Chapter 3:
Linear Programming
Modeling Applications

© 2007 Pearson Education
Linear Programming (LP) Can Be
Used for Many Managerial Decisions:
•
•
•
•
•
•
•

Product mix
Make-buy
Media selection
Marketing research
Portfolio selection
Shipping & transportation
Multiperiod scheduling
For a particular application we begin with
the problem scenario and data, then:
1) Define the decision variables
2) Formulate the LP model using the
decision variables
•
•

Write the objective function equation
Write each of the constraint equations

1) Implement the model in Excel
2) Solve with Excel’s Solver
Product Mix Problem:
Fifth Avenue Industries
• Produce 4 types of men's ties
• Use 3 materials (limited resources)
Decision: How many of each type of tie to
make per month?
Objective: Maximize profit
Resource Data

Material
Silk

Yards available
Cost per yard
per month
$20
1,000

Polyester

$6

2,000

Cotton

$9

1,250

Labor cost is $0.75 per tie
Product Data
Type of Tie
Silk
Selling Price

Polyester Blend 1 Blend 2

$6.70

$3.55

$4.31

$4.81

Monthly
Minimum

6,000

10,000

13,000

6,000

Monthly
Maximum

7,000

14,000

16,000

8,500

0.125

0.08

0.10

0.10

(per tie)

Total material
(yards per tie)
Material Requirements
(yards per tie)
Type of Tie
Material

Silk

Blend 1
Polyester
(50/50)

Blend 2
(30/70)

Silk

0.125

0

0

0

Polyester

0

0.08

0.05

0.03

Cotton

0

0

0.05

0.07

0.125

0.08

0.10

0.10

Total yards
Decision Variables
S = number of silk ties to make per month
P = number of polyester ties to make per
month
B1 = number of poly-cotton blend 1 ties to
make per month
B2 = number of poly-cotton blend 2 ties to
make per month
Profit Per Tie Calculation
Profit per tie =
(Selling price) – (material cost) –(labor cost)
Silk Tie
Profit = $6.70 – (0.125 yds)($20/yd) - $0.75
= $3.45 per tie
Objective Function (in $ of profit)
Max 3.45S + 2.32P + 2.81B1 + 3.25B2
Subject to the constraints:

Material Limitations (in yards)
0.125S

< 1,000 (silk)

0.08P + 0.05B1 + 0.03B2 < 2,000 (poly)
0.05B1 + 0.07B2

< 1,250 (cotton)
Min and Max Number of Ties to Make
6,000 < S < 7,000
10,000 < P < 14,000
13,000 < B1 < 16,000
6,000 < B2 < 8,500
Finally nonnegativity S, P, B1, B2 > 0
Go to file 3-1.xls
Media Selection Problem:
Win Big Gambling Club
• Promote gambling trips to the Bahamas
• Budget: $8,000 per week for advertising
• Use 4 types of advertising
Decision: How many ads of each type?
Objective: Maximize audience reached
Data
Advertising Options
Radio

Radio

TV Spot

Newspaper

(prime time)

(afternoon)

Audience
Reached
(per ad)

5,000

8,500

2,400

2,800

Cost
(per ad)

$800

$925

$290

$380

Max Ads
Per week

12

5

25

20
Other Restrictions
• Have at least 5 radio spots per week
• Spend no more than $1800 on radio
Decision Variables
T = number of TV spots per week
N = number of newspaper ads per week
P = number of prime time radio spots per
week
A = number of afternoon radio spots per week
Objective Function (in num. audience reached)
Max 5000T + 8500N + 2400P + 2800A
Subject to the constraints:

Budget is $8000
800T + 925N + 290P + 380A < 8000
At Least 5 Radio Spots per Week
P+A>5
No More Than $1800 per Week for Radio
290P + 380A < 1800
Max Number of Ads per Week

T < 12
N< 5
Finally nonnegativity

P < 25
A < 20
T, N, P, A > 0

Go to file 3-3.xls
Portfolio Selection:
International City Trust
Has $5 million to invest among 6 investments
Decision: How much to invest in each of 6
investment options?
Objective: Maximize interest earned
Data
Interest
Rate

Risk Score

Trade credits

7%

1.7

Corp. bonds

10%

1.2

Gold stocks

19%

3.7

Platinum stocks

12%

2.4

Mortgage securities

8%

2.0

Construction loans

14%

2.9

Investment
Constraints
• Invest up to $ 5 million
• No more than 25% into any one investment
• At least 30% into precious metals
• At least 45% into trade credits and
corporate bonds
• Limit overall risk to no more than 2.0
Decision Variables
T = $ invested in trade credit
B = $ invested in corporate bonds
G = $ invested gold stocks
P = $ invested in platinum stocks
M = $ invested in mortgage securities
C = $ invested in construction loans
Objective Function (in $ of interest earned)
Max 0.07T + 0.10B + 0.19G + 0.12P
+ 0.08M + 0.14C
Subject to the constraints:

