The document is a letter from the Governor of the Kostroma region inviting businesses to invest in the region. It highlights the region's history of successful partnerships and unique resources. It promotes several promising sectors for investment and says the region works to create comfortable conditions for investors by improving infrastructure and reducing administrative barriers. Businesses that develop plans in the region will receive necessary infrastructure support from local authorities. The governor welcomes mutually profitable business partnerships.
2. Dear Ladies and gentlemen,
Kostroma region that I have the honour to represent
has an abundant history of the successful partnership, the
unique productions and natural resources.
This edition presents the investment appeal in the most
perspective sectors, which are capable to open new hori-
zons for your business development.
We do our best to extend the competitive advantages
of the Kostroma region creating the most comfortable con-
ditions for investments improving the measures of the ad-
ministrative barriers lowering.
Your business development plans will be realized in the
Kostroma region at the forming investment sites. From our
side we provide you with necessary infrastructure.
We invite you to the mutually profitable business partner-
ship.
Welcome to the hospitable Kostroma region.
Sergey Sitnikov
Kostroma region Governor
3. CONTENT
Land lots for the industrial sites location ...................................... 5
Land lots for farming ....................................................................... 27
Investment proposals ...................................................................... 63
Industrial park “Industrial`nyi”....................................................... 79
3
6. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
7. Land lot
limited by the streets Industrial`naya-
Bazovaya-Galichskoe highway (Kostroma)
Area - 23,6 ha
Transport availability
Distance to:
• Railway station – 5,4 km;
• River port – 11,5 km;
• Motorway sides with the land lot.
Civil engineering infrastructure avaliability
• Power supply – along the land lot border;
• Gas supply – 170 m far from the land lot border close to Vostochnyi
lane, out of Kostroma city territory;
• Heat supply – 350 m far from the land lot close to No.4 Vostochnyi
lane;
• Water supply – 300 m far from the land lot close to No.2 Vostochnyi
lane;
• Sewerage system - alongside the land lot border;
• Communication cable - alongside the land lot border.
Land lot usage
Placement of the industrial objects.
7
8. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
9. Land lot
in Moskovskaya Street
near the Klyuchevka - river (Kostroma)
Area - 38,0 ha
Transport availability
Distance to:
• Motorway: Moskovskaya Str. – 10 m;
• Magistral`naya Str. – 300 m;
• Railway – 1,2 km;
• houses – 1,1 km
Civil engineering infrastructure avaliability
• Power supply – 6 m far from the land lot close to Moskovskaya Str.;
• Gas supply – 72 m far from the land lot close to Moskovskaya Str.;
• Water supply – 20 m in the land lot close to Moskovskaya Str., piping
d-250; 60 m far from the land lot there is a d-800 piping;
• Sewerage system - 73 m far from the land lot close
to Moskovskaya Str.;
• Communication cable - across the land lot border from the Moskovs-
kaya Str. side.
Land lot usage
Placement of the industrial objects.
9
10. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
11. Cluster in Magistral`naya street
(Kostroma)
Area - 59,6 ha
Transport availability
Located out of the city border
Distance to:
• Motorway: Moskovskaya Str. – 10 m;
• Solonkovskaya Str. – 10 m;
• Railway – 1,0 km.
Civil engineering infrastructure avaliability
• Power supply – 120 m far from the land lot close to Magistral`naya Str.;
Power cable goes alongside Solonikovskaya Str.
• Gas supply – 65 m far from the land lot close to Soloikovskya Str.;
• Water supply – piping of d-150 crosses the land lot,
close to Solonikovskaya Str. there is as well piping d-500;
• Sewerage system – alongside the land lot
close the Magistral`naya Str.;
• Communication cable – alongside Magistral`naya Str.
Land lot usage
Placement of the industrial objects.
11
12. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
13. Land lot
on the territory of Baksheevskoe rural settlement
close to OAO “Motordetal”
Area - 40,0 ha
Transport availability
Located out of the city border
Distance to:
• Motorway Kostroma-Yaroslavl`– 10 m;
• Railway-300 m.
Civil engineering infrastructure avaliability
• Power supply – 0,3 km far from the land lot border;
• Gas supply – 0,5 km far from the land lot border, pressure – 159 kg;
• Water supply – 0,3 km far from the land lot;
• Sewerage system – crosses the land lot;
• Communication cable – crosses the land lot.
