1. Overview of Watershed Assessment and Modeling Data
(A i WMT i f ti )(Accessing WMT information)
Hala Flores PE Richard FisherHala Flores, P.E Richard Fisher
Rapid Stream Assessment Protocolsp
Janis Markusic Christopher Victoria
Overview of SPSC Design Guidelines and Calculator
Hala Flores, P.E
HBAM Meetingeet g
February 28th, 2011
Ron Bowen, P.E.
2.
3. Anne Arundel County Stormwater Management Practices
and Procedures Manual
__________________________________________________
Chapter 11 Appendices 11.6
11 3 Li k t i d /i f ti
11 3 8 D t t f P bli W k t h d
11.3. Links to required resources/information
11.3.8. Department of Public Works watershed
management tool
htt // i ld t / /http://gis-world.aacounty.org/wers/
5. 2 000 estimated2 000 estimated milesmiles
Anne Arundel County
2,000 estimated2,000 estimated milesmiles
ofof nonnon--tidal waterwaystidal waterways
P i l (S d W l d )Perennial (Streams and Wetlands)
Ephemeral and Intermittent
Pond/Lake/Floodway
Other
6. BIOLOGICAL CONDITIONS
B hi I d f Bi iBenthic Index for Biotic
Integrity (BIBI) Score
Number of Samples - 376p
- 5%
- 23%Fair
Good
23%
- 49%
Fair
Poor
- 23%Very Poor
13. Stream Assessment Protocol: an
overviewoverview
Anne Arundel County
Department of Public WorksDepartment of Public Works
Bureau of Engineering
Watershed, Ecosystem, and Restoration Services
Ecological Assessment ProgramEcological Assessment Program
14. Introduction
• Regulatory Triggers
G l W h d Ch i i• General Watershed Characterization
– Land Use and Imperviousness
– Drainage Area and Bankfull Indicator Determination
G l St Ch t i ti• General Stream Characterization
– Rosgen Level II Classification (pebble count, slope determination,
valley type, etc.)
• Lateral Stability DeterminationLateral Stability Determination
– BEHI and NBS Evaluation
– Bank armoring and localized versus widespread issues
• Vertical Stability DeterminationVertical Stability Determination
– Incision Ratio
– Headcuts, control points, depositional features
• Overall Reach Stability Determinationy
– Includes a variety of trend and reach-level evaluations
15. Regulatory TriggersRegulatory Triggers
• The use of the Stream Assessment Protocol is triggered by a finding of an
“i d f ll” i h f d i i if O b k Fl d“inadequate outfall” in the context of determining if Overbank Flood
Protection is required due to the impact of a given development site.
• Once such an “inadequate outfall” finding is made, a downstream analysis
iis necessary.
• This method is applied only to a “…clearly defined open channel…”
(Section 7.2.2.D.II; Chapter 7, p. 7.4)
• The assessment reach comprises the channel from “…the outfall(s) from
the site and progress[es] to the Point(s) of Investigation (POI).” (Section
7.2, Chapter 7, p. 7.2)
• See the Procedures and Practices Manual for details on what constitutes an
adequate or inadequate outfall and on how to establish the POI.
16. This is a field-based assessment! You must leave the office to apply it correctly!
17. Watershed
Characterization
Standard Header Items
•Watershed Date DrainageWatershed, Date, Drainage
Area, etc.
Watershed Characterization
•Should be mostly an office
exercise
•Land use and land cover are
the primary items to
determine, both in the basin,
and adjacent to the reach of
interest
•DA calculation needed for
bankfull determinationbankfull determination
•Significant land uses that
may impact stream stability
conditions
18. Stream
Characterization and
Classification
•Rosgen Level II
Classification is basicClassification is basic
characterization
•Not discussed in detail here
•All standard work, all
found in Rosgen (1996):
Width, depth, slope, D50,
sinuosity, W/D ratio,
entrenchment, etc.
•Bankfull channel dimensions
using known regional
relationships developed by
others are necessary forothers are necessary for
Rosgen classification
20. …and they are easily used in a spreadsheet to
h h l h i icompute these channel characteristics.
21. Lateral Stability
DeterminationDetermination
•Lateral stability. What is it?
