARD-LOOKING STATEMENTS

Certain information contained herein regarding Champion Iron Mines Ltd., including
management’s assessment of future plans and operations, may constitute forward-looking
statements under applicable securities law and necessarily involve risks, including but not
limited to risks associated with mining exploration, operating costs, production costs, volatility
of share prices, currency fluctuations, imprecision of resource and reserve estimates,
environmental risks and ability to access sufficient capital from internal and external sources.

As a consequence, actual results may differ materially from those anticipated in any forward
looking statements. Plans, intentions or expectations disclosed in any forward-looking
statements or information should not be read as guarantees of future results or events, and will
not necessarily be accurate indications of whether or when or by which such results or events
will be achieved.

Except as required by law, Champion Iron Mines Ltd., expressly disclaims any intention and
undertakes no obligation to update any forward looking statements or information as conditions
change.

The historical mineral resources mentioned are strictly historical in nature and are non-
compliant to National Instrument 43-101 mineral resources and mineral reserves standards,
and should therefore not be relied upon. A qualified person has not done sufficient work to
upgrade or classify the historical mineral resources as current National Instrument NI-43-101
compliant.

                                                                                                     2
About Champion Iron Mines
  Advanced iron ore exploration and development projects located in
  Canada’s principal iron ore district, the Labrador Trough

  Fermont Projects (747 km2)
   14 projects in the Fermont Iron Ore District
   Flagship Consolidated Fire Lake North Project
    with the feasibility study due in early Q4 2012
   4.7 billion tonnes of NI 43-101 compliant estimates of
    iron mineral resources on 3 projects
   100% direct interest, 3% NSR (C$1.5 million buyback
    for an additional 0.5% NSR)

  Attikamagen Project (310 km2)
   Champion Iron Mines holds a 44% interest
   Century Iron Mines Corp. subsidiary has a 56% interest
    and can earn up to a 60% interest by spending further $3
    million on exploration expenditures by May 2014*.


* Investment by WISCO of 25% ($60M) and Minmetals of 5% ($12M)
                                                                      3
Quebec’s Next
Major Iron Ore Mine
Fire Lake North (FLN) Development Project
   Nov. 21 2011 PEA indicated an ability to produce 8.7 million tonnes of
    concentrate per year for the first 25 years of a 40-year mine life  the first
    5 years will average approximately 10 million tonnes of concentrate annually

   Net Present Value of $4 billion at a discounted cash flow rate of 8% with
    an Internal Rate of Return of 41.5% and a payback period of 2.3 years

Established Iron Ore District
   Canada produces 44 mtpy of iron ore concentrate in the southern end of the
    Labrador Trough and this is expected to grow to 200 mtpy over the next 10
    years if all proposed development projects are realized

   Established rail, power and port infrastructure
     - Quebec’s Plan Nord: $80 billion investment over the next 25 years in
         northern Quebec for various projects including infrastructure projects
     - Competitive power rates: ~ $0.04 - $0.045; price to be negotiated in 2012
     -   World-class multi-user port project (50 Mtpa) underway

Proven Team
   Strengthened advisory board and board of directors includes former
    Consolidated Thompson Iron Mines management and officers




                                                                                 4
Capital Structure

Share Data and Cash Position as of July 31, 2012.
                        Shares Outstanding     119.3 million
                                   Warrants    10.0 million @ C$2.59 (avg. strike price)
                                               (7.0 million @ C$3.00 not exerciseable until Nov. 2014
                                               0.8 million @ C$2.84 expiring Feb. 2013
                                               2.22 million @ C$1.50 expiring Oct. 2013, which are owned
                                               by insiders and advisors.)
                                    Options    11.6 million @ C$1.03 (avg. exercise price)
            Fully Diluted Shares Outstanding   141.1 million
                       Market Capitalization   C$112.2 million
                (based on $0.94 share price)
                              Cash Position    C$21.9 million
                 Fully Diluted Cash Position   C$59.7 million
           Management /Insiders Ownership      ~ 17%
                          Analyst Coverage     Canaccord Genuity                 Paradigm Capital
                                               Desjardins Capital Markets        Raymond James
                                               Dundee Capital Markets            RBC Capital Markets
                                               Fraser Mackenzie                  Salman Partners
                                               Haywood Securities                Scotia Capital
                                               Jennings Capital                  Stifel Nicolaus
                                               Macquarie Capital Markets         TD Securities


                                                                                                           5
Analyst Coverage




                   6
Experienced Management Team
   Over 200 years of combined exploration and mine operations experience

Board of Directors                     Management Team
Tom Larsen                             Tom Larsen
Chairman                               President and CEO
Alexander Horvath, P.Eng.              Alexander Horvath, P.Eng.
Director                               Executive Vice President, Exploration
Jean Depatie, P.Geo.                   Martin Bourgoin, P.Geo.
Director                               Executive Vice President, Operations
Ashwath Mehra                          Jeff Hussey, P.Geo.
Director                               Executive Vice President, Business Development
Donald A. Sheldon, LLB., P.Eng.        Bruce Mitton, P.Geo.
Director                               Vice President, Exploration
Jean Lafleur P.Geo.                    Jean-Luc Chouinard, P Eng.
Director                               Vice President, Project Development
Francis Sauvé                          Miles Nagamatsu, CA
Director                               Chief Financial Officer
Joseph S. C. Chan                      Jorge Estepa
Director                               Vice President, Secretary-Treasurer
Richard Quesnel: Senior Technical Advisor and Head of the Advisory Board
Advisory Board: Richard Quesnel, Paul Ankcorn, Doug Bache, and William Harding
                                                                                        7
Why invest in Champion Iron Mines?
                   Favourable Operating                 Champion Iron Mines’
                       Environment                      Competitive Advantage
                Established iron ore mining         Fermont holdings: 14 iron ore
                 district: The Labrador Trough        Brownfield projects (747 km2)