Invest Up To $5 Million
T + B + G + P + M + C < 5,000,000
No More Than 25% Into Any One Investment
T < 0.25 (T + B + G + P + M + C)
B < 0.25 (T + B + G + P + M + C)
G < 0.25 (T + B + G + P + M + C)
P < 0.25 (T + B + G + P + M + C)
M < 0.25 (T + B + G + P + M + C)
C < 0.25 (T + B + G + P + M + C)
At Least 30% Into Precious Metals
G + P > 0.30 (T + B + G + P + M + C)
At Least 45% Into
Trade Credits And Corporate Bonds
T + B > 0.45 (T + B + G + P + M + C)
Limit Overall Risk To No More Than 2.0
Use a weighted average to calculate portfolio risk
1.7T + 1.2B + 3.7G + 2.4P + 2.0M + 2.9C < 2.0
T+B+G+P+M+C
OR
1.7T + 1.2B + 3.7G + 2.4P + 2.0M + 2.9C <
2.0 (T + B + G + P + M + C)
finally nonnegativity: T, B, G, P, M, C > 0
Go to file 3-5.xls
Labor Planning:
Hong Kong Bank
Number of tellers needed varies by time of day

Decision: How many tellers should begin
work at various times of the day?
Objective: Minimize personnel cost
Time Period
9 – 10
10 – 11
11 – 12

Min Num. Tellers
10
12
14

12 – 1
1–2
2-3
3–4
4–5

16
18
17
15
10

Total minimum daily requirement is 112 hours
Full Time Tellers
• Work from 9 AM – 5 PM
• Take a 1 hour lunch break, half at 11, the
other half at noon
• Cost $90 per day (salary & benefits)
• Currently only 12 are available
Part Time Tellers
• Work 4 consecutive hours (no lunch break)
• Can begin work at 9, 10, 11, noon, or 1
• Are paid $7 per hour ($28 per day)
• Part time teller hours cannot exceed 50%
of the day’s minimum
requirement
(50% of 112 hours = 56 hours)
Decision Variables
F = num. of full time tellers (all work 9–5)
P1 = num. of part time tellers who work 9–1
P2 = num. of part time tellers who work 10–2
P3 = num. of part time tellers who work 11–3
P4 = num. of part time tellers who work 12–4
P5 = num. of part time tellers who work 1–5
Objective Function (in $ of personnel cost)
Min 90 F + 28 (P1 + P2 + P3 + P4 + P5)
Subject to the constraints:

Part Time Hours Cannot Exceed 56 Hours
4 (P1 + P2 + P3 + P4 + P5) < 56
Minimum Num. Tellers Needed By Hour
Time of Day

F + P1
> 10
(9-10)
F + P 1 + P2
> 12
(10-11)
0.5 F + P1 + P2 + P3 > 14
(11-12)
0.5 F + P1 + P2 + P3+ P4 > 16 (12-1)
F + P 2 + P 3+ P 4 + P 5
> 18
(1-2)
F + P 3+ P 4 + P 5
> 17
(2-3)
F + P4 + P5
> 15
(3-4)
F + P5
> 10
(4-5)
Only 12 Full Time Tellers Available
F < 12
finally nonnegativity: F, P1, P2, P3, P4, P5 > 0
Go to file 3-6.xls
Vehicle Loading:
Goodman Shipping
How to load a truck subject to weight and
volume limitations
Decision: How much of each of 6 items to
load onto a truck?
Objective: Maximize the value shipped
Data
Item
1

2

3

4

5

6

Value $15,500 $14,400 $10,350 $14,525 $13,000 $9,625
Pounds

5000

4500

3000

3500

4000

3500

$ / lb

$3.10

$3.20

$3.45

$4.15

$3.25

$2.75

Cu. ft.
per lb

0.125

0.064

0.144

0.448

0.048

0.018
Decision Variables
Wi = number of pounds of item i to load onto
truck,
(where i = 1,…,6)
Truck Capacity
• 15,000 pounds
• 1,300 cubic feet
Objective Function (in $ of load value)
Max 3.10W1 + 3.20W2 + 3.45W3 + 4.15W4 +
3.25W5 + 2.75W6
Subject to the constraints:

Weight Limit Of 15,000 Pounds
W1 + W2 + W3 + W4 + W5 + W6 < 15,000
Volume Limit Of 1300 Cubic Feet
0.125W1 + 0.064W2 + 0.144W3 +
0.448W4 + 0.048W5 + 0.018W6 < 1300
Pounds of Each Item Available
W1 < 5000
W4 < 3500
W2 < 4500
W5 < 4000
W3 < 3000
W6 < 3500
Finally nonnegativity: Wi > 0, i=1,…,6
Go to file 3-7.xls
Blending Problem:
Whole Food Nutrition Center
Making a natural cereal that satisfies
minimum daily nutritional requirements
Decision: How much of each of 3 grains to
include in the cereal?
Objective: Minimize cost of a 2 ounce
serving of cereal
A
$ per pound

Grain
B

C

Minimum
$0.33 $0.47 $0.38
Daily
Requirement

Protein per
pound

22

28

21

3

Riboflavin per
pound

16

14

25

2

Phosphorus
per pound

8

7

9

1

Magnesium
per pound

5

0

6

0.425
Decision Variables
A = pounds of grain A to use
B = pounds of grain B to use
C = pounds of grain C to use

Note: grains will be blended to form a 2
ounce serving of cereal
Objective Function (in $ of cost)
Min 0.33A + 0.47B + 0.38C
Subject to the constraints:

Total Blend is 2 Ounces, or 0.125 Pounds
A + B + C = 0.125

(lbs)
Minimum Nutritional Requirements
22A + 28B + 21C > 3

(protein)

16A + 14B + 25C > 2

(riboflavin)

8A + 7B + 9C > 1

(phosphorus)

5A

+ 6C > 0.425 (magnesium)

