Development Objectives of ENReP
To support government’s efforts to rapidly
resettling IDPs in the Northern province to
their place of origin to start their livelihood
through
    Emergency Assistance to IDPs


    Work-fare Program (Cash for work)


    Rehabilitation and Reconstruction of Essential Public
     and Economic Infrastructure


                                                             2
IDPs Resettled to their place of origin as per
government’s phase iii and phase iv of the
resettlement program in the districts of
        1.   Jaffna

        2.   Kilinochchi

        3.   Mullaitivu

        4.   Mannar

        5.   Vavuniya

                                                 3
Project Components of ENReP
Component A: Emergency Assistance to IDPs
                   (US$6 million)

  This component would provide assistance to, returned
 households to re-engage in livelihood activities such as
 agricultural farming and marine fishing

Component B: Work-fare (US$12 million)
 The work-fare component is intended to provide labor
 employment to the returnees immediately after they have
 been resettled helping to bridge the income gap between
 the time of return (after having received emergency
 assistance) and until IDPs can obtain income from regular
 livelihoods.
                                                             4
Project Components of ENReP
 Component C: Rehabilitation and Reconstruction of Essential Public
  and Economic Infrastructure
                      (US$44 million)


  This component will provide assistance to repair reconstruct and restore vital
  public and economic infrastructure and facilities damaged by the war and that
  are dysfunctional or partly functional at present

 Component D: Project Management, Oversight, Monitoring and
  Evaluation, and Special Studies
                      (US$3 million)


  This component will support the Government in implementing the project,
  coordinating all project related activities, monitoring and evaluating project
  inputs,        outputs and results, carrying out financial management,
  technical, procurement and safeguard audits.
                                                                            5
This component will provide financing to:

•   Meet cost related to the operation of mobile land task forces,
    surveys and studies required to rapidly restore contested
    property rights of the resettled people
•   Conduct demining awareness program to IDPs, project staff
    and contractors
•   Clear thick vegetative growth of paddy lands to be able to
    resume land preparation for cultivation
•   Provide seeds, basic and miscellaneous agricultural and
    fishing implements to the people to be able to start paddy
    farming   and     marine   fishing   immediately   after   the
    resettlement.
                                                                 6
Component B: Work-fare (US$12 million)

 Execute small scale labor intensive repair and

   rehabilitation works of village level infrastructure
 Provide a minimum of 50 labor days of guaranteed

   work employment for one person from each IDP
   household

        Of these 50 days, returnees will be eligible to spend ten
         days to make their own homes repaired and functional


                                                                     7
Component B: Work-fare (US$12 million) ctd.

The    work-fare   program    fulfills   a   dual
objective


  provide    short-term and immediately
      required cash to the people
  undertake       urgent    labor   intensive
      repair works such as

                                                    8
Component B: Work-fare (US$12 million) ctd.

Possible labor intensive repair works

  •   Clearing debris of damaged houses and village
      buildings,
  •   Cleaning dug wells,
  •   Repairing hamlet level access roads
  •   Repairing small irrigation canals
  •   Repairing small drainage cannels

                                                      9
Component C: Rehabilitation and Reconstruction of Essential
          Public and Economic Infrastructure
                     (US$44 million)

Rehabilitation of Irrigation Systems (US$12
 million)
Rehabilitation of Rural Roads (US$10 million)

Restoration of Drinking Water Schemes (US$
 12 million)
Rehabilitation and Reconstruction of Public
 Buildings and Facilities (US$ 10 million)
                                                        10
Component D: Project Management, Oversight, Monitoring
   and Evaluation, and Special Studies (US$3 million)

    Incremental operating costs

    Procurement of goods

    Public information awareness campaigns

    Mine risk awareness campaigns

    Needs assessments




                                                         11
Component D: Project Management, Oversight, Monitoring
  and Evaluation, and Special Studies (US$3 million) ctd.

Independent technical audits

Financial management audits

Procurement and safeguard audits

Independent Monitoring and Evaluation (M&E)


     Note:-   If necessary, the project will also finance any strategic studies as
              well as special and feasibility studies required to improve
              the development effectiveness of this project as well as for
              future longer term development of the North.


                                                                                12
Resettlement Plan of ENReP Area

Phase III


    District      No of DS   No of GN    No of
                  Division   Division   Families

Jaffna               4          17       1346
Vavuniya             2          20       1684
Killinochchi         2          12       6020
Mannar               3          31       4991
Mulaitivu            1          48       8493
     Total           14        128       22534
                                                   13
Resettlement Plan of ENReP Area
PhaseIV

     District     No of DS   No of GN    No of
                  Division   Division   Families


Jaffna               4          17         1017
Vavuniya             1          7          1171
Killinochchi         3          18         7733
Mannar               -          -            -
Mulaitivu            1          1           118
      Total          9          49         10039
                                                   14
Resettlement Plan of ENReP Area

Phase III & IV


    District      No of DS   No of GN    No of
                  Division   Division   Families