Land lot usage
Placement of the industrial objects.
13
14. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
15. Land lot
in Solonikovskaya street, close to No.6
Area - 4,35 ha
Transport availability
Distance to:
• Solonikovskaya Str.– 300 m;
• Railway – 630 m.
Civil engineering infrastructure avaliability
• Power supply – 300-500 m;
• Gas supply – 300-500 m;
• Water supply – 300-500 m;
• Railway
Land lot usage
Placement of the industrial objects.
15
17. Land lot limited by:
Volgorechensk-Ivankovo-Vladychnoe-Rostilovo-
hole Pozdeevo-the Ivanovo region border up to
Volgorechensk
Area - 3 600 ha
Transport availability
Motorways:
• Volgorechensk-Ivankovo-Vladychnoe – 6 km of asphalt
• Ivankovo-Tolstokvasovo-Gorki-Neronovo – 11 km of asphalt;
• Tolstokvasovo-Mikshino – 3 km of earth road;
• Vladychnoe-Rastilovo-hole Pozdeevo-the Ivanovo region border –
5,5 km of earth road.
Civil engineering infrastructure availability
• Power supply – there two lines VL-220 kW on the territory of the land
lot. The substation is needed;
• Gas supply – distributing net is 1 km from the land lot border;
• Heat supply – there are two variants: gas boiling room or central heat-
ing supply from Kostroma regional power station – distance from the
land lot border – 6 km;
• Water intake facility are 1,5 km far from the land lot border;
• Sewerage system is 5,5 km far from the land lot border;
Land lot usage
Placement of the industrial objects.
17
18. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (250 km)
19. Land lot
situated on the west side
of the village Pustoshki
Area - 35,4 ha
Transport availability
• From the South the lot has the common border with the motorway
Kostroma-V.Spasskoe (Nikol`skoe rural settlement);
• Railway is on the North of the land lot.
Civil engineering infrastructure avaliability
• Power supply – on the territory of v.Pustoshki;
• Gas supply – on the territory of v.Pustoshki.
Land lot usage
Placement of the industrial objects.
19
20. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (250 km)
21. Land lot
surrounding the village Pyesikovo
Area - 59,3 ha
Transport availability
• From the South the lot has the common border with the railway;
• Motorway – 3 km far from the land lot.
Civil engineering infrastructure availability
• Power supply – VL-35 kW
Land lot usage
Placement of the industrial objects.
21
22. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (250 km)
23. Land lot
to the North of the village Kharino
Area - 66,5 ha
Transport availability
• From the South the lot has the common border with the railway;
• Motorway – 500 m far from the land lot.
Civil engineering infrastructure availability
• Power supply – 200 m far from the land lot, on the territory of v.Kharino;
• Gas supply – 200 m far from the land lot, on the territory of v.Kharino.
Land lot usage
Placement of the industrial objects.
23
24. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (250 km)
25. Land lot
500 m to the West from the village Gubachevo
Area - 1,5 ha
Transport availability
Distance to:
• The Centre of the city – 7 km;
• Motorway Kostroma – V.Spasskoe – 800 m;
• Railway – 1,5 km.
Civil engineering infrastructure availability
• Power supply – 200 m far from the land lot.
Land lot usage
Placement of the industrial objects.
25
29. Land lot
of the village Prosek
Area - 631,4 ha
Transport availability
Distance to the regional centre:
• By motorway – 167 km;
• By railway (Antropovo station) – 178 m;
• Distance to the district centre – 3 km;
• Road with asphalt covering.
Land lot property
Regional
Civil engineering infrastructure availability
• Power supply – power line up to 1000 V;
• Water supply - artesian well.
Land lot usage
Placement of the agricultural objects.
29
31. Land lot
of the village Tsaryovo
Area - 100 ha (possibility of expansion to 200 ha)
Transport availability
• Distance to the regional centre – 67 km;
• Distance to the district centre – 25 km;
• 1,5 km of the earth road till the motorway Kostroma-Bui.
Land lot property
Regional.
Civil engineering infrastructure availability
• Power supply – own substation for 250 kWt;
• Water supply - artesian well;
• Gas supply – average pressure 128.
Labor resources
Area population is about 600 people including 250 employable.
Land lot usage
Placement of the agricultural objects.
