1. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
"Innovating, Building and Enabling the Future Today"
“To become the 'Best in Class' among professional service providers
to telecommunications and broadband networks.
The Management Team of InPro Solutions LLC is 100% committed
to our Quality Management System and the International
Standards Organization 9001-2008.
This commitment to world class standards and service excellence is
seen as the best strategy for our long-term success and distinguishes
us in the marketplace”.
2. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Executive Summary
InPro Solutions LLC is an EF&I (Engineering, Furnish & Installation) and
subcontracting and consulting organization in the field of telecommunications.
InPro Solutions has extensive resources that can provide a wide variety of
services:
• Telecom & IT consulting, training and certification
• Broadband wireless engineering, audit & construction
• Central office and inside/outside plant engineering & implementation
• Program and construction management
• Enterprise network services
Project resources deployed are certified engineers and field technicians for clients
including Ericsson, Nokia, Siemens, Nortel, Lucent, Alcatel, Huawei and ZTE.
With our recent expansion in Canada (dba InPro Networks Corporation), we
gained massive coverage in providing materials, services and other associated
equipment in building telecom facilities across North America. Our financial
capability is strong and our available credit facility is up to US$10 Million.
InPro Solutions is confident that with this wide range of capabilities and
continental presence in North America, the company will be able to provide
excellent resources, leading-edge products and render world-class quality
customer services.
3. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
About Us
InPro Solutions LLC is duly registered in the State of Texas. With an initial
capitalization of $100 Million, InPro Solutions has grown rapidly in revenues,
earnings and organization. To date, the company has emerged as a major
provider of telecommunications subcontracting and consulting services in the
broadband RF and fiber-optic/copper network industries and the U.S. Federal
Government.
The company launched its turnkey telecom solutions and network operations
businesses during the 4th quarter of 2006. This led to the company adopting an
ambitious mission in the beginning of 2007, which is expressed by the vision
statement:
"Innovating, Building and Enabling the Future Today"
4. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Business Model
InPro Solutions LLC promotes the adoption of a Process Approach when
developing, implementing and improving the effectiveness of our Quality
Management System (QMS). This enhances customer satisfaction by meeting
customer requirements. To function effectively, our organization identifies and
manages numerous linked activities. An activity using resources, and managed in
order to enable the transformation of inputs to outputs, can be considered a
process. The application of a system of processes within InPro Solutions, together
with the identification and interactions of these processes, and their
management, can be referred to as the ''process approach''.
This approach emphasizes the importance of:
- Understanding and meeting requirements.
- The need to consider processes in terms of added value.
- Obtaining results of process performance and effectiveness.
- Continual improvement of processes based on objective measurement.
5. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Products and Services
Telecom Consulting Services
InPro Solutions provides qualified and skilled both on/off-premise
telecommunications engineers, contractors and managers in the areas of central
office, outside plant, fiber optics, satellite, mobile, in-building repeater and last
mile/LAN networks. Our pool of resources an contractors have current work
experiences in IP, SONET/SDH, VSAT, FTTx, TDMA, CDMA, EV-DO, GSM,
UMTS, DLC/NGDLC, Ethernet, LTE, Femtocells, Wi-Fi and WiMAX. InPro
Solutions provide construction supervision, TDMA site maintenance, GSM
integration & change-outs and 3G, HSPA and 4G roll-out services.
Central office personnel are certified in Nortel, Lucent, Alcatel and Ericsson
switching equipment. Field technicians in the LAN/WAN are Dell and IBM-
certified.
Engineering & Construction Services
InPro Solutions performs turn-key projects in electrical construction and repair
of commercial and government markets including, FTTx, outside plant
engineering (survey and design for aerial, buried & underground facilities), pair-
bonding and CAD services. We provide V-RAD design and F1/F2 Conditions
engineering Services to the entire AT&T market in support of the U-verse /
Project Light Speed. Situated in the upscale North Dallas business area, our
corporate offices are equipped with T1/LAN infrastructure for AutoCAD
workstations with high-speed printing services.
