SlideShare une entreprise Scribd logo
1  sur  9
go!
out of your mind.
Design Automation of Fore hearth
go!
out of your mind.
Fore hearth in Glass Conditioning Process
A refractory channel whose function is to receive molten glass from
furnace, reduce its temperature to desired level and discharge it to
the feeder mechanism at a uniform temperature.
Fore hearth
go!
out of your mind.
Fore Hearth Construction
1. Sub Structure Steel Assembly
2. Sub Structure Insulation Assembly
3. Channel Assembly
4. Burner Course Assembly
5. Roof Course Assembly
6. Super Structure Insulation Assembly
7. Super Structure Steel Assembly
8. Burner Piping Assembly
3
2
1
4
5 7
8
go!
out of your mind.
The Need
• Design to be manufactured across the globe
• Product optimization & Standardization
• To Increase the Productivity & reducing the routine
work
• Knowledge capturing
• Reusing the design
• To increase the product ranges to suit the new
customer requirements
• Integrating the design process with PDM
go!
out of your mind.
Design Process
Design Automation Process
Design Process Of FDA
Application
Customer Requirements to Emhart
Specification preparation by Emhart
Designer User Inputs to FDA Application
Generation of Quotation Layout
Customer
Approval
No
Yes
Generation of All Production
Drawings
Insulation Report Generation
Installation & Transportation
Drawings
Moving Complete
project to Intra link
Database Database
Manual Design Process
FDA
Application
go!
out of your mind.
Development Platform
Software
• Pro/Engineer Wildfire 2.0 (32 bit)
• Java 1.5
• Oracle 9i
Production Hardware
• Intel Xeon processor
• RAM : 4 GB
go!
out of your mind.
Product Complexity
• Maintaining model history by using database (Legacy Data)
• Generating generic parametric library that supports
generation of all possible configurations of fore hearth.
• Tailor making the components to satisfy the Pro/ Wind
Chill conditions
• Execution of Pro/E tasks at application runtime, like..
• Renaming of all used components
• Deletion of un used model tree objects
• Dynamic assembling based on the requirement
• Insulation assembly & report generation
• Generation of models in metric & Imperial units.
• Interdependency between components
s+c.avi
go!
out of your mind.
Salient Features of Application
• Modular based assembly generation
• Legacy data base
• generating Input report for user validation before going for
model generation.
• Even a non designer can handle the application, if he had
specification sheet.
• Compliance of part numbering system to suit with Pro Wind-chill
specifications.
• Generation of Quotation & Installation layouts
• Calculation of insulation material
go!
out of your mind.
Before Design
Automation
After Design
Automation
Projects
Efforts 1056 Man Hours 4 Man Hours
Duration 66 Days 1 days
Quotations
Efforts 120 Man Hours 4 Man Hours
Duration 15 Days 1 days
Design Cycle Time

Contenu connexe

Similaire à Forehearth Design Automation

E infochips mechanical capabilities
E infochips mechanical capabilitiesE infochips mechanical capabilities
E infochips mechanical capabilities
Abhishek Kumar
 
VIKAS _SENIOR HARDWARE
VIKAS _SENIOR HARDWAREVIKAS _SENIOR HARDWARE
VIKAS _SENIOR HARDWARE
VIKAS G
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
Chris Baichoo
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
Teow Beng Hur
 
“Smarter Manufacturing with Intel’s Deep Learning-Based Machine Vision,” a Pr...
“Smarter Manufacturing with Intel’s Deep Learning-Based Machine Vision,” a Pr...“Smarter Manufacturing with Intel’s Deep Learning-Based Machine Vision,” a Pr...
“Smarter Manufacturing with Intel’s Deep Learning-Based Machine Vision,” a Pr...
Edge AI and Vision Alliance
 
Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14
Fides Sales
 
Kaysun overview
Kaysun overviewKaysun overview
Kaysun overview
mdelrealkc
 
Radical Innovations In Storage for Multi-Tenant Infrastructure
Radical Innovations In Storage for Multi-Tenant InfrastructureRadical Innovations In Storage for Multi-Tenant Infrastructure
Radical Innovations In Storage for Multi-Tenant Infrastructure
NetApp
 

Similaire à Forehearth Design Automation (20)

E infochips mechanical capabilities
E infochips mechanical capabilitiesE infochips mechanical capabilities
E infochips mechanical capabilities
 
Dcs capabilities
Dcs capabilitiesDcs capabilities
Dcs capabilities
 
VIKAS _SENIOR HARDWARE
VIKAS _SENIOR HARDWAREVIKAS _SENIOR HARDWARE
VIKAS _SENIOR HARDWARE
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
 
What is the Siemens Open Library, and How it Decreased Development Time for E...
What is the Siemens Open Library, and How it Decreased Development Time for E...What is the Siemens Open Library, and How it Decreased Development Time for E...
What is the Siemens Open Library, and How it Decreased Development Time for E...
 