Finally nonnegativity: A, B, C > 0
Go to file 3-9.xls
Multiperiod Scheduling:
Greenberg Motors
Need to schedule production of 2 electrical
motors for each of the next 4 months
Decision: How many of each type of motor
to make each month?
Objective: Minimize total production and
inventory cost
Decision Variables
PAt = number of motor A to produce in
month t (t=1,…,4)
PBt = number of motor B to produce in
month t (t=1,…,4)
IAt = inventory of motor A at end of
month t (t=1,…,4)
IBt = inventory of motor B at end of
month t (t=1,…,4)
Sales Demand Data
Motor
A
B

Month
1 (January)

800

1000

2 (February)

700

1200

3 (March)

1000 1400

4 (April)

1100 1400
Production Data
Motor
(values are per motor)
A
B
Production cost

$10

$6

Labor hours

1.3

0.9

• Production costs will be 10% higher in months
3 and 4
• Monthly labor hours most be between
2240 and 2560
Inventory Data
Motor
A
B
Inventory cost
$0.18 $0.13
(per motor per month)
Beginning inventory
(beginning of month 1)

0

0

Ending Inventory
(end of month 4)

450

300

Max inventory is 3300 motors
Production and Inventory Balance
(inventory at end of previous period)
+ (production the period)
- (sales this period)
= (inventory at end of this period)
Objective Function (in $ of cost)
Min 10PA1 + 10PA2 + 11PA3 + 11PA4
+ 6PB1 + 6 PB2 + 6.6PB3 + 6.6PB4
+ 0.18(IA1 + IA2 + IA3 + IA4)
+ 0.13(IB1 + IB2 + IB3 + IB4)
Subject to the constraints:
(see next slide)
Production & Inventory Balance
0 + PA1 – 800 = IA1
(month 1)
0 + PB1 – 1000 = IB1
IA1 + PA2 – 700 = IA2

(month 2)

IB1 + PB2 – 1200 = IB2
IA2 + PA3 – 1000 = IA3

(month 3)

IB2 + PB3 – 1400 = IB3
IA3 + PA4 – 1100 = IA4
IB3 + PB4 – 1400 = IB4

(month 4)
Ending Inventory
IA4 = 450
IB4 = 300
Maximum Inventory level
IA1 + IB1 < 3300 (month 1)
IA2 + IB2 < 3300 (month 2)
IA3 + IB3 < 3300 (month 3)
IA4 + IB4 < 3300 (month 4)
Range of Labor Hours
2240 < 1.3PA1 + 0.9PB1 < 2560

(month 1)

2240 < 1.3PA2 + 0.9PB2 < 2560

(month 2)

2240 < 1.3PA3 + 0.9PB3 < 2560

(month 3)

2240 < 1.3PA4 + 0.9PB4 < 2560

(month 4)

finally nonnegativity: PAi, PBi, IAi, IBi > 0
Go to file 3-11.xls

More Related Content

Similar to Chapter 3

Managerial_economics (3).docx
Managerial_economics (3).docxManagerial_economics (3).docx
Managerial_economics (3).docxAbhishekModak17
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.pptMehulDatta1
 
Linear Programming Application
Linear Programming ApplicationLinear Programming Application
Linear Programming ApplicationKashif Latif
 
Ch 7.pptx Linear Optimization for Finance
Ch 7.pptx Linear Optimization for FinanceCh 7.pptx Linear Optimization for Finance
Ch 7.pptx Linear Optimization for FinanceSogirKhandoker
 
Business Canvas and SWOT Analysis For mo.docx
             Business Canvas and SWOT Analysis   For mo.docx             Business Canvas and SWOT Analysis   For mo.docx
Business Canvas and SWOT Analysis For mo.docxhallettfaustina
 
WPC PowerPoint
WPC PowerPointWPC PowerPoint
WPC PowerPointYung Le
 
Alternative strategies.pptx
Alternative strategies.pptxAlternative strategies.pptx
Alternative strategies.pptxBrumsanPhan
 
Formulation Lpp
Formulation  LppFormulation  Lpp
Formulation LppSachin MK
 
Lpp formulations - 2018 - 1
Lpp  formulations  - 2018 - 1Lpp  formulations  - 2018 - 1
Lpp formulations - 2018 - 1Utshav Chaudhary
 
Bagian 3 PTI
Bagian 3 PTIBagian 3 PTI
Bagian 3 PTIHIMTI
 
Taylor introms10 ppt_04
Taylor introms10 ppt_04Taylor introms10 ppt_04
Taylor introms10 ppt_04QA Cmu
 
08.1 Aggregate Planning in SC. and scope pptx
08.1 Aggregate Planning in SC. and scope pptx08.1 Aggregate Planning in SC. and scope pptx
08.1 Aggregate Planning in SC. and scope pptxassadullahdm1
 
Econ789 chapter009
Econ789 chapter009Econ789 chapter009
Econ789 chapter009sakanor
 
CA NOTES ON FOREX PRACTICALS OF STRATEGIC FINANCIAL MODELING
CA NOTES ON FOREX PRACTICALS OF STRATEGIC FINANCIAL MODELINGCA NOTES ON FOREX PRACTICALS OF STRATEGIC FINANCIAL MODELING
CA NOTES ON FOREX PRACTICALS OF STRATEGIC FINANCIAL MODELINGKanoon Ke Rakhwale India
 