31
33. Land lot
of the village Baranovo
Area - 475 ha
Transport availability
Distance to the regional centre:
• By motorway – 100 km;
• Railway (Bui station);
• Road with asphalt covering
• Distance to the district centre – 2 km.
Land lot property
The land lot is under the procedure of converting into the regional
property.
Civil engineering infrastructure availability
• Power supply – power line up to 1000 V;
• Water supply - artesian well;
• Gas supply – average pressure.
Labor resources
Area population is about 600 people.
Land lot usage
Placement of the agricultural objects.
33
35. Land lot
of the village Borok
Area - 371,7 ha
Transport availability
• Distance to the regional centre – 100 km;
• Distance to the district centre – 10 km;
• Road with asphalt covering.
Land lot property
The land lot is under the procedure of converting into the regional
property.
Civil engineering infrastructure availability
• Power supply – power line up to 1000 V;
• Water supply - artesian well;
• Gas supply – average pressure.
Labor resources
Area population is about 250 people.
Land lot usage
Placement of the agricultural objects.
35
37. Land lot
of the village Falino
Area - 3 ha (possibility of expansion)
Transport availability
• Distance to the regional centre – 280 km;
• Distance to the district centre – 25 km;
• Road with asphalt covering - 15 km;
• Road with crushed stone covering - 10 km.
Land lot property
Private.
Civil engineering infrastructure availability
Electrified.
Comment
Half-ruined livestock farm.
Land lot usage
Placement of the agricultural objects.
37
39. Land lot
of the Industrial complex
Area - 6 ha
Transport availability
• Distance to the regional centre – 360 km;
• Distance to the district centre – 1 km;
• Road with asphalt covering.
Land lot property
Municipal.
Civil engineering infrastructure availability
Power supply – power line up to 1000 V.
Labor resources
Available.
Comment
Object is not completed, no roof.
Land lot usage
Placement of the industrial objects.
39
41. Land lot
of the village Georgievskoe
Production base of the former Industrial complex
Area - 4 ha (possibility of expansion)
Transport availability
• Distance to the regional centre – 360 km;
• Road with asphalt covering.
Land lot property
Private.
Civil engineering infrastructure availability
Power supply – power line up to 1000 V.
Labor resources
Available.
Comments
The construction total area 300 m2.
Ceiling height exceeds 6 m.
Barrels for petroleum product are available.
Garage and warehouse avaliable.
Land lot usage
Placement of the industrial objects.
41
43. Land lot
of the village Serednyaya
Production base of the former agricultural college
Area - 3 ha (possibility of expansion)
Transport availability
• Distance to the regional centre – 360 km;
• Distance to the district centre – 5 km;
• Road with asphalt covering.
Land lot property
Private.
Civil engineering infrastructure availability
Electrified.
Labor resources
Available.
Comments
Ceiling height exceeds 6 m.
Warehouse available.
Land lot usage
Placement of the industrial objects.
43
45. Land lot
of the village Yakushovka
Area - 30 ha (possibility of expansion up to 200 ha)
According to the Land distribution Fund data there are about 655 ha
of agricultural lands
Transport availability
• Distance to the regional centre – 35 km;
• Distance to the district centre – 3 km;
• Road with asphalt covering.
Land lot property
Municipal.
Civil engineering infrastructure availability
• Power supply – power line up to 1000 V;
• Water supply - artesian well;
• Gas supply – average pressure 108.
Labor resources
Population is 708 people including employable 400.
Comments
Ceiling height exceeds 6 m.
Warehouse available.
Land lot usage
Placement of the agricultural objects.
45
47. Land lot
of the village Aleksandrovo
State farm “Aleksandrovskii”
Area - 2 325 ha
Transport availability
• Distance to the regional centre – 64 km;
• Distance to the district centre – 12 km;
• Road with gravel (partially earth) covering.
Land lot property
Private, share, municipal, Land distribution Fund.
Civil engineering infrastructure availability
• Power supply – substation;
• Water supply - artesian well.
Land lot usage
Placement of the agricultural objects.
47
49. Land lot
of the village Isajevo
OOO “Isajevo”
Area - 1 611 ha
Transport availability
• Distance to the regional centre – 92 km;
• Distance to the district centre – 42 km;
• Road with gravel (partially earth) covering.
Land lot property
Private, share, municipal.
Civil engineering infrastructure availability
• Power supply - available;
• Water supply - artesian well.
Land lot usage
Placement of the agricultural objects.
