SlideShare une entreprise Scribd logo
1  sur  3
RANA SIKANDAR
Objective:
Committed to professionalism and highly organized, work under strict deadline schedule with
attention to details. Technically qualified in physical layer, during working with different
projects, I have developed the skills and acquire the knowledge to ensure the highest level of
competence, time management, tact and confidentiality. I believe these qualities are keys to
good management. I am confident that with my interpersonal skills.
Personal information:
Father Name : Kanwar Munawar ali
Date of birth : 16 Sep 1989
Religion : Islam
Marital Status : Single
Passport No : DS1805961
Emirates I.d : 784-1989-4053098-7
Nationality : Pakistani
Mailing Address : H#35 zubaida raza town near gill wala Sargodha
Mobile (UAE) : +97150 7659668
(Pakistan) : +92321 6032723
Email Address : sikandarrana786@yahoo.com
Academic Qualification:
Diploma: Clinical Assistant [2009]
Institute: Vocational Training institute
B.I.S.E Sargodha
Fa: (2007)
Institute: Anbala Muslim college sargodha
B.I.S.E Sargodha
Matric: (2005)
Institute: Govt. High School no. 2 sargodha
B.I.S.E Sargodha
Computer skills:
 Microsoft OS installation (Windows XP ,Windows Vista , Window 7 )
 Microsoft Office
 Installation of Server, Router, Switches in Data Cabinets.
Professional Experience:
1. Xad Technologies Dubai
Experience: February 2015 to up to date
Designation: Field Technician
2. Water Meterproject
Electrical installation, Troubleshooting, cable termination
Arrange and pull all cables and termination of
All water meters
Arrange in MUC
Experience: Augest 2015 to up to date with Ericson
3. Pakistan telecom communication Limited
Experience: March 2014 to January 2015
Designation: CPE Installer
3. Mobile hardware and software
Experience: 20 August 2010 to February 2014
Designation: Mobile hardware Engineer
Job Description:
1: Site Surveys & BOQs preparations and documentation.
2: Fiber optic network Survey, lying and distribution
3: Cable jointing, testing, Termination, troubleshooting and services provisioning.
4: Horizontal cabling & structure cabling, installation & maintenance.
5: Structured Cabling including UTP, Copper and Optical Fiber.
6: Telephone and copper cable jointing connectorization, termination & troubleshooting.
7: MDF and DB installation
8: Fiber Optics laying, termination and testing
9: Installation of racks, Cable Tray/Ladders, Fiber ducts.
10: Maintenance and installation of Data centre telecom part including cable basket.
11: OTDRs:
ACTERNA JDSU 6000.
ACTERNA MTS 5000e.
EXFO FTB400.
EXFO FTB200.
13 FUSION Splicer Machine:
Fujikura 50s.
Fujikura 60s.
Fujikura 70s.
13 Fiber optic testing (Single mode & multi mode)
Check and maintain link loss after jointing
Measurement of attenuation loss
Measurement of fiber length by OTDR
Check the fiber colour quality
14 Gpon Service Tools are Stripper ,cutter, FC Connector, Light Source, Sqrue Driver,
Small Cutter, Tissue , Clivered ,Patch Card
15 Used For
ZONE(2424,2520),HUAWEI(HG8240,HG851,HG851A),ALKATAL(IG440)
16 Etisalat Connections going for OLT->ODF->SPLITTER->FDH->MINI ODF->ONT
17 Power Meter used for Find the Power Loss
18 Rj11 Used For Voice Service
19 Rj45 Used For Data Service
20 Handled Withs Migration, Service order, PABX External Shifting ,Docket.
21 Check and maintain link loss after jointing
22 Measurement of fiber length by OTDR
23 Fiber optic splicing & testing in Filed
24 Direct termination of OFC in ODF.
25 UTP Cat 5 and Cat 6 and cat6 a cable Networking

Contenu connexe

En vedette

En vedette (13)

TATA TERTIB MUBES simulasi
TATA TERTIB MUBES simulasiTATA TERTIB MUBES simulasi
TATA TERTIB MUBES simulasi
 
Future of data center french
Future of data center frenchFuture of data center french
Future of data center french
 
Michael Gardner Final PPP
Michael Gardner Final PPPMichael Gardner Final PPP
Michael Gardner Final PPP
 
Futbol gaelico
Futbol gaelicoFutbol gaelico
Futbol gaelico
 
Slideshare
SlideshareSlideshare
Slideshare
 
о музее будь готов 2012
о музее будь готов 2012о музее будь готов 2012
о музее будь готов 2012
 
Job monitoring and failure analysis
Job monitoring and failure analysisJob monitoring and failure analysis
Job monitoring and failure analysis
 
CV Chris van Groeningen English Feb 2016
CV Chris van Groeningen English Feb 2016CV Chris van Groeningen English Feb 2016
CV Chris van Groeningen English Feb 2016
 
IMCProject
IMCProjectIMCProject
IMCProject
 
Magazine evaluation 3
Magazine evaluation 3Magazine evaluation 3
Magazine evaluation 3
 
Question 3
Question 3 Question 3
Question 3
 
Presentazione Club4business
Presentazione Club4businessPresentazione Club4business
Presentazione Club4business
 
National 16 p1
National 16 p1National 16 p1
National 16 p1
 

Similaire à SIKANDAR07 (20)

