SlideShare une entreprise Scribd logo
1  sur  17
Télécharger pour lire hors ligne
All Copyrights Reserved
RSP DESIGN CONSULTANTS (INDIA) PVT LTD
MEP SERVICES
DESIGN CONSULTANTS (I) PVT. LTD.
MEP ENGINEERING
SERVICES
All Copyrights Reserved
MEP TEAM STRUCTURE
DATTATREYA
BHAT
HOD – ELEC.
CADD
ENGINEERS
CADD
ENGINEERS
UTPAL
CHATTERJEE
HOD - HVAC
DESIGN
ENGINEERS
CADD
ENGINEERS
DESIGN
ENGINEERS
CADD
ENGINEERS
CHIEF ENGINEER
PHE - FIRE
SENIOR DIRECTOR
ASSO. DIRECTOR
PHE - FIRE
ASSOCIATE
COORDINATION
ASSO. DIRECTOR
HVAC
DY CH. ENGINEER
HVAC
ASSO. DIRECTOR
ELECTRICAL
CADD
ENGINEERS
ASSOCIATE
ELV SYSTEMS
CHIEF ENGINEER
ELECTRICAL
DESIGN
ENGINEERS
DESIGN
ENGINEERS
PRINCIPAL ADVISOR
ENGINEERING
COORDINATION
ENGINEERS
2
All Copyrights Reserved
SCOPE OF MEP SERVICES OFFERED
1. ELECTRICAL
2. FIRE DETECTION AND ALARM SYSTEMS
2. STAND BY POWER SUPPLY SYSTEMS
3. VERTICAL TRANSPORTATION SYSTEMS
4. SECURITY SYSTEMS
5. PLUMBING
6. FIRE PROTECTION AND SUPPRESSION SYSTEMS
7. HVAC
8. BMS
9. SUPPORT FOR MOEF CLEARANCE
10. SUPPORT FOR GREEN BUILDING DOCUMENTATION
All Copyrights Reserved
DESIGN PHILOSOPHY – MEP SERVICES
COMPLIANCE WITH LOCAL CODES & IE RULES
CONFORMITY TO INDIAN STANDARDS
SAFETY AND SECURITY OF EQUIPMENT AND PERSONNEL
SIMPLE AND RELIABLE DESIGN
MODULAR SYSTEMS
EASILY MAINTAINABLE
ENERGY EFFICIENCY
ENVIRONMENTALLY SUSTAINABLE WITH GREEN INITIATIVES
COST EFFECTIVE
All Copyrights Reserved
 LOCAL CODES
 BUILDING CODE OF INDIA (NBC – 2005)
 ENERGY CONSERVATION BUILDING CODE (ECBC – 2007)
 APPLICABLE ELECTRICITY RULES & REGULATIONS
 POLLUTION CONTROL BOARD STIPULATIONS PERTAINING TO AIR /
WATER / NOISE POLLUTION.
 RELEVANT STANDARDS OF BIS / INTERNATIONAL STANDARDS FOR
 MANUFACTURING, INSTALLATION, TESTING COMMISSIONING,
OPERATION & MAINTENANCE OF ELECTRICAL & MECHANICAL
EQUIPMENT.
 ASHRAE STANDARDS FOR AIR CONDITIONING AND VENTILATION
 ASPE & IPHE STANDARDS FOR PLUMBING.
CODES & STANDARDS - MEP SERVICES
All Copyrights Reserved
POWER SUPPLY SANCTION.
1. MOEF CLEARANCE WHERE APPLICABLE
2. NOC FROM LOCAL FIRE AUTHORITY
3. CEIG APPROVAL FOR SUB STATIONS.
4. CEIG APPROVAL FOR DG SETS.
5. CEIG APPROVAL FOR MS BUILDING ELECTRICALS.
6. APPROVAL FOR LIFTS.
7. NOC FROM PCB.
8. CCOE , NOC AND APPROVAL FOR BULK FUEL STORAGE
9. LOCAL FIRE CODES
APPROVALS & SANCTIONS - MEP SERVICES
All Copyrights Reserved
 ESTIMATION OF POWER REQUIREMENTS.
 ELECTRICAL SCHEMATIC DRAWINGS
 SELECTION OF TRANSFORMER AND CAPTIVE POWER CAPACITY.
 HT AND LT DISTRIBUTION SYSTEM DESIGN INCLUDING METERING.