49
51. Land lot
of the village Zhvalovo
Agricultural customer cooperation “Zhvalovo”
Area - 2 587 ha
Transport availability
• Distance to the regional centre – 55 km;
• Distance to the district centre – 6 km;
• Road with gravel (partially earth) covering.
Land lot property
Private (2 016 ha);
Share (414,4 ha);
Municipal (156,9 ha).
Civil engineering infrastructure availability
• Power supply – available;
• Water supply - artesian well.
Land lot usage
Placement of the agricultural objects.
51
53. Land lot
of the village Svozovo
Agricultural customer cooperation “Svozovo”
Area - 2 627 ha
Transport availability
• Distance to the regional centre – 84 km;
• Distance to the district centre – 32 km;
• Road with gravel (partially earth) covering.
Land lot property
Private (496 ha);
Share (1 508 ha);
Municipal (623 ha).
Civil engineering infrastructure availability
• Power supply – available;
• Water supply - artesian well.
Land lot usage
Placement of the agricultural objects.
53
55. Land lot
of the village Oshurki
Agricultural customer cooperation “Rassvet”
Area - 2 195 ha
Transport availability
• Distance to the regional centre – 64 km;
• Distance to the district centre – 12 km;
• Road with gravel (partially earth) covering;
• Railway route KOSTROMA-GALICH runs through the territory of the
land lot.
Land lot property
Private (1415 ha);
Share (536 ha);
Municipal (244 ha).
Civil engineering infrastructure availability
• Power supply – available;
• Water supply - artesian well.
Land lot usage
Placement of the agricultural objects.
55
57. Land lot
of the village Zavrazhje
Agricultural customer cooperation “Zavrazhje”
Area - 672,2 ha
Transport availability
• Distance to the regional centre – 64 km;
• Distance to the district centre – 12 km;
• Road with gravel (partially earth) covering.
Land lot property
Private (402,7 ha);
Share (192,5 ha);
Municipal (77 ha).
Civil engineering infrastructure availability
• Power supply – available;
• Water supply - artesian well;
• Gas supply - projected.
Land lot usage
Placement of the agricultural objects.
57
59. Land lot
of the village Shakhovo
Collective farm “Rossia”
Area - 2 929 ha
Transport availability
• Distance to the regional centre – 57 km;
• Distance to the district centre – 7 km;
• Road with gravel (partially earth) covering.
Land lot property
Private (1 817 ha);
Share (1 112,6 ha).
Civil engineering infrastructure availability
Power supply – available;
Water supply - water tower;
Gas supply - projected.
Land lot usage
Placement of the agricultural objects.
59
61. Land lot
of the village Kalinki
Former Agricultural customer cooperation “Oktyabr`”
Area - 1 809 ha
Transport availability
• Distance to the regional centre – 22 km;
• Distance to the district centre – 30 km;
• Motorway (partially earth covering).
Land lot property
Private (945,9 ha);
Share (505 ha);
Municipal (358,1 ha).
Civil engineering infrastructure availability
• Power supply – available;
• Water supply - artesian well.
Land lot usage
Placement of the agricultural objects.