                Favourable tax environment          Consolidated Fire Lake North
                 (40% tax rebate on exploration       Project: Feasibility Study of surface
                 expenditures)                        deposits of coarse grained
                                                      specular Hematite:
                Access to low-cost power and
                 close to rail and port                       Easier to liberate
                 infrastructure
                                                              Deleterious elements in
                Quebec’s Plan Nord  $80 billion              concentrate are well below
                 over 25 years                                 industry specifications
                                                               limits
                Quebec is a world class area to
                 develop mines                       Experienced team of project
                                                      developers and mine builders
                Unprecedented Iron Ore price
                 range and forecast                  Upside potential for growth is high
                                                      with 4.7 Billion tonnes
                Skilled labor work force
                                                     Several de-risking initiatives
                Environmental: Iron ore process      underway including rail, port,
                 is grinding to liberate iron and     agreements and environmental
                 using gravity and magnetics for      studies and permit applications
                 separation from gangue minerals

                                                                                              8
Existing Rail Infrastructure
Quebec North Shore & Labrador
Railway (“QNS&L”)
    Fire Lake North PEA Base Case
    connection to Bloom Lake railway
    requires 94 km of rail – includes
    turnaround loop and sidings
   QNS&L links to Sept-Iles and Pointe Noire
    Bloom Lake and QNS&L railways are
    considered common carriers
    Common carriers allocate capacity on a
    first-come, first-serve basis

Cartier Railway:
   Linked to Port-Cartier
   Privately owned by ArcelorMittal
   Within Fire Lake North Project boundary



                                              9
World Class Port of Sept-Îles Infrastructure
Expanding to Meet Demand
Pointe Noire Multi User Wharf
 Announced long term agreement (20-40
  years) on July 18th, 2012
 10 Mt ship loading capacity reserved with
  the possibility to increase tonnage
 Completion March 31st, 2014; 18 months
  prior to "FLN" startup                               Sept-Iles
 Phase 1: 50Mtpy $220 million
 Federal Government announced $55
  million funding or 25% of project                   Pointe Noire
 Phase 2: Planning for 100 Mtpy

Port of Sept-Îles
 RTZ-IOC shipping facility
Port-Cartier
 ArcelorMittal shipping facility
 $2.1B expansion is underway and will                                   China Max ship capacity 300kt
  include concentrator expansion with port
  and rail infrastructure upgrades
 Located 62 km west of Sept-Iles

                                              Courtesy of the Port de Sept Isles                         10
Champion Iron Mines participating in a
 feasibility study with CN Rail and Caisse
    de Depot et Placements du Québec
 See August 29th 2012 press release
 Reduction in OPEX compared to PEA
  study
 Objective to reduce rail CAPEX
  component
 CHM still focused on the feasibility study
 CN focused on environmental permitting
 CHM will continue to develop independent
  options for port handling for concentrate
  stockpiling and reclaiming
Development: Consolidated Fire Lake North
                Project




                                            12
Fire Lake North Development Project
    November 2011 Preliminary Economic Assessment Update – Highlights

      Key Results                                                                    Pre-Tax Basis
     Internal Rate of Return (IRR) (8% Discount Rate)                                     41.5%
     Undiscounted Cash Flow                                                              $10.9B
     Net Present Value @ 5% Discounted Cash Flow                                          $5.6B
     Net Present Value @ 8% Discounted Cash Flow                                          $4.0B
    Based upon the following assumptions:
     Net Present Value @ 10% Discounted Cash Flow                                         $3.2B

     Payback Period (8% Discount Rate)                                                 2.3 Years

   Capital Costs:        US$1,368 million (includes rail and port infrastructure)
   Operating Costs:      US$51.01 per tonne (average 25 years);
                          US$39.46 per tonne (average years 1 to 5)
   Price assumptions:    US$115 per tonne of concentrate at 65% Fe
   Mine-Life:            40 years (average of 8.7 million tonnes/year for the first 25 years)
   Exchange rate:        $1.00 USD to $1.00 CDN
   Total Resources(1):   400 million tonnes grading 30.6% Fe (NI43-101 Measured and Indicated Resources)
                          661 million tonnes grading 27.7% Fe (NI43-101 Inferred Resources)
   In Pit Resources      921.8 million tonnes grading 28.8% Fe at an 8% cut-off grade                  14
Fire Lake North Project
Preliminary Economic Assessment Study
OPERATING EXPENDITURES (US$/TONNE OF CONCENTRATE)
                COST PARAMETERS                         AVERAGE 25 YEARS   AVERAGE YEARS 1 TO 5
Mining                                                       22.56                12.13
Concentrating, crushing and processing                       4.52                 3.97
Site infrastructure, sales and general administration        4.40                 3.39
Environmental tailings and management                        0.29                 0.26
Rail transport                                               15.52                16.14
Port facilities                                              3.72                 3.57
Equipment Lease Cost                                         1.67                 5.17
                                                Total        52.68                44.63


CAPITAL EXPENDITURES (US$ MILLIONS)
                                 COST CENTRES                                      $ MILLIONS
Pre-stripping of open pit areas                                                      97.5
Concentrator and site infrastructure including loadout facilities                    682.3
Railway (62km distance and 94km total including turnaround loop and sidings)         228.8
Port Facilities: Railcar unloading, stacker/reclaimer, conveyors                     96.8
Environmental and Tailings Management                                                27.9
Other Pre Production Costs                                                           34.0
                                                                      Sub-total      1,167
                                                                   Contingency        201
                                                                          Total      1,368
                                                                                                  15
Fire Lake North Project Schedule
     Development, Construction, and Production


                                     2011        2012        2013        2014        2015
                                 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Diamond Drilling

Scoping Study

Feasibility Study

Environmental / Social Studies

Community Consultation

Permitting

Construction

Production




                                                                                               16
Fire Lake North Project
    Growth through Development

  Feasibility Study: Early Q4 2012
  Press Release June 21, 2012: Over
   20,000 m feasibility definition drilling is
   completed for feasibility study
  Strike length of both the West Pit
   (3500m) and the East Pit (2400m)
   synformal fold closures are open at
   depth
  Resources are increasing outside the
   Nov. 2011 PEA ultimate pit limits
  Several de-risking initiatives are
   underway




See www.championiromines.com for reports maps and assays
                                                           17
Fire Lake North – Metallurgy
Press Release, August 1st, 2012