 EXTERNAL LIGHTING AND POWER DISTRIBUTION
 GROUNDING AND LIGHTNING PROTECTION SYSTEMS
 ADOPTION OF RENEWABLE ENERGY FOR LIGHTING
 EQUIPMENT SELECTION & COST ESTIMATION
 SCHEMATICS AND LAYOUT DRAWINGS
DESIGN CONSIDERATIONS – ELECTRICAL SERVICES
All Copyrights Reserved
1. SOURCE OF WATER SUPPLY AND TREATMENT
2. WATER DEMAND ESTIMATION
3. WATER STORAGE CAPACITIES
4. WATER DISTRIBUTION SYSTEM AND ZERO DISCHARGE CONCEPT.
5. SEWAGE HANDLING AND TREATMENT
6. UTILIZATION OF TREATED WATER
7. RAIN WATER COLLECTION AND HARVESTING
8. SOLID WASTE MANAGEMENT
9. EQUIPMENT SELECTION AND COST ESTIMATION
10. SCHEMATICS AND LAYOUT DRAWINGS
DESIGN CONSIDERATIONS – PHE SERVICES
All Copyrights Reserved
1. FIRE WATER STORAGE
2. HYDRANT SYSTEM
3. SPRINKLER SYSTEM
4. SPECIAL FIRE SUPPRESSION SYSTEMS
5. FIRE DETECTION AND PROTECTION
6. EQUIPMENT SELECTION AND COST ESTIMATION
7. SCHEMATICS AND LAYOUT DRAWINGS
DESIGN CONSIDERATIONS – FIRE SERVICES
1. Sprinkler Head
All Copyrights Reserved
1. CLIMATIC CONDITIONS.
2. BUILDING ENVELOPE
3. HEAT LOAD DETERMINATION
4. COOLING LOAD ESTIMATION
5. EQUIPMENT OPTIONS AND SELECTION
6. AIR DISTRIBUTION
7. FIRE & SMOKE SAFETY
8. NOISE LEVEL
9. COST ESTIMATION
10. SCHEMATICS AND LAYOUT DRAWINGS
DESIGN CONSIDERATIONS – HVAC SERVICES
All Copyrights Reserved
1. REFLECTED CEILING PLAN
2. COORDINATION OF SERVICES ABOVE FALSE CEILING
3. SERVICES COORDINATION BELOW FALSE FLOOR
4. BASEMENT AND TERRACE LEVEL SERVICES COORDINATION
5. EXTERNAL SERVICES
6. SERVICES ON THE WALLS / PARTITIONS
7. SITE MONITORING
DESIGN CONSIDERATIONS – COORDINATION
All Copyrights Reserved
DESIGN CRITERIA FOR
GREEN BUILDINGS
All Copyrights Reserved
1. COMPLIANCE WITH LOCAL CODE – ECBC 2007.
2. ENERGY EFFICIENT AIR-CONDITIONING SYSTEM WITH
ECO-FRIENDLY REFRIGERANTS.
3. IMPROVED INDOOR AIR QUALITY FOR HEALTHY
ENVIRONMENT & ENHANCED PRODUCTIVITY,
4. MINIMIZING WATER CONSUMPTION.
5. ENERGY MANAGEMENT & CONSERVATION BY
AUTOMATION & CONTROLS.
6. LIGHTING CONTROLS & DAY LIGHT HARVESTING.
7. INTEGRATED BUILDING MANAGEMENT SYSTEM TO
MONITOR, CONTROL & OPTIMIZE ENERGY
CONSUMPTION.
8. HARNESSING SOLAR ENERGY FOR HOT WATER
GENERATION & LIGHTING.
9. ENHANCED COMMISSIONING PROCEDURES.
SUSTAINABILITY MEASSURES
All Copyrights Reserved
Rating:
Certified: 40 – 49 Points
Silver: 50 – 59 Points
Gold: 60 – 79 Points
Platinum: 80 Points and above
NOTE:
1. Feasibility study to be conducted to assess the Potential rating and set the target.