Chapter 2.ppt
Chapter 2.pptChapter 2.ppt
Chapter 2.pptEbsaAbdi
 
Topic 2 Cf And Making Investment Decisions
Topic 2 Cf And Making Investment DecisionsTopic 2 Cf And Making Investment Decisions
Topic 2 Cf And Making Investment Decisionsshengvn
 

Similar to Chapter 3 (20)

Managerial_economics (3).docx
Managerial_economics (3).docxManagerial_economics (3).docx
Managerial_economics (3).docx
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt
 
Linear Programming Application
Linear Programming ApplicationLinear Programming Application
Linear Programming Application
 
Ch 7.pptx Linear Optimization for Finance
Ch 7.pptx Linear Optimization for FinanceCh 7.pptx Linear Optimization for Finance
Ch 7.pptx Linear Optimization for Finance
 
OR_L03.pdf
OR_L03.pdfOR_L03.pdf
OR_L03.pdf
 
Business Canvas and SWOT Analysis For mo.docx
             Business Canvas and SWOT Analysis   For mo.docx             Business Canvas and SWOT Analysis   For mo.docx
Business Canvas and SWOT Analysis For mo.docx
 
WPC PowerPoint
WPC PowerPointWPC PowerPoint
WPC PowerPoint
 
Alternative strategies.pptx
Alternative strategies.pptxAlternative strategies.pptx
Alternative strategies.pptx
 
Formulation Lpp
Formulation  LppFormulation  Lpp
Formulation Lpp
 
Lpp formulations - 2018 - 1
Lpp  formulations  - 2018 - 1Lpp  formulations  - 2018 - 1
Lpp formulations - 2018 - 1
 
Bagian 3 PTI
Bagian 3 PTIBagian 3 PTI
Bagian 3 PTI
 
Taylor introms10 ppt_04
Taylor introms10 ppt_04Taylor introms10 ppt_04
Taylor introms10 ppt_04
 
Intro week3 excel vba_114e
Intro week3 excel vba_114eIntro week3 excel vba_114e
Intro week3 excel vba_114e
 
08.1 Aggregate Planning in SC. and scope pptx
08.1 Aggregate Planning in SC. and scope pptx08.1 Aggregate Planning in SC. and scope pptx
08.1 Aggregate Planning in SC. and scope pptx
 
Econ789 chapter009
Econ789 chapter009Econ789 chapter009
Econ789 chapter009
 
CA NOTES ON FOREX PRACTICALS OF STRATEGIC FINANCIAL MODELING
CA NOTES ON FOREX PRACTICALS OF STRATEGIC FINANCIAL MODELINGCA NOTES ON FOREX PRACTICALS OF STRATEGIC FINANCIAL MODELING
CA NOTES ON FOREX PRACTICALS OF STRATEGIC FINANCIAL MODELING
 
linear optimization.pptx
linear optimization.pptxlinear optimization.pptx
linear optimization.pptx
 
Chapter 2.ppt
Chapter 2.pptChapter 2.ppt
Chapter 2.ppt
 
Chapter 2.ppt
Chapter 2.pptChapter 2.ppt
Chapter 2.ppt
 
Topic 2 Cf And Making Investment Decisions
Topic 2 Cf And Making Investment DecisionsTopic 2 Cf And Making Investment Decisions
Topic 2 Cf And Making Investment Decisions
 

Recently uploaded

Call Girls SG Highway 7397865700 Ridhima Hire Me Full Night
Call Girls SG Highway 7397865700 Ridhima Hire Me Full NightCall Girls SG Highway 7397865700 Ridhima Hire Me Full Night
Call Girls SG Highway 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Call Girls Prahlad Nagar 9920738301 Ridhima Hire Me Full Night
Call Girls Prahlad Nagar 9920738301 Ridhima Hire Me Full NightCall Girls Prahlad Nagar 9920738301 Ridhima Hire Me Full Night
Call Girls Prahlad Nagar 9920738301 Ridhima Hire Me Full Nightssuser7cb4ff
 
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...Apsara Of India
 
NO1 WorldWide Amil baba in pakistan Amil Baba in Karachi Black Magic Islamaba...
NO1 WorldWide Amil baba in pakistan Amil Baba in Karachi Black Magic Islamaba...NO1 WorldWide Amil baba in pakistan Amil Baba in Karachi Black Magic Islamaba...
NO1 WorldWide Amil baba in pakistan Amil Baba in Karachi Black Magic Islamaba...Amil baba
 
Call Girl Contact Number Andheri WhatsApp:+91-9833363713
Call Girl Contact Number Andheri WhatsApp:+91-9833363713Call Girl Contact Number Andheri WhatsApp:+91-9833363713
Call Girl Contact Number Andheri WhatsApp:+91-9833363713Sonam Pathan
 
Call Girls Near Delhi Pride Hotel New Delhi 9873777170
Call Girls Near Delhi Pride Hotel New Delhi 9873777170Call Girls Near Delhi Pride Hotel New Delhi 9873777170
Call Girls Near Delhi Pride Hotel New Delhi 9873777170Sonam Pathan
 
Gripping Adult Web Series You Can't Afford to Miss
Gripping Adult Web Series You Can't Afford to MissGripping Adult Web Series You Can't Afford to Miss
Gripping Adult Web Series You Can't Afford to Missget joys
 
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.comKolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.comKolkata Call Girls
 