 High quality sinter concentrate with very low deleterious elemental content
 Liberates at 850 micron (-20 mesh) and produces a 65-66% iron concentrate
 Assuming a concentrate with 66% Fe ; No magnetic separation circuit required
     Alumina is 0.52% International Standard < 2%
     Silica content is 5%
     Al2O3 : SiO2 ratio of 0.14 versus the upper industry specification limit of 1

 This very low alumina to silica ratio is an ideal blending product for steel mills




  High Grade – Coarse Specular Hematite           Quartz Specular Hematite Mineralization   18
Fire Lake North Development Project




                                      19
Fire Lake North Development Project




                                      20
Moire Lake Project
Initial Mineral Resource Estimate: March 29, 2012
                                              Mineral Resource Estimate:
 Arcelor Mittal Property Boundary




                                                  Indicated Resources: 164 million
                                                   tonnes grading 30.5% Total Iron

                                                  Inferred Resources: 417 million
                                                   tonnes grading 29.4% Total Iron
                                              DDH LM11-12: 503 m @ 31% total iron
                                              Kilometric synform with hematite and
                                               magnetite outcrops at surface
                                        A’    Adjacent to ArcelorMittal Mont-Wright mine



                                    A
                                                                 500
                                                                 meters




                                                                                       21
Moire Lake Project
Infrastructure: Adjacent to Bloom Lake Railway (8km), road, & power




                                                      500
                                                      meters




                                                                      22
Oil Can Project
                                                                      Initial Mineral Resource Estimate
                                                                    Potential for low strip ratio < 1 : 1
                                                                    Potential Bench width  150- 350m
                                                                    972 Mt of iron oxide grading 33.2% at a
                                                                     15% iron cut-off
                                                                    924 Mt of mixed iron oxide
                                                                     mineralization with a silicate component
                                                                    This deposit is open at depth
                                                                    Orientation metallurgical tests indicate a
                                                                     relatively coarse liberation grind size
                                                                    Commercial grade magnetite sinter feed
                                                                     concentrate can be produced




To view a larger more detailed version of this map please visit:
http://www.championironmines.com/vns-site/page-oil_can.html                                                  23
Oil Can Project
 Exploration Upside
 The 2011 drill program returned long magnetite-hematite iron formation
  intersections up to 545 metres in length.
 The 400 metre spaced drill program is completed.
 Mineral Resource Estimate scheduled for Q2 2012.
                            SELECTED* COMPOSITE ASSAY RESULTS
  HOLE-ID       HOLE LENGTH         AZIMUTH         DIP      FROM         TO       INTERVAL**       GRADE***

                     Metres          Degrees     Degrees     Metres     Metres        Metres         Total Fe%
  OC11-02             594              310          -45       188.5      590.0         401.5            30.7
  Including                                                   246.9      460.4         213.5            33.1
  OC11-05             545              020          -45       241.6      545.0         303.4            34.7
  Including                                                   407.2      538.0         130.8            36.5
  OC11-08             616              180          -50       67.0       612.7         545.7            33.7
  Including                                                   67.0       509.3         442.3            36.4
 * Selected Composite Assay Results are stated only for results recently received. The Selected Composites are not
 necessarily representative of the average grade or thickness of the mineral zones or potential resource.
 ** Intervals are down-hole lengths and not true widths of the mineral zones.
 *** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the “High
 Grade/Ores Method” and XRF analysis.
                                                                                                                     24
Oil Can Project
Exploration Upside
                                           South & East Zones
                                        Section 9800N (Facing North)


                         South Zone
             OC11-05
                       OC11-07                                               East Zone
                                       OC11-08
 303.4m @ 34.7%                                                OC11-02                   OC11-19
                                 Ovb                                                                  OC11-01
  incl. 130.8m @
       36.5%
                                                                         Assay Pending
                                          545.7m @ 33.7%                                  IF
                                            incl. 442.3 @
                                  IF            36.4%                                              190.0m @
                                                                                                     30.6%

             197.2m @ 26.8%
                                                      401.5m @ 30.7%
               incl. 145.5 @
                                                        incl. 213.5 @
                  28.1%
                                                            33.1%




                                                                                     200 metres




                                                                                                                25
Oil Can Project
Exploration Upside
                                        Central Zone
                                       (Facing Northwest)



                                        OC11-14 OC11-16
                                                          OC11-03
                                 191.7m @                           OC11-10
                                   28.2%                            Ovb



               311.4m @ 27.6%
                incl. 269.0m @
                     29.2%
                     224.0m @ 28.1%
                      incl. 140.0m @                          472.2m @ 28.0%
                           30.0%
                                                 IF            incl. 119.6m @
                                                                    35.2%




                                                                                200 metres




                                                                                             26
Oil Can Project
Exploration Upside
                                     North Zone
                              Section 5800E (Facing East)


                              OC11-12   OC11-13    OC11-15
                                                                                     OC11-04
                                                          141.5m @ 29.2%
                                   OC11-09                                  Ovb
            221.2m @ 25.0%
             incl. 128.9m @
                  28.7%

                                 Assays Pending                                179.5m @ 32.8%


                                             IF
                                        414.1m @ 25.1%
                                         incl. 139.0m @
                                              29.5%                        472.2m @ 28.0%
                                                                            incl. 119.6m @
                                                                                 35.2%




                                                                                  200 metres




                                                                                                27
Milestones




Fire Lake North Definition Drilling                                     Completed
Updated PEA on Fire Lake North                                          Completed

Initial NI 43-101 Mineral Resource Estimate for Oil Can Project
                                                                        Completed
(adjacent to Fire Lake North Project)

Metallurgical results - Fire Lake North, Moire Lake, Oil Can Projects   Completed

Fire Lake North Feasibility Study                                        Q3 2012

Fire Lake North Construction Start                                       Q4 2013
Fire Lake North Production                                                2015




                                                                                    28
Why Invest in
Champion Iron Mines?
 Fire Lake North NPV: $4 Billion @ 8% DCF.
 Oil Can Deposit: Initial Resource Estimate 1,896Mt @
  28.7%.
 14 Brownfield projects (747 km2) near 5 operating mines.
 Experienced team: Exploration; development;
  construction; commissioning & operations management.
 Financed through to feasibility; Favourable tax
  environment.
 Quebec`s Plan Nord: Object to attract $80B in investment.
 Access to power and close to rail and port.
 Multi-user port in construction; Trans-shipping is an option.
 Iron price range and forecasts is unprecedented.
 Several de-risking initiatives associated to mine start-up
  underway.

