SlideShare une entreprise Scribd logo
1  sur  9
SHIVENDRA KUMAR AGARWAL
Mobile: 09015350011/08527163099
E-Mail: free7snax@yahoo.co.in / shivendraa@hotmail.com / shivendraa950@gmail.com
               Top Management Professional – Power & Energy/Oil & Gas/Real Estate
        Business Development ~ Project Management ~ Contract Management ~Construction Management~
                               Preferred Location: Delhi / NCR/North India
Professional Snapshot
Seasoned Senior Level Professional with over 23 years Hardcore cross cultural Experience in India as well as Gulf
in Execution of Large Size EPC Projects, Project Management & Marketing, Procurement Operation, Profit Centre
Operations, Business Development and Techno Commercial Acumen. Adept in implementing programmes to ensure
attainment of growth and profit plans. Dept in providing direction & structure for operating units, participating in
developing policy and strategic plans. Adroit in planning, organising & controlling technical and commercial aspects
within the Power & Energy, Oil & Gas ,Real-estate Sector.
    Track record of managing complete operations with key focus on bottom line profitability by ensuring optimal
utilization of available resources,P&L - Top Line and Bottom Line responsibility of Business. Overseeing all operational
issues and developing / executing projects. Providing leadership, coaching, and mentoring to the management team,
and ensuring that they are accountable for maintaining high performance levels., Passion for quality & eye for minute
detailing, holds the distinction of handling assignments of Railways, Metro Railways, Bridges, Expressway, Oil & Gas,
Refinery, Coal Mines, Thermal, Hydro, Solar Power, Mega/High rise Commercial/Residential complexes, Group
Housing &Township, Real Estate EPCM / EPC / LSTK.
     Well versed with the concepts of advanced construction techniques, High quality finishes with good proposal,
estimation, tendering, costing, contract management etc. An enterprising leader with proven dexterity in leading and
directing personnel towards accomplishment of a common goal. Talent for proactively identifying, resolving &
troubleshooting problems, ramping-up project activities with on time deliverables and maximising efficiency, expert
in maintaining a smooth flow of work between departments and resolving inter-departmental conflicts. Spent several
years in EPC Power Industry, Project Management / EPC Business in leadership/Head/Project Mgt positions for the
last 15years.Expert particularly in execution and commissioning of projects in Coal Fired Power Stations. Each project
has its own P&L and operates like a separate business entity with separate dash boards of accountability such as on
time delivery, zero accidents, working capital management, PBIT, profitability & capacity to manage and lead
                                                 multiple large Power Projects & intimate knowledge of the various
               Strategic Planning                technicalities involved in Projects of Turbine Island, Boiler Island and
                                                 integrated BOP/various sub systems of the Balance of Plant (BOP).
            Profit Centre Operations             Have a good blend of knowledge that encompasses mechanical & civil
                                                 structural engineering, electrical and C&I disciplines in project
             Business Development                management. Good Experience and understanding of Hot Rolling/Cold
                                                 Rolling, steel producing, Metal manufacturing, Aluminum , Stainless
      Tendering & Contract Negotiations
                                                 steel producing, cement producing, fertilizers & chemicals, electricity
          Multi-lateral Funded Project           producing by solar ,coke, hydro.
                                               SNAP SUMMERY
           Clean / Solar Technology        Presently associated with Jindal India Thermal Power Ltd as Add Vice
        Construction HSE Management        President (Civil & Structural)/Head Of Project for [5x600] 3000 MW
                                           Coal based Mega power Plant BTG/BOP of total project cost
        Civil Structural & Procurement
                    Operations             approx.INR 22000 Cr. Previously I have worked with LANCO INFRATEK
                                           INDIA LIMITED for a brief tenure as PROJECT HEAD (G M) FOR [4x660]
      Proposal & Estimation Engineering    2640 MW Cost INR 20000 Cr BTG/BOP, Coal Based Mega Power plant,
              Liaison & Networking         IOCL Para deep Large Refinery & Special Projects. I have worked with.
                                           RVR PROJECT I LTD BCPL ASSAM Petro Chemical Large Refinery as
        Vendor & People Management
                                           Resident    Construction Manager/SR GM            Product Warehouse
          Value Engineering Process        (500mx100m) ,Gas Sweetening Unit, Lldpe/ Hdpe, Fire Auxiliary
                                           ,Chemical Building, Teal & Catalyst Buildings, Plant Building, Non Plant
           Exploration &Reservoir
    Characterization & Optimization        Building, Raw Water/Oil Reservoir, Steel fabrication, Commissioning,
                                           erection of approximate 3000000 MT M,I have worked with DYNAMIC
                                           engineers    Infratek   ltd Mumbai        ,Railway, Metro Railway
                                           MRVC,DMRC,SOLAR                Thermal               power[15MW],High
Rise[40+1,45+1]Storey, have worked with BGR energy system ltd[MSPL] as GM-projects ,1800 MW, coal based Mega
power plant BTG/BOP cost INR 6000 cr. client RRVUNL . I have worked with DSCL group as GM-PROJECT Executed
Large Size Project, 100 MW Captative Power Project,50+1,70+1 High-rise Building. started my career from PUNJ
LLOYD LTD as Trainee Graduate Engineer and rose up to as Team Leader /DGM/Project Head executed in
MATHURA ,DULIJAN ASSAM Refinery, E & P business from seismic acquisition to the flow line with the latest data
and analysis on exploration & reservoir characterization, well construction, production optimization, Atomic power,
Hydro Power [54MW,144MW],Railway, Real Estate, T&D, Fertilizers &Chemicals Plant, Cross Country Pipe line[150
KM]500 Crs. INR, National Highway, Express way, Bridge, Railway.
Expertise in soft skills

  Indian and International codes (Viz. ACI /AISC /BS / DIN/IRC/BIS or other recognized codes)
  Software’s like STAAD / RISA / GTS for analysing and designing the structures.
  PRIMEAVERA-P6,CUBE,VOYAGER,VISSUM,VISSIM,ASCE,ACI
  MS OFFICE, MS PROJECT,AUTOCAD, STAAD PRO
  Professional mastery, Team building, Decision making, Striving for excellence,
  Strategic thinking, Stewardship of resources, widely travelled.
  Capable of adjusting any working conditions, Good communication skill.
Proficiency Forte

 Managing preliminary project plan, site selection, layout, preliminary engineering, material management detailed
    engineering, equipment specification, to run full project life cycle from inception to hand over.
 Debottlenecking and expansion of the project Spearheading activities, business dynamics pertaining to energy and
  wheeling of power, involving working out various requirements and monitoring overall project operations for
  ensuring timely completion.
 Site Management and Site Construction Operations of the assigned project. Ensuring timely completion of
  projects and execution levels of the highest grade. Directing and monitoring projects progress by coordinating
  with architects, consultants, contracts and site engineering teams.
 Regular reporting of material status and progress of work at site. Keeping track of bills and ensures timely
  payments to contractors and prepares rate analysis of various items. Maintaining strict quality control procedures
  - regular testing of materials, visual inspections of work, conducting regular site safety checks etc.
 Responsible for project planning, scheduling and cost control. Review construction, purchase, installation and
  commissioning.
    Bid Evaluation and Analysis, Complete Detailed Project Analysis, EPC/PPP Contract Management – Power, Real Estate Roads and
    Highways, Developer’s Perspectives on Project Risk Management, Technical Construction of different Projects: Project
    Equipment Management, Financing, Financial Modeling and Parameters.
 Scrutinizing contract/ tender documents, techno – commercial evaluation, reviewing technical specifications,
    estimates and day -to-day activities.
 Floating tenders, handling fair price / market analysis, negotiation and selection of contractor / vendors.
    Managing overall activities pertaining to operation & maintenance of the plant. Responsible for supervising the
    functions of troubleshooting & predictive/ preventive / shutdown maintenance for identifying areas of obstruction
    / breakdowns & reducing machinery down time to minimum.
   Meet all project milestones, design & implement schedules, tendering process, costs & contract prices; Adhere
    to project completion & material delivery schedules. Handle HVAC, MEP, services, contracts, procurement, deal
    extensively with architects, consultants, high calibre contractors, vendors etc. Adopt best practices in
    Construction, introduce new materials, technology and value engineering techniques to reduce cost.
   Quality Control/Quality Assurance Ensuring compliance of various quality standards such as EMS & IS014001 & ISO
    9001: 2000 standards Implementing measures for the smooth working of operations. Supervising budgeting,
    monitoring expenditures, preparing MIS report on project and capital expenditure. Managing the entire gamut of
    business development activities, Handling commercial negotiation and structuring with respect to Purchase, JV ,
    Lease , and finalization.
   Well, Reservoir, Petro physical and Production Data for identification of Field development and exploration
    potential. Knowledge in Folded thrust belt basin. Concept of prospect generation, Reservoir characterization and
    preparation of pay maps by integration of subsurface geological information, well log data and various seismic
    attributes. Knowing Concept of sequence stratigraphy.
    Experience in Geotechnical field with operational & business development experience in Foundation Engineering
    (Piling, Retaining Structures, Ground Improvement etc.)
   Coordinating projects for the set-up standards with accountability for strategic utilization & deployment of
    available resources to achieve organizational objectives develop & implement health, safety envoirment.
   Strong business brain having exceptional commercial acumen with a good working knowledge of contracts, FIDIC,
    health safety, procurement programme management.
   Raise the level of proficiency by influencing, training and recruiting staff, development of staff is essential and is
    a core value of the group, increases efficiencies.
   Drive the business forward through success full implementation of new ideas and process where possible.
   Leading & monitoring the performance of team members to ensure efficiency in project operations and meeting of
    targets.
 Drive the strategic growth of the business in accordance with group strategy. Responsible for entire process of
    Land Acquisition including legal and commercial due diligence, Title search, registration formalities and co-
    ordination with revenue and other government and Municipal body for necessary approval required for land and
    property acquisitions.
   Specialised in the design and execution of all areas of Metro Rail, transportation and infrastructure ranging
    from project management, traffic and transportation studies, structural design, CADD design, alignments and
    surveys, quantity surveying, environmental, social and geotechnical studies.
   Expertise in Underground Tunnelling work by. Tunnel Boring Machine/[New Australian Tunnelling Method, Open &
    cut Method] Checking, Monitoring, Supervising, Planning, Quality Control & Compliances with Technical
    Specifications, Railway Siding works, Stacker & Reclamier, Track Hoper, Railway Electrification works including
    OHE,TSS,SWS/SCADA, general electric works, Tilting Turn Table, Track Linking, Coal Storage platform,
    Construction of Track.
   Ensuring cost effective operations and maintenance of highly mechanized opencast mines through techno-
    economical planning and logical scheduling of operation to achieve the desired output.
   Experience in Operation of Mining, Production, Development, Mineral processing, Marketing, Business
    development, Visualizing opportunities, Brand management, Market intelligence, Conceptualizing Business
    Strategies, Technical Services, R&D.
   Experience in the field of Traffic Engineering, Transport Planning and Traffic Solutions, transport planning team
    analyzing traffic data, preparing traffic forecasts, developing transport mobility plans, public transport plans and
    various other traffic and transportation studies and conducting feasibility studies. Developing and applying
    computer-based transport models (comprising highway and public transport / transit models) using state-of-the-
    art transport modelling software.

