Gabion structure
Gabion structure
Submitted by-sweta
M.TECH
OUT LINE
1.General Information About Gabion
2.Introduction
3.Characteristics
4.Uses Of Gabion
5.Gabion Structures Employment
6.Advantages Of Gabions
7.Construction Of Gabion Structure
8.Construction Steps
9.Computation Of Construction Cost Of Gabion.
10.Computation Procedure .
11.case study
12.reference
general information about gabion
OriginatedINITALY.
Basicallyrectangularwiremesh.
Filledwithstones.
Sizeofthestonesfilledisalwaysgreater
thanthemeshopening.
INTRODUCTION
Accordingtooxforddictionary :: Acylindricalbasketor
containerfilledwith earth,stones,orothermaterialandin
civilengineeringworks.
Isawiremeshcageorbasketfilledwithstones.
Agabionisabigwireboxfullofsmallstone.
.
CHARACTERSTICS:
FLEXIBLE
PERMIABLE
ECONOMIC $
BOXES ARE MADE OF GALVENISED WIRE.
USES OF GABION
GullyControl.
TorrentControl
LandslipControl,landSlideControl
RiverBankProtectionWorks
GABION STRUCTURES ARE EMPLOYED(Gupta&dalre 1967
As a retaining wall
Gabionstructureusedasretainingwalliscalledasgabionretaining
wall.
USES -
Unstable condition
Constructed to any height and shape.
 As a spur:
For controlling stream bank erosion.
Depth of spur’s foundation should be kept deeper towards upstream
side.
As a drop structure:
Gabion structure used as a drop structure are called as gabion drop
structure.
Reduces gully gradient. to serve as silt trip.
It is used where the drop height is more than 1 m.
5 cm thick concrete should be furnished after settlement
 As a flexible apron:
Gabion aprons are extensively used as flexible apron to act as a
revetment , retaining wall to protect the existing structure.
Gabion structure as revetment
Its main function is to provide the blanket type protection to
the affected surface.
Gabion structure for lining
The gabion also employed for lining the beds and banks of the
water cores
Maximum slope for the channel lining is1:1 or 1.5:1.
Advantages of gabions
1)Efficient
2)Permanent
3)Easy to construct
4)Economical
Special features which proves as advantages
1)It is flexible structure
2It is a permanent structure
3)It is a stable structure
4)It is a economical structure
Construction of gabion structure
Material required –
1.Galvanised wire
2.Hexagonal triple twisted mesh in the size ranging from 7.5to15cm
3.Wire no-8 gauge, less than10 gauge is not used
Construction steps
1)Assembled each gabion unit by
binding there vertical edges with
the help of about 12-15 cm long
wire ties. it is good to make 5 ties
per metre height.
2) As per plane place, few empty
unit on position and tie them with
the adjacent boxes, using at lest 5
wire per metre.
3) With the help of standard fence
stretcher, stretch the box before
filling the stones, to provide
effective alignment after they
are tied together.
4)Filled the rocks into stretched
boxes and also insert connecting
in each cell. When the box is
filled by its 1/3 portion, the first
four wires, two in each direction
in each cell are placed. repeat the
procedure until the box is filled
by its2/3rd portion
Contd..
5.when filling operation of stones
to construct the gabion boxes has
been completed ,then tie the lid
from sides and the end portions.
A half meter long ‘pinch bar ’
can be used.
Computation of construction cost of gabion
parameter considered:
1.size of gabion box(length, width and depth)
2.capacity of box (m³)
3.area of wire mesh in each gabion (m²)
4.density of wire used (kg/m³)
5.cost of mesh construction (Rs/kg)
6.labour charge per box including construction cost of wire mesh.
7.cost of rock filling (Rs/m³)
computation procedure :
step(1): find out the area of mesh involved in each gabion box.
Step(2) : calculate the weight of wire needed per box. it is given as
weight= density of wire x area of mesh in each box.
Step(3) : calculate cost per box. it is obtained as:
weigh of box x cost.
step(4) : estimate labour charge per box including construction cost
of wire mesh, which is computed as:
labour charge x area of wire mesh of one gabion box.
step(5) : compute the cost of rock filling per 100m³ .
It is given as cost of rock filing x capacity of gabion.
Step(6) : find the total cost of construction which is the sum of Step(3),
Step(4) , Step(5).
CASE STUDY : PERFORMANCE OF GULLY PLUG
STRUCTURE(GABION) IN BLACK CLAY SOIL.
D. H. RANADE, L. K. JAIN, S. K. VISHWAKARMA S.M
NARULKAR and A. S .TOMAR
AICRP On Dry land Agriculture, College of Agriculture , J .N. K.
