2. Agar Prinsip Pertambangan dapat berjalan dengan baik, perlu pengawasan oleh Inspektur Tambang/IT secara rutin/berkala IT DJMBPB IT Kab/Kota IT Provinsi Perusahaan Pertambangan - Andal, RKP/RPL - RTKPL - Tata Ruang, RUTR - Baku Mutu - Status/peruntukan lahan Eksploitasi Produksi Pasca Tambang/ Mine Clossure
3.
4.
5.
6. DISAIN PANEL UJI COBA PENGELOLAAN BATUAN PAF Red Overburden (PAF) NAG : > 35 kg H 2 SO 4 /ton Blue Overburden (PAF) NAG : 1 – 35 kg H 2 SO 4 /ton Blended Limestone and Blue Overburden (1:3) Stacker 20 m 80 m 60 m Stacker Layering by truck Direct Truck Dumping Intimate blending 1 2 3 4 5 6 7 8 Panel 1 – HDPE Cover Panel 2 – Control Panel 3 – Road Mud Cover Panel 4 – Weathered Overburden Panel 5/6 – Limestone Cover Panel 7/8 – Control