GENERAL DUTIES AND RESPONSIBILITIES-
Responsible for Conceptualization, Execution and finally Profitability of all other Money Churning ventures. Projects Planning,
Projects Execution, Projects marketing and all other Departments as are there in company. Accountable for planning,
recruitment, training, appraisals, managing and motivating the entire team and ensure efficiency. Set out the standards of
quality to provide the customers with a world class residential or commercial property related experience. Develop and
implement       a     Business      Plan    through      expansion,        upgrade      &     modernize      the      capacity.
Oversee technical & commercial aspects of the Business Plan.
1. Strategy formulation - Develop a strategic plan to advance the company's mission and objectives and to promote
                revenue, profitability, and growth .Infra structure finance advisory role. This would involve modeling
                a variety of scenarios to plan for the anticipated future along with involvement in capital market /
                funds infusion.
2. Organization structuring –Tactical Design of Project management Structuring the organiza tión to deliver current
                as well as future services by aligning organization design, leadership and individual capabilities to
                carry out the necessary Works.
3. Management Processes and Systems - Designing or developing new management systems that impact a major part
of the organization such as reporting structure to ensure business continuity and managing risk. Taking Corrective
Actions, To Achieve Goals in a set period Process Enhancement / Cost Control -Identifying scope for implementation
& monitoring technological changes to enhance productivity. Executing cost saving techniques / measures and
modifications to achieve substantial reduction in O&M
4. Planning & Budgeting - Ensuring operational effectiveness within the budgets for the company. Allocating funds
suitably during implementation and O&M phases. Maintaining close control on the company's expenditures and
managing its capital. Ensuring achievement of shareholder commitments.
5. Monitoring & Review - Overseeing company operations to ensure production efficiency, quality, service, and cost-
                effective management of resources. Monitor and Review KPIs of all the functions and operational
                matrix reports on monthly basis. Review of various costs and driving improvements to ensure effective
                utilization of organizational resources (financial, systemic, people). Review activity reports and
                financial statements to determine progress and status in attaining objectives and revise objectives
                and plans in accordance with current conditions. Approve company operational procedures, policies,
                and standards.
6. Culture Building - Taking initiatives to develop the desired culture for the company and develop strategies to
                manage employee motivation.
7. Communication - Comunicación of organizational direction and vision to members of organization. Driving,
                motivating and enthusing them about the way forward.
8. Community and public relations - Ensures that the organization and its mission, projects and services are
                consistently presented in strong and positive image to relevante stakeholders.
Ocupacional Contour
Jindal India Thermal Power Ltd., New Delhi                                                        since Jul’11
Project Site: 5X600[3000MW] Thermal Mega Power Projects, Derang, Odisha
Additional Vice President/Head of Project
Key Deliverables
 Interfacing& business development of project with various sub vendors deploying by the contractors to execute
   the work & Labour gangs, directing to the Contractors for augmentation of resources in case of shortfalls.
 Managing large coal power plants or combined cycle power plants, engineering of power block area viz., Turbine
   Generator Auxiliaries and Water Steam Cycle Equipments.
 Liaising with the Consultants & Vendors for finalizing the specifications and designs, reviewing & suggesting
   modifications.
 Rendering assistance to the Projects/Stations during erection and commissioning activities and O & M phase for
   specific design issues and failure analysis.
 Heading the power trading business of the group, negotiation & finalisation of power sale/power purchase
   agreement.
 Case-1bidding, medium/short term trading, power exchange trading, scanning the market for prospective buyers
   and sellers of powers.
 Executed structures namely Main Power House, T G Foundations, ESP, CW System, etc. which involved massive
   quantity of concreting.
Notable Highlights
 Essayed stellar role in executing and constructing various Dir Phases of Thermal Power Projects viz., site
   levelling, grading, foundation, structural steel works, cooling water system, coal handling plant, ash handling
   plant, boiler turbine generation, turbine generation building, balance of plant package, main plant civil &
   structural works, DM plant, PT plant, effluent treatment plant, water treatment plant, coal handling plant, fire
   fighting package, misc. buildings sub-station buildings, chimney, raw water reservoir, townships, Transmission
   Distribution Line,5000 m tunnelling from TBM for Coal Belt conveyer 7m dia etc.
 Instrumental in reviewing, checking, commenting and finalizing:
             o Heat Balance Diagram, P & ID, and System Operating Instructions & Design Manuals for calculations,
                  detailed project report (DPR) & design basis report (DBR).
 Dexterously supervised the development of :
             o In-house expertise on all facets of Power Plant Design Engineering.
             o Framework for preparation of FR, DPR and Design Memoranda
             o Engineering design of all infrastructure facilities required for a Power Plant including Township,
                  Offices, and Roads, etc.
 Fortuitously directed the provision of timely inputs from engineering groups to ensure:
             o Timely completion of Pre and Post Award activities for projects under construction.
             o Standardization of specifications, layouts and quality plans.
             o Issue of design guidelines and checklist for vendor drawings.
 Carried out detail engineering analysis and execution of:
             o BOP Packages viz., CW/CT Pump Houses, EOT Cranes, Miscellaneous Cranes & Hoists, Miscellaneous
                  Pumps, etc.
             o BTG specifications, consulting concept note & technical specification requirements of BOP
                  packages, sizing calculations, finalization of layouts, plot plan for TG and auxiliary a, checking BOQ,
                  BOM, etc.
 Spearheaded the entire gamut of the engineering design of BEPL Power Plants to ensure completion of projects
   construction in a timely, cost effective manner ensuring the desired quality and operational performance as per
   design for the life of the plant.
 Ascertained the finalization of Quality Assurance Plan of the Vendors and Contractors and inspection of quality
   audits (both field quality and manufacturers).
 Dexterously reduced the Manpower of the dept. by 20 % in a span of one year by totally computerizing &
   improving the Different Processes.
 Successfully executed the projects in 18 months which otherwise used to take 2 years.
 Holds the credit of saving at least Rs.50 Crs. through Value Engineering & Quality Improvement activities.
   Received several Value Engineering & Quality Improvement awards.
 Efficaciously maintained highest standard of Safety in different Construction sites.



Lanco Infratek Ltd., Gurgaon                                                             May’10 – Jul’11
4X66O Babandh Thermal Power Project, Angul, Odisha
Head of Project/General Manager (as a Profit Centre Head)
Key Deliverables
 Business Development & Oversaw the engineering of power block area viz.,Boiler-turbine-Generator
   Auxiliaries and Water Steam Cycle Equipments.
 Significantly reviewed, checked, commented & finalized the Heat Balance Diagram, P&ID, System Operating
   Instructions / Design Manuals for calculations.
 Instrumental in detail engineering and execution of BOP packages such as CW Pumps, EOT Cranes, Miscellaneous
   Cranes & Hoists, Miscellaneous Pumps, etc.
 Involved in reviewing, analysing & execution BTG Specifications, Consultant Concept Note & Technical
   Specification Requirements of BOP Packages, Sizing Calculations, Finalizing the Layouts / Plot Planning for
   BTG/BOP Package and Auxiliary, Checking BOQ, BOM, etc.
 Handled the overall engineering design and execution of BEPL Power Plants to ascertain the completion of
   projects construction in a timely, cost effective manner ensuring the desired quality and operational performance
   as per design for the life of the plant.
Notable Highlights
 Efficaciously laid down the :
             o Quality Management System for Commercial & Contracts department at Lanco infratech Limited.
                  Prepared the Quality Manual.
             o Procurement processes for project procurement at EPC division and handled procurement.