2. Design of services to be dovetailed to achieve the same.
LEED 2009 for NEW CONSTRUCTION
Sustainable Sites
(26 Points Max)
Water Efficiency
(10 Points Max)
Energy & Atmosphere
(35 Points Max)
Materials & Resources
(14 Points Max)
Indoor Environmental Quality
(15 Points Max)
Innovation in Design
(6 Points Max)
Regional Priority
(4 Points Max)
All Copyrights Reserved
1. LOW LOSS TRANSFORMERS FOR POWER DISTRIBUTION.
2. HIGH EFFICIENCY MOTORS FOR ALL MAJOR DRIVES.
3. AUTOMATIC MAINTENANCE OF HIGH POWER FACTOR.
4. HARMONIC MITIGATION FOR REDUCING DISTRIBUTION LOSSES
5. CENTRALIZED MONITORING AND DATA ACQUISITION.
6. LOAD BASED OPERATION OF CAPTIVE POWER SYSTEM WITH PLC
CONTROLS.
7. DAY LIGHT HARVESTING FOR ENERGY SAVING IN LIGHTING.
8. HIGH EFFICIENCY & ENVIRONMENT FRIENDLY LAMPS FOR MINIMUM
LPD.
9. TIME / OCCUPANCY BASED LIGHTING CONTROLS TO MINIMIZE
WASTAGE OF ELECTRICAL ENERGY.
10. INTEGRATION OF ELECTRICAL AND HVAC SYSTEMS FOR ENERGY
SAVING.
ELECTRICAL SERVICES
All Copyrights Reserved
1. WATER EFFICIENT FIXTURES.
2. DUAL FLUSHING SYSTEM FOR WATER CLOSETS.
3. STP TREATED WATER FOR FLUSHING.
4. IR SENSORS FOR WASH BASINS.
5. MINIMIZING WATER REQUIREMENT FOR IRRIGATION BY
DEPLOYING LATEST TECHNOLOGICAL DEVELOPMENTS.
6. HARNESSING SOLAR ENERGY FOR HOT WATER GENERATION.
7. METERING & AUDITING OF WATER CONSUMPTION.
PHE SERVICES
1. WATER COOLED / HYBRID CHILLERS FOR OPTIMUM UTILIZATION OF
TREATED WASTE WATER.
2. VARIABLE SPEED SECONDARY PUMPING FOR IMPROVED EFFICIENCY.
3. VFDS FOR AHUS.
4. SEPARATE AHUS FOR PERIPHERAL AREAS.
5. HEAT RECOVERY WHEELS FOR BETTER EFFICIENCY.
6. IMPROVED EFFICIENCY WITH INTEGRATED BMS COVERING ALL MEP
SERVICES.
7. NIGHT TIME PURGE OUT CYCLE FOR IMPROVED IAQ.
8. VICTUALIC COUPLINGS FOR MINIMIZING / ELIMINATING WELDING.
HVAC SERVICES
All Copyrights Reserved
WHY RSP?
 ONE OF THE LARGEST INTERNATIONAL PRACTICES IN INDIA WITH OVER 300 PROFESSIONALS IN
FULLY ESTABLISHED DESIGN FACILITY AT BANGALORE.
 OVER 12 YEARS OF SUCCESSFUL OPERATION IN INDIA.
 ON TIME DELIVERY OF RESIDENTIAL , INSTITUTIONAL , CAMPUS PROJECTS IN INDIA.
 SINGLE STOP MULTIDISCIPLINARY DESIGN SERVICE UNDER ONE ROOF COVERING MASTER
PLANNING, ARCHITECTURAL, INTERIOR, LANDSCAPE AND MEP SERVICES.
 COMPREHENSIVE DATA BASE ON BUILDING MATERIALS AND LOCAL CONSTRUCTION PRACTICES
TO ENSURE BUILD ABILITY AND COST EFFICIENCY.
 SYSTEM ORIENTED WORK CULTURE FOR PRECISE AND TIMELY DELIVERY.
 FOCUS ON BIOCLIMATIC AND ENVIRONMENTALLY SENSITIVE DESIGN SOLUTIONS
 DIVERSIFIED PORTFOLIO OF PROJECTS