Jaffna               8          34         2363
Vavuniya             3          27         2855
Killinochchi         5          30       13753
Mannar               3          31         4991
Mulaitivu            2          49         8611
      Total          23        177       32573

                                                   15
Distribution of Component A



                           Farm land      Providing      Supply of
            District
                            Clearing        seeds       basic needs


Jaffna
                                  13.78         19.95         16.69
Vavuniya
                                  16.65         24.10         20.16
Killinochchi
                                  80.22        116.11         97.11
Mannar
                                  29.11         42.14         35.24
Mulaitivu
                                  50.23         72.70         60.80
     Total (million Rs.)
                                   190            275           230

                                                                      16
Distribution of Component B



                                                                                Total
 Description of work   Jaffna   Vavuniya   Killinochchi   Mannar   Mulaitivu   (million
                                                                                 Rs.)


Cleaning of wells        4.35       5.26        25.33       9.19      15.86          60
Cleaning of debris       4.35       5.26        25.33       9.19      15.86          60

Rehabilitation of
rural roads             33.37     40.32        194.22      70.48     121.61         460

Rehabilitation of
irrigation canals       33.37     40.32        194.22      70.48     121.61         460

Rehabilitation of
drainage canals         25.03     30.24        145.67      52.86      91.20         345


                                                                                          17
Six month work plan

Full Component - ENReP 6 Month Work Plan

NP- ENReP 6 Month Work Plan

Jaffna- ENReP 6 Month Work Plan

Kilinochchi- ENReP 6 Month Work Plan

Mullaitivu- ENReP 6 Month Work Plan

Vavuniya - ENReP 6 Month Work Plan

Mannar- ENREP 6 Month Work Plan
                                            18
Implementation Responsibilities of the Project
                  Component A
Restitution of Land and Property Rights
   Mobile Land Task Forces

Farm Land clearing
   Irrigation Departments

Provision of Seeds
   Agriculture Department

Provision of Agriculture Implements
   Agriculture Department

Provision of Fishing Implements
   Fisheries Department

                                                     19
Implementation Responsibilities of the Project
              Component B

Selection and implementation by Divisional
Secretaries (assisted by GNs) in consultation
with the IDPs and relevant local government
agencies (assisted by RAP)




                                                 20
Implementation Responsibilities of the Project
                  Component C

Rehabilitation of Irrigation Schemes, Ponds
   Irrigation Department

 Rehabilitation of Rural Roads
   Local Government/Road Development Department

Restoration of Drinking Water Supply Schemes
   National Water Supply and Drainage Board

Rehabilitation of Public Buildings
   Department of Buildings/Appropriate Provincial Agencies
                                                              21
Procurement of Works
   International Competitive Bidding (ICB). Civil works contracts estimated to
    cost US$5.0 million equivalent or more per contract shall be procured using ICB
    (not envisaged at this time)


   National Competitive Bidding (NCB): Civil works contracts estimated to cost less
    than US$5.0 million equivalent per contract will be procured using NCB


   Shopping: For small value works, shopping procedures will be followed
    (solicitation of a minimum of three quotations from prequalified contractors), up to
    a limit of US$200,000 equivalent per contract


   Direct Contracting (DC): For priority works in the first eighteen months of
    implementation, direct contracting with autonomous state-owned agencies may be
    followed up to a limit of US$200,000 equivalent per contract.

                                                                                    22
Procurement of Works ctd.

   Community-Based Contracting (CBC):           Small value, simple civil
    works implemented with community participation (e.g. village roads,
    community wells, sanitation, irrigation channels, and infrastructure for
    community economic activities), up to US$50,000 equivalent per
    contract, may be awarded to community based organizations
    registered with the respective RAP PICs. Procurement procedures to be
    followed under CBC are detailed in the RAP Community Operational
    Manual


   Work-fare payments: Small quantities of materials and implements
    required for the program to function effectively will be procured by the
    communities, upto a limit of US$100 per purchase, following
    procedures agreed in the RAP community operational manual            23
Procurement of agriculture commodities



Procurement of agriculture commodities, such as seed
and fertilizers, will be through direct contracting
based on rates agreed between the Provincial
Agriculture Department and registered vendors, with
a justification provided for such rates




                                                   24
Role of RAP in Implementing ENEeP

 ENReP has been designed to complement its development effectiveness benefiting

  from the RAP’s design

 ENReP and RAP (with expected additional funding of US$12 million) would be

  programmed and implemented in tandem and with close coordination in all the
  villages covered by the ENReP

 RAP would extend its support with provision of block grants through simplified and

  speedy implementation mechanisms tailored to the specific emergency circumstances
  of the target villages

 Arrangement to use RAP implementation structure and staff for initial implementation

  to kick-off ENReP is expected to establish closer collaboration and coordination from
  the beginning of implementation of ENReP