Call Girls Ellis Bridge 7397865700 Independent Call Girls
Call Girls Ellis Bridge 7397865700 Independent Call GirlsCall Girls Ellis Bridge 7397865700 Independent Call Girls
Call Girls Ellis Bridge 7397865700 Independent Call Girlsssuser7cb4ff
 
ViP Call Girls In Udaipur 9602870969 Gulab Bagh Escorts SeRvIcE
ViP Call Girls In Udaipur 9602870969 Gulab Bagh Escorts SeRvIcEViP Call Girls In Udaipur 9602870969 Gulab Bagh Escorts SeRvIcE
ViP Call Girls In Udaipur 9602870969 Gulab Bagh Escorts SeRvIcEApsara Of India
 
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...Amil Baba Company
 
(伦敦大学毕业证学位证成绩单-PDF版)
(伦敦大学毕业证学位证成绩单-PDF版)(伦敦大学毕业证学位证成绩单-PDF版)
(伦敦大学毕业证学位证成绩单-PDF版)twfkn8xj
 
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort ServicesHi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort ServicesApsara Of India
 
Call US '' 8377087607'' !! Call Girls In Model Town Metro (Delhi NCR)
Call US '' 8377087607'' !! Call Girls In Model Town Metro (Delhi NCR)Call US '' 8377087607'' !! Call Girls In Model Town Metro (Delhi NCR)
Call US '' 8377087607'' !! Call Girls In Model Town Metro (Delhi NCR)dollysharma2066
 
Statement Of Intent - - Copy.documentfile
Statement Of Intent - - Copy.documentfileStatement Of Intent - - Copy.documentfile
Statement Of Intent - - Copy.documentfilef4ssvxpz62
 
Call Girls CG Road 7397865700 Independent Call Girls
Call Girls CG Road 7397865700  Independent Call GirlsCall Girls CG Road 7397865700  Independent Call Girls
Call Girls CG Road 7397865700 Independent Call Girlsssuser7cb4ff
 
定制(UofT毕业证书)加拿大多伦多大学毕业证成绩单原版一比一
定制(UofT毕业证书)加拿大多伦多大学毕业证成绩单原版一比一定制(UofT毕业证书)加拿大多伦多大学毕业证成绩单原版一比一
定制(UofT毕业证书)加拿大多伦多大学毕业证成绩单原版一比一lvtagr7
 
Udaipur Call Girls 9602870969 Call Girl in Udaipur Rajasthan
Udaipur Call Girls 9602870969 Call Girl in Udaipur RajasthanUdaipur Call Girls 9602870969 Call Girl in Udaipur Rajasthan
Udaipur Call Girls 9602870969 Call Girl in Udaipur RajasthanApsara Of India
 
The Fine Line Between Honest and Evil Comics by Salty Vixen
The Fine Line Between Honest and Evil Comics by Salty VixenThe Fine Line Between Honest and Evil Comics by Salty Vixen
The Fine Line Between Honest and Evil Comics by Salty VixenSalty Vixen Stories & More
 

Recently uploaded (20)

Call Girls SG Highway 7397865700 Ridhima Hire Me Full Night
Call Girls SG Highway 7397865700 Ridhima Hire Me Full NightCall Girls SG Highway 7397865700 Ridhima Hire Me Full Night
Call Girls SG Highway 7397865700 Ridhima Hire Me Full Night
 
Call Girls Prahlad Nagar 9920738301 Ridhima Hire Me Full Night
Call Girls Prahlad Nagar 9920738301 Ridhima Hire Me Full NightCall Girls Prahlad Nagar 9920738301 Ridhima Hire Me Full Night
Call Girls Prahlad Nagar 9920738301 Ridhima Hire Me Full Night
 
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
 
NO1 WorldWide Amil baba in pakistan Amil Baba in Karachi Black Magic Islamaba...
NO1 WorldWide Amil baba in pakistan Amil Baba in Karachi Black Magic Islamaba...NO1 WorldWide Amil baba in pakistan Amil Baba in Karachi Black Magic Islamaba...
NO1 WorldWide Amil baba in pakistan Amil Baba in Karachi Black Magic Islamaba...
 
Call Girl Contact Number Andheri WhatsApp:+91-9833363713
Call Girl Contact Number Andheri WhatsApp:+91-9833363713Call Girl Contact Number Andheri WhatsApp:+91-9833363713
Call Girl Contact Number Andheri WhatsApp:+91-9833363713
 
Call Girls Near Delhi Pride Hotel New Delhi 9873777170
Call Girls Near Delhi Pride Hotel New Delhi 9873777170Call Girls Near Delhi Pride Hotel New Delhi 9873777170
Call Girls Near Delhi Pride Hotel New Delhi 9873777170
 
Gripping Adult Web Series You Can't Afford to Miss
Gripping Adult Web Series You Can't Afford to MissGripping Adult Web Series You Can't Afford to Miss
Gripping Adult Web Series You Can't Afford to Miss
 
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.comKolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
 
Call Girls Ellis Bridge 7397865700 Independent Call Girls
Call Girls Ellis Bridge 7397865700 Independent Call GirlsCall Girls Ellis Bridge 7397865700 Independent Call Girls
Call Girls Ellis Bridge 7397865700 Independent Call Girls
 
ViP Call Girls In Udaipur 9602870969 Gulab Bagh Escorts SeRvIcE
ViP Call Girls In Udaipur 9602870969 Gulab Bagh Escorts SeRvIcEViP Call Girls In Udaipur 9602870969 Gulab Bagh Escorts SeRvIcE
ViP Call Girls In Udaipur 9602870969 Gulab Bagh Escorts SeRvIcE
 