Contenu connexe

Tendances

the leela kempinski gurgaon delhi ncr
the leela kempinski gurgaon delhi ncrthe leela kempinski gurgaon delhi ncr
the leela kempinski gurgaon delhi ncr
Dr. Sunil Kumar
 
Ducted distribution of services
Ducted distribution of servicesDucted distribution of services
Ducted distribution of services
Noorule Inie Osman
 

Tendances (20)

Aranya Low Cost Housing
Aranya Low Cost HousingAranya Low Cost Housing
Aranya Low Cost Housing
 
Case study on group housing - Architectural design
Case study on group housing - Architectural designCase study on group housing - Architectural design
Case study on group housing - Architectural design
 
FIRE DETECTION AND ALARM SYSTEM IN HOTEL
FIRE DETECTION AND ALARM SYSTEM IN HOTELFIRE DETECTION AND ALARM SYSTEM IN HOTEL
FIRE DETECTION AND ALARM SYSTEM IN HOTEL
 
LOW RISE MEDIUM SCALE COMMERCIAL COMPLEX
LOW RISE MEDIUM SCALE COMMERCIAL COMPLEXLOW RISE MEDIUM SCALE COMMERCIAL COMPLEX
LOW RISE MEDIUM SCALE COMMERCIAL COMPLEX
 
Data collection of malls
Data collection of mallsData collection of malls
Data collection of malls
 
Housing design n standards
Housing design n standardsHousing design n standards
Housing design n standards
 
Sports complex
Sports complexSports complex
Sports complex
 
Parking final
Parking finalParking final
Parking final
 
Group Housing Bye Laws
Group Housing Bye LawsGroup Housing Bye Laws
Group Housing Bye Laws
 
Landscape in housing projects
Landscape in housing projectsLandscape in housing projects
Landscape in housing projects
 
Case Study of Shukla Villa
Case Study of Shukla VillaCase Study of Shukla Villa
Case Study of Shukla Villa
 
Row house case study
Row house case study Row house case study
Row house case study
 
EPABX SYSTEM
EPABX SYSTEMEPABX SYSTEM
EPABX SYSTEM
 
Water supply in DB mall Bhopal
Water supply in DB mall BhopalWater supply in DB mall Bhopal
Water supply in DB mall Bhopal
 
Tara Apartment - New Delhi
Tara Apartment - New DelhiTara Apartment - New Delhi
Tara Apartment - New Delhi
 
Electrical system design of garden project at belhaven (10 Storey High Rise B...
Electrical system design of garden project at belhaven (10 Storey High Rise B...Electrical system design of garden project at belhaven (10 Storey High Rise B...
Electrical system design of garden project at belhaven (10 Storey High Rise B...
 
the leela kempinski gurgaon delhi ncr
the leela kempinski gurgaon delhi ncrthe leela kempinski gurgaon delhi ncr
the leela kempinski gurgaon delhi ncr
 
building services -Lift's and escalators
building services -Lift's and escalatorsbuilding services -Lift's and escalators
building services -Lift's and escalators
 
Ducted distribution of services
Ducted distribution of servicesDucted distribution of services
Ducted distribution of services
 
Lighting architecture lecture 2
Lighting architecture lecture 2Lighting architecture lecture 2
Lighting architecture lecture 2
 

Similaire à RSP MEP Services Profile

Hydrogen Production Cost Analysis recreate content pdf.pdf
Hydrogen Production Cost Analysis recreate content pdf.pdfHydrogen Production Cost Analysis recreate content pdf.pdf
Hydrogen Production Cost Analysis recreate content pdf.pdf
YogitaMali7
 
Hydrogen Production Cost Analysis rc pdf2.pdf
Hydrogen Production Cost Analysis rc pdf2.pdfHydrogen Production Cost Analysis rc pdf2.pdf
Hydrogen Production Cost Analysis rc pdf2.pdf
YogitaMali7
 
Fuelcellapplicationspresentation
FuelcellapplicationspresentationFuelcellapplicationspresentation
Fuelcellapplicationspresentation
Zondits
 
EM web content 1
EM web content 1EM web content 1
EM web content 1
NC Sustain
 
ETP AC Gas Chiller for Middle East in Kw- Oct 2015 dispos V1
ETP AC Gas Chiller for Middle East in Kw- Oct 2015 dispos V1ETP AC Gas Chiller for Middle East in Kw- Oct 2015 dispos V1
ETP AC Gas Chiller for Middle East in Kw- Oct 2015 dispos V1
Christian Moreau
 

Similaire à RSP MEP Services Profile (20)