                                                                                    25
The primary outcome of the project is that it would help in
        the resettlement of about 100,000 IDPs by

 Commodity grants (seeds and implements etc.) and assistance
  provided to about 15,000 farming households
 50 days of labor work opportunities per person provided to about
  45,000 IDP households
 About 12,000 hectares of agricultural (paddy) lands brought back to
  production
 650 km of rural roads rehabilitated ensuring inter-village connectivity
  and market linkages
 Eight drinking water supply schemes restored benefiting about 30,000
  households
 260 public buildings restored and functional
                                                                       26
27

Contenu connexe

Tendances

Fallon Gateway Uses
Fallon Gateway UsesFallon Gateway Uses
Fallon Gateway Usesarounddublin
 
Growing Gardens: A Resource Package on How to Start Your Own Community Garden
Growing Gardens: A Resource Package on How to Start Your Own Community GardenGrowing Gardens: A Resource Package on How to Start Your Own Community Garden
Growing Gardens: A Resource Package on How to Start Your Own Community GardenangeliaGeo
 
Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006Adam Cohen
 
Creekside Park Village 2013
Creekside Park Village 2013Creekside Park Village 2013
Creekside Park Village 2013Caren Hotchkiss
 
Creekside Park Shopping Center | The Woodlands TX
Creekside Park Shopping Center | The Woodlands TXCreekside Park Shopping Center | The Woodlands TX
Creekside Park Shopping Center | The Woodlands TXKen Brand
 
Creekside parkvillage 2013
Creekside parkvillage 2013Creekside parkvillage 2013
Creekside parkvillage 2013Courtney Buie
 
2013.10.17 mgd letter to mo ef request to examine rp 2021
2013.10.17 mgd letter to mo ef request to examine rp 20212013.10.17 mgd letter to mo ef request to examine rp 2021
2013.10.17 mgd letter to mo ef request to examine rp 2021National Citizens Movement
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCAMill City Times
 
Bursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal ReportBursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal ReportCRAIG BRITS
 
Town of Stony Plain - Municipal Development Plan (2005-2020)
Town of Stony Plain - Municipal Development Plan (2005-2020)Town of Stony Plain - Municipal Development Plan (2005-2020)
Town of Stony Plain - Municipal Development Plan (2005-2020)TownofStonyPlain
 
Project Completion Review of Food Security Livelihood Improvement and Climate...
Project Completion Review of Food Security Livelihood Improvement and Climate...Project Completion Review of Food Security Livelihood Improvement and Climate...
Project Completion Review of Food Security Livelihood Improvement and Climate...BijayaUpadhya
 
St. Louis Co Planning Annual Report2010
St. Louis Co Planning Annual Report2010St. Louis Co Planning Annual Report2010
St. Louis Co Planning Annual Report2010St. Louis County
 
Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request Fred Bothwell
 

Tendances (17)

Fallon Gateway Uses
Fallon Gateway UsesFallon Gateway Uses
Fallon Gateway Uses
 
Growing Gardens: A Resource Package on How to Start Your Own Community Garden
Growing Gardens: A Resource Package on How to Start Your Own Community GardenGrowing Gardens: A Resource Package on How to Start Your Own Community Garden
Growing Gardens: A Resource Package on How to Start Your Own Community Garden
 
Overview of the Coast Change Analysis Program (C-CAP)
Overview of the Coast Change Analysis Program (C-CAP)Overview of the Coast Change Analysis Program (C-CAP)
Overview of the Coast Change Analysis Program (C-CAP)
 
Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006Northampton Landfill Waiver from DEP 06-23-2006
Northampton Landfill Waiver from DEP 06-23-2006
 
Creekside Park Village 2013
Creekside Park Village 2013Creekside Park Village 2013
Creekside Park Village 2013
 
Creekside Park Shopping Center | The Woodlands TX
Creekside Park Shopping Center | The Woodlands TXCreekside Park Shopping Center | The Woodlands TX
Creekside Park Shopping Center | The Woodlands TX
 
Creekside parkvillage 2013
Creekside parkvillage 2013Creekside parkvillage 2013
Creekside parkvillage 2013
 
Creekside parkvillage 2013
Creekside parkvillage 2013Creekside parkvillage 2013
Creekside parkvillage 2013
 
2013.10.17 mgd letter to mo ef request to examine rp 2021
2013.10.17 mgd letter to mo ef request to examine rp 20212013.10.17 mgd letter to mo ef request to examine rp 2021
2013.10.17 mgd letter to mo ef request to examine rp 2021
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCA
 
Bursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal ReportBursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal Report
 
Town of Stony Plain - Municipal Development Plan (2005-2020)
Town of Stony Plain - Municipal Development Plan (2005-2020)Town of Stony Plain - Municipal Development Plan (2005-2020)
Town of Stony Plain - Municipal Development Plan (2005-2020)
 
Project Completion Review of Food Security Livelihood Improvement and Climate...
Project Completion Review of Food Security Livelihood Improvement and Climate...Project Completion Review of Food Security Livelihood Improvement and Climate...
Project Completion Review of Food Security Livelihood Improvement and Climate...
 