Side to side movement of stream
channel which is a function ofchannel, which is a function of
two major influences:
•A streambank’s characteristics
that make it resistant to erosion
•The work done on the bank of
interest related to the hydraulic
characteristics of the overall
channel (Near Bank Stress) Done on dominant bank( )
•How are these two opposing
forces evaluated? Using
Rosgen’s BEHI and NBS ratings
Done on dominant bank
within the assessment
reach.
If two bank types are
t d ll threpresented equally, the
higher BEHI and/or
NBS rating (i.e.—more
unstable) is used.)
23. Vertical Stabilityy
Determination
•Primary determination using
the Incision Ratiothe Incision Ratio
•Also used presence of the
following:
•Head Cuts
•Depositional Features
•Bed Control
•Taken together, these features
i i i h i i lgive insight into vertical
stability
27. Final Steps
• Using weight of evidence, a finding of
either 1) localized or widespread
i bili 2) bl di i iinstability or 2) stable conditions is
made for the assessment reach
• Report is produced for the assessment
h h d ib h bilireach that describes the stability
conditions observed
• Photodocumentation is a required
f hiaspect of this report
28. Links
Guidance Documents:
• Stream Assessment Protocols:
http://www aacounty org/DPW/Watershed/DownstreamAdequacyProtocols cfmhttp://www.aacounty.org/DPW/Watershed/DownstreamAdequacyProtocols.cfm
• Stormwater Practices and Procedures Manual:
http://www.aacounty.org/PlanZone/Resources/Practices_Procedures_Manual.pdf
GIS/M i Li kGIS/Mapping Links:
• AA County Watershed Mapping Application:
http://gis-world.aacounty.org/wers/
• GIS Hydro:
http://www.gishydro.umd.edu/ Information Links
• US Fish and Wildlife CBFO:US Fish and Wildlife CBFO:
http://www.fws.gov/chesapeakebay/stream.html
• DNR Rosgen Spreadsheets:
http://www.dnr.state.oh.us/soilandwater/water/streammorphology/default/tabid/9188/Defaulhttp://www.dnr.state.oh.us/soilandwater/water/streammorphology/default/tabid/9188/Defaul
t.aspx
29. SPSC – What are they?
SPSC are open-channel conveyance structures that
convert, through attenuation pools and a sand
seepage filter s rface storm flo to shalloseepage filter, surface storm flow to shallow
groundwater flow.
Wetland Seepage System
Perennial Application
Step Pool Storm Conveyance
Ephemeral Application
30. Types of BMPs
Pipe
Conveyance
i i
Receiving
Stream
Micro Practice
(Off-line)
Pipe
Conveyance
Receiving
Stream
Macro Practice
(On-line)
A shift in Paradigm
Receiving
SPSC
Conveyance
SPSC Integrated System
Receiving
Stream
31. A, ??
STEP POOL STORM CONVEYANCE FOR EPHEMERAL OUTFALLS
B, 32% The physical characteristics of the SPSC channel
are best characterized by the Rosgen A or B stream
classification types, where “bedform occurs as a
step/pool, cascading channel which often stores
large amounts of sediment in the pools associated
with debris dams” (Rosgen, 1996).
36. Harvesting the taming powers of the floodplain
Before Restoration – Rosgen G Channel
Any size floodplain bench is better
than a hardened wall
After Restoration – Rosgen B Channel
The larger and more accessible theThe larger and more accessible the
floodplain is, the more sustainable the
restoration
39. Undesired Consequences of Peak Detention
Potential Effect of Cumulative Detention Basins on Downstream Conditions
• Longer duration of higher flows
• Cumulative effect will increase peak discharge downstream
g g
40. Stormwater Management Best Management Practices
(BMPs)( )
SPSC
Infiltration Conditional on underlying soil conditionsInfiltration Conditional on underlying soil conditions
Filtration Sized for 100% CreditS ed o 00% C ed t
Wetland Creation Seepage berm designWetland Creation Seepage berm design
Wet Ponds Function of Seepage berm
design
Extended Detention Outflow is discharged as shallow
groundwater seeps
41. Implementation of SPSC Systems
1- As an outfall or stream retrofit techniqueq
2- As mitigation for development2 As mitigation for development
Structural BMP
Or
P t f th ESD T iPart of the ESD Train
42. Functional Components of Step Pool
Storm Conveyance (SPSC)
Functional Components of Step Pool
Storm Conveyance (SPSC)
Design Water Surface
Riffle Boulder Pools
Riffle Cobble
Sand/Wood Chip
Footer Boulders
Pools = 0% Slope
Geotextile
46. Mapping the SPSC Vertical Alignment
In the event that the proposed SPSC connects to an incised downstream channel, the elevation of the floodplain p p , p
terrace shall be used as the downstream elevation. An in‐stream weir design with a top of weir elevation set at the
floodplain terrace is required at the tie‐in location.