                                                          29
Thank You
            www.championironmines.com
            FSE: P02; OTCQX: CPMNF




                                        30




                                             30
Fire Lake North Exploration Camp




                                          Coarse Grained
Coarse Specular Hematite in Drill Core
                                         Specular Hematite




                                                             31
O’Keefe Purdy Project
Exploration Upside




                        32
Advanced Exploration
Bellechasse Deposit                                     Harvey Tuttle Project
   Deposit located within Consolidated Fire Lake          NI 43-101 Inferred Resource Estimate:
    North                                                   717Mt @ 25% iron; magnetite rich iron formation

   NI 43-101 Resource Estimate:                            Intersected multiple significant iron formation
                                                            intervals in 2010 drill program
   Inferred Resources; 215Mt @ 29% Iron
                                                           Total of 13,165m of drilling completed
   Magnetite rich iron formation
                                                           Less than 50% of the kilometric scale magnetic
   Adjacent to Hwy 389
                                                            anomalies have been tested
   Synform geometry is favorable for open pit mining
                                                           25 km W-NW of Consolidated Fire Lake North
                                                           Within conveying distance from Fire Lake North
                                                            planned concentrator (20-30km)




                                                                                                               33
Labrador Trough Annual Production
Iron Ore Production Upside

                                              Current Annual       Future
                 Company
                                               Production      Annual Forecast
 IOC/RTZ                                          17 mtpy         26 mtpy1

 ArcelorMittal                                    13 mtpy         24 mtpy2

 Cliffs Natural Resources (Wuhan)                 12 mtpy          28 mtpy

 Labrador Iron Mines                               2 mtpy          5 mtpy

 Adriana Resources (Wuhan)                             0           50 mtpy

 New Millennium (Tata)                                 0           27 mtpy

 Century Iron Mines (Wuhan)                            0          ~22 mtpy

 Champion Iron Mines                                   0          ~18 mtpy

 Alderon Iron Ore Corp.                                0          ~16 mtpy

 Total Current and Forecasted Production               44        ~ 200 mtpy

1. Possibility of expanding production up to 50 mtpy
2. Possibility of expanding production to 50 mtpy
                                                                                 34
Global Steel Production Shows
           Continued Demand for Iron Ore
           1,600,000



           1,400,000                China’s CAGR* is 9.88% over
                                   the last 30 years vs. 2.30% for
           1,200,000
                                    total global steel production
                                       over the same period.
Kilotons




           1,000,000
                                                                                      China

            800,000
                                                                                      Japan

            600,000                                                                   Rest of the
                                                                                      World

            400,000



            200,000



                  -
                       1980        1985         1990   1995      2000   2005   2010

      Source: World Steel Association website
      * CAGR: Compound annual growth rate                                                       35
Iron Ore Types




                                Coarse Grained Specular Hematite
    Direct Shipping Ore




Magnetite Rich Taconite & DSO   Coarse Grained Specular Hematite   36
Fermont Iron Ore District
              (“FIOD”)

Historically the Fermont and Labrador mining
        camps have produced 33 Mta.

            RTZ/IOC = 17 Mta
           ArcelorMittal = 13 Mta
             Wabush = 3 Mta

               “ Marginal Era”:
         For 30-40 years pre-2003
     the price per tonne of concentrate
            was $25- $30/tonne,
        costs per tonne were similar.

     Current 3 years moving average is
              $115-120/tonne

2011 spot price averaged ~$150-170/tonne


                                           37

Contenu connexe

Tendances

Champion Minerals Corporate Presentation - August 1, 2012
Champion Minerals Corporate Presentation - August 1, 2012Champion Minerals Corporate Presentation - August 1, 2012
Champion Minerals Corporate Presentation - August 1, 2012
shosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
shosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
shosein2011
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25th
shosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
shosein2011
 
Champion Minerals Corporate Presentation March 30, 2012
Champion Minerals Corporate Presentation March 30, 2012Champion Minerals Corporate Presentation March 30, 2012
Champion Minerals Corporate Presentation March 30, 2012
shosein2011
 
Champion Minerals Corporate Presentation - June 5, 2012
Champion Minerals Corporate Presentation - June 5, 2012Champion Minerals Corporate Presentation - June 5, 2012
Champion Minerals Corporate Presentation - June 5, 2012
shosein2011
 
Champion Minerals Corporate Presentation Jan 16th 2012
Champion Minerals Corporate Presentation Jan 16th 2012Champion Minerals Corporate Presentation Jan 16th 2012
Champion Minerals Corporate Presentation Jan 16th 2012
shosein2011
 
Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012
shosein2011
 
Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012
shosein2011
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011
shosein2011
 
Hudson Resources - 2012 PDAC Corporate Presentation
Hudson Resources - 2012 PDAC Corporate PresentationHudson Resources - 2012 PDAC Corporate Presentation
Hudson Resources - 2012 PDAC Corporate Presentation
tuer
 

Tendances (20)

Champion Minerals Corporate Presentation - August 1, 2012
Champion Minerals Corporate Presentation - August 1, 2012Champion Minerals Corporate Presentation - August 1, 2012
Champion Minerals Corporate Presentation - August 1, 2012
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25th
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
Champion Minerals Corporate Presentation March 30, 2012
Champion Minerals Corporate Presentation March 30, 2012Champion Minerals Corporate Presentation March 30, 2012
Champion Minerals Corporate Presentation March 30, 2012
 
Champion Minerals Corporate Presentation - June 5, 2012
Champion Minerals Corporate Presentation - June 5, 2012Champion Minerals Corporate Presentation - June 5, 2012
Champion Minerals Corporate Presentation - June 5, 2012
 
Champion Minerals Corporate Presentation Jan 16th 2012
Champion Minerals Corporate Presentation Jan 16th 2012Champion Minerals Corporate Presentation Jan 16th 2012
Champion Minerals Corporate Presentation Jan 16th 2012
 
Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012
 
Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011
 
Partnering with International Capital to develop West African minerals: Austr...
Partnering with International Capital to develop West African minerals: Austr...Partnering with International Capital to develop West African minerals: Austr...
Partnering with International Capital to develop West African minerals: Austr...
 