BSS Updated cv
BSS Updated cvBSS Updated cv
BSS Updated cv
 
SEKAR M
SEKAR MSEKAR M
SEKAR M
 
ashiq resume
ashiq resumeashiq resume
ashiq resume
 
Resume Anurag
Resume AnuragResume Anurag
Resume Anurag
 
imran khan cv
imran khan cvimran khan cv
imran khan cv
 
Vamsi Krishna Kalavala
Vamsi Krishna KalavalaVamsi Krishna Kalavala
Vamsi Krishna Kalavala
 
Curriculum Vitae
Curriculum Vitae  Curriculum Vitae
Curriculum Vitae
 
Raj CV 25-11-2014
Raj CV 25-11-2014Raj CV 25-11-2014
Raj CV 25-11-2014
 
Rakesh cv updated
Rakesh cv updatedRakesh cv updated
Rakesh cv updated
 
Hamayun-CV
Hamayun-CVHamayun-CV
Hamayun-CV
 
Fahad Ali Shah new
Fahad Ali Shah newFahad Ali Shah new
Fahad Ali Shah new
 
Fahad ali shah new
Fahad ali shah newFahad ali shah new
Fahad ali shah new
 
Resume_E&TC Engineer exp
Resume_E&TC Engineer expResume_E&TC Engineer exp
Resume_E&TC Engineer exp
 
wipro sravan 16 june 2015 resume
wipro sravan 16 june 2015 resumewipro sravan 16 june 2015 resume
wipro sravan 16 june 2015 resume
 
Wasim Mahroof CV ztw
Wasim Mahroof CV ztwWasim Mahroof CV ztw
Wasim Mahroof CV ztw
 
CV_Koustav
CV_KoustavCV_Koustav
CV_Koustav
 
Dhirendra_Resume
Dhirendra_ResumeDhirendra_Resume
Dhirendra_Resume
 
akorjoe cvs
akorjoe cvsakorjoe cvs
akorjoe cvs
 
CV_Sheraz
CV_SherazCV_Sheraz
CV_Sheraz
 
MY CV Version 15
MY CV Version 15MY CV Version 15
MY CV Version 15
 

SIKANDAR07

  • 1. RANA SIKANDAR Objective: Committed to professionalism and highly organized, work under strict deadline schedule with attention to details. Technically qualified in physical layer, during working with different projects, I have developed the skills and acquire the knowledge to ensure the highest level of competence, time management, tact and confidentiality. I believe these qualities are keys to good management. I am confident that with my interpersonal skills. Personal information: Father Name : Kanwar Munawar ali Date of birth : 16 Sep 1989 Religion : Islam Marital Status : Single Passport No : DS1805961 Emirates I.d : 784-1989-4053098-7 Nationality : Pakistani Mailing Address : H#35 zubaida raza town near gill wala Sargodha Mobile (UAE) : +97150 7659668 (Pakistan) : +92321 6032723 Email Address : sikandarrana786@yahoo.com Academic Qualification: Diploma: Clinical Assistant [2009] Institute: Vocational Training institute B.I.S.E Sargodha Fa: (2007) Institute: Anbala Muslim college sargodha B.I.S.E Sargodha Matric: (2005) Institute: Govt. High School no. 2 sargodha
  • 2. B.I.S.E Sargodha Computer skills:  Microsoft OS installation (Windows XP ,Windows Vista , Window 7 )  Microsoft Office  Installation of Server, Router, Switches in Data Cabinets. Professional Experience: 1. Xad Technologies Dubai Experience: February 2015 to up to date Designation: Field Technician 2. Water Meterproject Electrical installation, Troubleshooting, cable termination Arrange and pull all cables and termination of All water meters Arrange in MUC Experience: Augest 2015 to up to date with Ericson 3. Pakistan telecom communication Limited Experience: March 2014 to January 2015 Designation: CPE Installer 3. Mobile hardware and software Experience: 20 August 2010 to February 2014 Designation: Mobile hardware Engineer Job Description: 1: Site Surveys & BOQs preparations and documentation. 2: Fiber optic network Survey, lying and distribution 3: Cable jointing, testing, Termination, troubleshooting and services provisioning. 4: Horizontal cabling & structure cabling, installation & maintenance. 5: Structured Cabling including UTP, Copper and Optical Fiber. 6: Telephone and copper cable jointing connectorization, termination & troubleshooting. 7: MDF and DB installation 8: Fiber Optics laying, termination and testing 9: Installation of racks, Cable Tray/Ladders, Fiber ducts. 10: Maintenance and installation of Data centre telecom part including cable basket. 11: OTDRs: ACTERNA JDSU 6000. ACTERNA MTS 5000e. EXFO FTB400. EXFO FTB200.
  • 3. 13 FUSION Splicer Machine: Fujikura 50s. Fujikura 60s. Fujikura 70s. 13 Fiber optic testing (Single mode & multi mode) Check and maintain link loss after jointing Measurement of attenuation loss Measurement of fiber length by OTDR Check the fiber colour quality 14 Gpon Service Tools are Stripper ,cutter, FC Connector, Light Source, Sqrue Driver, Small Cutter, Tissue , Clivered ,Patch Card 15 Used For ZONE(2424,2520),HUAWEI(HG8240,HG851,HG851A),ALKATAL(IG440) 16 Etisalat Connections going for OLT->ODF->SPLITTER->FDH->MINI ODF->ONT 17 Power Meter used for Find the Power Loss 18 Rj11 Used For Voice Service 19 Rj45 Used For Data Service 20 Handled Withs Migration, Service order, PABX External Shifting ,Docket. 21 Check and maintain link loss after jointing 22 Measurement of fiber length by OTDR 23 Fiber optic splicing & testing in Filed 24 Direct termination of OFC in ODF. 25 UTP Cat 5 and Cat 6 and cat6 a cable Networking