RVR Projects P Ltd., Lapetkata, BCPL Refinery Assam
Apr’9 – May’10
Resident Construction Manager/Head of Projects/ Sr. GM Projects
[Executed 8 no’s Contract at a time]
Key Deliverables
 Business Development & Instrumental in checking vendor’s bill, material bill, client bill obtaining payments,
   arranging progress, and reviewing meetings, attending client MD meeting and providing advice for the progress of
   project.
 Involved in operational functions installation, testing and commissioning in Refinery / Petrochemical Complexes,
   Hydro Treatment Dcu, Coke Handling System Fcc and Propylene Recovery Unit.
 E&P business from seismic acquisition to the flow line with the latest data and analysis on exploration & reservoir
   characterization, well construction, production optimization,
 Liaised with Engineers India Ltd., BCPL the development of the functional disciplines viz.,
             o Construction, execution and supervision of Central Workshop, Reservoir planning, Data Collection
                  Audit, Product Warehouse (500mx100m) ,Gas Sweetening Unit, Lldpe/ Hdpe, Fire Auxiliary
                  ,Chemical Building, Teal & Catalyst Buildings, Plant Building, Non Plant Building, Raw Water
                  Reservoir, Steel fabrication, erection of approximate 300000 MT at Different Industrial Buildings,
                  Commercial Operation and Business Development, General Administration, Human Resources,
                  System, etc.
             o     The duties set out under the contract are extensive, and the assignee will find involved deeply in
                  many aspects of the construction process: design liaison, reviewing the quality of work,
                  assessing/advising on liability in relation to contractual claims, or assessing values of work done and
                  problem solving. All types of piling in different / difficult site conditions.
             o Heavy foundations related to civil work (Single pour of 3000 Cum); all types of foundations in power
                  plant, RCC chimney, heavy lift erection (world largest coke drum of 600 MT at a height of 28 m, air
                  lifting of 80 m Diameter LNG Tank Roof of 560 MT)
             o Critical erection of Columns & Vessels, Piping, Fire Proofing, Insulation, etc.
             o Responsible for planning, implementing, supervising, and monitoring of G&G and other technical
                  studies related to Exploration and Field Development activities in Oil Field.
                  Integration of Geological, Geophysical ( 2D , 3D Seismic and VSP ), experience in Geotechnical field
                  with operational & business development experience in Foundation Engineering (Piling, Retaining
                  Structures, Ground Improvement etc.)
             o Well, Reservoir, Petro physical and Production Data for identification of Field development and
                  exploration potential. Knowledge in Folded thrust belt basin. Concept of prospect generation,
                  Reservoir characterization and preparation of pay maps by integration of subsurface geological
                  information, well log data and various seismic attributes. Knowing Concept of sequence
                  stratigraphy.
             o Exploration strategy, its execution and evaluation thereof, Appraisal and development planning.
                  Planning        for       seismic        API,       budgeting         and       project       execution.
                  Working experience in Kingdom Seismic interpretation Software, PETREL Geological, Geophysical
                  and reservoir modelling suite, and landmark interpretation software with understanding of static
                  and dynamic modelling. Reform the outlook at every level on core objectives and G & G functions
                  on cost/ time factors.
Notable Highlights
 Accredited for being a high potential candidate and being groomed for future leadership.
 Stellar role in saving Rs. 300 Crs for a project thru’ Technical innovation.


Dynamic Engineers Infratek Ltd., Mumbai                                                            Apr’07 – Apr’9
    Coordinator Projects/In charge Projects/General Manager [Projects]
High Rise Building 40+1, 45+1 MULTI STORY BUILDING
Key Deliverables
              o      Managing Construction projects, Project Management, Project co - ordination, Project
                   Planning, monitoring & Execution, Tenders, Coordinating, design, tendering, structural
                   designing , contracting , legal ,billing project closure, Supervising marketing, PR, IT & HR functions
              o    Turnaround strategy, Branding, Training, Assisting, Strategy making to invade in the market, Method
                   Development, Developing systems to smoothen the process. Looking after the overall function ,
                   construction of high rise buildings ,Five star hotel and commercial projects.(all type
                   of projects are mandatory/mixed use project. )
              o      Experience in Geotechnical field with operational & business development experience in
                   Foundation Engineering (Piling, Retaining Structures, and Ground Improvement etc.)



BGR Energy System Ltd., Chennai [CLIENT]
MSPL JHALAWAR                                                                           Feb’06 – Apr’07
General Manager - Projects / Profit Centre Head
Setting Out 3X600[1800] MW Ka TPP 3 Unit Jhalawar 6000 Crs. INR
Key Deliverables
 Business Development& Oversaw the erection, testing and commissioning of power plant.
 Instrumental in supporting commercial & contracts for various contract finalizations.
 Involved in identifying:
             o The EPC Contractors, Sub-Contractors/Financing Institutions, etc. for bidding and executing the
                 projects.
             o The designing modifications as per O & M requirements and forwarding to Steering Committee for
                 approval
 Administered regulations at regional and national level.
 Pivotal role in finalizing the power purchase agreements and gas supply and transportation agreements for the
   power projects.
 Heading power trading business, Power Exchange Trading, Negotiation of power sale agreement.
 Scanning the market for prospective buyers and sellers of power.
Notable Highlights
 Steered efforts for saving for a project thru’ commercial & Technical innovation.
 Played a key role in acquisition of Land.
 Dexterously submitted proposal for Transmission Projects – Declared best Technical Bid (among 9 other bidders
   domestic & international).
Preceding Tasks

Feb’05 – Feb’06: DCM Shriram Consolidated (I) Ltd., Kota as General Manager – Project
Jan’90 – Feb’05: Punj Lloyd Ltd., Nehru Place, New Delhi
Joined as Graduate Engineer [Trainee] and rose to the post of DGM , Team Leader& Head Of Project
Business Development & Develop PPP projects and handled as team leader project preparation, construction,
supervision work of major
    1. NH project of four laning/six laning/expressway costing over 2000 crores and total executed 410 KM.
    2. Kolkata Metro Underground metro railway
    3. DMRC Metro Railway
Responsible for reviewing the entire project preparation and implementation activities of the concessionaire and
check the design being prepared by concessionare, ensure of execution of works on site as per [FIDIC] concessionaire
agreement, standard specifications & continuously interact with the NHAI and the concessionaire and undertake the
project site visits, guide, supervise, coordinate, monitoring & project management operations of the multi lateral
funded projects.
 Notable Highlights
 Oversaw the Submission of Tariff based bidding on competitive basis Case 1/case 2 bids, Transmission Projects,
   Coal Mining projects, etc.
 Efficaciously rendered risk alerts to the management.
 Oversaw the PPP model contracts for Transmission Projects.
 Supervising marketing, PR, IT & HR functions, Turnaround strategy, Branding, Training, Assisting, Strategy making to invade in
   the market, Method Development, Developing systems to smoothen the process. Looking after the overall function.
Scholastics
 MBA (International Business) from IGNOU, Delhi in 2000.
 B.E. (CIVIL) from Jai Narayana Vyas Jodhpur University, Jodhpur in 1990.
 Diploma (Civil Engineering) from Jodhpur Technical Board, Jodhpur in 1985.
Personal Dossier
Date of Birth            ; 16th June, 1967
Present Address          ; Vasant Kunj New Delhi /JITPL Derang Angul Odisha
Permanent Address        ; A 44, Gayatri Vihar, Baja rang Nagar, Kota – 324001 Rajasthan
Languages Known          ; Hindi, English
Father’s Name             ; Mr. Anand Swaroop Agarwal
Brief Family              ; my wife is Principal in Govt Girls college
History                   ; My daughter read in Amity University ,civil engineering & son read in 11 th standard
References
1-  Mr V R Vahne PM, E I Ltd near Bhikaji Kama Place New Delhi/BCPL Assam +919435745013
2- Mr A K Tondon RCM, E I Ltd near Bhikaji Kama Place New Delhi]/[ BCPL Assam +919435573581
2-  Mr SL Sharma Chief Construction Manager New Delhi, GAIL/ BCPL Assam        +919435746223
       Please find the annexure for Projects Handled & Knowledge Purview:
Annexure: 1
                                JINDAL INDIA THERMAL POWER LTD NEWDELHI

 Accountable for the drawings& Execution of underground RCC tunnels for conveyors , clarifiers, gravity filters,
    chemical house buildings, project & construction management, balance of plant (BOP) including CHP, AHP, WTP,
    PTP & DM, CW, cross country pipe and river water pump house, CW, FOHS, cooling tower, ETP, STP, LP Piping,
    HVAC and compressed air system, etc. of coal fired thermal power plant, Track hopper,
 Developing, planning and constructing the CHP, AHP, STG, CW. ACW, River Water, Cross country piping,
    FWH,WTP, DMW, etc Railway Siding, Stacker Recamier ,Track Hoper, Railway Electrification, Tilting Turn Table,
    Track Linking, Coal Storage platform, Construction of Track.
 Construction of tunnelling work 4200m by open cut cut and covers method.
    .                           LANCO INFRA TECH LTD.GURGAON
IOCL Refinery Project, Para dip, Odisha
Role:                     Head of Project/Resident Construction Manager /General Manager
Project Package:          Delayed Coker Unit [030], Coke Handling System [0245]
Client:                   M/s. IOCL-Refinery, Para deep, Orissa
Cpc /Lstk Contractor:     M/s. Toyo Global Engineering India Ltd. Para deep, Orissa,
Pmc:                      M/s. Jacobs Engineering India Pvt. Ltd., Para deep, Orissa
Profile:                      Worked as an Over All In-charge for executing, planning, coordinating, Independently,
troubleshooting, supporting and interfacing with client viz., PMC, CPC/LSTK Contractor Manager, Dy Manager Resident
Engineer, Project Engineer for the optimum performance of the project. Railway Siding, Stacker Recamier ,Track
Hoper, Railway Electrification, Tilting Turn Table, Track Linking, Coal Storage platform, Construction of Track.
                                         RVR PROJECTS P LTD ASSAM
Title:                  Brahmaputra Petrochemical Complex Projects, Lapetkata, Dibrugarah, Assam, India
Client:                  Brahmaputra Gas Cracker & Polymer Ltd., Assam & Captative Power Project (Heavy Industrial
                         Project)
PMC:                      M/s. Engineers India Ltd., Bhikajikama Place, New Delhi
                                      DYNAMIC ENGINEERS INFRATEK LTD.MUMBAI

 MRVC [Mumbai Railway Vikas Corporation Ltd. A PSU of Govt of India Ministry of Railways) Track linking Works in
    Connection with Construction of Emu Maintenance Car Shed between Nallasopara and Virar Stations of western
    railways.
   Constructions of New Fob in Mumbai Suburban Section Lower Parrel, Elphinston Road (N) of Mumbai.
   Construction of New FOB in Mumbai Suburban Section at Bandra (c) Vasai Road (n), Virar of Mumbai Division.
   Era Infrastructure, MRVC site Installation of track inspection car shed project Virar.
   DMRC (Delhi Metro Railway Corporation Ltd., A PSU of Govt of India Ministry of Railways], Construction of Metro
    Station Barakhamba Road, Mandi House Delhi Foundation, Underground, Tunnelling Structural, Fabrication,
    Finishing Work.
   Construction Head/Operation Head of Solar Thermal project [BIKANER] for ACME TELE POWER LTD
              o Steel Fabrication Erection of FOB Approximate 500000 MT, Launching of Steel Girder, Steel Column,
                   Beam Steel Structure for Foot Over Bridge.
              o Construction of Tunnelling work from TBM/New Australian method Approximate 4000 m length for
                   DMRC PROJECT,2000 m by, Cut and cover method.
              o The duties set out under the contract are extensive, and the assignee will find involved deeply in
                   many aspects of the construction process: design liaison, reviewing the quality of work,
                   assessing/advising on liability in relation to contractual claims, or assessing values of work done and
                   problem solving.
                                      DCM SHRIRAM CONSOLIDATED (INDIA) LTD.