AB Land-use Framework - Conference 2009 (C2)
AB Land-use Framework - Conference 2009 (C2)AB Land-use Framework - Conference 2009 (C2)
AB Land-use Framework - Conference 2009 (C2)
 
South academy street revitalization presentation
South academy street revitalization presentation South academy street revitalization presentation
South academy street revitalization presentation
 
St. Louis Co Planning Annual Report2010
St. Louis Co Planning Annual Report2010St. Louis Co Planning Annual Report2010
St. Louis Co Planning Annual Report2010
 
Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request
 

En vedette

Um Ambiente MDA de Desenvolvimento de Sistemas Multi-agentes
Um Ambiente MDA de Desenvolvimento de Sistemas Multi-agentesUm Ambiente MDA de Desenvolvimento de Sistemas Multi-agentes
Um Ambiente MDA de Desenvolvimento de Sistemas Multi-agentesCarlos Eduardo Pantoja
 
Integrating a Tropos Modeling Tool With a MDA Methodology For Engineering Mul...
Integrating a Tropos Modeling Tool With a MDA Methodology For Engineering Mul...Integrating a Tropos Modeling Tool With a MDA Methodology For Engineering Mul...
Integrating a Tropos Modeling Tool With a MDA Methodology For Engineering Mul...Carlos Eduardo Pantoja
 
A Middleware for Using PIC Microcontrollers and Jason Framework for Programmi...
A Middleware for Using PIC Microcontrollers and Jason Framework for Programmi...A Middleware for Using PIC Microcontrollers and Jason Framework for Programmi...
A Middleware for Using PIC Microcontrollers and Jason Framework for Programmi...Carlos Eduardo Pantoja
 
Uma Abordagem Orientada a Modelos para Modelagem Conceitual de Banco de Dados
Uma Abordagem Orientada a Modelos para Modelagem Conceitual de Banco de DadosUma Abordagem Orientada a Modelos para Modelagem Conceitual de Banco de Dados
Uma Abordagem Orientada a Modelos para Modelagem Conceitual de Banco de DadosCarlos Eduardo Pantoja
 
Water balance study to develop a technique to improve the groundwater system
Water balance study to develop a technique to improve the groundwater systemWater balance study to develop a technique to improve the groundwater system
Water balance study to develop a technique to improve the groundwater systemDr (Eng) Sivakumar Subramaniam
 
Introdução a Programação de Agentes Robóticos Usando Jason e ARGO
Introdução a Programação de Agentes Robóticos Usando Jason e ARGOIntrodução a Programação de Agentes Robóticos Usando Jason e ARGO
Introdução a Programação de Agentes Robóticos Usando Jason e ARGOCarlos Eduardo Pantoja
 
ARGO - A Customized Jason Architecture for Programming Embedded Robotic Agents
ARGO - A Customized Jason Architecture for Programming Embedded Robotic AgentsARGO - A Customized Jason Architecture for Programming Embedded Robotic Agents
ARGO - A Customized Jason Architecture for Programming Embedded Robotic AgentsCarlos Eduardo Pantoja
 
Aplicando Sistemas Multi-Agentes Ubíquos em um Modelo de Smart Home Usando o ...
Aplicando Sistemas Multi-Agentes Ubíquos em um Modelo de Smart Home Usando o ...Aplicando Sistemas Multi-Agentes Ubíquos em um Modelo de Smart Home Usando o ...
Aplicando Sistemas Multi-Agentes Ubíquos em um Modelo de Smart Home Usando o ...Carlos Eduardo Pantoja
 
CONJUNCTIVE USE OF SURFACE AND GROUNDWATER TO IMPROVE FOOD PRODUCTIVITY IN A ...
CONJUNCTIVE USE OF SURFACE AND GROUNDWATER TO IMPROVE FOOD PRODUCTIVITY IN A ...CONJUNCTIVE USE OF SURFACE AND GROUNDWATER TO IMPROVE FOOD PRODUCTIVITY IN A ...
CONJUNCTIVE USE OF SURFACE AND GROUNDWATER TO IMPROVE FOOD PRODUCTIVITY IN A ...Dr (Eng) Sivakumar Subramaniam
 
Comunicação entre Java e Arduino Utilizando o Middleware Javino
Comunicação entre Java e Arduino Utilizando o Middleware JavinoComunicação entre Java e Arduino Utilizando o Middleware Javino
Comunicação entre Java e Arduino Utilizando o Middleware JavinoCarlos Eduardo Pantoja
 
LuBras: Uma Arquitetura de um Dispositivo Eletrônico para a Comunicação LIBRA...
LuBras: Uma Arquitetura de um Dispositivo Eletrônico para a Comunicação LIBRA...LuBras: Uma Arquitetura de um Dispositivo Eletrônico para a Comunicação LIBRA...
LuBras: Uma Arquitetura de um Dispositivo Eletrônico para a Comunicação LIBRA...Carlos Eduardo Pantoja
 