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
 
(伦敦大学毕业证学位证成绩单-PDF版)
(伦敦大学毕业证学位证成绩单-PDF版)(伦敦大学毕业证学位证成绩单-PDF版)
(伦敦大学毕业证学位证成绩单-PDF版)
 
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort ServicesHi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
 
Call US '' 8377087607'' !! Call Girls In Model Town Metro (Delhi NCR)
Call US '' 8377087607'' !! Call Girls In Model Town Metro (Delhi NCR)Call US '' 8377087607'' !! Call Girls In Model Town Metro (Delhi NCR)
Call US '' 8377087607'' !! Call Girls In Model Town Metro (Delhi NCR)
 
Statement Of Intent - - Copy.documentfile
Statement Of Intent - - Copy.documentfileStatement Of Intent - - Copy.documentfile
Statement Of Intent - - Copy.documentfile
 
Call Girls CG Road 7397865700 Independent Call Girls
Call Girls CG Road 7397865700  Independent Call GirlsCall Girls CG Road 7397865700  Independent Call Girls
Call Girls CG Road 7397865700 Independent Call Girls
 
Call Girls Koti 7001305949 all area service COD available Any Time
Call Girls Koti 7001305949 all area service COD available Any TimeCall Girls Koti 7001305949 all area service COD available Any Time
Call Girls Koti 7001305949 all area service COD available Any Time
 
定制(UofT毕业证书)加拿大多伦多大学毕业证成绩单原版一比一
定制(UofT毕业证书)加拿大多伦多大学毕业证成绩单原版一比一定制(UofT毕业证书)加拿大多伦多大学毕业证成绩单原版一比一
定制(UofT毕业证书)加拿大多伦多大学毕业证成绩单原版一比一
 
Udaipur Call Girls 9602870969 Call Girl in Udaipur Rajasthan
Udaipur Call Girls 9602870969 Call Girl in Udaipur RajasthanUdaipur Call Girls 9602870969 Call Girl in Udaipur Rajasthan
Udaipur Call Girls 9602870969 Call Girl in Udaipur Rajasthan
 
The Fine Line Between Honest and Evil Comics by Salty Vixen
The Fine Line Between Honest and Evil Comics by Salty VixenThe Fine Line Between Honest and Evil Comics by Salty Vixen
The Fine Line Between Honest and Evil Comics by Salty Vixen
 

