Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Aurum phase 01 photo report_24th july 2013 [read-only]
1. Phase 01 – Photo report Position ‐ 01
C t
Key Plan
AURUM_Photo Report ‐ Phase 01
Comments :
• A Block –Thirteenth floor pour 1 reinforcement in Progress. Block work at 2nd floor in progress.
2. Phase 01 – Photo report Position ‐ 02
C t
Key Plan
AURUM_Photo Report ‐ Phase 01
Comments :
• B‐Block ‐ Twelfth floor pour 1 shuttering in progress. Block work at 2nd floor in progress.
3. Phase 01 – Photo report Position – 03
C t
Key Plan
AURUM_Photo Report ‐ Phase 01
Comments :
• C‐Block – Tenth floor pour 1 shuttering in progress. Block work at 2nd floor in progress.
4. Phase 01 – Photo report Position ‐ 04
C t
Key Plan
AURUM_Photo Report ‐ Phase 01
Comments :
• D‐Block –Twelfth Floor pour 1 concreting in progress. Block work at 2nd floor in progress.