Bacs and water per il condizionamento degli edifici
Bacs and water per il condizionamento degli edificiBacs and water per il condizionamento degli edifici
Bacs and water per il condizionamento degli edifici
 
Rnn 02.07.2012 copy
Rnn 02.07.2012   copyRnn 02.07.2012   copy
Rnn 02.07.2012 copy
 
Efficient Power Usage
Efficient Power UsageEfficient Power Usage
Efficient Power Usage
 
energy audit
energy auditenergy audit
energy audit
 
Dairy Wastewater Treatment and Electricity Generation using Microbial Fuel Cell
Dairy Wastewater Treatment and Electricity Generation using Microbial Fuel CellDairy Wastewater Treatment and Electricity Generation using Microbial Fuel Cell
Dairy Wastewater Treatment and Electricity Generation using Microbial Fuel Cell
 
IRJET- Design and Fabrication of “Cavitation Water Heater”
IRJET-  	  Design and Fabrication of “Cavitation Water Heater”IRJET-  	  Design and Fabrication of “Cavitation Water Heater”
IRJET- Design and Fabrication of “Cavitation Water Heater”
 
Hydrogen Production Cost Analysis recreate content pdf.pdf
Hydrogen Production Cost Analysis recreate content pdf.pdfHydrogen Production Cost Analysis recreate content pdf.pdf
Hydrogen Production Cost Analysis recreate content pdf.pdf
 
FEA Consulting Green Power Point Click
FEA Consulting Green Power Point   ClickFEA Consulting Green Power Point   Click
FEA Consulting Green Power Point Click
 
Hydrogen Production Cost Analysis rc pdf2.pdf
Hydrogen Production Cost Analysis rc pdf2.pdfHydrogen Production Cost Analysis rc pdf2.pdf
Hydrogen Production Cost Analysis rc pdf2.pdf
 
IJSRED-V2I2P6
IJSRED-V2I2P6IJSRED-V2I2P6
IJSRED-V2I2P6
 
Fuelcellapplicationspresentation
FuelcellapplicationspresentationFuelcellapplicationspresentation
Fuelcellapplicationspresentation
 
Town planning & analysis of green building
Town planning & analysis of green building Town planning & analysis of green building
Town planning & analysis of green building
 
EM web content 1
EM web content 1EM web content 1
EM web content 1
 
ETP AC Gas Chiller for Middle East in Kw- Oct 2015 dispos V1
ETP AC Gas Chiller for Middle East in Kw- Oct 2015 dispos V1ETP AC Gas Chiller for Middle East in Kw- Oct 2015 dispos V1
ETP AC Gas Chiller for Middle East in Kw- Oct 2015 dispos V1
 
perfect project report (1)
perfect project report (1)perfect project report (1)
perfect project report (1)
 
Overview of Water cycles, wastewater treatment processes, wastewater plant en...
Overview of Water cycles, wastewater treatment processes, wastewater plant en...Overview of Water cycles, wastewater treatment processes, wastewater plant en...
Overview of Water cycles, wastewater treatment processes, wastewater plant en...
 
IRJET- Desalination of Sea Water using Solar Energy
IRJET-  	  Desalination of Sea Water using Solar EnergyIRJET-  	  Desalination of Sea Water using Solar Energy
IRJET- Desalination of Sea Water using Solar Energy
 
HYBRID POWER GENERATION SYSTEM From KMP College
HYBRID POWER  GENERATION SYSTEM From KMP CollegeHYBRID POWER  GENERATION SYSTEM From KMP College
HYBRID POWER GENERATION SYSTEM From KMP College
 
Energy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment AnalysisEnergy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment Analysis
 
Development of an inexpensive data logger for solar water heating system regu...
Development of an inexpensive data logger for solar water heating system regu...Development of an inexpensive data logger for solar water heating system regu...
Development of an inexpensive data logger for solar water heating system regu...
 