Chapter 3

  • 1. Chapter 3: Linear Programming Modeling Applications © 2007 Pearson Education
  • 2. Linear Programming (LP) Can Be Used for Many Managerial Decisions: • • • • • • • Product mix Make-buy Media selection Marketing research Portfolio selection Shipping & transportation Multiperiod scheduling
  • 3. For a particular application we begin with the problem scenario and data, then: 1) Define the decision variables 2) Formulate the LP model using the decision variables • • Write the objective function equation Write each of the constraint equations 1) Implement the model in Excel 2) Solve with Excel’s Solver
  • 4. Product Mix Problem: Fifth Avenue Industries • Produce 4 types of men's ties • Use 3 materials (limited resources) Decision: How many of each type of tie to make per month? Objective: Maximize profit
  • 5. Resource Data Material Silk Yards available Cost per yard per month $20 1,000 Polyester $6 2,000 Cotton $9 1,250 Labor cost is $0.75 per tie
  • 6. Product Data Type of Tie Silk Selling Price Polyester Blend 1 Blend 2 $6.70 $3.55 $4.31 $4.81 Monthly Minimum 6,000 10,000 13,000 6,000 Monthly Maximum 7,000 14,000 16,000 8,500 0.125 0.08 0.10 0.10 (per tie) Total material (yards per tie)
  • 7. Material Requirements (yards per tie) Type of Tie Material Silk Blend 1 Polyester (50/50) Blend 2 (30/70) Silk 0.125 0 0 0 Polyester 0 0.08 0.05 0.03 Cotton 0 0 0.05 0.07 0.125 0.08 0.10 0.10 Total yards
  • 8. Decision Variables S = number of silk ties to make per month P = number of polyester ties to make per month B1 = number of poly-cotton blend 1 ties to make per month B2 = number of poly-cotton blend 2 ties to make per month
  • 9. Profit Per Tie Calculation Profit per tie = (Selling price) – (material cost) –(labor cost) Silk Tie Profit = $6.70 – (0.125 yds)($20/yd) - $0.75 = $3.45 per tie
  • 10. Objective Function (in $ of profit) Max 3.45S + 2.32P + 2.81B1 + 3.25B2 Subject to the constraints: Material Limitations (in yards) 0.125S < 1,000 (silk) 0.08P + 0.05B1 + 0.03B2 < 2,000 (poly) 0.05B1 + 0.07B2 < 1,250 (cotton)
  • 11. Min and Max Number of Ties to Make 6,000 < S < 7,000 10,000 < P < 14,000 13,000 < B1 < 16,000 6,000 < B2 < 8,500 Finally nonnegativity S, P, B1, B2 > 0 Go to file 3-1.xls
  • 12. Media Selection Problem: Win Big Gambling Club • Promote gambling trips to the Bahamas • Budget: $8,000 per week for advertising • Use 4 types of advertising Decision: How many ads of each type? Objective: Maximize audience reached
  • 13. Data Advertising Options Radio Radio TV Spot Newspaper (prime time) (afternoon) Audience Reached (per ad) 5,000 8,500 2,400 2,800 Cost (per ad) $800 $925 $290 $380 Max Ads Per week 12 5 25 20
  • 14. Other Restrictions • Have at least 5 radio spots per week • Spend no more than $1800 on radio Decision Variables T = number of TV spots per week N = number of newspaper ads per week P = number of prime time radio spots per week A = number of afternoon radio spots per week
  • 15. Objective Function (in num. audience reached) Max 5000T + 8500N + 2400P + 2800A Subject to the constraints: Budget is $8000 800T + 925N + 290P + 380A < 8000 At Least 5 Radio Spots per Week P+A>5
  • 16. No More Than $1800 per Week for Radio 290P + 380A < 1800 Max Number of Ads per Week T < 12 N< 5 Finally nonnegativity P < 25 A < 20 T, N, P, A > 0 Go to file 3-3.xls
  • 17. Portfolio Selection: International City Trust Has $5 million to invest among 6 investments Decision: How much to invest in each of 6 investment options? Objective: Maximize interest earned
  • 18. Data Interest Rate Risk Score Trade credits 7% 1.7 Corp. bonds 10% 1.2 Gold stocks 19% 3.7 Platinum stocks 12% 2.4 Mortgage securities 8% 2.0 Construction loans 14% 2.9 Investment
  • 19. Constraints • Invest up to $ 5 million • No more than 25% into any one investment • At least 30% into precious metals • At least 45% into trade credits and corporate bonds • Limit overall risk to no more than 2.0
  • 20. Decision Variables T = $ invested in trade credit B = $ invested in corporate bonds G = $ invested gold stocks P = $ invested in platinum stocks M = $ invested in mortgage securities C = $ invested in construction loans
  • 21. Objective Function (in $ of interest earned) Max 0.07T + 0.10B + 0.19G + 0.12P + 0.08M + 0.14C Subject to the constraints: Invest Up To $5 Million T + B + G + P + M + C < 5,000,000
  • 22. No More Than 25% Into Any One Investment T < 0.25 (T + B + G + P + M + C) B < 0.25 (T + B + G + P + M + C) G < 0.25 (T + B + G + P + M + C) P < 0.25 (T + B + G + P + M + C) M < 0.25 (T + B + G + P + M + C) C < 0.25 (T + B + G + P + M + C)
  • 23. At Least 30% Into Precious Metals G + P > 0.30 (T + B + G + P + M + C) At Least 45% Into Trade Credits And Corporate Bonds T + B > 0.45 (T + B + G + P + M + C)
  • 24. Limit Overall Risk To No More Than 2.0 Use a weighted average to calculate portfolio risk 1.7T + 1.2B + 3.7G + 2.4P + 2.0M + 2.9C < 2.0 T+B+G+P+M+C OR 1.7T + 1.2B + 3.7G + 2.4P + 2.0M + 2.9C < 2.0 (T + B + G + P + M + C) finally nonnegativity: T, B, G, P, M, C > 0 Go to file 3-5.xls
  • 25. Labor Planning: Hong Kong Bank Number of tellers needed varies by time of day Decision: How many tellers should begin work at various times of the day? Objective: Minimize personnel cost
  • 26. Time Period 9 – 10 10 – 11 11 – 12 Min Num. Tellers 10 12 14 12 – 1 1–2 2-3 3–4 4–5 16 18 17 15 10 Total minimum daily requirement is 112 hours