   Extension of Cement Plant, Urea Plants
   Construction of Road Project
   Construction of Water Treatment Plant
   Construction of Pipeline & Underground Pipeline Project (layout to testing)
   Commercial Complex Two Lakhs SQM
   Residential Building One Lakhs SQM
   Multi-storeyed Building 50+1, 70+1
   Captative Power Plant 2x100 MW
   Construction of Railway Electrification works, OHE,TSS,SWS/SCADA, yard, cement Cilo.
   Residential/Commercial Spaces/Malls/Sky Scrapers
                                            PUNJ LLOYD LTD.NEWDEHLI

 Oversaw the designing & executing the Bridge, Highway Project, and Road Construction & Maintenance.
 Experience in the field of Traffic Engineering, Transport Planning and Traffic Solutions. Transport planning team
    analyzing traffic data, preparing traffic forecasts, developing transport mobility plans,
 Public transport plans and various other traffic and transportation studies and conducting feasibility studies.
    developing and applying computer-based transport models (comprising highway and public transport / transit
    models) using state-of-the-art transport modelling software such as CUBE Voyager, VISUM, Vissim
   National Highway Project Total No.6 Length of 4, 6 Lane and expressway 410 Km Consultant & PMC Rites Limited.
   Construction of Tunnelling work 4500 m[Horse Shoe Type 5M,9M Dia ]for Hydro power project
   Railway Siding, Stacker Recamier ,Track Hoper, Railway Electrification, Tilting Turn Table, Track Linking, Coal
    Storage platform, Construction of Track.
   BOT/DBFOT/BOOT Road & Bridge Projects:
              o Kota to Jhalawar National Highway four Lane [By Pass] 80km Com18 Months.
              o Jaipur Delhi NH Project 4 Lane 150 Km Comp36months.
              o Delhi Mathura Road NH 6 Lane, Rigid& Flexible Pavement 40 Km Comp18 Months.
              o Jabalpur, Jaipur NH 12, 45km Six Lane Road 15 Months.
              o Kota Bijoliya Udaipur NH Project 4 Lane Road 95 Km Comp 36 Months.
   Bridge Projects [total No. 5 Length 8.2 KM]
              o Bridge Projects (Chambal River) 1.2 Km with Caisson, Well Foundation.
              o Residential Colony for Rajasthan Housing Board. (2000 Houses)
              o Bridge Projects 500m -4nos Open Raft & Pile Foundation & Caisson Foundation
   Power Projects Thermal
                Kota Super Thermal Power Project 3x250 MW 3 No’s .Unit
                Badarpur Delhi 3x110 mw 3 No. Unit

 Hydro Power Projects

 Planning, Execution, Analysis & Design of Dam, Spillways, Power Intakes, Retaining Walls and related Structures and estimation of
quantities of related structures, Preparation of Tender & Construction stage Drawings of Dam and Allied works. Preparing &
review technical specifications of civil works of various Dam structures working out bill of quantities and unit rate
analysis Equipment planning and scheduling for construction .Preparation of design report Preparation draft drawings
for        the      structures         designed        Checking       and        finalizing      the        drawings
Regular visit to the Project site for monitoring of works and interaction with engineers at the project
Execution work of Hydro Power Project construction, Tunnel[3500 m], DAM, Pen Stroke Tail Race Channel, Approach Channel, Roads
& Power House Control, parameter for RMC knowledge of different type Admixtures and construction chemicals, Plastisizers ,Super
plastisizers, Airentrainingad mixtures, fresh concrete resistant to Freezing &Thawing effect, using Natural & Artificial pozzolanic
material, making pump able concrete, placing concrete, Slip form technique.
Barrage, Cofferdam, diversion structures etc.
1.RANA PRATAP SAGAR Dam[Hydro Power Project 2x70 MW]
PROFILE; OVERALL INCHARGE [DGM/SITE HEAD]
SPECIFICATION FOR PROJECT
A.CREST LENGTH; 1715 M                B.DAM HEIGHT; 80M                      C.EXCAVATION 1,85000 M3
D.FILLINGS; 1,10,000 M3              E. DRILLING;1,20,000 M                  F.CONCRETE;1,00,000 M3
G.GROUTING; 20,000 MT [Cement, Clay, Bentonyte Silica gel]                 H.INTAKE TOWER ;65 M [With intake gates at four level]
I. TUNNEL;6.5 M Finished dia 4500m long                                    J.GALLARIES; 875 M Long[2.0m to3.5 m]
K. ROAD ;30 km [In Hilly areas]       L. PURPOSE; IRRIGATION       M. CLIENT;STATE GOVT RAJASTHAN

2.JAWAHAR SAGAR DAM[ 1X54 MW].
PROFILE ; OVERALL INCHARGE DGM/ SITE HEAD
SPECIFICATION OF PROJET
A. Diversion and guide wall of Chambal River U/S &D/S
B. Coffer Dams and 8M dia , 721m long diversion tunnel on right bank.
C. Construction of concrete gravity dam of 60.50 m height and 370 m long.
D. 4 NOS. intakes with opening of size 19.95mx18m.
F. 4 NOS. Underground desilting chambers of size 525mx15mx30m each.
G. 6 mDia2100 m long horse shoe shaped flushing tunnel,4 gate shafts for flushing tunnels and all allied works

3. Mathura Oil & Gas Refinery Projects IOCL/ Dulijan Refinery Assam

4.Chambal Fertilizers & Chemicals limited, Gadepan, Kota, Rajasthan
5.Railway Project (Hazarat, Nizamudeen) in New Delhi

6.Cross Country Pipe Line Project-HBJ Petro Gas of 150 KM Cost [500] five Hundred CRs
                                    KNOWLEDGE PURVIEW

 Business Development & Increasing the market share by developing contacts with industries, PSUs & consultants,
    Liasoning with PGCIL, MRVC, DMRC, IOCL, BCPL, RVUNL, EIL, & GAIL.
 Developing and implementing aggressive marketing strategies to support existing market segments and
    establishing new market segments.
   Continually prospecting and tapping new customers to generate enquiries.
   Prompt and viable techno-commercial solutions.
   Sales &Project Marketing of EPC Turnkey Projects / Capital equipments / Industrial products.
   Identifying various media and trade fares for marketing purpose & organization branding.
   Expertise in FIDIC conditions of contract and concession agreements and their interpretations.
   Reviewing RPF documents, identifying need for JV partner / alliance.
   Identifying new projects in the focused sector of business basically (Road, Bridges, Highways / Shopping Malls /
    Thermal Power/Hydropower/ Cross Country Pipeline/ Airport / Metro Rails, etc.) and in different areas, fields,
    projects, countries.
   Project Implementation Documents (PID) for secured jobs, Implementing SHE, security, fire fighting system &
    procedure at site.
   Pre-qualification, Post-qualification Techno-commercial & Financial Bids.
   Marketing Initiatives, Developing New Markets, Business Start Up.
   Rules and regulations related to SEZs, Industrial Parks, land procurement and acquisition, Real Estate rules and
    regulations.
   Flair for marketing and customer-centric attitude while dealing with potential customers and investors.
   Ability to negotiate with farmers, identify the best route to be adopted for land procurement in different
    locations, identify Rehabilitation and Resettlement needs of farmers, handling land intermediaries.
   Understanding of concepts related to project structuring, ability to identify strategic investors and negotiate
    favourable terms with financial investors and banks.
                                     LEGAL AND TECHNO LEGAL

 Various ongoing civil suits pertaining to land and project, Trademark suits, Arbitration and contract management,
    Agreements, leases, lien documents.
 Various affiliate group legal matters, Liaison with statutory bodies-legal departments, court, and machinery.
 Dealing with Advocates, solicitors and opponents of suits both in the capacity of Respondent & Petitioner.
 Out of Court & affiliate settlements. Rent Act Matters & Taxation Tribunals
 Well aware of international markets and trade policy, commercial developments, contract law, excise, sales tax,
    VAT, Import & Export, customs rules & regulations.
 To deal with Government / Municipal bodies, get clearances, handle legal issues, liaison. Interaction with State
    Pollution control Boards,
 Ministry of Environment & Forests and Indian Bureau of Mines regarding Statutory Clearances required for Safe and
    Best Industrial Mining.