61
64. WOOD PROCESSING INDUSTRY
Project name Construction of the pulp-paper plant
Location of the project subject of the Russian Federation Kostroma region
realization
Manturovo municipal district
municipality
(Manturovo township)
Project coordinator Name Forestry department of the Kostroma region
Postal address 128a, Mira avenue,156013 Kostroma
Telephone 007(4942) 55-36-21
Fax 007(4942)55-80-32
e-mail address upkostr@kmtn.ru
web-site http://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Production of the competitive capable to
Target of the project
replace import paper and cardboard goods
Basic products (usage) Paper, cardboard
Plain paper - 250 000 ton
Production capacity Coated paper – 250 000 ton
Coated cardboard – 300 000 ton
Russia, the near abroad and foreign
Trade area
countries
Pulp-paper plants in Ust`-Ilimsk and in
Main competitors
Arkhangel`sk
Financial aspects Project total cost 51 billion RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
NPV 21 897 million RUR
DPB 10,8 years
Planning period 15 years
IRR 16,5%
Additional information Project is included in the list of the
prior investment projects in Kostroma
region in the sphere of forest
exploitation
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
65. Project name Creation of the OSB production in the Kostroma region
Location of the project Subject of the Russian Federation Kostroma region
realization
municipality Bui municipal district
Project coordinator Name Forestry department of the Kostroma region
Postal address 128a, Mira avenue,156013 Kostroma
Telephone 007(4942) 55-36-21
Fax 007(4942)55-80-32
e-mail address upkostr@kmtn.ru
web-site http://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Maximal satisfaction of the home market
needs for boards OSB produced with
Target of the project
the usage of the new technologies and
equipment
Basic products (usage) OSB boards
Production capacity 400 000 m3
Trade area Russian Federation
Main competitors No competitors in Russia
Financial aspects Project total cost 5 445 million RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
NPV 4 663,9 million RUR
DPB 6,75 years
Planning period 13 years
IRR 31,85%
Additional information Estimated annual cutting area volume
Forest composition: 4B2As2P2F
– 725 000 m3
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
66. Project name Creation of the integrated house-building factory in the Kostroma region
Location of the project Subject of the Russian Federation Kostroma region
realization
municipality Chukhloma municipal district
Project coordinator
Name Forestry department of the Kostroma region
Postal address 128a, Mira avenue,156013 Kostroma
Telephone 007(4942) 55-36-21
Fax 007(4942)55-80-32
e-mail address upkostr@kmtn.ru
web-site http://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Creation of the complete wood processing
Target of the project
complex
Basic products (usage) House assembly
Production capacity Up to 180 000 m3 per year
Trade area CFD regions
Main competitors CFD productions
Financial aspects Project total cost 900 million RUR
Direct investments, equipment delivery,
Forms of investment long-term partnership, share in building
NPV 247,9 million RUR
DPB 5 years
Planning period 7 years
IRR 24,7%
Additional information Estimated annual cutting area volume
– 175 000 m3
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
67. Creation of the modern wasteless timber processing production
Project name
in the Kostroma region
Location of the project subject of the Russian Federation Kostroma region
realization
municipality Vokhma municipal district
Project coordinator Name Forestry department of the Kostroma region
Postal address 128a, Mira avenue,156013 Kostroma
Telephone 007(4942) 55-36-21
Fax 007(4942)55-80-32
e-mail address upkostr@kmtn.ru
web-site http://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Target of the project Competitive production output
Squared beam
Basic products (usage) Board
Pellet
72 000 m3 of lumber
Production capacity
72 000 m3 of pellets
Trade area Russian Federation
Main competitors Far off
Financial aspects Project total cost 900 million RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
NPV 268,8 million RUR
DPB 3,7 years
Planning period 6 years
IRR 53,9 %
Additional information Estimated annual cutting area volume
– 180 000 m3
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
68. Creation of the production of furniture workpieces made out of birch in the
Project name
Kostroma region
Location of the project subject of the Russian Federation Kostroma region
realization
municipality Shar`ja municipal district
Project coordinator
Name Forestry department of the Kostroma region
Postal address 128a, Mira avenue,156013 Kostroma
Telephone 007(4942) 55-36-21
Fax 007(4942)55-80-32
e-mail address upkostr@kmtn.ru
web-site http://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Organization of the furniture components
Target of the project
production
Furniture plates
Basic products (usage)
Wood chips
40 000 m3 of ready goods
Production capacity
80 000 m3 of chips
Trade area Russian Federation, EU countries
Main competitors Far off
Financial aspects Project total cost 1,5 billion RUR
Direct investments, equipment delivery,
Forms of investment long-term partnership, share in building