Lithium supply: how much can the market digest?
Lithium supply: how much can the market digest?Lithium supply: how much can the market digest?
Lithium supply: how much can the market digest?
 
South American lithium
South American lithiumSouth American lithium
South American lithium
 
Providing future US niobium/ rare earth supplies
Providing future US niobium/ rare earth suppliesProviding future US niobium/ rare earth supplies
Providing future US niobium/ rare earth supplies
 
World class production centre in Greenland
World class production centre in GreenlandWorld class production centre in Greenland
World class production centre in Greenland
 
Ngualla Project: A large new rare earth discovery
Ngualla Project: A large new rare earth discoveryNgualla Project: A large new rare earth discovery
Ngualla Project: A large new rare earth discovery
 
Hudson Resources - 2012 PDAC Corporate Presentation
Hudson Resources - 2012 PDAC Corporate PresentationHudson Resources - 2012 PDAC Corporate Presentation
Hudson Resources - 2012 PDAC Corporate Presentation
 
Soviet expertise, Canadian security
Soviet expertise, Canadian securitySoviet expertise, Canadian security
Soviet expertise, Canadian security
 
Lofdal heavy rare earths
Lofdal heavy rare earthsLofdal heavy rare earths
Lofdal heavy rare earths
 

Similaire à English champion iron mines sept 5, 2012

Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012
shosein2011
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011
shosein2011
 
Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011
shosein2011
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011
shosein2011
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011
shosein2011
 
Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011
shosein2011
 
Champion Minerals Corporate Presentation October 13 2011
Champion Minerals  Corporate Presentation October 13 2011Champion Minerals  Corporate Presentation October 13 2011
Champion Minerals Corporate Presentation October 13 2011
shosein2011
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010
PENTA
 
Crk marketing pres european gold forum 2011
Crk marketing pres   european gold forum 2011Crk marketing pres   european gold forum 2011
Crk marketing pres european gold forum 2011
Crocodile Gold
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor Presentation
Company Spotlight
 
25 04 12 reservoir minerals_v01_si (2)
25 04 12 reservoir minerals_v01_si  (2)25 04 12 reservoir minerals_v01_si  (2)
25 04 12 reservoir minerals_v01_si (2)
reservoirminerals
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
Symposium
 
Dgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forum
DetourGold
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentation
Sagegold
 

Similaire à English champion iron mines sept 5, 2012 (19)

Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011
 
Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011
 
Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011
 
Champion Minerals Corporate Presentation October 13 2011
Champion Minerals  Corporate Presentation October 13 2011Champion Minerals  Corporate Presentation October 13 2011
Champion Minerals Corporate Presentation October 13 2011
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010
 
Iron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentationIron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentation
 
Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting
 
Crk marketing pres european gold forum 2011
Crk marketing pres   european gold forum 2011Crk marketing pres   european gold forum 2011
Crk marketing pres european gold forum 2011
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor Presentation
 
25 04 12 reservoir minerals_v01_si (2)
25 04 12 reservoir minerals_v01_si  (2)25 04 12 reservoir minerals_v01_si  (2)
25 04 12 reservoir minerals_v01_si (2)
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
 
Investor Presentation October 2014
Investor Presentation October 2014Investor Presentation October 2014
Investor Presentation October 2014
 
Dgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forum
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentation
 
Resources roadshow april geoff laing, exco resources ltd
Resources roadshow april  geoff laing, exco resources ltdResources roadshow april  geoff laing, exco resources ltd
Resources roadshow april geoff laing, exco resources ltd
 

Plus de shosein2011

Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012
shosein2011
 
Fr champion iron mines november 2012
Fr champion iron mines november 2012Fr champion iron mines november 2012
Fr champion iron mines november 2012
shosein2011
 
German champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsxGerman champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsx
shosein2011
 
12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]
shosein2011
 
12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]
shosein2011
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
shosein2011
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
shosein2011
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
shosein2011
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
shosein2011
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
shosein2011
 
August1 chinesecp
August1 chinesecpAugust1 chinesecp
August1 chinesecp
shosein2011
 
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - ChineseChampion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
shosein2011
 

Plus de shosein2011 (17)

Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012
 
Fr champion iron mines november 2012
Fr champion iron mines november 2012Fr champion iron mines november 2012
Fr champion iron mines november 2012
 
German champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsxGerman champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsx
 
12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]
 
12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
 
Aug1chmcpc
Aug1chmcpcAug1chmcpc
Aug1chmcpc
 
Aug1chmcpc
Aug1chmcpcAug1chmcpc
Aug1chmcpc
 
Aug1chmcpg
Aug1chmcpgAug1chmcpg
Aug1chmcpg
 
August1 chinesecp
August1 chinesecpAugust1 chinesecp
August1 chinesecp
 
August1germancp
August1germancpAugust1germancp
August1germancp
 
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - ChineseChampion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
 