Notes and Preliminary Assumptions:
Maximum slope = 5%
Minimum length of pool = 12 ft
Maximum length of riffle = 10 ft
Depth of filter media is minimum 18 inches below the lowest structure
L pool
L Riffle
Depth of pool is minimum 18 inches
Un‐armored Pool side slopes shall be laid back at 3H:1V
Special attention to paid at the inflow and outflow tie in locations
Silica Cobbles
1 ft (typ.)
(12 ft min.)(10 ft max.)
Boulders
hf Typical
(18 in. min.)
In‐stream
Boulders
In‐stream 100 – Year floodplain may
inundate last SPSC structure
Sand/Wood Chip Mix
d ( ffl )d ( l) df (riffle)
Existing Ground
Filter Fabric
df (pool)
min 18 inches
Sand Mix “Sandbags from E&S
phase maybe left in place”
48. Design the typical cross‐section for the riffle/cascade
Design Criteria:Design Criteria:
‐ Conveyance shall be designed to address the 100‐year Peak Discharge
1959,
2
3
2
22
2
Chow
DW
RadiusHydraulic
SolutionalMathematic
WD
Area
=
=
,
83 22
DW
y
+
Q = (1.49/n) (A) (Rh)2/3 (S)1/2 Must be > or = Q 100
W (8 ft min.)
D
Where:
Q = 100 year ultimate flow (cfs)
1.49 = conversion factor
n = Manning’s n, determined by USDA, 2006 equation
A = cross‐section area of a riffle channel, which for a parabola = 2/3(W)(D),
Riffle Section through Boulder
2 x d50
n = D1/6/ (21.6 log (D/d50)+14), (USDA, 2006).
A cross section area of a riffle channel, which for a parabola 2/3(W)(D),
where W is top constructed width (ft) and D is the constructed depth (ft)
Rh = hydraulic radius (ft), calculated using Chow 1959 relationship for parabolas
S = average slope over entire length of project (ft/ft)
V = velocity in the riffle channel (ft/sec), V = Q/A
Riffle Section through Cobble
( g ( ) ) ( )
Where:
n = Manning’s n, use 0.05 for cascades.
D = depth of water in the riffle channel associated with unmanaged
100‐year Q design, ft.,
d50 = cobble size, ft
53. The pretreatment, recharge, and water quality sizing criteria presented in the Anne Arundel
C SPSC id li f ll l l h S f M l d’ i i f i l
Designing the water quality sand filter system
County SPSC guidelines follow closely the State of Maryland’s criteria for a typical stormwater
filtering device.
2000, MDECriteriaSizingFiltering
dxWQ
A
fv
f = 2000,
)(
MDECriteriaSizingFiltering
tdhK
A
fff
f
+
2 x d
W (8 ft min.)
D
hf (18 inch min.)
df (riffle)
Sand/Woodchip Mix
2 x d50
Df (18 in min.)
Wsand (2 ft min.)
Sand/Woodchip Mix
Pool Cross Section
df (pool)
18 inches min.
Riffle Weir Cross Section through Cobble
sand ( )
Silica Cobbles
L pool
(10 ft min.)(10 ft max.)
Boulders
hf Typical
L Riffle
In‐stream Boulders
Sand/Wood Chip Mix
1 ft (typ.)
hf Typical
(18 in. min.)