                                     SHIVENDRA KUMAR AGARWAL

Contenu connexe

Tendances (19)

SNM CV NEW-1
SNM CV NEW-1SNM CV NEW-1
SNM CV NEW-1
 
MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)
 
Ska3
Ska3Ska3
Ska3
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
T. Kiran
T. KiranT. Kiran
T. Kiran
 
PETER CRAMER CV April 2016
PETER CRAMER CV April 2016PETER CRAMER CV April 2016
PETER CRAMER CV April 2016
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
Mansoor CV_0616
Mansoor CV_0616Mansoor CV_0616
Mansoor CV_0616
 
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
 
Resume - Ajay Gupta (pdf)
Resume - Ajay Gupta (pdf)Resume - Ajay Gupta (pdf)
Resume - Ajay Gupta (pdf)
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
 
Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez Resume 2015
Francisco Cortez Resume 2015
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
Updated Mansoor's Resume
Updated Mansoor's ResumeUpdated Mansoor's Resume
Updated Mansoor's Resume
 

En vedette

En vedette (10)

Christopher Griffin Construction CV
Christopher Griffin Construction CVChristopher Griffin Construction CV
Christopher Griffin Construction CV
 
Resume.
Resume.Resume.
Resume.
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Afroz Resume - Civil Engr- .doc OG
Afroz Resume - Civil Engr- .doc OGAfroz Resume - Civil Engr- .doc OG
Afroz Resume - Civil Engr- .doc OG
 
CV Vinod Kumar Technip
CV Vinod Kumar TechnipCV Vinod Kumar Technip
CV Vinod Kumar Technip
 
Project Scope Statement
Project Scope StatementProject Scope Statement
Project Scope Statement
 
TONY HERCEGl resume
TONY  HERCEGl resumeTONY  HERCEGl resume
TONY HERCEGl resume
 
Murali procurement
Murali procurementMurali procurement
Murali procurement
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project report
 

Similaire à Ska5 (20)

Resume (1)
Resume (1)Resume (1)
Resume (1)
 
KRT Resume 29th July 2015
KRT Resume 29th July 2015KRT Resume 29th July 2015
KRT Resume 29th July 2015
 
RESUME
RESUMERESUME
RESUME
 
social profile.
social profile.social profile.
social profile.
 
Profile R1
Profile R1Profile R1
Profile R1
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 
CV
CVCV
CV
 
MDS CV 24.9.16
MDS CV 24.9.16MDS CV 24.9.16
MDS CV 24.9.16
 
SNS-CV Latest
SNS-CV LatestSNS-CV Latest
SNS-CV Latest
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
Satish Resume (21062016)
Satish Resume (21062016)Satish Resume (21062016)
Satish Resume (21062016)
 
Resume (Sunil Kumar)
Resume (Sunil Kumar)Resume (Sunil Kumar)
Resume (Sunil Kumar)
 
27 Yrs.Exp-EPC-Intl Exp Caspian Sea Projects.Pdf
27 Yrs.Exp-EPC-Intl Exp Caspian Sea Projects.Pdf27 Yrs.Exp-EPC-Intl Exp Caspian Sea Projects.Pdf
27 Yrs.Exp-EPC-Intl Exp Caspian Sea Projects.Pdf
 
amit
amitamit
amit
 
Curriculam Vitae
Curriculam VitaeCurriculam Vitae
Curriculam Vitae
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles f
 
Resume - Shabbir Ahmed 1
Resume - Shabbir Ahmed  1Resume - Shabbir Ahmed  1
Resume - Shabbir Ahmed 1
 

Dernier

H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 

Dernier (20)

