5. Design Qualification
● Check manufacturer and supplier.
● Verify Model number and serial number.
● Check any physical damage.
● Measure machine height
● Machine height - measure with measuring tape
● Overall dimension- measure with measuring tape
6. Installation Qualification
IQ is done to check all critical contact parts parts which directly affect the quality of
the product.
To check for:
● Required utilities- electricity.
● Thickness of controller cam
● Main drive :
i) ON indicator
ii) Potentiometer
iii) Selector Switch
iv) Emergency switch
● Dust extraction and exhaust system
7. ● Verify alarm control.
● Perform calibration requirements, identify in the manual or established by
the validation team.
● Operate the equipment at low medium and high speed as per operation
manual to verify the operation control.
● Verify that all switches and push buttons are functioning properly
● Establish procedures for operation, maintenance and calibration
● Establish training program for relevant staff Run one pilot batch for each
product
Operational qualification
8. Operational Qualification Checklist
1.Main switch- check visually by operating the main switch of the machine.
2. Start push button- illuminated green switch : by pressing start button the green
switch glows & the main drive motor should start
3. Stop push button- illuminated red switch : By pressing stop button the red
switch glows & the main drive motor should stop
4. Turret RPM challenge test- set in the digital table counter : by rotating the knob,
check by tachometer
5. Rotation direction (clockwise)- by visual check
6. Emergency switch by visual check.
7. Operate the equipment at low medium and high speed as per operation
manual to verify the operation control.
9. Performance Qualification
• Its an Evaluation of compression capabilities and tablet characteristics.
• The compression capabilities and tablet characteristics are:
1) Content uniformity
2) Thickness
3) Hardness
4) Friability
5) weight variation
6) Disintegration test.
All of the above parameters should be investigated.
10. Performance parameters
CONTENT UNIFORMITY:
Select 30 tablets randomly from
batch - Assay individually
ACCEPTANCE CRITERIA:
Out of 30 tablets
3 tablets can be with in 75 – 125%
and
all tablets should be with in 85 -
115%
FRIABILITY:
First 20, last 20, middle 20 tablets %
friability =( initial wt - final wt / initial
wt)
ACCEPTANCE CRITERIA:
- Weight loss less than or equal to
1%, per USP
11. Performance Parameters (contd.)
WEIGHT VARIATION:
20- TABLETS
% weight variation= (individual wt-avg
wt/ avg wt) x 100
ACCEPTANCE CRITERIA :
For Average Weight 130 mg or less 10%
difference
For Average Weight 130 to 324 mg 7.5%
difference
For Average Weight More than 324 mg
5% difference
Disintegration test
12. References
1. Subrahmanyam CVS, Setty JT, Sarasija S & Devi VK in " Pharmaceutical Engineering-
Principles & Practices", Vallabh Prakashan, New Delhi, 2001, 390-391, 397-399.
2. https://www.slideshare.net/YashMenghani2/qualification-of-tablet-compression-
machine-capsule-filling-machine