  • 27. Full Time Tellers • Work from 9 AM – 5 PM • Take a 1 hour lunch break, half at 11, the other half at noon • Cost $90 per day (salary & benefits) • Currently only 12 are available
  • 28. Part Time Tellers • Work 4 consecutive hours (no lunch break) • Can begin work at 9, 10, 11, noon, or 1 • Are paid $7 per hour ($28 per day) • Part time teller hours cannot exceed 50% of the day’s minimum requirement (50% of 112 hours = 56 hours)
  • 29. Decision Variables F = num. of full time tellers (all work 9–5) P1 = num. of part time tellers who work 9–1 P2 = num. of part time tellers who work 10–2 P3 = num. of part time tellers who work 11–3 P4 = num. of part time tellers who work 12–4 P5 = num. of part time tellers who work 1–5
  • 30. Objective Function (in $ of personnel cost) Min 90 F + 28 (P1 + P2 + P3 + P4 + P5) Subject to the constraints: Part Time Hours Cannot Exceed 56 Hours 4 (P1 + P2 + P3 + P4 + P5) < 56
  • 31. Minimum Num. Tellers Needed By Hour Time of Day F + P1 > 10 (9-10) F + P 1 + P2 > 12 (10-11) 0.5 F + P1 + P2 + P3 > 14 (11-12) 0.5 F + P1 + P2 + P3+ P4 > 16 (12-1) F + P 2 + P 3+ P 4 + P 5 > 18 (1-2) F + P 3+ P 4 + P 5 > 17 (2-3) F + P4 + P5 > 15 (3-4) F + P5 > 10 (4-5)
  • 32. Only 12 Full Time Tellers Available F < 12 finally nonnegativity: F, P1, P2, P3, P4, P5 > 0 Go to file 3-6.xls
  • 33. Vehicle Loading: Goodman Shipping How to load a truck subject to weight and volume limitations Decision: How much of each of 6 items to load onto a truck? Objective: Maximize the value shipped
  • 34. Data Item 1 2 3 4 5 6 Value $15,500 $14,400 $10,350 $14,525 $13,000 $9,625 Pounds 5000 4500 3000 3500 4000 3500 $ / lb $3.10 $3.20 $3.45 $4.15 $3.25 $2.75 Cu. ft. per lb 0.125 0.064 0.144 0.448 0.048 0.018
  • 35. Decision Variables Wi = number of pounds of item i to load onto truck, (where i = 1,…,6) Truck Capacity • 15,000 pounds • 1,300 cubic feet
  • 36. Objective Function (in $ of load value) Max 3.10W1 + 3.20W2 + 3.45W3 + 4.15W4 + 3.25W5 + 2.75W6 Subject to the constraints: Weight Limit Of 15,000 Pounds W1 + W2 + W3 + W4 + W5 + W6 < 15,000
  • 37. Volume Limit Of 1300 Cubic Feet 0.125W1 + 0.064W2 + 0.144W3 + 0.448W4 + 0.048W5 + 0.018W6 < 1300 Pounds of Each Item Available W1 < 5000 W4 < 3500 W2 < 4500 W5 < 4000 W3 < 3000 W6 < 3500 Finally nonnegativity: Wi > 0, i=1,…,6 Go to file 3-7.xls
  • 38. Blending Problem: Whole Food Nutrition Center Making a natural cereal that satisfies minimum daily nutritional requirements Decision: How much of each of 3 grains to include in the cereal? Objective: Minimize cost of a 2 ounce serving of cereal
  • 39. A $ per pound Grain B C Minimum $0.33 $0.47 $0.38 Daily Requirement Protein per pound 22 28 21 3 Riboflavin per pound 16 14 25 2 Phosphorus per pound 8 7 9 1 Magnesium per pound 5 0 6 0.425
  • 40. Decision Variables A = pounds of grain A to use B = pounds of grain B to use C = pounds of grain C to use Note: grains will be blended to form a 2 ounce serving of cereal
  • 41. Objective Function (in $ of cost) Min 0.33A + 0.47B + 0.38C Subject to the constraints: Total Blend is 2 Ounces, or 0.125 Pounds A + B + C = 0.125 (lbs)
  • 42. Minimum Nutritional Requirements 22A + 28B + 21C > 3 (protein) 16A + 14B + 25C > 2 (riboflavin) 8A + 7B + 9C > 1 (phosphorus) 5A + 6C > 0.425 (magnesium) Finally nonnegativity: A, B, C > 0 Go to file 3-9.xls
  • 43. Multiperiod Scheduling: Greenberg Motors Need to schedule production of 2 electrical motors for each of the next 4 months Decision: How many of each type of motor to make each month? Objective: Minimize total production and inventory cost
  • 44. Decision Variables PAt = number of motor A to produce in month t (t=1,…,4) PBt = number of motor B to produce in month t (t=1,…,4) IAt = inventory of motor A at end of month t (t=1,…,4) IBt = inventory of motor B at end of month t (t=1,…,4)
  • 45. Sales Demand Data Motor A B Month 1 (January) 800 1000 2 (February) 700 1200 3 (March) 1000 1400 4 (April) 1100 1400
  • 46. Production Data Motor (values are per motor) A B Production cost $10 $6 Labor hours 1.3 0.9 • Production costs will be 10% higher in months 3 and 4 • Monthly labor hours most be between 2240 and 2560
  • 47. Inventory Data Motor A B Inventory cost $0.18 $0.13 (per motor per month) Beginning inventory (beginning of month 1) 0 0 Ending Inventory (end of month 4) 450 300 Max inventory is 3300 motors
  • 48. Production and Inventory Balance (inventory at end of previous period) + (production the period) - (sales this period) = (inventory at end of this period)
  • 49. Objective Function (in $ of cost) Min 10PA1 + 10PA2 + 11PA3 + 11PA4 + 6PB1 + 6 PB2 + 6.6PB3 + 6.6PB4 + 0.18(IA1 + IA2 + IA3 + IA4) + 0.13(IB1 + IB2 + IB3 + IB4) Subject to the constraints: (see next slide)
  • 50. Production & Inventory Balance 0 + PA1 – 800 = IA1 (month 1) 0 + PB1 – 1000 = IB1 IA1 + PA2 – 700 = IA2 (month 2) IB1 + PB2 – 1200 = IB2 IA2 + PA3 – 1000 = IA3 (month 3) IB2 + PB3 – 1400 = IB3 IA3 + PA4 – 1100 = IA4 IB3 + PB4 – 1400 = IB4 (month 4)
  • 51. Ending Inventory IA4 = 450 IB4 = 300 Maximum Inventory level IA1 + IB1 < 3300 (month 1) IA2 + IB2 < 3300 (month 2) IA3 + IB3 < 3300 (month 3) IA4 + IB4 < 3300 (month 4)
  • 52. Range of Labor Hours 2240 < 1.3PA1 + 0.9PB1 < 2560 (month 1) 2240 < 1.3PA2 + 0.9PB2 < 2560 (month 2) 2240 < 1.3PA3 + 0.9PB3 < 2560 (month 3) 2240 < 1.3PA4 + 0.9PB4 < 2560 (month 4) finally nonnegativity: PAi, PBi, IAi, IBi > 0 Go to file 3-11.xls