NPV 122,6 million RUR
DPB 7 years
Planning period 10 years
IRR 28,4 %
Additional information Estimated annual cutting area volume
– 160 000 m3
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
69. Construction of the plant producing granulated timber-fuel (pellets) and
Project name
lumber in the Kostroma region
Location of the project Subject of the Russian Federation Kostroma region
realization municipality Galich municipal district
Project coordinator Forestry department of the Kostroma
Name
region
Postal address 128a, Mira avenue,156013 Kostroma
Telephone 007(4942) 55-36-21
Fax 007(4942)55-80-32
e-mail address upkostr@kmtn.ru
web-site http://www.kostroma-depleshoz.ru
Project description Sector Deep wood processing
Organization of the production of the
Target of the project
innovative goods - pellets
Lumber
Basic products (usage)
Pellets
120 000 m3 of lumber
Production capacity
140 000 m3 of pellets
Trade area Russian Federation, EU countries
Main competitors CFD productions
Financial aspects Project total cost 2 billion RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
NPV 396 million RUR
DPB 6 years
Planning period 8 years
IRR 27,6 %
Additional information Estimated annual cutting area
volume – 200 000 m3
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
70. EXTRACTION AND PROCESSIING OF MINERAL RESOURCES
Project name Construction of the ferrosilicon plant in the Kostroma region
Location of the project Subject of the Russian Federation Kostroma region
realization
municipality Bui municipal district
Project coordinator The department of natural resources and
Name environmental protection of the Kostroma
region
Postal address 128a, Mira avenue,156013 Kostroma
Telephone 007(4942) 55-36-21
Fax 007(4942)55-80-32
e-mail address Dpr44@bk.ru
web-site http://www.dpr44.ru
Project description Extraction and processing of mineral
Sector
resources
Creation of the ferrosilicon production – the
Target of the project
first one in the European part of Russia
Basic products (usage) Ferrosilicon FS75
Production capacity 20 000 ton
Trade area European Russian iron and steel plants
Main competitors Far off
Financial aspects Project total cost 4 020 million RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
NPV 128,7 million RUR
DPB 5,9 years
Planning period 9 years
IRR 9,2 %
Additional information Estimated annual cutting area volume
High-silica sand deposits – 40 million ton
– 169 000 m3
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
71. Extraction and processing of sapropel at the deposit “Galichskoe”
Project name
in the Kostroma region
Location of the project subject of the Russian Federation Kostroma region
realization
municipality Galich municipal district
Project coordinator The department of natural resources and
Name environmental protection of the Kostroma
region
Postal address 128a, Mira avenue,156013 Kostroma
Telephone 007(4942) 55-36-21
Fax 007(4942)55-80-32
e-mail address Dpr44@bk.ru
web-site http://www.dpr44.ru
Project description Extraction and processing of mineral
Sector
resources
Organization of the extraction and
Target of the project processing of sapropel, construction of the
processing plant
Farming, municipal engineering, chemical
Basic products (usage)
and pharmaceutical industries, other
Production capacity 10 000 ton
Trade area Russia, CNI and foreign countries
Main competitors Producers of chemical fertilizer
Financial aspects Project total cost 580 million RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
NPV 193,3 million RUR
DPB 7,5 years
Planning period 10 years
IRR 26,8 %
Additional information Estimated sapropel deposit of the The capacity of sapropel deposition is about
Galichskoe Lake – 258 195 000 ton 12,0 m with average index of 5,73 m
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
72. Peat extraction at the deposits “Kremnevo”, “Chapyzhnoe”, “Petrovskoe”
Project name
and construction of the peat pellet plantin the Kostroma region
Location of the project subject of the Russian Federation Kostroma region
realization
municipality Pyschug municipal district
Project coordinator The department of natural resources and
Name environmental protection of the Kostroma
region
Postal address 128a, Mira avenue,156013 Kostroma
Telephone 007(4942) 55-36-21
Fax 007(4942)55-80-32
e-mail address dpr44@bk.ru
web-site http://www.dpr44.ru
Project description Extraction and processing of mineral
Sector
resources
Increase of local fuel assortment in the fuel
Target of the project
balance of the Kostroma region
Peat pellet
Basic products (usage) Milled peat
Farming peat
Production capacity 50 000 ton
Trade area Russia
Main competitors Far off
Financial aspects Project total cost 100 million RUR
Forms of investment Direct investments, equipment delivery,
long-term partnership, share in building
NPV 45,5 million RUR
DPB 5,5 years
Planning period 8 years
IRR 22,8 %
Additional information Estimated peat deposits - 7,7 million
ton
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
73. AGRICULTURAL SECTOR
Project name Creation of the dairy farm for 1200 heads
Location of the project subject of the Russian Federation Kostroma region
realization municipality Susanino municipal district
Project coordinator The department of the agricultural sector of
