HDPE PIPE LAYING
The simplicity of laying pipes made fronr- HDPE

1. Trench
The trench should be nanow, but not less than 40 cm
(16 inches) wide and should be checked for depth and slope'
The bottom of

trench must be even and stonefree.

2. Bedding
ln normal soil the bedding should be of sand or gravel and

r'

15

cm (6 inches) thick. Stones in the graUel:must not be bigger
than 20 mm. (415 inches). It is not necessary to compact the
bedding.

3. Bottom supporting
When pipe is laid clearances are allowed for sockets and
flanges so that the pipe is supported along its whole iength.
The bottom supporting is compacted as shown in the diagram.

It is important that the supporting is finn and even along whole
length of pipe, otherwse the pipe could be darnaged. lf more

than one pipe is being iaid in the trench the initial backfill for

the lower pipes must be compacted 6efore the next layer of
pipes is laid.Check the pipe for slope and alignment.
ww t#,j:-,

C

,,,:.:,.,:;r,:=,;:,1

::: ;:::1,,,

4-lnitial_ Bagkfill
The initial backfill should be made in 10 cm (4 inches) thick
layers using sand or gravel and compacted as illustrated in the

diagram. lf a machine is used for compacting it should be light
and easy to handle and care should be taken that the machine
does not contact the top of the pipe.Compact to a 90% Proctor

density.

lt is this initial backfill that supports the pipe

and

protects if from deformation so that compacting must be carried
out carefully by tamping on each side of the pipe altemately. lt
is important that gravel size should.not be greater than 20 mm.
(4/5 inches)diameter.

5, Prp.tecjive
.. Use

Fl|Jir.rg

the same

s'

described'for the initial backfill.
,'B-

It is essential that thbre are no large stones in this fill as they
can cause point stresses on the pipe and damage it. protective
filling should be 30 cm. (t foot) thick and tamping with a heavy
machine on top of the pipe should be avoided. lf ground water

flows into the trench during ihis operation increase the speed of
filling or the or the pipe wilt ftoat

6.

Final. Backfill

complete the filling of the temch with the excavated materiar
evenly distributing the stones through out ihe fill. compact to
minimum

of g0% Proclor density. Foilow the

building instructions. The pipelaid will need
maintenance.

recommended

a

minimum of

Li;-

Contenu connexe

Tendances

Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & AbandonmentStatoil
 
Penetrating snow guard installation
Penetrating snow guard installationPenetrating snow guard installation
Penetrating snow guard installationRoofers World
 
Well abandonment process procedures
Well abandonment process proceduresWell abandonment process procedures
Well abandonment process proceduresDrilling Manual
 
Sonia Enterprises, Bahadurgarh, Kitchen and Wardrobe Accessories
Sonia Enterprises, Bahadurgarh, Kitchen and Wardrobe AccessoriesSonia Enterprises, Bahadurgarh, Kitchen and Wardrobe Accessories
Sonia Enterprises, Bahadurgarh, Kitchen and Wardrobe AccessoriesIndiaMART InterMESH Limited
 
A Guide To Internal Lime Plastering
A Guide To Internal Lime PlasteringA Guide To Internal Lime Plastering
A Guide To Internal Lime PlasteringThe WDS Group
 
Consistency test,Initial & Final setting time of Hydraulic Cement specimen
Consistency test,Initial & Final setting time of Hydraulic Cement specimenConsistency test,Initial & Final setting time of Hydraulic Cement specimen
Consistency test,Initial & Final setting time of Hydraulic Cement specimenMUST,Mirpur AJK,Pakistan
 

Tendances (10)

Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
Penetrating snow guard installation
Penetrating snow guard installationPenetrating snow guard installation
Penetrating snow guard installation
 
OCHAI 002
OCHAI 002OCHAI 002
OCHAI 002
 
Well abandonment process procedures
Well abandonment process proceduresWell abandonment process procedures
Well abandonment process procedures
 
Sonia Enterprises, Bahadurgarh, Kitchen and Wardrobe Accessories
Sonia Enterprises, Bahadurgarh, Kitchen and Wardrobe AccessoriesSonia Enterprises, Bahadurgarh, Kitchen and Wardrobe Accessories
Sonia Enterprises, Bahadurgarh, Kitchen and Wardrobe Accessories
 