H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 

Ska5

  • 1. SHIVENDRA KUMAR AGARWAL Mobile: 09015350011/08527163099 E-Mail: free7snax@yahoo.co.in / shivendraa@hotmail.com / shivendraa950@gmail.com Top Management Professional – Power & Energy/Oil & Gas/Real Estate Business Development ~ Project Management ~ Contract Management ~Construction Management~ Preferred Location: Delhi / NCR/North India Professional Snapshot Seasoned Senior Level Professional with over 23 years Hardcore cross cultural Experience in India as well as Gulf in Execution of Large Size EPC Projects, Project Management & Marketing, Procurement Operation, Profit Centre Operations, Business Development and Techno Commercial Acumen. Adept in implementing programmes to ensure attainment of growth and profit plans. Dept in providing direction & structure for operating units, participating in developing policy and strategic plans. Adroit in planning, organising & controlling technical and commercial aspects within the Power & Energy, Oil & Gas ,Real-estate Sector. Track record of managing complete operations with key focus on bottom line profitability by ensuring optimal utilization of available resources,P&L - Top Line and Bottom Line responsibility of Business. Overseeing all operational issues and developing / executing projects. Providing leadership, coaching, and mentoring to the management team, and ensuring that they are accountable for maintaining high performance levels., Passion for quality & eye for minute detailing, holds the distinction of handling assignments of Railways, Metro Railways, Bridges, Expressway, Oil & Gas, Refinery, Coal Mines, Thermal, Hydro, Solar Power, Mega/High rise Commercial/Residential complexes, Group Housing &Township, Real Estate EPCM / EPC / LSTK. Well versed with the concepts of advanced construction techniques, High quality finishes with good proposal, estimation, tendering, costing, contract management etc. An enterprising leader with proven dexterity in leading and directing personnel towards accomplishment of a common goal. Talent for proactively identifying, resolving & troubleshooting problems, ramping-up project activities with on time deliverables and maximising efficiency, expert in maintaining a smooth flow of work between departments and resolving inter-departmental conflicts. Spent several years in EPC Power Industry, Project Management / EPC Business in leadership/Head/Project Mgt positions for the last 15years.Expert particularly in execution and commissioning of projects in Coal Fired Power Stations. Each project has its own P&L and operates like a separate business entity with separate dash boards of accountability such as on time delivery, zero accidents, working capital management, PBIT, profitability & capacity to manage and lead multiple large Power Projects & intimate knowledge of the various Strategic Planning technicalities involved in Projects of Turbine Island, Boiler Island and integrated BOP/various sub systems of the Balance of Plant (BOP). Profit Centre Operations Have a good blend of knowledge that encompasses mechanical & civil structural engineering, electrical and C&I disciplines in project Business Development management. Good Experience and understanding of Hot Rolling/Cold Rolling, steel producing, Metal manufacturing, Aluminum , Stainless Tendering & Contract Negotiations steel producing, cement producing, fertilizers & chemicals, electricity Multi-lateral Funded Project producing by solar ,coke, hydro. SNAP SUMMERY Clean / Solar Technology Presently associated with Jindal India Thermal Power Ltd as Add Vice Construction HSE Management President (Civil & Structural)/Head Of Project for [5x600] 3000 MW Coal based Mega power Plant BTG/BOP of total project cost Civil Structural & Procurement Operations approx.INR 22000 Cr. Previously I have worked with LANCO INFRATEK INDIA LIMITED for a brief tenure as PROJECT HEAD (G M) FOR [4x660] Proposal & Estimation Engineering 2640 MW Cost INR 20000 Cr BTG/BOP, Coal Based Mega Power plant, Liaison & Networking IOCL Para deep Large Refinery & Special Projects. I have worked with. RVR PROJECT I LTD BCPL ASSAM Petro Chemical Large Refinery as Vendor & People Management Resident Construction Manager/SR GM Product Warehouse Value Engineering Process (500mx100m) ,Gas Sweetening Unit, Lldpe/ Hdpe, Fire Auxiliary ,Chemical Building, Teal & Catalyst Buildings, Plant Building, Non Plant Exploration &Reservoir Characterization & Optimization Building, Raw Water/Oil Reservoir, Steel fabrication, Commissioning, erection of approximate 3000000 MT M,I have worked with DYNAMIC engineers Infratek ltd Mumbai ,Railway, Metro Railway MRVC,DMRC,SOLAR Thermal power[15MW],High Rise[40+1,45+1]Storey, have worked with BGR energy system ltd[MSPL] as GM-projects ,1800 MW, coal based Mega power plant BTG/BOP cost INR 6000 cr. client RRVUNL . I have worked with DSCL group as GM-PROJECT Executed Large Size Project, 100 MW Captative Power Project,50+1,70+1 High-rise Building. started my career from PUNJ
  • 2. LLOYD LTD as Trainee Graduate Engineer and rose up to as Team Leader /DGM/Project Head executed in MATHURA ,DULIJAN ASSAM Refinery, E & P business from seismic acquisition to the flow line with the latest data and analysis on exploration & reservoir characterization, well construction, production optimization, Atomic power, Hydro Power [54MW,144MW],Railway, Real Estate, T&D, Fertilizers &Chemicals Plant, Cross Country Pipe line[150 KM]500 Crs. INR, National Highway, Express way, Bridge, Railway. Expertise in soft skills  Indian and International codes (Viz. ACI /AISC /BS / DIN/IRC/BIS or other recognized codes)  Software’s like STAAD / RISA / GTS for analysing and designing the structures.  PRIMEAVERA-P6,CUBE,VOYAGER,VISSUM,VISSIM,ASCE,ACI  MS OFFICE, MS PROJECT,AUTOCAD, STAAD PRO  Professional mastery, Team building, Decision making, Striving for excellence,  Strategic thinking, Stewardship of resources, widely travelled.  Capable of adjusting any working conditions, Good communication skill. Proficiency Forte  Managing preliminary project plan, site selection, layout, preliminary engineering, material management detailed engineering, equipment specification, to run full project life cycle from inception to hand over.  Debottlenecking and expansion of the project Spearheading activities, business dynamics pertaining to energy and wheeling of power, involving working out various requirements and monitoring overall project operations for ensuring timely completion.  Site Management and Site Construction Operations of the assigned project. Ensuring timely completion of projects and execution levels of the highest grade. Directing and monitoring projects progress by coordinating with architects, consultants, contracts and site engineering teams.  Regular reporting of material status and progress of work at site. Keeping track of bills and ensures timely payments to contractors and prepares rate analysis of various items. Maintaining strict quality control procedures - regular testing of materials, visual inspections of work, conducting regular site safety checks etc.  Responsible for project planning, scheduling and cost control. Review construction, purchase, installation and commissioning.  Bid Evaluation and Analysis, Complete Detailed Project Analysis, EPC/PPP Contract Management – Power, Real Estate Roads and Highways, Developer’s Perspectives on Project Risk Management, Technical Construction of different Projects: Project Equipment Management, Financing, Financial Modeling and Parameters.  Scrutinizing contract/ tender documents, techno – commercial evaluation, reviewing technical specifications, estimates and day -to-day activities.  Floating tenders, handling fair price / market analysis, negotiation and selection of contractor / vendors. Managing overall activities pertaining to operation & maintenance of the plant. Responsible for supervising the functions of troubleshooting & predictive/ preventive / shutdown maintenance for identifying areas of obstruction / breakdowns & reducing machinery down time to minimum.  Meet all project milestones, design & implement schedules, tendering process, costs & contract prices; Adhere to project completion & material delivery schedules. Handle HVAC, MEP, services, contracts, procurement, deal extensively with architects, consultants, high calibre contractors, vendors etc. Adopt best practices in Construction, introduce new materials, technology and value engineering techniques to reduce cost.  Quality Control/Quality Assurance Ensuring compliance of various quality standards such as EMS & IS014001 & ISO 9001: 2000 standards Implementing measures for the smooth working of operations. Supervising budgeting, monitoring expenditures, preparing MIS report on project and capital expenditure. Managing the entire gamut of business development activities, Handling commercial negotiation and structuring with respect to Purchase, JV , Lease , and finalization.  Well, Reservoir, Petro physical and Production Data for identification of Field development and exploration potential. Knowledge in Folded thrust belt basin. Concept of prospect generation, Reservoir characterization and preparation of pay maps by integration of subsurface geological information, well log data and various seismic attributes. Knowing Concept of sequence stratigraphy.  Experience in Geotechnical field with operational & business development experience in Foundation Engineering (Piling, Retaining Structures, Ground Improvement etc.)  Coordinating projects for the set-up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives develop & implement health, safety envoirment.  Strong business brain having exceptional commercial acumen with a good working knowledge of contracts, FIDIC, health safety, procurement programme management.  Raise the level of proficiency by influencing, training and recruiting staff, development of staff is essential and is a core value of the group, increases efficiencies.  Drive the business forward through success full implementation of new ideas and process where possible.  Leading & monitoring the performance of team members to ensure efficiency in project operations and meeting of targets.
  • 3.  Drive the strategic growth of the business in accordance with group strategy. Responsible for entire process of Land Acquisition including legal and commercial due diligence, Title search, registration formalities and co- ordination with revenue and other government and Municipal body for necessary approval required for land and property acquisitions.  Specialised in the design and execution of all areas of Metro Rail, transportation and infrastructure ranging from project management, traffic and transportation studies, structural design, CADD design, alignments and surveys, quantity surveying, environmental, social and geotechnical studies.  Expertise in Underground Tunnelling work by. Tunnel Boring Machine/[New Australian Tunnelling Method, Open & cut Method] Checking, Monitoring, Supervising, Planning, Quality Control & Compliances with Technical Specifications, Railway Siding works, Stacker & Reclamier, Track Hoper, Railway Electrification works including OHE,TSS,SWS/SCADA, general electric works, Tilting Turn Table, Track Linking, Coal Storage platform, Construction of Track.  Ensuring cost effective operations and maintenance of highly mechanized opencast mines through techno- economical planning and logical scheduling of operation to achieve the desired output.  Experience in Operation of Mining, Production, Development, Mineral processing, Marketing, Business development, Visualizing opportunities, Brand management, Market intelligence, Conceptualizing Business Strategies, Technical Services, R&D.  Experience in the field of Traffic Engineering, Transport Planning and Traffic Solutions, transport planning team analyzing traffic data, preparing traffic forecasts, developing transport mobility plans, public transport plans and various other traffic and transportation studies and conducting feasibility studies. Developing and applying computer-based transport models (comprising highway and public transport / transit models) using state-of-the- art transport modelling software. GENERAL DUTIES AND RESPONSIBILITIES- Responsible for Conceptualization, Execution and finally Profitability of all other Money Churning ventures. Projects Planning, Projects Execution, Projects marketing and all other Departments as are there in company. Accountable for planning, recruitment, training, appraisals, managing and motivating the entire team and ensure efficiency. Set out the standards of quality to provide the customers with a world class residential or commercial property related experience. Develop and implement a Business Plan through expansion, upgrade & modernize the capacity. Oversee technical & commercial aspects of the Business Plan. 1. Strategy formulation - Develop a strategic plan to advance the company's mission and objectives and to promote revenue, profitability, and growth .Infra structure finance advisory role. This would involve modeling a variety of scenarios to plan for the anticipated future along with involvement in capital market / funds infusion. 