In‐stream 100 – Year floodplain may
inundate last SPSC structure
Typical Profile – Alternating Pools and Riffles
df (riffle)
Existing Ground
Filter Fabric
df (pool)
min 18 inches
Sand Mix “Sandbags from E&S
phase maybe left in place”
Footer boulder shall extend 6 inches below the lowest
point in the excavated pool
54. Checking Storage/Quantity Management
Th d SPSC ill ti f k t flThe proposed SPSC will satisfy peak management flow
requirements if two conditions are met:
a‐ First, adequate storage volume within the pools
and sand/woodchip voids shall be provided to meet
the required storage volume/quantity managementthe required storage volume/quantity management
for the project
b Second it must be demonstrated that the designb‐ Second, it must be demonstrated that the design
renders the hydraulic power equivalent to the
predevelopment/desired hydraulic power through
the proposed energy dissipation pools.
55. Checking Storage/Quantity Management
a‐ First, adequate storage volume within the pools and , q g p
sand/woodchip voids shall be provided to meet the required
storage volume/quantity management for the project
Vin = Qpost /Ain
Storage Volume in Pools
Design Water Surface Elevation
Din
Dout2
Dout3
Dout1
Driffle
L
out3
Df
Storage Volume in Voids
Df x L x Wsand x Porosity
Sand/Woodchip mix
Porosity = 30%
Df (Average filter bed area= (Driifle +Dpool)/2
59. SPSC – FAQ
What type of maintenance access is required for SPSC
systems?
The intend behind the vehicular access requirement is to allow the County access toThe intend behind the vehicular access requirement is to allow the County access to
public structures for routine maintenance and in the event of structural failure to
perform necessary fixes.
• Probability of future utilization of access road‐ Delicate balance
• Considering relaxing current policy of requiring vehicular access to all weirs to
requiring access to the any point throughout SPSC and existence of sufficient public
easement around the system to allow the County future access if needed.
61. Innovative Outfall &Innovative Outfall &
Stream RestorationStream Restoration
Riva 400Riva 400 -- Constructed in Dec 2009Constructed in Dec 2009
Techniques:Techniques:
Step Pool StormStep Pool Stormpp
Conveyance (SPSC)Conveyance (SPSC)
Riva 400 Before Restoration (2004)Riva 400 Before Restoration (2004)
ConveyanceConveyance
StabilityStability
HabitatHabitatHabitatHabitat
Water QualityWater Quality 61
62. Central Sanitation FacilityCentral Sanitation Facility
S h G l R iS h G l R i
Before RestorationBefore Restoration
Stretch Goal RequirementsStretch Goal Requirements
Public ProjectPublic Project
Drainage Area = 94 AcresDrainage Area = 94 Acres
Impervious Treated = 23 AcresImpervious Treated = 23 AcresImpervious Treated 23 AcresImpervious Treated 23 Acres
Total Project cost = $700,000Total Project cost = $700,000
After RestorationAfter Restoration
Length of Stream Restored = 0.5 milesLength of Stream Restored = 0.5 miles
Acres of Wetlands created =Acres of Wetlands created =
Project equivalent to 13,650 rainProject equivalent to 13,650 rainj q ,j q ,
barrels at $1,365,000barrels at $1,365,000
or 190 bioretention facilities, at theor 190 bioretention facilities, at the
cost of $20 000/each or $3 800 000cost of $20 000/each or $3 800 000
62
cost of $20,000/each or $3,800,000cost of $20,000/each or $3,800,000
63. Before RestorationBefore Restoration
Saefern Outfall RestorationSaefern Outfall Restoration
Steep Slope ApplicationSteep Slope Applicationp p ppp p pp
Community ProjectCommunity Project
After RestorationAfter Restoration
After RestorationAfter RestorationAfter RestorationAfter Restoration
63
70. Contact Information
Janis Markusic Christopher Victoria
Program Manager Environmental Scientist
pwmark02@aacounty.org pwvict16@aacounty.org
Anne Arundel County Department of Public Works
Watershed, Ecosystem, and Restoration Services
Ecological Assessment ProgramEcological Assessment Program
2662 Riva Road
Annapolis, Maryland 21401
410.222.4240410.222.4240
71. Contact Information
Hala Flores, P.E. Richard Fisher
Program Manager Environmental Scientist
Hala.flores@aacounty.org rfisher@aacounty.org
Anne Arundel County Department of Public Works
Watershed, Ecosystem, and Restoration Services
Ecological Assessment ProgramEcological Assessment Program
2662 Riva Road
Annapolis, Maryland 21401
410.222.4240410.222.4240