As per the Quickr Wiki ( http://www-10.lotus.com/ldd/lqwiki.nsf/dx/20052009045545WEBCGW.htm ):
"This document contains the presentation from Quickr masterclass covering planning optimal deployments – crawl/walk/run.
Discussing simplistic deployment architectures which can be linearily scaled over time (e.g. from POC to simple-non-clustered to clustered)
Sharing of key tips/recommendations from SVT and Perf - so as to help avoid expensive crit-sits in the field
Tuning for performance, stability and reliability"
Please note, I do not claim any ownership of this presentation, just am uploading to allow sharing via the Quickr Blog. Any questions/comments/issues, just let me know!
4. Planning is an essential step: If you Fail to Plan then Plan to Fail !!
5. Planning should be based on the intended short term use of the deployment and the possible future long term use of the system to avoid future performance and reliability issues and possible re-deployment at a later stage.
11. Detailed Hardware and Software requirements can be found at the url below, it is advisable to check these in detail during the planning stage: http://www-01.ibm.com/support/docview.wss?rs=3264&uid=swg27014510