Choosing an OEM of process heat equipment can be challenging; we've created an 8 step project timeline, to give potential clients and idea of what it is like to work with Stelter & Brinck.
2. 1. Order Placement
• Order is placed
•Business terms are confirmed
•Process data is finalized
Stelter & Brinck
Since 1956
3. 2. Drawings Submitted
•Drawings and plans are given to customer for
approval
3. Approval
•AutoCad drawings are submitted to customer for
approval
Stelter & Brinck
Since 1956
5. 5. In-House Test Firing
• S&B can fire up to 30MM BTU/hr, fuel oil/natural
gas/propane testing
•Ability to mimic overseas power with in house
generator
•Testing firing includes an 81 point inspection
Stelter & Brinck
Since 1956
6. 6. Electronic Manuals Issued
•Manuals include start-up/shut down procedures and
a troubleshooting guide
7. Shipment
•Equipment is delivered on schedule
Stelter & Brinck
Since 1956
7. 8. Installation and Start-Up
•Stelter & Brinck’s service technicians
are able to install, start-up, and train
machine operators
Stelter & Brinck
Since 1956
8. Aftermarket
•Field Service- Technicians keep the equipment
operating at peak performance.
•Parts- Stelter & Brinck keep a wide variety of spare
parts in stock.
Stelter & Brinck
Since 1956
9. Thank you!
Stelter & Brinck
Since 1956