Dernier

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 

Dernier (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 

English champion iron mines sept 5, 2012

  • 1. Building the Next Major Iron Ore Mine in the Labrador Trough Corporate Presentation September 2012 www.championironmines.com FSE: P02; OTCQX: CPMNF
  • 2. FORWARD-LOOKING STATEMENTS Certain information contained herein regarding Champion Iron Mines Ltd., including management’s assessment of future plans and operations, may constitute forward-looking statements under applicable securities law and necessarily involve risks, including but not limited to risks associated with mining exploration, operating costs, production costs, volatility of share prices, currency fluctuations, imprecision of resource and reserve estimates, environmental risks and ability to access sufficient capital from internal and external sources. As a consequence, actual results may differ materially from those anticipated in any forward looking statements. Plans, intentions or expectations disclosed in any forward-looking statements or information should not be read as guarantees of future results or events, and will not necessarily be accurate indications of whether or when or by which such results or events will be achieved. Except as required by law, Champion Iron Mines Ltd., expressly disclaims any intention and undertakes no obligation to update any forward looking statements or information as conditions change. The historical mineral resources mentioned are strictly historical in nature and are non- compliant to National Instrument 43-101 mineral resources and mineral reserves standards, and should therefore not be relied upon. A qualified person has not done sufficient work to upgrade or classify the historical mineral resources as current National Instrument NI-43-101 compliant. 2
  • 3. About Champion Iron Mines Advanced iron ore exploration and development projects located in Canada’s principal iron ore district, the Labrador Trough Fermont Projects (747 km2)  14 projects in the Fermont Iron Ore District  Flagship Consolidated Fire Lake North Project with the feasibility study due in early Q4 2012  4.7 billion tonnes of NI 43-101 compliant estimates of iron mineral resources on 3 projects  100% direct interest, 3% NSR (C$1.5 million buyback for an additional 0.5% NSR) Attikamagen Project (310 km2)  Champion Iron Mines holds a 44% interest  Century Iron Mines Corp. subsidiary has a 56% interest and can earn up to a 60% interest by spending further $3 million on exploration expenditures by May 2014*. * Investment by WISCO of 25% ($60M) and Minmetals of 5% ($12M) 3
  • 4. Quebec’s Next Major Iron Ore Mine Fire Lake North (FLN) Development Project  Nov. 21 2011 PEA indicated an ability to produce 8.7 million tonnes of concentrate per year for the first 25 years of a 40-year mine life  the first 5 years will average approximately 10 million tonnes of concentrate annually  Net Present Value of $4 billion at a discounted cash flow rate of 8% with an Internal Rate of Return of 41.5% and a payback period of 2.3 years Established Iron Ore District  Canada produces 44 mtpy of iron ore concentrate in the southern end of the Labrador Trough and this is expected to grow to 200 mtpy over the next 10 years if all proposed development projects are realized  Established rail, power and port infrastructure - Quebec’s Plan Nord: $80 billion investment over the next 25 years in northern Quebec for various projects including infrastructure projects - Competitive power rates: ~ $0.04 - $0.045; price to be negotiated in 2012 - World-class multi-user port project (50 Mtpa) underway Proven Team  Strengthened advisory board and board of directors includes former Consolidated Thompson Iron Mines management and officers 4
  • 5. Capital Structure Share Data and Cash Position as of July 31, 2012. Shares Outstanding 119.3 million Warrants 10.0 million @ C$2.59 (avg. strike price) (7.0 million @ C$3.00 not exerciseable until Nov. 2014 0.8 million @ C$2.84 expiring Feb. 2013 2.22 million @ C$1.50 expiring Oct. 2013, which are owned by insiders and advisors.) Options 11.6 million @ C$1.03 (avg. exercise price) Fully Diluted Shares Outstanding 141.1 million Market Capitalization C$112.2 million (based on $0.94 share price) Cash Position C$21.9 million Fully Diluted Cash Position C$59.7 million Management /Insiders Ownership ~ 17% Analyst Coverage Canaccord Genuity Paradigm Capital Desjardins Capital Markets Raymond James Dundee Capital Markets RBC Capital Markets Fraser Mackenzie Salman Partners Haywood Securities Scotia Capital Jennings Capital Stifel Nicolaus Macquarie Capital Markets TD Securities 5
  • 7. Experienced Management Team Over 200 years of combined exploration and mine operations experience Board of Directors Management Team Tom Larsen Tom Larsen Chairman President and CEO Alexander Horvath, P.Eng. Alexander Horvath, P.Eng. Director Executive Vice President, Exploration Jean Depatie, P.Geo. Martin Bourgoin, P.Geo. Director Executive Vice President, Operations Ashwath Mehra Jeff Hussey, P.Geo. Director Executive Vice President, Business Development Donald A. Sheldon, LLB., P.Eng. Bruce Mitton, P.Geo. Director Vice President, Exploration Jean Lafleur P.Geo. Jean-Luc Chouinard, P Eng. Director Vice President, Project Development Francis Sauvé Miles Nagamatsu, CA Director Chief Financial Officer Joseph S. C. Chan Jorge Estepa Director Vice President, Secretary-Treasurer Richard Quesnel: Senior Technical Advisor and Head of the Advisory Board Advisory Board: Richard Quesnel, Paul Ankcorn, Doug Bache, and William Harding 7