Name
the Kostroma region
Postal address 37, Marshala Novikova Street,156602
Telephone Kostroma
Fax 007(4942) 55-16-31
e-mail address papk@kos-obl.kmtn.ru
web-site http://www.apkkostroma.ru
Project description Sector Agricultural sector
Target of the project Increase of heavy beasts livestock
Milk,
Basic products (usage)
Milk products
Production capacity 9,6 thousand ton
Trade area Russia
Main competitors Far off
Financial aspects Project total cost 534,6 million RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
NPV 5,96 million RUR
DPB 6 years
Planning period 8 years
IRR 10,72 %
Additional information The land lot area – 3 600 ha
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
74. BUILDING
Project name Construction of the housing estate “Agashkina Gora”
Location of the project subject of the Russian Federation Kostroma region
realization
municipality Kostroma
Project coordinator Name The building, architecture and urban
planning department of the Kostroma region
Postal address 17, Sennaya Street,156602 Kostroma
Telephone 007(4942) 31-28-12
Fax 007(4942)47-10-94
e-mail address depstroy@kmtn.ru
web-site http://www.depstroyko.ru
Project description Sector Building
Creation of the up-to-date residential
Target of the project
complex
Living area 121 000 m3
Flats number 2 190
Main competitors Building companies of Kostroma
Financial aspects Project total cost 5 569,5 million RUR
Forms of investment Direct investments, share in building
NPV 149,9 million RUR
DPB 3,3 years
Planning period 4 years
IRR 6,04 %
Additional information The land lot area 23,6 ha
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
75. Project name Construction of the cement plant, annual capacity - 2,7 million ton
Location of the project Subject of the Russian Federation Kostroma region
realization
municipality Susanino municipal district
Project coordinator The building, architecture and urban
Name
planning department of the Kostroma region
Postal address 17, Sennaya Street,156602 Kostroma
Telephone 007(4942) 31-28-12
Fax 007(4942)47-10-94
e-mail address depstroy@kmtn.ru
web-site http://www.depstroyko.ru
Project description Sector Building materials production
Target of the project
Creation of the modern industrial production
Basic products Cement
Production capacity 2,7 million ton
Trade area Russia
Main competitors Far off
Financial aspects Project total cost 14,8 billion RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
NPV 3,4 billion RUR
DPB 5 years
Planning period 12 years
IRR 16,3 %
Additional information For the project implementation
it is possible to use Bedinskoe
deposit
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
76. PROCESSING INDUSTRY
Project name Creation of the energy-efficient lamps production
Location of the project Subject of the Russian Federation Kostroma region
realization
municipality Nerekhta and Nerekhta municipal district
Project coordinator Body of investment and industrial policy of
Name
the Kostroma region
Postal address 15, Dzerzhinskogo Street,156006 Kostroma
Telephone 007(4942) 31-20-01
Fax 007(4942) 31-87-33
e-mail address spi.kostroma@yandex.ru
Project description Sector Industrial production
Creation of the production for output of the
Target of the project advanced technology products – energy-
efficient lamps
Basic products Energy-efficient lamps
Production capacity 28 million pcs
Trade area Russia
Main competitors Low-quality products from Asia
Financial aspects Project total cost 2 billion RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
NPV 2 164,7 million RUR
DPB 4,9 years
Planning period 7 years
IRR 31,8 %
Additional information There is a possibility of OAO ROSNANO
Land lot area of the plant – 20 ha
partnership
Contact data Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Email address spi@kostroma@yandex.ru
77. ENERGY
Project name Construction of the building block boiler rooms
Location of the project Subject of the Russian Federation Kostroma region
realization municipality
Name The department of the fuel-energy complex
and tariff policy of the Kostroma region
Project coordinator Postal address 129G, Sverdlova Street,156029 Kostroma
Telephone 007(4942) 31-52-13
Fax 007(4942) 37-34-01
e-mail address rst@kostroma-net.ru
web-site http://tektarif.ru
Sector Heat power engineering
Creation of the modern system of the heat
Target of the project
supply
Heat energy
Project description Basic products
Hot water
Production capacity 35 000 Hkal
Trade area Kostroma region
Main competitors Absent
Project total cost 100 million RUR
Direct investments, equipment delivery,
Forms of investment
long-term partnership, share in building
Financial aspects NPV 8,5 million RUR
DPB 5 years
Planning period 7 years
IRR 16,28 %
The project can be implemented
Additional information in the form of state-and-private
partnership
Tel.:/fax 007(4942) 31-20-01 / 31-87-33
Contact data
Email address spi@kostroma@yandex.ru
80. Kostroma
distance to:
Yaroslavl` (75 km)
Nizhnii Novgorod (300 km)
Ivanovo (100 km)
Moscow (345 km)
Vologda (280 km)
81. Land lot
in Moskovskaya Str., No.105
close to OAO “Motordetal” (Kostroma)
Area - 137,0 ha
Transport availability
Distance to:
• Motorway Kostroma-Yaroslavl`– 10 m;
• 3,342 km of railway crosses the land lot.