2. Organization structuring –Tactical Design of Project management Structuring the organiza tión to deliver current as well as future services by aligning organization design, leadership and individual capabilities to carry out the necessary Works. 3. Management Processes and Systems - Designing or developing new management systems that impact a major part of the organization such as reporting structure to ensure business continuity and managing risk. Taking Corrective Actions, To Achieve Goals in a set period Process Enhancement / Cost Control -Identifying scope for implementation & monitoring technological changes to enhance productivity. Executing cost saving techniques / measures and modifications to achieve substantial reduction in O&M 4. Planning & Budgeting - Ensuring operational effectiveness within the budgets for the company. Allocating funds suitably during implementation and O&M phases. Maintaining close control on the company's expenditures and managing its capital. Ensuring achievement of shareholder commitments. 5. Monitoring & Review - Overseeing company operations to ensure production efficiency, quality, service, and cost- effective management of resources. Monitor and Review KPIs of all the functions and operational matrix reports on monthly basis. Review of various costs and driving improvements to ensure effective utilization of organizational resources (financial, systemic, people). Review activity reports and financial statements to determine progress and status in attaining objectives and revise objectives and plans in accordance with current conditions. Approve company operational procedures, policies, and standards. 6. Culture Building - Taking initiatives to develop the desired culture for the company and develop strategies to manage employee motivation. 7. Communication - Comunicación of organizational direction and vision to members of organization. Driving, motivating and enthusing them about the way forward. 8. Community and public relations - Ensures that the organization and its mission, projects and services are consistently presented in strong and positive image to relevante stakeholders. Ocupacional Contour Jindal India Thermal Power Ltd., New Delhi since Jul’11 Project Site: 5X600[3000MW] Thermal Mega Power Projects, Derang, Odisha Additional Vice President/Head of Project Key Deliverables  Interfacing& business development of project with various sub vendors deploying by the contractors to execute the work & Labour gangs, directing to the Contractors for augmentation of resources in case of shortfalls.
  • 4.  Managing large coal power plants or combined cycle power plants, engineering of power block area viz., Turbine Generator Auxiliaries and Water Steam Cycle Equipments.  Liaising with the Consultants & Vendors for finalizing the specifications and designs, reviewing & suggesting modifications.  Rendering assistance to the Projects/Stations during erection and commissioning activities and O & M phase for specific design issues and failure analysis.  Heading the power trading business of the group, negotiation & finalisation of power sale/power purchase agreement.  Case-1bidding, medium/short term trading, power exchange trading, scanning the market for prospective buyers and sellers of powers.  Executed structures namely Main Power House, T G Foundations, ESP, CW System, etc. which involved massive quantity of concreting. Notable Highlights  Essayed stellar role in executing and constructing various Dir Phases of Thermal Power Projects viz., site levelling, grading, foundation, structural steel works, cooling water system, coal handling plant, ash handling plant, boiler turbine generation, turbine generation building, balance of plant package, main plant civil & structural works, DM plant, PT plant, effluent treatment plant, water treatment plant, coal handling plant, fire fighting package, misc. buildings sub-station buildings, chimney, raw water reservoir, townships, Transmission Distribution Line,5000 m tunnelling from TBM for Coal Belt conveyer 7m dia etc.  Instrumental in reviewing, checking, commenting and finalizing: o Heat Balance Diagram, P & ID, and System Operating Instructions & Design Manuals for calculations, detailed project report (DPR) & design basis report (DBR).  Dexterously supervised the development of : o In-house expertise on all facets of Power Plant Design Engineering. o Framework for preparation of FR, DPR and Design Memoranda o Engineering design of all infrastructure facilities required for a Power Plant including Township, Offices, and Roads, etc.  Fortuitously directed the provision of timely inputs from engineering groups to ensure: o Timely completion of Pre and Post Award activities for projects under construction. o Standardization of specifications, layouts and quality plans. o Issue of design guidelines and checklist for vendor drawings.  Carried out detail engineering analysis and execution of: o BOP Packages viz., CW/CT Pump Houses, EOT Cranes, Miscellaneous Cranes & Hoists, Miscellaneous Pumps, etc. o BTG specifications, consulting concept note & technical specification requirements of BOP packages, sizing calculations, finalization of layouts, plot plan for TG and auxiliary a, checking BOQ, BOM, etc.  Spearheaded the entire gamut of the engineering design of BEPL Power Plants to ensure completion of projects construction in a timely, cost effective manner ensuring the desired quality and operational performance as per design for the life of the plant.  Ascertained the finalization of Quality Assurance Plan of the Vendors and Contractors and inspection of quality audits (both field quality and manufacturers).  Dexterously reduced the Manpower of the dept. by 20 % in a span of one year by totally computerizing & improving the Different Processes.  Successfully executed the projects in 18 months which otherwise used to take 2 years.  Holds the credit of saving at least Rs.50 Crs. through Value Engineering & Quality Improvement activities. Received several Value Engineering & Quality Improvement awards.  Efficaciously maintained highest standard of Safety in different Construction sites. Lanco Infratek Ltd., Gurgaon May’10 – Jul’11 4X66O Babandh Thermal Power Project, Angul, Odisha Head of Project/General Manager (as a Profit Centre Head) Key Deliverables  Business Development & Oversaw the engineering of power block area viz.,Boiler-turbine-Generator Auxiliaries and Water Steam Cycle Equipments.  Significantly reviewed, checked, commented & finalized the Heat Balance Diagram, P&ID, System Operating Instructions / Design Manuals for calculations.  Instrumental in detail engineering and execution of BOP packages such as CW Pumps, EOT Cranes, Miscellaneous Cranes & Hoists, Miscellaneous Pumps, etc.
  • 5.  Involved in reviewing, analysing & execution BTG Specifications, Consultant Concept Note & Technical Specification Requirements of BOP Packages, Sizing Calculations, Finalizing the Layouts / Plot Planning for BTG/BOP Package and Auxiliary, Checking BOQ, BOM, etc.  Handled the overall engineering design and execution of BEPL Power Plants to ascertain the completion of projects construction in a timely, cost effective manner ensuring the desired quality and operational performance as per design for the life of the plant. Notable Highlights  Efficaciously laid down the : o Quality Management System for Commercial & Contracts department at Lanco infratech Limited. Prepared the Quality Manual. o Procurement processes for project procurement at EPC division and handled procurement. RVR Projects P Ltd., Lapetkata, BCPL Refinery Assam Apr’9 – May’10 Resident Construction Manager/Head of Projects/ Sr. GM Projects [Executed 8 no’s Contract at a time] Key Deliverables  Business Development & Instrumental in checking vendor’s bill, material bill, client bill obtaining payments, arranging progress, and reviewing meetings, attending client MD meeting and providing advice for the progress of project.  Involved in operational functions installation, testing and commissioning in Refinery / Petrochemical Complexes, Hydro Treatment Dcu, Coke Handling System Fcc and Propylene Recovery Unit.  E&P business from seismic acquisition to the flow line with the latest data and analysis on exploration & reservoir characterization, well construction, production optimization,  Liaised with Engineers India Ltd., BCPL the development of the functional disciplines viz., o Construction, execution and supervision of Central Workshop, Reservoir planning, Data Collection Audit, Product Warehouse (500mx100m) ,Gas Sweetening Unit, Lldpe/ Hdpe, Fire Auxiliary ,Chemical Building, Teal & Catalyst Buildings, Plant Building, Non Plant Building, Raw Water Reservoir, Steel fabrication, erection of approximate 300000 MT at Different Industrial Buildings, Commercial Operation and Business Development, General Administration, Human Resources, System, etc. o The duties set out under the contract are extensive, and the assignee will find involved deeply in many aspects of the construction process: design liaison, reviewing the quality of work, assessing/advising on liability in relation to contractual claims, or assessing values of work done and problem solving. All types of piling in different / difficult site conditions. o Heavy foundations related to civil work (Single pour of 3000 Cum); all types of foundations in power plant, RCC chimney, heavy lift erection (world largest coke drum of 600 MT at a height of 28 m, air lifting of 80 m Diameter LNG Tank Roof of 560 MT) o Critical erection of Columns & Vessels, Piping, Fire Proofing, Insulation, etc. o Responsible for planning, implementing, supervising, and monitoring of G&G and other technical studies related to Exploration and Field Development activities in Oil Field. Integration of Geological, Geophysical ( 2D , 3D Seismic and VSP ), experience in Geotechnical field with operational & business development experience in Foundation Engineering (Piling, Retaining Structures, Ground Improvement etc.) o Well, Reservoir, Petro physical and Production Data for identification of Field development and exploration potential. Knowledge in Folded thrust belt basin. Concept of prospect generation, Reservoir characterization and preparation of pay maps by integration of subsurface geological information, well log data and various seismic attributes. Knowing Concept of sequence stratigraphy. o Exploration strategy, its execution and evaluation thereof, Appraisal and development planning. Planning for seismic API, budgeting and project execution. Working experience in Kingdom Seismic interpretation Software, PETREL Geological, Geophysical and reservoir modelling suite, and landmark interpretation software with understanding of static and dynamic modelling. Reform the outlook at every level on core objectives and G & G functions on cost/ time factors. Notable Highlights  Accredited for being a high potential candidate and being groomed for future leadership.  Stellar role in saving Rs. 300 Crs for a project thru’ Technical innovation. Dynamic Engineers Infratek Ltd., Mumbai Apr’07 – Apr’9 Coordinator Projects/In charge Projects/General Manager [Projects] High Rise Building 40+1, 45+1 MULTI STORY BUILDING
  • 6. Key Deliverables o Managing Construction projects, Project Management, Project co - ordination, Project Planning, monitoring & Execution, Tenders, Coordinating, design, tendering, structural designing , contracting , legal ,billing project closure, Supervising marketing, PR, IT & HR functions o Turnaround strategy, Branding, Training, Assisting, Strategy making to invade in the market, Method Development, Developing systems to smoothen the process. Looking after the overall function , construction of high rise buildings ,Five star hotel and commercial projects.(all type of projects are mandatory/mixed use project. ) o Experience in Geotechnical field with operational & business development experience in Foundation Engineering (Piling, Retaining Structures, and Ground Improvement etc.) BGR Energy System Ltd., Chennai [CLIENT] MSPL JHALAWAR Feb’06 – Apr’07 General Manager - Projects / Profit Centre Head Setting Out 3X600[1800] MW Ka TPP 3 Unit Jhalawar 6000 Crs. INR Key Deliverables  Business Development& Oversaw the erection, testing and commissioning of power plant.  Instrumental in supporting commercial & contracts for various contract finalizations.  Involved in identifying: o The EPC Contractors, Sub-Contractors/Financing Institutions, etc. for bidding and executing the projects. o The designing modifications as per O & M requirements and forwarding to Steering Committee for approval  Administered regulations at regional and national level.  Pivotal role in finalizing the power purchase agreements and gas supply and transportation agreements for the power projects.  Heading power trading business, Power Exchange Trading, Negotiation of power sale agreement.  Scanning the market for prospective buyers and sellers of power. Notable Highlights  Steered efforts for saving for a project thru’ commercial & Technical innovation.  Played a key role in acquisition of Land.  Dexterously submitted proposal for Transmission Projects – Declared best Technical Bid (among 9 other bidders domestic & international). Preceding Tasks Feb’05 – Feb’06: DCM Shriram Consolidated (I) Ltd., Kota as General Manager – Project Jan’90 – Feb’05: Punj Lloyd Ltd., Nehru Place, New Delhi Joined as Graduate Engineer [Trainee] and rose to the post of DGM , Team Leader& Head Of Project Business Development & Develop PPP projects and handled as team leader project preparation, construction, supervision work of major 1. NH project of four laning/six laning/expressway costing over 2000 crores and total executed 410 KM. 2. Kolkata Metro Underground metro railway 3. DMRC Metro Railway Responsible for reviewing the entire project preparation and implementation activities of the concessionaire and check the design being prepared by concessionare, ensure of execution of works on site as per [FIDIC] concessionaire agreement, standard specifications & continuously interact with the NHAI and the concessionaire and undertake the project site visits, guide, supervise, coordinate, monitoring & project management operations of the multi lateral funded projects. Notable Highlights  Oversaw the Submission of Tariff based bidding on competitive basis Case 1/case 2 bids, Transmission Projects, Coal Mining projects, etc.  Efficaciously rendered risk alerts to the management.  Oversaw the PPP model contracts for Transmission Projects.  Supervising marketing, PR, IT & HR functions, Turnaround strategy, Branding, Training, Assisting, Strategy making to invade in the market, Method Development, Developing systems to smoothen the process. Looking after the overall function. Scholastics  MBA (International Business) from IGNOU, Delhi in 2000.  B.E. (CIVIL) from Jai Narayana Vyas Jodhpur University, Jodhpur in 1990.  Diploma (Civil Engineering) from Jodhpur Technical Board, Jodhpur in 1985. Personal Dossier