  • 8. Why invest in Champion Iron Mines? Favourable Operating Champion Iron Mines’ Environment Competitive Advantage  Established iron ore mining  Fermont holdings: 14 iron ore district: The Labrador Trough Brownfield projects (747 km2)  Favourable tax environment  Consolidated Fire Lake North (40% tax rebate on exploration Project: Feasibility Study of surface expenditures) deposits of coarse grained specular Hematite:  Access to low-cost power and close to rail and port  Easier to liberate infrastructure  Deleterious elements in  Quebec’s Plan Nord  $80 billion concentrate are well below over 25 years industry specifications limits  Quebec is a world class area to develop mines  Experienced team of project developers and mine builders  Unprecedented Iron Ore price range and forecast  Upside potential for growth is high with 4.7 Billion tonnes  Skilled labor work force  Several de-risking initiatives  Environmental: Iron ore process underway including rail, port, is grinding to liberate iron and agreements and environmental using gravity and magnetics for studies and permit applications separation from gangue minerals 8
  • 9. Existing Rail Infrastructure Quebec North Shore & Labrador Railway (“QNS&L”)  Fire Lake North PEA Base Case connection to Bloom Lake railway requires 94 km of rail – includes turnaround loop and sidings  QNS&L links to Sept-Iles and Pointe Noire  Bloom Lake and QNS&L railways are considered common carriers  Common carriers allocate capacity on a first-come, first-serve basis Cartier Railway:  Linked to Port-Cartier  Privately owned by ArcelorMittal  Within Fire Lake North Project boundary 9
  • 10. World Class Port of Sept-Îles Infrastructure Expanding to Meet Demand Pointe Noire Multi User Wharf  Announced long term agreement (20-40 years) on July 18th, 2012  10 Mt ship loading capacity reserved with the possibility to increase tonnage  Completion March 31st, 2014; 18 months prior to "FLN" startup Sept-Iles  Phase 1: 50Mtpy $220 million  Federal Government announced $55 million funding or 25% of project Pointe Noire  Phase 2: Planning for 100 Mtpy Port of Sept-Îles  RTZ-IOC shipping facility Port-Cartier  ArcelorMittal shipping facility  $2.1B expansion is underway and will China Max ship capacity 300kt include concentrator expansion with port and rail infrastructure upgrades  Located 62 km west of Sept-Iles Courtesy of the Port de Sept Isles 10
  • 11. Champion Iron Mines participating in a feasibility study with CN Rail and Caisse de Depot et Placements du Québec  See August 29th 2012 press release  Reduction in OPEX compared to PEA study  Objective to reduce rail CAPEX component  CHM still focused on the feasibility study  CN focused on environmental permitting  CHM will continue to develop independent options for port handling for concentrate stockpiling and reclaiming
  • 12. Development: Consolidated Fire Lake North Project 12
  • 13.
  • 14. Fire Lake North Development Project November 2011 Preliminary Economic Assessment Update – Highlights Key Results Pre-Tax Basis Internal Rate of Return (IRR) (8% Discount Rate) 41.5% Undiscounted Cash Flow $10.9B Net Present Value @ 5% Discounted Cash Flow $5.6B Net Present Value @ 8% Discounted Cash Flow $4.0B Based upon the following assumptions: Net Present Value @ 10% Discounted Cash Flow $3.2B Payback Period (8% Discount Rate) 2.3 Years  Capital Costs: US$1,368 million (includes rail and port infrastructure)  Operating Costs: US$51.01 per tonne (average 25 years); US$39.46 per tonne (average years 1 to 5)  Price assumptions: US$115 per tonne of concentrate at 65% Fe  Mine-Life: 40 years (average of 8.7 million tonnes/year for the first 25 years)  Exchange rate: $1.00 USD to $1.00 CDN  Total Resources(1): 400 million tonnes grading 30.6% Fe (NI43-101 Measured and Indicated Resources) 661 million tonnes grading 27.7% Fe (NI43-101 Inferred Resources)  In Pit Resources 921.8 million tonnes grading 28.8% Fe at an 8% cut-off grade 14
  • 15. Fire Lake North Project Preliminary Economic Assessment Study OPERATING EXPENDITURES (US$/TONNE OF CONCENTRATE) COST PARAMETERS AVERAGE 25 YEARS AVERAGE YEARS 1 TO 5 Mining 22.56 12.13 Concentrating, crushing and processing 4.52 3.97 Site infrastructure, sales and general administration 4.40 3.39 Environmental tailings and management 0.29 0.26 Rail transport 15.52 16.14 Port facilities 3.72 3.57 Equipment Lease Cost 1.67 5.17 Total 52.68 44.63 CAPITAL EXPENDITURES (US$ MILLIONS) COST CENTRES $ MILLIONS Pre-stripping of open pit areas 97.5 Concentrator and site infrastructure including loadout facilities 682.3 Railway (62km distance and 94km total including turnaround loop and sidings) 228.8 Port Facilities: Railcar unloading, stacker/reclaimer, conveyors 96.8 Environmental and Tailings Management 27.9 Other Pre Production Costs 34.0 Sub-total 1,167 Contingency 201 Total 1,368 15
  • 16. Fire Lake North Project Schedule Development, Construction, and Production 2011 2012 2013 2014 2015 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Diamond Drilling Scoping Study Feasibility Study Environmental / Social Studies Community Consultation Permitting Construction Production 16
  • 17. Fire Lake North Project Growth through Development  Feasibility Study: Early Q4 2012  Press Release June 21, 2012: Over 20,000 m feasibility definition drilling is completed for feasibility study  Strike length of both the West Pit (3500m) and the East Pit (2400m) synformal fold closures are open at depth  Resources are increasing outside the Nov. 2011 PEA ultimate pit limits  Several de-risking initiatives are underway See www.championiromines.com for reports maps and assays 17
  • 18. Fire Lake North – Metallurgy Press Release, August 1st, 2012  High quality sinter concentrate with very low deleterious elemental content  Liberates at 850 micron (-20 mesh) and produces a 65-66% iron concentrate  Assuming a concentrate with 66% Fe ; No magnetic separation circuit required  Alumina is 0.52% International Standard < 2%  Silica content is 5%  Al2O3 : SiO2 ratio of 0.14 versus the upper industry specification limit of 1  This very low alumina to silica ratio is an ideal blending product for steel mills High Grade – Coarse Specular Hematite Quartz Specular Hematite Mineralization 18
  • 19. Fire Lake North Development Project 19
  • 20. Fire Lake North Development Project 20
  • 21. Moire Lake Project Initial Mineral Resource Estimate: March 29, 2012  Mineral Resource Estimate: Arcelor Mittal Property Boundary  Indicated Resources: 164 million tonnes grading 30.5% Total Iron  Inferred Resources: 417 million tonnes grading 29.4% Total Iron  DDH LM11-12: 503 m @ 31% total iron  Kilometric synform with hematite and magnetite outcrops at surface A’  Adjacent to ArcelorMittal Mont-Wright mine A 500 meters 21