Our outside plant network engineers are former AT&T/Bell and independent
telco/MSO employees which are experienced in FTTN (OPTI & ARES) and
FTTP/FTTH deployment (ICGS/IDDS).
6. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Key Customers
• AT&T
• T-Mobile USA
• Verizon Communications
• Sprint/Clearwire
• United States Federal Government
• TNS/Quanta Wireless
• Parsons
• Ericsson
• Nokia-Siemens
• Huawei
• Brosna Communications
• SAC Wireless
• Nexius Wireless
• Towerstream
The InPro Solutions Team
The men and women of InPro Solutions come from a widely diverse and
entrepreneurial group of people whose primary mission is to:
"Realize the goals and aspirations of our valued customers, suppliers,
employees and shareholders, and commit Excellence in work, Integrity in
relationships, Teamwork in the workplace and Profitability in our business."
With a combined management experience of 100 years in various fields, InPro
Solutions Management is fully committed towards the attainment of the
company's vision, mission and goals.
Our employees and contractors are among the brightest, well-mannered and
highly skilled in their professions. The company is an EOE with pending ISO
9001:2008 registration.
7. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Management Commitment
“To become the 'Best in Class' among professional service providers to
telecommunications and broadband networks.
The Management Team of InPro Solutions LLC is 100% committed to our
Quality Management System and the International Standards Organization
9001-2008.
This commitment to world class standards and service excellence is seen as the
best strategy for our long-term success and distinguishes us in the
marketplace”.
Quality Policy Statement
“It is the primary objective of each employee within InPro Solutions LLC
working together to provide reliable and defect free quality of service to our
Customers.
We absolutely commit to maintaining a Quality Management System that
identifies InPro Solutions LLC as the “Best in Class” in our industry.
We shall meet or exceed our Customer’s expectation, and we will continually
improve the QMS and our service to insure the success and continued growth of
our company.”
Management ensures that this Quality Policy Statement is communicated and
understood throughout the organization.
8. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Broadband Wireless Implementation
On-going Projects
• Project management of deploying 500 Ericsson WCDMA NodeBs and 2nd
carrier GSM/HSPA sites in the San Francisco Bay Area CA;
• Staging and installation of Sun Micro equipment for NSN in Boca Raton
FL;
• Site walks, regrooming, GSM cabinet rip and replacement of Ericsson
WCDMA NodeBs in Livermore CA;
• T-1 testing, pulling cables from NIU to DSX, wire wrapping of DSX and
cable run to Ericsson WCDMA NodeBs in Houston TX;
• Site survey, troubleshooting, installation, commissioning, integration and
call testing of Nokia Flexi BTS sites in South Jordan UT;
• Installation of Ericsson WCDMA NodeBs in San Diego CA;
• New Ericsson WCDMA site integrations and T-1 adds in Central IL and
Wisconsin;
• Site walks and sweep tests in Stockton CA.
9. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Recent Projects
• Managed Ericsson WDMA system regrooming and change orders,
completed 867 NodeBs in the San Francisco Bay Area, CA;
• UMTS system engineering in Detroit MI and Richardson TX;
• Commissioning of Nokia HLR, MSS and MGW in Mt Airy MD;
• Installation of 400 Nokia Flexi BTS sites in Richardson TX. Tasks included
connectorizing, sweep tests and installation of bottom jumpers;
• Installations of Nokia HSS in Chicago IL;
• Installation of Sun racks and servers in Dallas TX;
• Site audit per QMS and customer standards in Phoenix AZ, Houston TX
and Detroit MI;
• Site visit, system integration, call testing, alarm clearing replacement of
spares of Ericsson WCDMA NodeBs in Fairfield NJ;
• True Position LMU/E911 implementation (installation, integration and
PSAP testing) in Salt Lake City UT and Boise ID;
• Installation, commissioning, integration and call testing of Nokia Flexi
BTS sites in Denver CO, Salt Lake UT and Boise ID;
• Operations and maintenance services of Ericsson WCDMA NodeBs in
Syracuse NY, Chicago IL, Orange County CA and Fort Meyers FL;
• Installation and integration of Ericsson WCDMA NodeBs in Schaumburg
IL , Montgomery AL and Chino CA;
• Motorola Canopy PTP/PTMP site engineering in West TX.
10. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Network Engineering
System Access
i. E-mail/OWA
ii. ELP
iii. FEI
iv. LEIS WEB w/ SecureID Token
v. Imagine
vi. F2C / MET / MET^2
vii. BSTCAD
viii. OPEDS
ix. LFACS
x. PLANET
xi. MapViewer
Statement of Conditioning
Primary commit pairs are designated per ATT-TELCO-002-620-003
1. Once the decision has been made as to which specific F2 pairs will be
designated as Primary Commit, the engineer will then access the FEI
application through the Engineering Login Portal (ELP) and place the
P-Comm indicator on the selected pairs and submit the request. FEI
will update LFACS with the P-Comm status automatically with a
nightly update.
2. The engineer will then review the updated records via the FEI
application. Based on these records, and previously reviewed DA route
layout (Plant Location Records) the engineer will determine which F2
pairs will be designated as Primary-Commit for every non-excludable
living unit/address within the DA. Per section 18.5.1 of the CLR and
any P-Committed F2 pairs identified with no assigned F1 pair should
be corrected at this time by re-establishing the CT’s. Only re-
established the number of CT’s based on available non-defective F1
pairs. No feeder relief projects should be triggered to re-establish CT’s
11. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
3. All condition work prints should be issued through Opti/ARES. F2
Conditioning packages (work print and associated documents) will
meet requirements as stated in ATT-TELCO-002-620-003.
4. Access OPTI/ARES and cut 11x17 work prints.
5. Analyze each terminal based on the current guidelines and parameters.
6. Input the request information into LFACS and run report
7. Each Terminal will have the following information
a. Terminal size and count
b. Fixed or Ready access
c. Spare pair assigned
d. Living units
8. Each terminal and splice locations will show the following
a. COB & PAIRS
b. Kft to SAI
c. Kft to Splice locations
d. Terminal trim outs
e. Full terminal counts after trim
f. RA terminal replacements
g. General notes will be placed on work prints to highlight support
document discrepancies.
9. Once package is ready for review, AT&T will be notified via e-mail
10. AT&T will notify InPro Solutions SPOC of approval or changes needed.
11. If any changes are required, InPro Solutions completes changes in a
timely manner and uphold a 48 hour window of return.
12. Other design considerations are addressed in ATT-TELCO-002-620-
003 and examples provided from ATT.
Anything other than this may are considered Out of Scope and addressed by
InPro Solutions Management and SPOC for billings purposes.
12. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Recent Projects
• Fiber-optic cable staking project of approximately 12,300 ft to a cell site in
Waco, TX for AT&T. Obtained ROW (Right Of Way) from TXDOT to
ensure that we were within the stipulated limits.
• Outside plant network design of fiber-optic cable placement of
approximately 21,000 ft to a proposed rural wire center in Mineral Wells,
TX for AT&T. We engineered and drafted using AutoCAD the proposed
route of the fiber placement to the proposed RT site.
• Outside plant network design job of relocating the existing copper cable
facilities due to road widening construction in Southlake, TX for AT&T.
We determined the ROW and acquired the necessary permits. We
conducted on-site surveys towards engineering and drafting using
AutoCAD the proposed route of the copper facility relocation.
• Outside plant network design and drafting project of placing 1 FW4100
and 3 TA3000 shelves in an existing 82G cabinet in Victor, OK for AT&T.
Took into account new cable counts leaving the RT unit, and new fiber and
cable stubs being spliced in a manhole.