Utilizando Sistemas Multi-agentes para a Programação de Plataformas Robóticas
Utilizando Sistemas Multi-agentes para a Programação de Plataformas RobóticasUtilizando Sistemas Multi-agentes para a Programação de Plataformas Robóticas
Utilizando Sistemas Multi-agentes para a Programação de Plataformas RobóticasCarlos Eduardo Pantoja
 

En vedette (17)

Um Ambiente MDA de Desenvolvimento de Sistemas Multi-agentes
Um Ambiente MDA de Desenvolvimento de Sistemas Multi-agentesUm Ambiente MDA de Desenvolvimento de Sistemas Multi-agentes
Um Ambiente MDA de Desenvolvimento de Sistemas Multi-agentes
 
Ph d presentation npc final
Ph d presentation npc finalPh d presentation npc final
Ph d presentation npc final
 
Ronile resume (2)
Ronile resume (2)Ronile resume (2)
Ronile resume (2)
 
Siva worldwaterdaypresent
Siva worldwaterdaypresentSiva worldwaterdaypresent
Siva worldwaterdaypresent
 
Coady presentation sri lanka
Coady presentation sri lankaCoady presentation sri lanka
Coady presentation sri lanka
 
Ronile resume
Ronile resumeRonile resume
Ronile resume
 
Integrating a Tropos Modeling Tool With a MDA Methodology For Engineering Mul...
Integrating a Tropos Modeling Tool With a MDA Methodology For Engineering Mul...Integrating a Tropos Modeling Tool With a MDA Methodology For Engineering Mul...
Integrating a Tropos Modeling Tool With a MDA Methodology For Engineering Mul...
 
A Middleware for Using PIC Microcontrollers and Jason Framework for Programmi...
A Middleware for Using PIC Microcontrollers and Jason Framework for Programmi...A Middleware for Using PIC Microcontrollers and Jason Framework for Programmi...
A Middleware for Using PIC Microcontrollers and Jason Framework for Programmi...
 
Uma Abordagem Orientada a Modelos para Modelagem Conceitual de Banco de Dados
Uma Abordagem Orientada a Modelos para Modelagem Conceitual de Banco de DadosUma Abordagem Orientada a Modelos para Modelagem Conceitual de Banco de Dados
Uma Abordagem Orientada a Modelos para Modelagem Conceitual de Banco de Dados
 
Water balance study to develop a technique to improve the groundwater system
Water balance study to develop a technique to improve the groundwater systemWater balance study to develop a technique to improve the groundwater system
Water balance study to develop a technique to improve the groundwater system
 
Introdução a Programação de Agentes Robóticos Usando Jason e ARGO
Introdução a Programação de Agentes Robóticos Usando Jason e ARGOIntrodução a Programação de Agentes Robóticos Usando Jason e ARGO
Introdução a Programação de Agentes Robóticos Usando Jason e ARGO
 
ARGO - A Customized Jason Architecture for Programming Embedded Robotic Agents
ARGO - A Customized Jason Architecture for Programming Embedded Robotic AgentsARGO - A Customized Jason Architecture for Programming Embedded Robotic Agents
ARGO - A Customized Jason Architecture for Programming Embedded Robotic Agents
 
Aplicando Sistemas Multi-Agentes Ubíquos em um Modelo de Smart Home Usando o ...
Aplicando Sistemas Multi-Agentes Ubíquos em um Modelo de Smart Home Usando o ...Aplicando Sistemas Multi-Agentes Ubíquos em um Modelo de Smart Home Usando o ...
Aplicando Sistemas Multi-Agentes Ubíquos em um Modelo de Smart Home Usando o ...
 
CONJUNCTIVE USE OF SURFACE AND GROUNDWATER TO IMPROVE FOOD PRODUCTIVITY IN A ...
CONJUNCTIVE USE OF SURFACE AND GROUNDWATER TO IMPROVE FOOD PRODUCTIVITY IN A ...CONJUNCTIVE USE OF SURFACE AND GROUNDWATER TO IMPROVE FOOD PRODUCTIVITY IN A ...
CONJUNCTIVE USE OF SURFACE AND GROUNDWATER TO IMPROVE FOOD PRODUCTIVITY IN A ...
 
Comunicação entre Java e Arduino Utilizando o Middleware Javino
Comunicação entre Java e Arduino Utilizando o Middleware JavinoComunicação entre Java e Arduino Utilizando o Middleware Javino
Comunicação entre Java e Arduino Utilizando o Middleware Javino
 
LuBras: Uma Arquitetura de um Dispositivo Eletrônico para a Comunicação LIBRA...
LuBras: Uma Arquitetura de um Dispositivo Eletrônico para a Comunicação LIBRA...LuBras: Uma Arquitetura de um Dispositivo Eletrônico para a Comunicação LIBRA...
LuBras: Uma Arquitetura de um Dispositivo Eletrônico para a Comunicação LIBRA...
 