2004 0824 Mt
2004 0824 Mt2004 0824 Mt
2004 0824 Mt
 
Normal consistency test
Normal consistency testNormal consistency test
Normal consistency test
 
Replace broken tiles
Replace broken tilesReplace broken tiles
Replace broken tiles
 
A Guide To Internal Lime Plastering
A Guide To Internal Lime PlasteringA Guide To Internal Lime Plastering
A Guide To Internal Lime Plastering
 
Consistency test,Initial & Final setting time of Hydraulic Cement specimen
Consistency test,Initial & Final setting time of Hydraulic Cement specimenConsistency test,Initial & Final setting time of Hydraulic Cement specimen
Consistency test,Initial & Final setting time of Hydraulic Cement specimen
 

En vedette

Laying Pipe with Transmogrifier
Laying Pipe with TransmogrifierLaying Pipe with Transmogrifier
Laying Pipe with TransmogrifierClayton Parker
 
Handbook of laying pipe sp57
Handbook of laying pipe sp57Handbook of laying pipe sp57
Handbook of laying pipe sp57Yogesh Nema
 
Week 9 slides growth&business cycle [core]
Week 9 slides  growth&business cycle [core]Week 9 slides  growth&business cycle [core]
Week 9 slides growth&business cycle [core]Nicooooleeee
 
Google Earth Basics
Google Earth BasicsGoogle Earth Basics
Google Earth Basicsteedawg12
 
Ms for-mechanical-piping-system-installation-work
Ms for-mechanical-piping-system-installation-workMs for-mechanical-piping-system-installation-work
Ms for-mechanical-piping-system-installation-workthanhuce
 
Introduction ot AutoCAD 2017
Introduction ot AutoCAD 2017Introduction ot AutoCAD 2017
Introduction ot AutoCAD 2017Mazhar Syed
 
PPI Webinar | Whats New in AutoCAD 2017
PPI Webinar | Whats New in AutoCAD 2017PPI Webinar | Whats New in AutoCAD 2017
PPI Webinar | Whats New in AutoCAD 2017Wendy Finch
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping worksSurya Kant
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboAnton Ricalovskis
 
Arc gis introduction-ppt
Arc gis introduction-pptArc gis introduction-ppt
Arc gis introduction-pptAshok Peddi
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methodsriyasood003
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment PlantDhruvin Patel
 
Water Treatment Plant Design project
Water Treatment Plant Design projectWater Treatment Plant Design project
Water Treatment Plant Design projectchris30277
 
Cold water supply and pipe sizing
Cold water supply and pipe sizingCold water supply and pipe sizing
Cold water supply and pipe sizingHumphrey Samati
 

En vedette (20)

Laying Pipe with Transmogrifier
Laying Pipe with TransmogrifierLaying Pipe with Transmogrifier
Laying Pipe with Transmogrifier
 
Handbook of laying pipe sp57
Handbook of laying pipe sp57Handbook of laying pipe sp57
Handbook of laying pipe sp57
 
HDPE Pipe
HDPE PipeHDPE Pipe
HDPE Pipe
 
Week 9 slides growth&business cycle [core]
Week 9 slides  growth&business cycle [core]Week 9 slides  growth&business cycle [core]
Week 9 slides growth&business cycle [core]
 
Google Earth Basics
Google Earth BasicsGoogle Earth Basics
Google Earth Basics
 
Ms for-mechanical-piping-system-installation-work
Ms for-mechanical-piping-system-installation-workMs for-mechanical-piping-system-installation-work
Ms for-mechanical-piping-system-installation-work
 
Introduction ot AutoCAD 2017
Introduction ot AutoCAD 2017Introduction ot AutoCAD 2017
Introduction ot AutoCAD 2017
 
PPI Webinar | Whats New in AutoCAD 2017
PPI Webinar | Whats New in AutoCAD 2017PPI Webinar | Whats New in AutoCAD 2017
PPI Webinar | Whats New in AutoCAD 2017
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in Colombo
 
Arc gis introduction-ppt
Arc gis introduction-pptArc gis introduction-ppt
Arc gis introduction-ppt
 
Cotter Joint
Cotter JointCotter Joint
Cotter Joint
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methods
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment Plant
 