  • 7. Date of Birth ; 16th June, 1967 Present Address ; Vasant Kunj New Delhi /JITPL Derang Angul Odisha Permanent Address ; A 44, Gayatri Vihar, Baja rang Nagar, Kota – 324001 Rajasthan Languages Known ; Hindi, English Father’s Name ; Mr. Anand Swaroop Agarwal Brief Family ; my wife is Principal in Govt Girls college History ; My daughter read in Amity University ,civil engineering & son read in 11 th standard References 1- Mr V R Vahne PM, E I Ltd near Bhikaji Kama Place New Delhi/BCPL Assam +919435745013 2- Mr A K Tondon RCM, E I Ltd near Bhikaji Kama Place New Delhi]/[ BCPL Assam +919435573581 2- Mr SL Sharma Chief Construction Manager New Delhi, GAIL/ BCPL Assam +919435746223 Please find the annexure for Projects Handled & Knowledge Purview: Annexure: 1 JINDAL INDIA THERMAL POWER LTD NEWDELHI  Accountable for the drawings& Execution of underground RCC tunnels for conveyors , clarifiers, gravity filters, chemical house buildings, project & construction management, balance of plant (BOP) including CHP, AHP, WTP, PTP & DM, CW, cross country pipe and river water pump house, CW, FOHS, cooling tower, ETP, STP, LP Piping, HVAC and compressed air system, etc. of coal fired thermal power plant, Track hopper,  Developing, planning and constructing the CHP, AHP, STG, CW. ACW, River Water, Cross country piping, FWH,WTP, DMW, etc Railway Siding, Stacker Recamier ,Track Hoper, Railway Electrification, Tilting Turn Table, Track Linking, Coal Storage platform, Construction of Track.  Construction of tunnelling work 4200m by open cut cut and covers method. . LANCO INFRA TECH LTD.GURGAON IOCL Refinery Project, Para dip, Odisha Role: Head of Project/Resident Construction Manager /General Manager Project Package: Delayed Coker Unit [030], Coke Handling System [0245] Client: M/s. IOCL-Refinery, Para deep, Orissa Cpc /Lstk Contractor: M/s. Toyo Global Engineering India Ltd. Para deep, Orissa, Pmc: M/s. Jacobs Engineering India Pvt. Ltd., Para deep, Orissa Profile: Worked as an Over All In-charge for executing, planning, coordinating, Independently, troubleshooting, supporting and interfacing with client viz., PMC, CPC/LSTK Contractor Manager, Dy Manager Resident Engineer, Project Engineer for the optimum performance of the project. Railway Siding, Stacker Recamier ,Track Hoper, Railway Electrification, Tilting Turn Table, Track Linking, Coal Storage platform, Construction of Track. RVR PROJECTS P LTD ASSAM Title: Brahmaputra Petrochemical Complex Projects, Lapetkata, Dibrugarah, Assam, India Client: Brahmaputra Gas Cracker & Polymer Ltd., Assam & Captative Power Project (Heavy Industrial Project) PMC: M/s. Engineers India Ltd., Bhikajikama Place, New Delhi DYNAMIC ENGINEERS INFRATEK LTD.MUMBAI  MRVC [Mumbai Railway Vikas Corporation Ltd. A PSU of Govt of India Ministry of Railways) Track linking Works in Connection with Construction of Emu Maintenance Car Shed between Nallasopara and Virar Stations of western railways.  Constructions of New Fob in Mumbai Suburban Section Lower Parrel, Elphinston Road (N) of Mumbai.  Construction of New FOB in Mumbai Suburban Section at Bandra (c) Vasai Road (n), Virar of Mumbai Division.  Era Infrastructure, MRVC site Installation of track inspection car shed project Virar.  DMRC (Delhi Metro Railway Corporation Ltd., A PSU of Govt of India Ministry of Railways], Construction of Metro Station Barakhamba Road, Mandi House Delhi Foundation, Underground, Tunnelling Structural, Fabrication, Finishing Work.  Construction Head/Operation Head of Solar Thermal project [BIKANER] for ACME TELE POWER LTD o Steel Fabrication Erection of FOB Approximate 500000 MT, Launching of Steel Girder, Steel Column, Beam Steel Structure for Foot Over Bridge. o Construction of Tunnelling work from TBM/New Australian method Approximate 4000 m length for DMRC PROJECT,2000 m by, Cut and cover method. o The duties set out under the contract are extensive, and the assignee will find involved deeply in many aspects of the construction process: design liaison, reviewing the quality of work, assessing/advising on liability in relation to contractual claims, or assessing values of work done and problem solving. DCM SHRIRAM CONSOLIDATED (INDIA) LTD.  Extension of Cement Plant, Urea Plants  Construction of Road Project  Construction of Water Treatment Plant  Construction of Pipeline & Underground Pipeline Project (layout to testing)
  • 8. Commercial Complex Two Lakhs SQM  Residential Building One Lakhs SQM  Multi-storeyed Building 50+1, 70+1  Captative Power Plant 2x100 MW  Construction of Railway Electrification works, OHE,TSS,SWS/SCADA, yard, cement Cilo.  Residential/Commercial Spaces/Malls/Sky Scrapers PUNJ LLOYD LTD.NEWDEHLI  Oversaw the designing & executing the Bridge, Highway Project, and Road Construction & Maintenance.  Experience in the field of Traffic Engineering, Transport Planning and Traffic Solutions. Transport planning team analyzing traffic data, preparing traffic forecasts, developing transport mobility plans,  Public transport plans and various other traffic and transportation studies and conducting feasibility studies. developing and applying computer-based transport models (comprising highway and public transport / transit models) using state-of-the-art transport modelling software such as CUBE Voyager, VISUM, Vissim  National Highway Project Total No.6 Length of 4, 6 Lane and expressway 410 Km Consultant & PMC Rites Limited.  Construction of Tunnelling work 4500 m[Horse Shoe Type 5M,9M Dia ]for Hydro power project  Railway Siding, Stacker Recamier ,Track Hoper, Railway Electrification, Tilting Turn Table, Track Linking, Coal Storage platform, Construction of Track.  BOT/DBFOT/BOOT Road & Bridge Projects: o Kota to Jhalawar National Highway four Lane [By Pass] 80km Com18 Months. o Jaipur Delhi NH Project 4 Lane 150 Km Comp36months. o Delhi Mathura Road NH 6 Lane, Rigid& Flexible Pavement 40 Km Comp18 Months. o Jabalpur, Jaipur NH 12, 45km Six Lane Road 15 Months. o Kota Bijoliya Udaipur NH Project 4 Lane Road 95 Km Comp 36 Months.  Bridge Projects [total No. 5 Length 8.2 KM] o Bridge Projects (Chambal River) 1.2 Km with Caisson, Well Foundation. o Residential Colony for Rajasthan Housing Board. (2000 Houses) o Bridge Projects 500m -4nos Open Raft & Pile Foundation & Caisson Foundation  Power Projects Thermal Kota Super Thermal Power Project 3x250 MW 3 No’s .Unit Badarpur Delhi 3x110 mw 3 No. Unit  Hydro Power Projects Planning, Execution, Analysis & Design of Dam, Spillways, Power Intakes, Retaining Walls and related Structures and estimation of quantities of related structures, Preparation of Tender & Construction stage Drawings of Dam and Allied works. Preparing & review technical specifications of civil works of various Dam structures working out bill of quantities and unit rate analysis Equipment planning and scheduling for construction .Preparation of design report Preparation draft drawings for the structures designed Checking and finalizing the drawings Regular visit to the Project site for monitoring of works and interaction with engineers at the project Execution work of Hydro Power Project construction, Tunnel[3500 m], DAM, Pen Stroke Tail Race Channel, Approach Channel, Roads & Power House Control, parameter for RMC knowledge of different type Admixtures and construction chemicals, Plastisizers ,Super plastisizers, Airentrainingad mixtures, fresh concrete resistant to Freezing &Thawing effect, using Natural & Artificial pozzolanic material, making pump able concrete, placing concrete, Slip form technique. Barrage, Cofferdam, diversion structures etc. 1.RANA PRATAP SAGAR Dam[Hydro Power Project 2x70 MW] PROFILE; OVERALL INCHARGE [DGM/SITE HEAD] SPECIFICATION FOR PROJECT A.CREST LENGTH; 1715 M B.DAM HEIGHT; 80M C.EXCAVATION 1,85000 M3 D.FILLINGS; 1,10,000 M3 E. DRILLING;1,20,000 M F.CONCRETE;1,00,000 M3 G.GROUTING; 20,000 MT [Cement, Clay, Bentonyte Silica gel] H.INTAKE TOWER ;65 M [With intake gates at four level] I. TUNNEL;6.5 M Finished dia 4500m long J.GALLARIES; 875 M Long[2.0m to3.5 m] K. ROAD ;30 km [In Hilly areas] L. PURPOSE; IRRIGATION M. CLIENT;STATE GOVT RAJASTHAN 2.JAWAHAR SAGAR DAM[ 1X54 MW]. PROFILE ; OVERALL INCHARGE DGM/ SITE HEAD SPECIFICATION OF PROJET A. Diversion and guide wall of Chambal River U/S &D/S B. Coffer Dams and 8M dia , 721m long diversion tunnel on right bank. C. Construction of concrete gravity dam of 60.50 m height and 370 m long. D. 4 NOS. intakes with opening of size 19.95mx18m. F. 4 NOS. Underground desilting chambers of size 525mx15mx30m each. G. 6 mDia2100 m long horse shoe shaped flushing tunnel,4 gate shafts for flushing tunnels and all allied works 3. Mathura Oil & Gas Refinery Projects IOCL/ Dulijan Refinery Assam 4.Chambal Fertilizers & Chemicals limited, Gadepan, Kota, Rajasthan
  • 9. 5.Railway Project (Hazarat, Nizamudeen) in New Delhi 6.Cross Country Pipe Line Project-HBJ Petro Gas of 150 KM Cost [500] five Hundred CRs KNOWLEDGE PURVIEW  Business Development & Increasing the market share by developing contacts with industries, PSUs & consultants, Liasoning with PGCIL, MRVC, DMRC, IOCL, BCPL, RVUNL, EIL, & GAIL.  Developing and implementing aggressive marketing strategies to support existing market segments and establishing new market segments.  Continually prospecting and tapping new customers to generate enquiries.  Prompt and viable techno-commercial solutions.  Sales &Project Marketing of EPC Turnkey Projects / Capital equipments / Industrial products.  Identifying various media and trade fares for marketing purpose & organization branding.  Expertise in FIDIC conditions of contract and concession agreements and their interpretations.  Reviewing RPF documents, identifying need for JV partner / alliance.  Identifying new projects in the focused sector of business basically (Road, Bridges, Highways / Shopping Malls / Thermal Power/Hydropower/ Cross Country Pipeline/ Airport / Metro Rails, etc.) and in different areas, fields, projects, countries.  Project Implementation Documents (PID) for secured jobs, Implementing SHE, security, fire fighting system & procedure at site.  Pre-qualification, Post-qualification Techno-commercial & Financial Bids.  Marketing Initiatives, Developing New Markets, Business Start Up.  Rules and regulations related to SEZs, Industrial Parks, land procurement and acquisition, Real Estate rules and regulations.  Flair for marketing and customer-centric attitude while dealing with potential customers and investors.  Ability to negotiate with farmers, identify the best route to be adopted for land procurement in different locations, identify Rehabilitation and Resettlement needs of farmers, handling land intermediaries.  Understanding of concepts related to project structuring, ability to identify strategic investors and negotiate favourable terms with financial investors and banks. LEGAL AND TECHNO LEGAL  Various ongoing civil suits pertaining to land and project, Trademark suits, Arbitration and contract management, Agreements, leases, lien documents.  Various affiliate group legal matters, Liaison with statutory bodies-legal departments, court, and machinery.  Dealing with Advocates, solicitors and opponents of suits both in the capacity of Respondent & Petitioner.  Out of Court & affiliate settlements. Rent Act Matters & Taxation Tribunals  Well aware of international markets and trade policy, commercial developments, contract law, excise, sales tax, VAT, Import & Export, customs rules & regulations.  To deal with Government / Municipal bodies, get clearances, handle legal issues, liaison. Interaction with State Pollution control Boards,  Ministry of Environment & Forests and Indian Bureau of Mines regarding Statutory Clearances required for Safe and Best Industrial Mining. SHIVENDRA KUMAR AGARWAL