Dernier

Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
Kamal Acharya
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单
一比一原版(UofT毕业证)多伦多大学毕业证成绩单一比一原版(UofT毕业证)多伦多大学毕业证成绩单
一比一原版(UofT毕业证)多伦多大学毕业证成绩单
tuuww
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 

Dernier (20)

BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Attraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptxAttraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptx
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Lect 2 - Design of slender column-2.pptx
Lect 2 - Design of slender column-2.pptxLect 2 - Design of slender column-2.pptx
Lect 2 - Design of slender column-2.pptx
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单
一比一原版(UofT毕业证)多伦多大学毕业证成绩单一比一原版(UofT毕业证)多伦多大学毕业证成绩单
一比一原版(UofT毕业证)多伦多大学毕业证成绩单
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdf
 
RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4
RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4
RM&IPR M4.pdfResearch Methodolgy & Intellectual Property Rights Series 4
 

RSP MEP Services Profile

  • 1. All Copyrights Reserved RSP DESIGN CONSULTANTS (INDIA) PVT LTD MEP SERVICES DESIGN CONSULTANTS (I) PVT. LTD. MEP ENGINEERING SERVICES
  • 2. All Copyrights Reserved MEP TEAM STRUCTURE DATTATREYA BHAT HOD – ELEC. CADD ENGINEERS CADD ENGINEERS UTPAL CHATTERJEE HOD - HVAC DESIGN ENGINEERS CADD ENGINEERS DESIGN ENGINEERS CADD ENGINEERS CHIEF ENGINEER PHE - FIRE SENIOR DIRECTOR ASSO. DIRECTOR PHE - FIRE ASSOCIATE COORDINATION ASSO. DIRECTOR HVAC DY CH. ENGINEER HVAC ASSO. DIRECTOR ELECTRICAL CADD ENGINEERS ASSOCIATE ELV SYSTEMS CHIEF ENGINEER ELECTRICAL DESIGN ENGINEERS DESIGN ENGINEERS PRINCIPAL ADVISOR ENGINEERING COORDINATION ENGINEERS 2
  • 3. All Copyrights Reserved SCOPE OF MEP SERVICES OFFERED 1. ELECTRICAL 2. FIRE DETECTION AND ALARM SYSTEMS 2. STAND BY POWER SUPPLY SYSTEMS 3. VERTICAL TRANSPORTATION SYSTEMS 4. SECURITY SYSTEMS 5. PLUMBING 6. FIRE PROTECTION AND SUPPRESSION SYSTEMS 7. HVAC 8. BMS 9. SUPPORT FOR MOEF CLEARANCE 10. SUPPORT FOR GREEN BUILDING DOCUMENTATION
  • 4. All Copyrights Reserved DESIGN PHILOSOPHY – MEP SERVICES COMPLIANCE WITH LOCAL CODES & IE RULES CONFORMITY TO INDIAN STANDARDS SAFETY AND SECURITY OF EQUIPMENT AND PERSONNEL SIMPLE AND RELIABLE DESIGN MODULAR SYSTEMS EASILY MAINTAINABLE ENERGY EFFICIENCY ENVIRONMENTALLY SUSTAINABLE WITH GREEN INITIATIVES COST EFFECTIVE
  • 5. All Copyrights Reserved  LOCAL CODES  BUILDING CODE OF INDIA (NBC – 2005)  ENERGY CONSERVATION BUILDING CODE (ECBC – 2007)  APPLICABLE ELECTRICITY RULES & REGULATIONS  POLLUTION CONTROL BOARD STIPULATIONS PERTAINING TO AIR / WATER / NOISE POLLUTION.  RELEVANT STANDARDS OF BIS / INTERNATIONAL STANDARDS FOR  MANUFACTURING, INSTALLATION, TESTING COMMISSIONING, OPERATION & MAINTENANCE OF ELECTRICAL & MECHANICAL EQUIPMENT.  ASHRAE STANDARDS FOR AIR CONDITIONING AND VENTILATION  ASPE & IPHE STANDARDS FOR PLUMBING. CODES & STANDARDS - MEP SERVICES