Water supply
Water supplyWater supply
Water supply
 
Cable and laying
Cable and layingCable and laying
Cable and laying
 
Water treatment plant design
Water treatment plant designWater treatment plant design
Water treatment plant design
 
Water Treatment Plant Design project
Water Treatment Plant Design projectWater Treatment Plant Design project
Water Treatment Plant Design project
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment Plant
 
Cold water supply and pipe sizing
Cold water supply and pipe sizingCold water supply and pipe sizing
Cold water supply and pipe sizing
 

Similaire à Hdpe pipe laying วิธีฝักกลบท่อ hdpe

Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipessathyan s
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewersathyan s
 
Item 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm DrainsItem 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm DrainsKing Angco
 
Road bridge & railway construction pdf
Road bridge & railway construction pdfRoad bridge & railway construction pdf
Road bridge & railway construction pdfSaqib Imran
 
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTUVATSAL PATEL
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptxssuser480182
 
Swe l-8-earthen channels and under ground pipe line
Swe l-8-earthen channels and under ground pipe lineSwe l-8-earthen channels and under ground pipe line
Swe l-8-earthen channels and under ground pipe lineHARI NUNAVATH
 
Raod side ditches
Raod side ditchesRaod side ditches
Raod side ditchesamanullahk
 
Well completion.
Well completion.Well completion.
Well completion.Mawa James
 
The Glockemann Ram Pump: Site and Installation Guide
The Glockemann Ram Pump: Site and Installation GuideThe Glockemann Ram Pump: Site and Installation Guide
The Glockemann Ram Pump: Site and Installation GuideFifi62z
 

Similaire à Hdpe pipe laying วิธีฝักกลบท่อ hdpe (20)

PIPE LAYING
PIPE LAYINGPIPE LAYING
PIPE LAYING
 
Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipes
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Gwe paper material
Gwe paper materialGwe paper material
Gwe paper material
 
Grp installation procedure
Grp installation procedureGrp installation procedure
Grp installation procedure
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
 
Item 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm DrainsItem 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm Drains
 
Sewer appertunces
Sewer appertuncesSewer appertunces
Sewer appertunces
 
Road bridge & railway construction pdf
Road bridge & railway construction pdfRoad bridge & railway construction pdf
Road bridge & railway construction pdf
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
Dewatering
DewateringDewatering
Dewatering
 
Swe l-8-earthen channels and under ground pipe line
Swe l-8-earthen channels and under ground pipe lineSwe l-8-earthen channels and under ground pipe line
Swe l-8-earthen channels and under ground pipe line
 
Compaction grouting hassan
Compaction  grouting hassanCompaction  grouting hassan
Compaction grouting hassan
 
Raod side ditches
Raod side ditchesRaod side ditches
Raod side ditches
 
Well completion.
Well completion.Well completion.
Well completion.
 
The Glockemann Ram Pump: Site and Installation Guide
The Glockemann Ram Pump: Site and Installation GuideThe Glockemann Ram Pump: Site and Installation Guide
The Glockemann Ram Pump: Site and Installation Guide
 
Method Statement D Wall
Method Statement D WallMethod Statement D Wall
Method Statement D Wall
 
Work check list
Work check listWork check list
Work check list
 

Plus de ไทยเอเชีย บริหารขาย

Plus de ไทยเอเชีย บริหารขาย (20)

เลขที่บัญชีไทยเอเซีย
เลขที่บัญชีไทยเอเซียเลขที่บัญชีไทยเอเซีย
เลขที่บัญชีไทยเอเซีย
 
เลขที่บัญชี ไทย เอเซียฯ
เลขที่บัญชี ไทย เอเซียฯเลขที่บัญชี ไทย เอเซียฯ
เลขที่บัญชี ไทย เอเซียฯ
 
ภพ20และหนังสือรับรอง
ภพ20และหนังสือรับรองภพ20และหนังสือรับรอง
ภพ20และหนังสือรับรอง
 
แค๊ทตาล๊อค Approve ท่อน้ำ v2
แค๊ทตาล๊อค Approve ท่อน้ำ v2แค๊ทตาล๊อค Approve ท่อน้ำ v2
แค๊ทตาล๊อค Approve ท่อน้ำ v2
 