  • 22. Moire Lake Project Infrastructure: Adjacent to Bloom Lake Railway (8km), road, & power 500 meters 22
  • 23. Oil Can Project Initial Mineral Resource Estimate  Potential for low strip ratio < 1 : 1  Potential Bench width  150- 350m  972 Mt of iron oxide grading 33.2% at a 15% iron cut-off  924 Mt of mixed iron oxide mineralization with a silicate component  This deposit is open at depth  Orientation metallurgical tests indicate a relatively coarse liberation grind size  Commercial grade magnetite sinter feed concentrate can be produced To view a larger more detailed version of this map please visit: http://www.championironmines.com/vns-site/page-oil_can.html 23
  • 24. Oil Can Project Exploration Upside  The 2011 drill program returned long magnetite-hematite iron formation intersections up to 545 metres in length.  The 400 metre spaced drill program is completed.  Mineral Resource Estimate scheduled for Q2 2012. SELECTED* COMPOSITE ASSAY RESULTS HOLE-ID HOLE LENGTH AZIMUTH DIP FROM TO INTERVAL** GRADE*** Metres Degrees Degrees Metres Metres Metres Total Fe% OC11-02 594 310 -45 188.5 590.0 401.5 30.7 Including 246.9 460.4 213.5 33.1 OC11-05 545 020 -45 241.6 545.0 303.4 34.7 Including 407.2 538.0 130.8 36.5 OC11-08 616 180 -50 67.0 612.7 545.7 33.7 Including 67.0 509.3 442.3 36.4 * Selected Composite Assay Results are stated only for results recently received. The Selected Composites are not necessarily representative of the average grade or thickness of the mineral zones or potential resource. ** Intervals are down-hole lengths and not true widths of the mineral zones. *** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the “High Grade/Ores Method” and XRF analysis. 24
  • 25. Oil Can Project Exploration Upside South & East Zones Section 9800N (Facing North) South Zone OC11-05 OC11-07 East Zone OC11-08 303.4m @ 34.7% OC11-02 OC11-19 Ovb OC11-01 incl. 130.8m @ 36.5% Assay Pending 545.7m @ 33.7% IF incl. 442.3 @ IF 36.4% 190.0m @ 30.6% 197.2m @ 26.8% 401.5m @ 30.7% incl. 145.5 @ incl. 213.5 @ 28.1% 33.1% 200 metres 25
  • 26. Oil Can Project Exploration Upside Central Zone (Facing Northwest) OC11-14 OC11-16 OC11-03 191.7m @ OC11-10 28.2% Ovb 311.4m @ 27.6% incl. 269.0m @ 29.2% 224.0m @ 28.1% incl. 140.0m @ 472.2m @ 28.0% 30.0% IF incl. 119.6m @ 35.2% 200 metres 26
  • 27. Oil Can Project Exploration Upside North Zone Section 5800E (Facing East) OC11-12 OC11-13 OC11-15 OC11-04 141.5m @ 29.2% OC11-09 Ovb 221.2m @ 25.0% incl. 128.9m @ 28.7% Assays Pending 179.5m @ 32.8% IF 414.1m @ 25.1% incl. 139.0m @ 29.5% 472.2m @ 28.0% incl. 119.6m @ 35.2% 200 metres 27
  • 28. Milestones Fire Lake North Definition Drilling Completed Updated PEA on Fire Lake North Completed Initial NI 43-101 Mineral Resource Estimate for Oil Can Project Completed (adjacent to Fire Lake North Project) Metallurgical results - Fire Lake North, Moire Lake, Oil Can Projects Completed Fire Lake North Feasibility Study Q3 2012 Fire Lake North Construction Start Q4 2013 Fire Lake North Production 2015 28
  • 29. Why Invest in Champion Iron Mines?  Fire Lake North NPV: $4 Billion @ 8% DCF.  Oil Can Deposit: Initial Resource Estimate 1,896Mt @ 28.7%.  14 Brownfield projects (747 km2) near 5 operating mines.  Experienced team: Exploration; development; construction; commissioning & operations management.  Financed through to feasibility; Favourable tax environment.  Quebec`s Plan Nord: Object to attract $80B in investment.  Access to power and close to rail and port.  Multi-user port in construction; Trans-shipping is an option.  Iron price range and forecasts is unprecedented.  Several de-risking initiatives associated to mine start-up underway. 29
  • 30. Thank You www.championironmines.com FSE: P02; OTCQX: CPMNF 30 30
  • 31. Fire Lake North Exploration Camp Coarse Grained Coarse Specular Hematite in Drill Core Specular Hematite 31
  • 33. Advanced Exploration Bellechasse Deposit Harvey Tuttle Project  Deposit located within Consolidated Fire Lake  NI 43-101 Inferred Resource Estimate: North 717Mt @ 25% iron; magnetite rich iron formation  NI 43-101 Resource Estimate:  Intersected multiple significant iron formation intervals in 2010 drill program  Inferred Resources; 215Mt @ 29% Iron  Total of 13,165m of drilling completed  Magnetite rich iron formation  Less than 50% of the kilometric scale magnetic  Adjacent to Hwy 389 anomalies have been tested  Synform geometry is favorable for open pit mining  25 km W-NW of Consolidated Fire Lake North  Within conveying distance from Fire Lake North planned concentrator (20-30km) 33
  • 34. Labrador Trough Annual Production Iron Ore Production Upside Current Annual Future Company Production Annual Forecast IOC/RTZ 17 mtpy 26 mtpy1 ArcelorMittal 13 mtpy 24 mtpy2 Cliffs Natural Resources (Wuhan) 12 mtpy 28 mtpy Labrador Iron Mines 2 mtpy 5 mtpy Adriana Resources (Wuhan) 0 50 mtpy New Millennium (Tata) 0 27 mtpy Century Iron Mines (Wuhan) 0 ~22 mtpy Champion Iron Mines 0 ~18 mtpy Alderon Iron Ore Corp. 0 ~16 mtpy Total Current and Forecasted Production 44 ~ 200 mtpy 1. Possibility of expanding production up to 50 mtpy 2. Possibility of expanding production to 50 mtpy 34
  • 35. Global Steel Production Shows Continued Demand for Iron Ore 1,600,000 1,400,000 China’s CAGR* is 9.88% over the last 30 years vs. 2.30% for 1,200,000 total global steel production over the same period. Kilotons 1,000,000 China 800,000 Japan 600,000 Rest of the World 400,000 200,000 - 1980 1985 1990 1995 2000 2005 2010 Source: World Steel Association website * CAGR: Compound annual growth rate 35
  • 36. Iron Ore Types Coarse Grained Specular Hematite Direct Shipping Ore Magnetite Rich Taconite & DSO Coarse Grained Specular Hematite 36
  • 37. Fermont Iron Ore District (“FIOD”) Historically the Fermont and Labrador mining camps have produced 33 Mta. RTZ/IOC = 17 Mta ArcelorMittal = 13 Mta Wabush = 3 Mta “ Marginal Era”: For 30-40 years pre-2003 the price per tonne of concentrate was $25- $30/tonne, costs per tonne were similar. Current 3 years moving average is $115-120/tonne 2011 spot price averaged ~$150-170/tonne 37