Brownlie Design Overview Process and Products
Brownlie Design Overview Process and ProductsBrownlie Design Overview Process and Products
Brownlie Design Overview Process and Products
 
Jeff Garrigues Portfolio
Jeff Garrigues PortfolioJeff Garrigues Portfolio
Jeff Garrigues Portfolio
 
AgO Synthesis Inc.
AgO Synthesis Inc.AgO Synthesis Inc.
AgO Synthesis Inc.
 
Panel Built Information Packet
Panel Built Information PacketPanel Built Information Packet
Panel Built Information Packet
 
Citec - Engineering and Consultant Services In India
Citec - Engineering and Consultant Services In IndiaCitec - Engineering and Consultant Services In India
Citec - Engineering and Consultant Services In India
 
Synergis University 2014-Top Reasons to Step Up from Basic Vault
Synergis University 2014-Top Reasons to Step Up from Basic VaultSynergis University 2014-Top Reasons to Step Up from Basic Vault
Synergis University 2014-Top Reasons to Step Up from Basic Vault
 
Becoming Software Oriented in a Solutions Centric Industry
Becoming Software Oriented in a Solutions Centric IndustryBecoming Software Oriented in a Solutions Centric Industry
Becoming Software Oriented in a Solutions Centric Industry
 
“Smarter Manufacturing with Intel’s Deep Learning-Based Machine Vision,” a Pr...
“Smarter Manufacturing with Intel’s Deep Learning-Based Machine Vision,” a Pr...“Smarter Manufacturing with Intel’s Deep Learning-Based Machine Vision,” a Pr...
“Smarter Manufacturing with Intel’s Deep Learning-Based Machine Vision,” a Pr...
 
Staying Close to Experts with Executable Specifications
Staying Close to Experts with Executable SpecificationsStaying Close to Experts with Executable Specifications
Staying Close to Experts with Executable Specifications
 
Final 483
Final 483Final 483
Final 483
 
Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14
 
Kaysun overview
Kaysun overviewKaysun overview
Kaysun overview
 
Radical Innovations In Storage for Multi-Tenant Infrastructure
Radical Innovations In Storage for Multi-Tenant InfrastructureRadical Innovations In Storage for Multi-Tenant Infrastructure
Radical Innovations In Storage for Multi-Tenant Infrastructure
 
Sitecore development approach evolution – destination helix
Sitecore development approach evolution – destination helixSitecore development approach evolution – destination helix
Sitecore development approach evolution – destination helix
 

Forehearth Design Automation

  • 1. go! out of your mind. Design Automation of Fore hearth
  • 2. go! out of your mind. Fore hearth in Glass Conditioning Process A refractory channel whose function is to receive molten glass from furnace, reduce its temperature to desired level and discharge it to the feeder mechanism at a uniform temperature. Fore hearth
  • 3. go! out of your mind. Fore Hearth Construction 1. Sub Structure Steel Assembly 2. Sub Structure Insulation Assembly 3. Channel Assembly 4. Burner Course Assembly 5. Roof Course Assembly 6. Super Structure Insulation Assembly 7. Super Structure Steel Assembly 8. Burner Piping Assembly 3 2 1 4 5 7 8
  • 4. go! out of your mind. The Need • Design to be manufactured across the globe • Product optimization & Standardization • To Increase the Productivity & reducing the routine work • Knowledge capturing • Reusing the design • To increase the product ranges to suit the new customer requirements • Integrating the design process with PDM
  • 5. go! out of your mind. Design Process Design Automation Process Design Process Of FDA Application Customer Requirements to Emhart Specification preparation by Emhart Designer User Inputs to FDA Application Generation of Quotation Layout Customer Approval No Yes Generation of All Production Drawings Insulation Report Generation Installation & Transportation Drawings Moving Complete project to Intra link Database Database Manual Design Process FDA Application
  • 6. go! out of your mind. Development Platform Software • Pro/Engineer Wildfire 2.0 (32 bit) • Java 1.5 • Oracle 9i Production Hardware • Intel Xeon processor • RAM : 4 GB
  • 7. go! out of your mind. Product Complexity • Maintaining model history by using database (Legacy Data) • Generating generic parametric library that supports generation of all possible configurations of fore hearth. • Tailor making the components to satisfy the Pro/ Wind Chill conditions • Execution of Pro/E tasks at application runtime, like.. • Renaming of all used components • Deletion of un used model tree objects • Dynamic assembling based on the requirement • Insulation assembly & report generation • Generation of models in metric & Imperial units. • Interdependency between components s+c.avi
  • 8. go! out of your mind. Salient Features of Application • Modular based assembly generation • Legacy data base • generating Input report for user validation before going for model generation. • Even a non designer can handle the application, if he had specification sheet. • Compliance of part numbering system to suit with Pro Wind-chill specifications. • Generation of Quotation & Installation layouts • Calculation of insulation material
  • 9. go! out of your mind. Before Design Automation After Design Automation Projects Efforts 1056 Man Hours 4 Man Hours Duration 66 Days 1 days Quotations Efforts 120 Man Hours 4 Man Hours Duration 15 Days 1 days Design Cycle Time