• Outside plant network design and drafting project of replacing
approximately 4000 ft of underground conduit system, 4 manholes, 800ft
of ADMC-1800, CDMC-1800, CDTZ-1500, ADAC-900, ADTC-2400, and
72, 432 fiber cables, 1930 ft of AFMW-900 and 36, 72 fiber cables, 100ft of
CDMC-1800, CDAZ-900, ADTC-1200,CDAZ-1200 and 432 fiber cables,
590ft of (2) AFTW-1500 and 72 fiber cables, 660ft of CDMC-1800, CDAZ-
900, ADTC-1200, CDAZ-1200 and 72, 432 fiber cables and 40ft of (4)
BKMH-400 cables and 3 apparatus cases in Norman OK for AT&T. This
was for a road expansion project in which all other utilities had to be
relocated.
13. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
• Outside plant network design job that was prompted after hurricane IKE
hit Houston. Conducted field verifications of DAs (Distribution Areas) and
produced hand-drawn sketches of any storm-damaged AT&T equipment
such as, downed telephone poles, downed drops, missing boots, etc.
Provided field supervision to AT&T construction crews in rectifying field
issues.
• Outside plant network conditioning job that covered 9 FTTN DAs in
Houston TX for AT&T. Dedicated pairs using Pair Bonding Zone
technology, to all living units in the DA at existing distribution terminals.
All multiples were removed from these dedicated pairs, and replaced all
RA (Ready Access) terminals with fixed count terminals. After completion,
the appropriate JAM (Job Administration Management) tasks were
placed. Design medium used: OPTINT and MS Excel.
• Outside plant network conditioning job that covered 10 FTTN DAs in
Houston, TX. Dedicated pairs to all living units in the DA at existing
distribution terminals. All multiples were removed from these dedicated
pairs, and we replaced all RA terminals with fixed count terminals. After
the F2 conditioning process was completed, the appropriate JAM tasks
were placed. This served as the basis on which AT&T could provide their
U-verse service to new and existing customers in the 10 DAs. Design
medium used: OPTINT and MS Excel.
14. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Previous Projects
• FTTP engineering design and F2 conditioning jobs for AT&T West.
Proposed appropriate fix lugs Terminals to replace RA Terminals, located
missing Terminals, and performed Cable Bridge Taps. Prepared FEI and
checked the “Pair Bonding Zone” of a certain SAI by the aid of SLI for “P-
Commits”, “S-Commits” and “T-Commits” after checking each pair from
“LFACS”. Assigned P-Commits to all the LUs (living units) in the DA based
on USOC priority using FEI through ELP (Engineering Login Portal).
Worked with cable records using ARES for F2 Conditioning, VRAD,
FTTP/FTTN of various DAs required for U-verse service. Designed DAs to
provide service to a given LU. Removed the multiple appearances in cable
with the help of Ripple Feature in ARES FRAMME. Estimated capital
budget using JAM and ACE program. Entered FRC (Field Reporting
Codes) codes in TELCO11i for capital budgeting. Worked on ELP to give P-
Commit and to download STW (Serving Terminal Worksheets). Generated
Macros using Visual Basic Editor in MS Excel to update STW from huge
databases like MET and P-Commit Workbooks. Accessed IMAGINE tool to
download ACR (Automated Cable Records). Used MIC to see the progress
of the submitted project. Used MWP (Mechanized Workprint) feature of
ARES to automate the process of creating the workprints. Used JAM FTI
codes (Functional Time-increment codes) in ARES workprints.
• Review of AT&T West Network Engineering work plans for special cases
and calculated Project cost/man-hours prior to Bidding/Quotation
preparations. Preliminary surveys for post TEP job and updated plans,
working lines, DP's being installed. Forecasting and Planning, Outside
Plan Fundamental Plan, Detail Design - Cable Network (primary and
secondary), Manhole and Conduits, Broadband Projects and Civil and
Electrical works for GSM projects. Negotiation for closing Outside Plant
projects for 3rd Generation worth US$ 25 Million.
15. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
• Planning and design of AT&T cable routes (copper/fiber optic). Design of
manholes and conduit for underground network including civil works.