ค่าแรงเชื่อมท่อและสตับเอ็น
ค่าแรงเชื่อมท่อและสตับเอ็นค่าแรงเชื่อมท่อและสตับเอ็น
ค่าแรงเชื่อมท่อและสตับเอ็น
 
ข้อกำหนด มอก.982 2548 ตัวต้นฉบับ
ข้อกำหนด มอก.982 2548 ตัวต้นฉบับข้อกำหนด มอก.982 2548 ตัวต้นฉบับ
ข้อกำหนด มอก.982 2548 ตัวต้นฉบับ
 
Weilding machine by tap
Weilding machine by tapWeilding machine by tap
Weilding machine by tap
 
Technical information
Technical informationTechnical information
Technical information
 
Tap welding guideline_english
Tap welding guideline_englishTap welding guideline_english
Tap welding guideline_english
 
Tap company profile english
Tap company profile englishTap company profile english
Tap company profile english
 
Support structure for hdpe
Support structure for hdpeSupport structure for hdpe
Support structure for hdpe
 
Standard sfs for site test butt fusion welding
Standard sfs for site test butt fusion weldingStandard sfs for site test butt fusion welding
Standard sfs for site test butt fusion welding
 
Standard dvs for butt fusion welding 2
Standard dvs for butt fusion welding 2Standard dvs for butt fusion welding 2
Standard dvs for butt fusion welding 2
 
Standard dvs for butt fusion welding
Standard dvs for butt fusion weldingStandard dvs for butt fusion welding
Standard dvs for butt fusion welding
 
Safetyfactor pe80
Safetyfactor pe80Safetyfactor pe80
Safetyfactor pe80
 
Safety factor pe100
Safety factor pe100Safety factor pe100
Safety factor pe100
 
Safety factor pe80
Safety factor pe80Safety factor pe80
Safety factor pe80
 
Quality control by tap
Quality control by tapQuality control by tap
Quality control by tap
 
Products cataloque tap
Products cataloque tapProducts cataloque tap
Products cataloque tap
 
Pipe friction nomogram (loss)
Pipe friction nomogram (loss)Pipe friction nomogram (loss)
Pipe friction nomogram (loss)
 

Hdpe pipe laying วิธีฝักกลบท่อ hdpe

  • 2. The simplicity of laying pipes made fronr- HDPE 1. Trench The trench should be nanow, but not less than 40 cm (16 inches) wide and should be checked for depth and slope' The bottom of trench must be even and stonefree. 2. Bedding ln normal soil the bedding should be of sand or gravel and r' 15 cm (6 inches) thick. Stones in the graUel:must not be bigger than 20 mm. (415 inches). It is not necessary to compact the bedding. 3. Bottom supporting When pipe is laid clearances are allowed for sockets and flanges so that the pipe is supported along its whole iength. The bottom supporting is compacted as shown in the diagram. It is important that the supporting is finn and even along whole length of pipe, otherwse the pipe could be darnaged. lf more than one pipe is being iaid in the trench the initial backfill for the lower pipes must be compacted 6efore the next layer of pipes is laid.Check the pipe for slope and alignment.
  • 3. ww t#,j:-, C ,,,:.:,.,:;r,:=,;:,1 ::: ;:::1,,, 4-lnitial_ Bagkfill The initial backfill should be made in 10 cm (4 inches) thick layers using sand or gravel and compacted as illustrated in the diagram. lf a machine is used for compacting it should be light and easy to handle and care should be taken that the machine does not contact the top of the pipe.Compact to a 90% Proctor density. lt is this initial backfill that supports the pipe and protects if from deformation so that compacting must be carried out carefully by tamping on each side of the pipe altemately. lt is important that gravel size should.not be greater than 20 mm. (4/5 inches)diameter. 5, Prp.tecjive .. Use Fl|Jir.rg the same s' described'for the initial backfill. ,'B- It is essential that thbre are no large stones in this fill as they can cause point stresses on the pipe and damage it. protective filling should be 30 cm. (t foot) thick and tamping with a heavy machine on top of the pipe should be avoided. lf ground water flows into the trench during ihis operation increase the speed of filling or the or the pipe wilt ftoat 6. Final. Backfill complete the filling of the temch with the excavated materiar evenly distributing the stones through out ihe fill. compact to minimum of g0% Proclor density. Foilow the building instructions. The pipelaid will need maintenance. recommended a minimum of Li;-