Civil engineering infrastructure avaliability
• Power supply - own step-down substation for 220/110/10 kW with the
capacity reserve of 20 MVt;
• Total consumption - 191,88 MVA;
• Gas supply – from distributing net of Kostroma city. Free gas capaci-
ties – 1000 m3/h;
• Heat supply – own boiling room with the water heating (4PTVM 50) and
steam (2DKVP 20/13 – DKVP 10/13) boilers.
Released energy – 75 Hkal/h with reserve of 50 Hkal/h.
Total capacity in delivery water – 200 Hkal/h, in steam – 10 ton/h;
81
82.
83. • Water supply – water is delivered from the Volga and from the arte-
sian wells. Household water supply –up to 100 m3/h, total debit – 250
m3/h, free capacities – up to 100 m3/h. Water recycling is provided
by 5 water-cooling towers with capacity of 1300 and 1200 m3/h.
Free capacity – up to 500 m3/h;
• Water drain – water escape is performed via city collector in volume
of 150 m3/h;
• Water treatment – buffer pool equipped with the aeration system,
through load – 900 m3/year. Sewerage system – crosses the land lot;
• Neutralization system:
- Coolant drain – 20 000 m3/year;
- Acid-based substance drain – 100 000 m3/year;
- Chrome-containing drain – 36 000 m3/year.
Land lot usage
Placement of the industrial objects.
83
84.
85. Industrial park is a territory of the former machine building plant
possessing up-to-date engineering buildings outfit with the latest in
technical equipment and united by the joint infrastructure and service
system.
Industrial park specializes in: automobile components
production.
Industrial park potential participants:
• companies organizing new productions;
• companies interested in relocation of their productions to the
regions with the higher competitive conditions;
• foreign companies planning to create their production in
Russia.
Industrial park proposes the unique conditions for the favorable
location of the residents` production.
Basic advantages:
• free connection to the power supply system;
• free capacity of gas;
• tax remissions for residents;
• low costs for land and property;
• own heat power produced by the boiler house.
85
86. CONTACTS
Body of Investment and Industrial policy of Kostroma region
Telephone: +7(4942) 31-20-01
Administration
Telephone: +7 (4942) 620-519
Kostroma region economic development department
Fax: +7 (4942) 620-536
Telephone: +7 (4942) 55-16-31
Kostroma region agricultural sector department
Fax: +7 (4942) 45-65-41
Telephone: +7 (4942) 55-33-02
Kostroma region forestry department
Fax: +7(4942) 55-80-32
Kostroma region natural resources and environmental Telephone: +7 (4942) 45-01-10
protection department Fax: +7 (4942) 51-35-91
Telephone: +7 (4942)45-65-66
Kostroma region property and land relation department
Fax: +7 (4942) 45-78-50
Kostroma region building, architecture and urban planning Telephone: +7 (4942)31-76-30
department Tel/fax: +7 (4942) 31-28-12
Kostroma region fuel and energy sector and tariff policy Telephone: +7 (4942)31-52-13
department Fax: +7 (4942) 37-34-01
Telephone: +7 (4942) 31-44-86
Kostroma region housing and communal services department
Fax: +7 (4942) 37-17-32
87. ADDITIONAL INFORMATION
In case you have not find the information you are looking for in this booklet and if you have any offers for cooperation with
the Kostroma region Administration, we ask you to fill in the following application form and send it to our e-mail address:
spi.kostroma@yandex.ru.
This form can be found as well at the Kostroma region authority portal: www.adm44.ru.
1 Investor
2 Investment project name
Necessary resources, namely:
Land lot area
Civil engineering infrastructure with
3 the capacity indication (electricity, gas,
water)
railway, motorway
other resources (nature, forest etc.)
Preferable location of the industrial
4 site (city/town, region, distance to the
regional or district centre)
5 Other conditions
6 Contacts
88. Kostroma region Administration
15, Dzerzhinskogo Street 156013 Kostroma
Tel.: +7 (4942) 31 34 72
www.adm44.ru
Body of Investment and Industrial policy
of Kostroma region Administration
15, Dzerzhinskogo Street 156013 Kostroma
Tel.: +7 (4942) 31 20 01