  • 6. All Copyrights Reserved POWER SUPPLY SANCTION. 1. MOEF CLEARANCE WHERE APPLICABLE 2. NOC FROM LOCAL FIRE AUTHORITY 3. CEIG APPROVAL FOR SUB STATIONS. 4. CEIG APPROVAL FOR DG SETS. 5. CEIG APPROVAL FOR MS BUILDING ELECTRICALS. 6. APPROVAL FOR LIFTS. 7. NOC FROM PCB. 8. CCOE , NOC AND APPROVAL FOR BULK FUEL STORAGE 9. LOCAL FIRE CODES APPROVALS & SANCTIONS - MEP SERVICES
  • 7. All Copyrights Reserved  ESTIMATION OF POWER REQUIREMENTS.  ELECTRICAL SCHEMATIC DRAWINGS  SELECTION OF TRANSFORMER AND CAPTIVE POWER CAPACITY.  HT AND LT DISTRIBUTION SYSTEM DESIGN INCLUDING METERING.  EXTERNAL LIGHTING AND POWER DISTRIBUTION  GROUNDING AND LIGHTNING PROTECTION SYSTEMS  ADOPTION OF RENEWABLE ENERGY FOR LIGHTING  EQUIPMENT SELECTION & COST ESTIMATION  SCHEMATICS AND LAYOUT DRAWINGS DESIGN CONSIDERATIONS – ELECTRICAL SERVICES
  • 8. All Copyrights Reserved 1. SOURCE OF WATER SUPPLY AND TREATMENT 2. WATER DEMAND ESTIMATION 3. WATER STORAGE CAPACITIES 4. WATER DISTRIBUTION SYSTEM AND ZERO DISCHARGE CONCEPT. 5. SEWAGE HANDLING AND TREATMENT 6. UTILIZATION OF TREATED WATER 7. RAIN WATER COLLECTION AND HARVESTING 8. SOLID WASTE MANAGEMENT 9. EQUIPMENT SELECTION AND COST ESTIMATION 10. SCHEMATICS AND LAYOUT DRAWINGS DESIGN CONSIDERATIONS – PHE SERVICES
  • 9. All Copyrights Reserved 1. FIRE WATER STORAGE 2. HYDRANT SYSTEM 3. SPRINKLER SYSTEM 4. SPECIAL FIRE SUPPRESSION SYSTEMS 5. FIRE DETECTION AND PROTECTION 6. EQUIPMENT SELECTION AND COST ESTIMATION 7. SCHEMATICS AND LAYOUT DRAWINGS DESIGN CONSIDERATIONS – FIRE SERVICES 1. Sprinkler Head
  • 10. All Copyrights Reserved 1. CLIMATIC CONDITIONS. 2. BUILDING ENVELOPE 3. HEAT LOAD DETERMINATION 4. COOLING LOAD ESTIMATION 5. EQUIPMENT OPTIONS AND SELECTION 6. AIR DISTRIBUTION 7. FIRE & SMOKE SAFETY 8. NOISE LEVEL 9. COST ESTIMATION 10. SCHEMATICS AND LAYOUT DRAWINGS DESIGN CONSIDERATIONS – HVAC SERVICES
  • 11. All Copyrights Reserved 1. REFLECTED CEILING PLAN 2. COORDINATION OF SERVICES ABOVE FALSE CEILING 3. SERVICES COORDINATION BELOW FALSE FLOOR 4. BASEMENT AND TERRACE LEVEL SERVICES COORDINATION 5. EXTERNAL SERVICES 6. SERVICES ON THE WALLS / PARTITIONS 7. SITE MONITORING DESIGN CONSIDERATIONS – COORDINATION
  • 12. All Copyrights Reserved DESIGN CRITERIA FOR GREEN BUILDINGS
  • 13. All Copyrights Reserved 1. COMPLIANCE WITH LOCAL CODE – ECBC 2007. 2. ENERGY EFFICIENT AIR-CONDITIONING SYSTEM WITH ECO-FRIENDLY REFRIGERANTS. 3. IMPROVED INDOOR AIR QUALITY FOR HEALTHY ENVIRONMENT & ENHANCED PRODUCTIVITY, 4. MINIMIZING WATER CONSUMPTION. 5. ENERGY MANAGEMENT & CONSERVATION BY AUTOMATION & CONTROLS. 6. LIGHTING CONTROLS & DAY LIGHT HARVESTING. 7. INTEGRATED BUILDING MANAGEMENT SYSTEM TO MONITOR, CONTROL & OPTIMIZE ENERGY CONSUMPTION. 8. HARNESSING SOLAR ENERGY FOR HOT WATER GENERATION & LIGHTING. 9. ENHANCED COMMISSIONING PROCEDURES. SUSTAINABILITY MEASSURES