Determination of cable size and distribution copper/fiber optic
(cable/transmission parameters). Network design of secondary network in
terms of Size distribution point/service boundary, Underground cable
route including civil works and Cable sizing and distribution
(cable/transmission parameters)
• Design Fiber Optic Backbone (Trunk and Toll), primary and secondary
cable network of AT&T West. Conduct study and survey area for telephone
distribution, plan and design cable routes (copper/fiber optic), design
manholes and conduit for underground network including civil works,
determine cable size and distribution copper/fiber optic
(cable/transmission parameters).
• Project LightSpeed Network engineering for AT&T South East/BellSouth.
Used MET^2 tool for network design. Accessed LFACS to get the ACR
(Automated Cable Records). Used Map Viewer tool for running LMU
(Loop Make Up) and to extract the distribution area in to BSTCAD and
create work prints. Used PLANET to procure details about each Terminal
and Living Units. Used OPEDS to retrieve or store a particular job in to the
database and also to fill up the EWO. Assigned splices and traps to the
Cables and Terminals for cost estimation. Sent job to AOTX and
eliminated all the errors encountered.
• Project Management of Fiber Optic projects for Siemens and Corning
Cable Systems. Managed project development of Fiber Optic projects and
conducted product presentation on new Fiber Optic Technology. Rendered
technical support in conducting product presentation. Gathered
information regarding product completion and market demands in order
to provide basis in formulation sales strategies. End user training (fiber
and copper closures installation use ad maintenance fusion splicers, POTS,
etc.) for Corning Cable Systems. Provided technical expertise in designing
fiber/copper cable route.
16. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
• Completion of As-built Engineering projects and Engineering Planning
and Design for Outside Plant projects of Alcatel. Coordination,
investigation and verification on Outside Plant projects including
documentation for Civil and Electrical works for GSM projects.
Completion of design links for 37 Inter-Office Trunking (IOT) project in
<3 years which generated 20% savings in man-hour cost and earned
completion bonus.
• Supervision on Design OSP Engineers and Surveyors for Alcatel.
Formulation of time schedule on specific project, Final Demand Forecast
Report, Fundamental Plans Detailed Primary and secondary cable design.
Coordinated meetings with client regarding plan corrections. Acquired
Right of Way Permits (ROW), coordinated joint survey, acceptance with
construction group government agencies on the implementation of plans.
Carried out field surveys and demand forecast to determine telephone
density. Updated maps for the use of forecasting, planning and fixed
network design. Network design of primary and secondary cable network.
Cabinet locations, As-built plans and site instructions certificates, BOM
and Building entrance and distribution and FTTD Structured Cabling.
• Designed Fiber Optic Backbone, primary and secondary cable network for
Saudi ARAMCO. Study and survey area for telephone distribution.
Planning and design of cable routes (copper/fiber optic). Designed
manholes and conduit for underground network including civil works and
determined cable size and distribution copper/fiber optic
(cable/transmission parameters). Designed structured cabling for LAN
using CAT-6/Fiber Optic topology of CCTV and Alarm Designs.
• Mapping, planning, and samplings on telephone requirements for
forecasting, detail design (civil works, primary and secondary cable,
manhole and conduits, residential houses, commercial private and
government establishments in Brunei Darussalam for Management
Services of UK (MSUK). Supervision and training support, task
assignment and coordination in manhole and conduit design. Review of
Network Engineering work plans for special cases to ensure that standards
are met.
17. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
• Preliminary surveys for post TEP job and updated plans, working lines,
DPs being installed for Saudi Telecom. Planning and design, final survey
for the size and number of cable pair, NESP for the Post TEP, material
detailing, updating of plant design. Competed Buried Service Wire and
Post Telephone Expansion Program (TEP) job; field work, analyze, design
and engineering drafting.
• Prepared Final Demand Forecast Report, Fundamental Plans Detailed
Primary & secondary cable design for Saudi Telecom. Supervision of
Project implementation. Formulation of time schedule on specific project.
Completed Final As built quantities and drawings. Coordinated/meetings
with client regarding plan corrections. Coordinated joint survey,
acceptance with customer, government agencies on the implementation of
plans. Managed implementation /engineering progress report.