Utilizando Sistemas Multi-agentes para a Programação de Plataformas Robóticas
Utilizando Sistemas Multi-agentes para a Programação de Plataformas RobóticasUtilizando Sistemas Multi-agentes para a Programação de Plataformas Robóticas
Utilizando Sistemas Multi-agentes para a Programação de Plataformas Robóticas
 

Similaire à ENReP 08-12-2009

10.25.2012 - Craig McIntosh
10.25.2012 - Craig McIntosh10.25.2012 - Craig McIntosh
10.25.2012 - Craig McIntoshAMDSeminarSeries
 
China's Initiatives of Recovery from the 2008 Wenchuan Earthquake
China's Initiatives of Recovery from the 2008 Wenchuan EarthquakeChina's Initiatives of Recovery from the 2008 Wenchuan Earthquake
China's Initiatives of Recovery from the 2008 Wenchuan EarthquakeGlobal Risk Forum GRFDavos
 
Minor Road Works. Tagla Gumine District ,Simbu Province
Minor Road Works. Tagla   Gumine District ,Simbu ProvinceMinor Road Works. Tagla   Gumine District ,Simbu Province
Minor Road Works. Tagla Gumine District ,Simbu ProvinceElias Elwai Williams
 
Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee CA Narinder Jit Singh
 
Shankaraiah N :Watershed Program Present
Shankaraiah N :Watershed Program  PresentShankaraiah N :Watershed Program  Present
Shankaraiah N :Watershed Program Presentshankaraiah, N
 
Monitoring rural water supplies in Ethiopia
Monitoring rural water supplies in EthiopiaMonitoring rural water supplies in Ethiopia
Monitoring rural water supplies in EthiopiaIRC
 
Monitoring water supplies and sanitation in Ethiopia
Monitoring water supplies and sanitation in EthiopiaMonitoring water supplies and sanitation in Ethiopia
Monitoring water supplies and sanitation in EthiopiaIRC
 
Dar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fDar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fRdc Cordillera
 
System of rice intensification in manipur, india
System of rice intensification in manipur, indiaSystem of rice intensification in manipur, india
System of rice intensification in manipur, indiaRafi Shah
 
ANALYSIS OF SEWAGE TREATMENT AT JAFFNA
ANALYSIS OF SEWAGE TREATMENT AT JAFFNAANALYSIS OF SEWAGE TREATMENT AT JAFFNA
ANALYSIS OF SEWAGE TREATMENT AT JAFFNAVj NiroSh
 
Proposal . Community Road Rehabilitation and beautification ward 3.pdf
Proposal . Community Road Rehabilitation and beautification  ward 3.pdfProposal . Community Road Rehabilitation and beautification  ward 3.pdf
Proposal . Community Road Rehabilitation and beautification ward 3.pdfElias Elwai Williams
 

Similaire à ENReP 08-12-2009 (15)

RNBA
RNBARNBA
RNBA
 
Wb final presentation
Wb final presentationWb final presentation
Wb final presentation
 
Finance
Finance Finance
Finance
 
10.25.2012 - Craig McIntosh
10.25.2012 - Craig McIntosh10.25.2012 - Craig McIntosh
10.25.2012 - Craig McIntosh
 
China's Initiatives of Recovery from the 2008 Wenchuan Earthquake
China's Initiatives of Recovery from the 2008 Wenchuan EarthquakeChina's Initiatives of Recovery from the 2008 Wenchuan Earthquake
China's Initiatives of Recovery from the 2008 Wenchuan Earthquake
 
Minor Road Works. Tagla Gumine District ,Simbu Province
Minor Road Works. Tagla   Gumine District ,Simbu ProvinceMinor Road Works. Tagla   Gumine District ,Simbu Province
Minor Road Works. Tagla Gumine District ,Simbu Province
 
Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee
 
Shankaraiah N :Watershed Program Present
Shankaraiah N :Watershed Program  PresentShankaraiah N :Watershed Program  Present
Shankaraiah N :Watershed Program Present
 
Monitoring rural water supplies in Ethiopia
Monitoring rural water supplies in EthiopiaMonitoring rural water supplies in Ethiopia
Monitoring rural water supplies in Ethiopia
 
UP PPT_0.ppt
UP PPT_0.pptUP PPT_0.ppt
UP PPT_0.ppt
 
Monitoring water supplies and sanitation in Ethiopia
Monitoring water supplies and sanitation in EthiopiaMonitoring water supplies and sanitation in Ethiopia
Monitoring water supplies and sanitation in Ethiopia
 
Dar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fDar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_f
 
System of rice intensification in manipur, india
System of rice intensification in manipur, indiaSystem of rice intensification in manipur, india
System of rice intensification in manipur, india
 
ANALYSIS OF SEWAGE TREATMENT AT JAFFNA
ANALYSIS OF SEWAGE TREATMENT AT JAFFNAANALYSIS OF SEWAGE TREATMENT AT JAFFNA
ANALYSIS OF SEWAGE TREATMENT AT JAFFNA
 