  • 14. All Copyrights Reserved Rating: Certified: 40 – 49 Points Silver: 50 – 59 Points Gold: 60 – 79 Points Platinum: 80 Points and above NOTE: 1. Feasibility study to be conducted to assess the Potential rating and set the target. 2. Design of services to be dovetailed to achieve the same. LEED 2009 for NEW CONSTRUCTION Sustainable Sites (26 Points Max) Water Efficiency (10 Points Max) Energy & Atmosphere (35 Points Max) Materials & Resources (14 Points Max) Indoor Environmental Quality (15 Points Max) Innovation in Design (6 Points Max) Regional Priority (4 Points Max)
  • 15. All Copyrights Reserved 1. LOW LOSS TRANSFORMERS FOR POWER DISTRIBUTION. 2. HIGH EFFICIENCY MOTORS FOR ALL MAJOR DRIVES. 3. AUTOMATIC MAINTENANCE OF HIGH POWER FACTOR. 4. HARMONIC MITIGATION FOR REDUCING DISTRIBUTION LOSSES 5. CENTRALIZED MONITORING AND DATA ACQUISITION. 6. LOAD BASED OPERATION OF CAPTIVE POWER SYSTEM WITH PLC CONTROLS. 7. DAY LIGHT HARVESTING FOR ENERGY SAVING IN LIGHTING. 8. HIGH EFFICIENCY & ENVIRONMENT FRIENDLY LAMPS FOR MINIMUM LPD. 9. TIME / OCCUPANCY BASED LIGHTING CONTROLS TO MINIMIZE WASTAGE OF ELECTRICAL ENERGY. 10. INTEGRATION OF ELECTRICAL AND HVAC SYSTEMS FOR ENERGY SAVING. ELECTRICAL SERVICES
  • 16. All Copyrights Reserved 1. WATER EFFICIENT FIXTURES. 2. DUAL FLUSHING SYSTEM FOR WATER CLOSETS. 3. STP TREATED WATER FOR FLUSHING. 4. IR SENSORS FOR WASH BASINS. 5. MINIMIZING WATER REQUIREMENT FOR IRRIGATION BY DEPLOYING LATEST TECHNOLOGICAL DEVELOPMENTS. 6. HARNESSING SOLAR ENERGY FOR HOT WATER GENERATION. 7. METERING & AUDITING OF WATER CONSUMPTION. PHE SERVICES 1. WATER COOLED / HYBRID CHILLERS FOR OPTIMUM UTILIZATION OF TREATED WASTE WATER. 2. VARIABLE SPEED SECONDARY PUMPING FOR IMPROVED EFFICIENCY. 3. VFDS FOR AHUS. 4. SEPARATE AHUS FOR PERIPHERAL AREAS. 5. HEAT RECOVERY WHEELS FOR BETTER EFFICIENCY. 6. IMPROVED EFFICIENCY WITH INTEGRATED BMS COVERING ALL MEP SERVICES. 7. NIGHT TIME PURGE OUT CYCLE FOR IMPROVED IAQ. 8. VICTUALIC COUPLINGS FOR MINIMIZING / ELIMINATING WELDING. HVAC SERVICES
  • 17. All Copyrights Reserved WHY RSP?  ONE OF THE LARGEST INTERNATIONAL PRACTICES IN INDIA WITH OVER 300 PROFESSIONALS IN FULLY ESTABLISHED DESIGN FACILITY AT BANGALORE.  OVER 12 YEARS OF SUCCESSFUL OPERATION IN INDIA.  ON TIME DELIVERY OF RESIDENTIAL , INSTITUTIONAL , CAMPUS PROJECTS IN INDIA.  SINGLE STOP MULTIDISCIPLINARY DESIGN SERVICE UNDER ONE ROOF COVERING MASTER PLANNING, ARCHITECTURAL, INTERIOR, LANDSCAPE AND MEP SERVICES.  COMPREHENSIVE DATA BASE ON BUILDING MATERIALS AND LOCAL CONSTRUCTION PRACTICES TO ENSURE BUILD ABILITY AND COST EFFICIENCY.  SYSTEM ORIENTED WORK CULTURE FOR PRECISE AND TIMELY DELIVERY.  FOCUS ON BIOCLIMATIC AND ENVIRONMENTALLY SENSITIVE DESIGN SOLUTIONS  DIVERSIFIED PORTFOLIO OF PROJECTS