• Survey of telephone project in the Sultanate of Oman for NTS. Generated
Diary and Bill of Quantity (BOQ), red lines for primary and secondary
schematic plans. Coordination of all site engineers in obtaining correct
routing and assignment. Discrepancy reports analysis through Site
Engineers findings.
• Review of Buried Cable, Underground Cable, Aerial Cable and BSW plans
for Saudi Telephone. Generate monthly variance report and comments on
the various performance of certain project. Verified requirements,
equipment and manpower through proper coordination and reflects
changes and revision if needed, job inspection of projects while
implementation is in progress to ensure accuracy of reports. Prepare
construction schedule and translate to PERT/CPM time scaled network to
ensure that required logistics and supports for each projects such as plans
specifications and drawings, equipment, materials and manpower were
made available on time. Coordination for materials availability.
• Rehabilitation of existing plants including rerouting of cable facilities.
Physical Inspection, surveying, monitoring and Acceptance of cables
(including pair gain devices), manholes and civil works. Evaluation and
approval of plans, acceptance certificates and site instructions.
18. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Strategic Delivery Partners
• Alvarion
• Redline Communications
• Motorola
• Dragonwave
• Proxim Wireless
• BelAir Networks
• TeraSpan
• Microsoft
• Goodman Networks
• Dell
• IBM/SAI People
• LCC International
• WinnCom
• Ingram Micro
• TESSCO
• TRS Rentelco
• Electro Rent
• Mountain Ltd
• Pro-Staff
• Alliance One LLC
• Bank of America
• Texans Credit Union
• The Hartford Insurance
• Paychex Inc
• Regus Group
• Autodesk DC CADD
• Enterprise
• Ryder Truck
• QuestCare
19. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Resourcing
InPro Solutions LLC focuses on recruitment in terms of targeted job web
searches, email and referrals. We maintain an extensive database of candidate
resumes which is updated on a regular basis for availability dates, locations and
compensation requirements. We append to it through receipt of new referrals
and new applicants from agencies and websites.
To ensure that our clients have access to the best candidates the market can offer,
we established a screening process which covers both technical and professional
assessments of candidates. Our employees are encouraged to take Quality
Workmanship (QW) tests and are offered advanced technical courses. In
addition, we also conduct regular performance reviews on our resources. To
ensure retention of quality candidates, we provide one of the best overall
compensation packages which include healthcare benefits, 401(k), performance
incentives, stock-option, vacation/sick leaves, financial assistance, etc.
Risk Management
InPro Solutions LLC has a structured approach to manage uncertainty. The
company is insured with The Hartford Insurance Company, to hedge against the
risk of a contingent loss. Below is a brief description of the insurance coverage:-
General Liability - US$ 2 Million general aggregate
Professional Liability - US$ 1 Million aggregate limit
Automobile Liability - US$ 1 Million combined single limit
Excess Liability - US$ 6 Million each occurrence
Worker's Comp - US$ 1 Million each accident
20. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Co-employment
Co-employment issues
Contractual obligations with customers are between InPro Solutions and the
customer. Employees and subcontractors are required to abide and observe
clients' administration and work requirements while on-premise or assignment.
Any issue with resources is immediately dealt with by InPro Solutions.
Co-employment liability
Resources assigned at customer premises continue to be employees of InPro
Solutions. Administrative and legal responsibilities rest with InPro Solutions.
Certifications and Awards
ISO 9001:2008 pending
Membership and Affiliations
Texas Telephone Association
Metroplex Technology Business Council
Texas State Society of Washington DC
CTIA
DFW Society
Rural Mobile Broadband Alliance
ClubCorp
21. Tollway Plaza Centre Tower II
15950 North Dallas Parkway
Suite 400,Dallas Texas 75248
972‐361‐8476 (Main Line)
972‐361‐8423 (Fax)
Contact Info
Sergio Maranan
Chairman & CEO
Ph : 972-672-1742
e-mail: smaranan@hotmedianetwork.com
http://www.linkedin.com/in/sergiomaranan
Joseph Ortillo
Director – Turnkey Program Management
Ph : 469-236-4618
e-mail : jortillo@inpro-solutions.com