Proposal . Community Road Rehabilitation and beautification ward 3.pdf
Proposal . Community Road Rehabilitation and beautification  ward 3.pdfProposal . Community Road Rehabilitation and beautification  ward 3.pdf
Proposal . Community Road Rehabilitation and beautification ward 3.pdf
 

Dernier

Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfSeasiaInfotech2
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 

Dernier (20)

Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdf
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 

ENReP 08-12-2009

  • 1. Introduction to Emergency Northern Recovery Project Dr.S.S.Sivakumar Project Director ENReP 08/12/2009 1
  • 2. Development Objectives of ENReP To support government’s efforts to rapidly resettling IDPs in the Northern province to their place of origin to start their livelihood through  Emergency Assistance to IDPs  Work-fare Program (Cash for work)  Rehabilitation and Reconstruction of Essential Public and Economic Infrastructure 2
  • 3. IDPs Resettled to their place of origin as per government’s phase iii and phase iv of the resettlement program in the districts of 1. Jaffna 2. Kilinochchi 3. Mullaitivu 4. Mannar 5. Vavuniya 3
  • 4. Project Components of ENReP Component A: Emergency Assistance to IDPs (US$6 million) This component would provide assistance to, returned households to re-engage in livelihood activities such as agricultural farming and marine fishing Component B: Work-fare (US$12 million) The work-fare component is intended to provide labor employment to the returnees immediately after they have been resettled helping to bridge the income gap between the time of return (after having received emergency assistance) and until IDPs can obtain income from regular livelihoods. 4
  • 5. Project Components of ENReP  Component C: Rehabilitation and Reconstruction of Essential Public and Economic Infrastructure (US$44 million) This component will provide assistance to repair reconstruct and restore vital public and economic infrastructure and facilities damaged by the war and that are dysfunctional or partly functional at present  Component D: Project Management, Oversight, Monitoring and Evaluation, and Special Studies (US$3 million) This component will support the Government in implementing the project, coordinating all project related activities, monitoring and evaluating project inputs, outputs and results, carrying out financial management, technical, procurement and safeguard audits. 5
  • 6. This component will provide financing to: • Meet cost related to the operation of mobile land task forces, surveys and studies required to rapidly restore contested property rights of the resettled people • Conduct demining awareness program to IDPs, project staff and contractors • Clear thick vegetative growth of paddy lands to be able to resume land preparation for cultivation • Provide seeds, basic and miscellaneous agricultural and fishing implements to the people to be able to start paddy farming and marine fishing immediately after the resettlement. 6
  • 7. Component B: Work-fare (US$12 million)  Execute small scale labor intensive repair and rehabilitation works of village level infrastructure  Provide a minimum of 50 labor days of guaranteed work employment for one person from each IDP household  Of these 50 days, returnees will be eligible to spend ten days to make their own homes repaired and functional 7
  • 8. Component B: Work-fare (US$12 million) ctd. The work-fare program fulfills a dual objective provide short-term and immediately required cash to the people undertake urgent labor intensive repair works such as 8
  • 9. Component B: Work-fare (US$12 million) ctd. Possible labor intensive repair works • Clearing debris of damaged houses and village buildings, • Cleaning dug wells, • Repairing hamlet level access roads • Repairing small irrigation canals • Repairing small drainage cannels 9
  • 10. Component C: Rehabilitation and Reconstruction of Essential Public and Economic Infrastructure (US$44 million) Rehabilitation of Irrigation Systems (US$12 million) Rehabilitation of Rural Roads (US$10 million) Restoration of Drinking Water Schemes (US$ 12 million) Rehabilitation and Reconstruction of Public Buildings and Facilities (US$ 10 million) 10
  • 11. Component D: Project Management, Oversight, Monitoring and Evaluation, and Special Studies (US$3 million) Incremental operating costs Procurement of goods Public information awareness campaigns Mine risk awareness campaigns Needs assessments 11
  • 12. Component D: Project Management, Oversight, Monitoring and Evaluation, and Special Studies (US$3 million) ctd. Independent technical audits Financial management audits Procurement and safeguard audits Independent Monitoring and Evaluation (M&E) Note:- If necessary, the project will also finance any strategic studies as well as special and feasibility studies required to improve the development effectiveness of this project as well as for future longer term development of the North. 12
  • 13. Resettlement Plan of ENReP Area Phase III District No of DS No of GN No of Division Division Families Jaffna 4 17 1346 Vavuniya 2 20 1684 Killinochchi 2 12 6020 Mannar 3 31 4991 Mulaitivu 1 48 8493 Total 14 128 22534 13
  • 14. Resettlement Plan of ENReP Area PhaseIV District No of DS No of GN No of Division Division Families Jaffna 4 17 1017 Vavuniya 1 7 1171 Killinochchi 3 18 7733 Mannar - - - Mulaitivu 1 1 118 Total 9 49 10039 14
  • 15. Resettlement Plan of ENReP Area Phase III & IV District No of DS No of GN No of Division Division Families Jaffna 8 34 2363 Vavuniya 3 27 2855 Killinochchi 5 30 13753 Mannar 3 31 4991 Mulaitivu 2 49 8611 Total 23 177 32573 15
  • 16. Distribution of Component A Farm land Providing Supply of District Clearing seeds basic needs Jaffna 13.78 19.95 16.69 Vavuniya 16.65 24.10 20.16 Killinochchi 80.22 116.11 97.11 Mannar 29.11 42.14 35.24 Mulaitivu 50.23 72.70 60.80 Total (million Rs.) 190 275 230 16
  • 17. Distribution of Component B Total Description of work Jaffna Vavuniya Killinochchi Mannar Mulaitivu (million Rs.) Cleaning of wells 4.35 5.26 25.33 9.19 15.86 60 Cleaning of debris 4.35 5.26 25.33 9.19 15.86 60 Rehabilitation of rural roads 33.37 40.32 194.22 70.48 121.61 460 Rehabilitation of irrigation canals 33.37 40.32 194.22 70.48 121.61 460 Rehabilitation of drainage canals 25.03 30.24 145.67 52.86 91.20 345 17
  • 18. Six month work plan Full Component - ENReP 6 Month Work Plan NP- ENReP 6 Month Work Plan Jaffna- ENReP 6 Month Work Plan Kilinochchi- ENReP 6 Month Work Plan Mullaitivu- ENReP 6 Month Work Plan Vavuniya - ENReP 6 Month Work Plan Mannar- ENREP 6 Month Work Plan 18
  • 19. Implementation Responsibilities of the Project Component A Restitution of Land and Property Rights  Mobile Land Task Forces Farm Land clearing  Irrigation Departments Provision of Seeds  Agriculture Department Provision of Agriculture Implements  Agriculture Department Provision of Fishing Implements  Fisheries Department 19
  • 20. Implementation Responsibilities of the Project Component B Selection and implementation by Divisional Secretaries (assisted by GNs) in consultation with the IDPs and relevant local government agencies (assisted by RAP) 20
  • 21. Implementation Responsibilities of the Project Component C Rehabilitation of Irrigation Schemes, Ponds  Irrigation Department  Rehabilitation of Rural Roads  Local Government/Road Development Department Restoration of Drinking Water Supply Schemes  National Water Supply and Drainage Board Rehabilitation of Public Buildings  Department of Buildings/Appropriate Provincial Agencies 21
  • 22. Procurement of Works  International Competitive Bidding (ICB). Civil works contracts estimated to cost US$5.0 million equivalent or more per contract shall be procured using ICB (not envisaged at this time)  National Competitive Bidding (NCB): Civil works contracts estimated to cost less than US$5.0 million equivalent per contract will be procured using NCB  Shopping: For small value works, shopping procedures will be followed (solicitation of a minimum of three quotations from prequalified contractors), up to a limit of US$200,000 equivalent per contract  Direct Contracting (DC): For priority works in the first eighteen months of implementation, direct contracting with autonomous state-owned agencies may be followed up to a limit of US$200,000 equivalent per contract. 22
  • 23. Procurement of Works ctd.  Community-Based Contracting (CBC): Small value, simple civil works implemented with community participation (e.g. village roads, community wells, sanitation, irrigation channels, and infrastructure for community economic activities), up to US$50,000 equivalent per contract, may be awarded to community based organizations registered with the respective RAP PICs. Procurement procedures to be followed under CBC are detailed in the RAP Community Operational Manual  Work-fare payments: Small quantities of materials and implements required for the program to function effectively will be procured by the communities, upto a limit of US$100 per purchase, following procedures agreed in the RAP community operational manual 23
  • 24. Procurement of agriculture commodities Procurement of agriculture commodities, such as seed and fertilizers, will be through direct contracting based on rates agreed between the Provincial Agriculture Department and registered vendors, with a justification provided for such rates 24
  • 25. Role of RAP in Implementing ENEeP  ENReP has been designed to complement its development effectiveness benefiting from the RAP’s design  ENReP and RAP (with expected additional funding of US$12 million) would be programmed and implemented in tandem and with close coordination in all the villages covered by the ENReP  RAP would extend its support with provision of block grants through simplified and speedy implementation mechanisms tailored to the specific emergency circumstances of the target villages  Arrangement to use RAP implementation structure and staff for initial implementation to kick-off ENReP is expected to establish closer collaboration and coordination from the beginning of implementation of ENReP 25
  • 26. The primary outcome of the project is that it would help in the resettlement of about 100,000 IDPs by  Commodity grants (seeds and implements etc.) and assistance provided to about 15,000 farming households  50 days of labor work opportunities per person provided to about 45,000 IDP households  About 12,000 hectares of agricultural (paddy) lands brought back to production  650 km of rural roads rehabilitated ensuring inter-village connectivity and market linkages  Eight drinking water supply schemes restored benefiting about 30,000 households  260 public buildings restored and functional 26