V. V campus, Indore INDIA
Published in INDIAN JOURNAL OF SOIL CONSERVATION
Volume 29 -2001
INTRODUCTION
The study was carried out in the year 2000 to assess the cause
of failure in gully reclamation in the black soils of malwa
region of village pipliyatapha.
Gabions had been constructed in the lower reaches of river
gambhir under hingoia pipliyatapha watershed area during
the year 1991-92
The soils of experimental area are highly erodible(clay 55
percent).
The average annual rainfall of area is 958mm.
The total length of gully is found to be 216m in the year
2000(which was only 195m in the year1992).
MATERIALS AND METHODS
Two structures were constructed at vertical interval
of 2m i.e. at distance of 44m and 140m from gully
head.
It was observed that the gabion were constructed in
narrow sections of the gully in order to reduce cost
of construction.
It was also noticed that the height of the first
gabion was 1m but is increased to 2m in case of
second gabion.
Solar Wonders, ©2007 Florida Solar Energy Center
•
SI No. Design of the existing structure Dimensions(m)
Structure -1 Structure-2
A Hydrological design details
i) Length of crest 3.00 2.65
ii) Head over the crest 0.50 1.00
B) Hydraulic design details
i) Depth of cut-off wall 0.00 0.00
ii) Depth of head wall 1.00 2.00
iii) Length of head wall
extension(on one side)
1.00 1.00
Iv Depth of toe wall 0.00 0.00
V Length of apron 0.00 0.00
Vi Length of side wall 0.00 0.00
vii Length of wing wall 0.00 0.00
DETAILS OF EXISTING GULLY PLUG STRUCTURES
It was observed that when runoff water entered
from the wider section to narrow section(3.00 to
2.65m width)
Its velocity increased tremendously an and crossed
the erosive velocity limit.
Instead of reclaiming the gully, it increased in
gully width and depth.
In this case the gully bed deepening up to 16m
(0.4m) from second structure while it was limited
to 9.50m(.73m)in the first structure.
Results and discussion
even after structural failure, The head wall of
gabion remained at its location this indicates that
the gabion is very stable structure.
From the above study, it is observed that the
gabion structure should be constructed in a fairly
reasonable uniform section of gully instead of
narrow section.
SEDIMENT RETENTION BY GABION STRUCTURE IN
BUNGA WATERSHED
P.K. GOEL, J.S.SAMRA AND R.C. BANSAL
Central soil and water conservation research and training
institute, research centre, chandigarh.
Published in INDIAN JOURNAL OF SOIL
CONSERVATION Volume 24 -1996
INTRODUCTION
The cost of gabion construction is almost ½
to 2/3rd of the cement masonry( juyal et al.,1992).
 gabion structures have relatively long life (20-25
years) in comparison to cement masonry permanent
structure
STUDY AREA
 bunga-II watershed project area is located in bunga,
Ambala (Haryana) and situated at 30ᵒ 42’N latitude and 77ᵒ
10’ E longitude.
Average rainfall o area is 1100mm.
Eight crate wire stone check dams constructed in the
catchment of water harvesting dam of bunga-II watershed
project in ambala district of haryana were selected for the
assessment of their effectiveness in retaining sediment.
DESIGN DETAILS OF CRATE WIRE STONE CHECK DAM IN THE
CATCHMENT OF BUNG-II dam
Structure
Number
Capacity of the structure up
To crest level(cum)
Capacity lost in (cum) Percentag
e of
capacity
lost in two
years
At the time
Of(june199
1)
constructio
n
After one
year(1991)
After two
year(1992)
One year Two year
1 642.2 537.2 290.0 105.0 352.2 54.84
2 550.9 464.5 65.2 86.4 485.7 88.15
3 380.4 298.5 32.6 81.9 347.8 91.43
4 295.9 198.2 * 97.7 * *
5 207.5 200.3 164.3 7.2 43.2 20.81
6 1603.9 1132.2 837.0 471.7 766.9 47.81
7 543.3 425.3 315.2 118.0 228.1 41.98
8 134.6 112.2 43.7 22.4 85.9 63.81
Within a short span of two years, loss in retention capacity
of structures ranged from minimum 20.18 percent to
maximum 91.43pecent with average loss of 58.40 percent .
Out of eight structures under study, two(structure
number2&3)lost almost 90% of their capacity due to sediment
deposition
The detained sediment was found conducive supporting the
growth of vegetation which in tern further improved control of
erosion.
This indicate that the crate wire stone check dams are very
much effective in retaining the sediment which would have
found its way to reservoir resulting in loss of valuable storage
capacity.
REFERENCES
Text book of SOIL AND WATER CONSERVATION ENGINEERING by :
R. Suresh
Google images.
Ranade, D. H., Jain, L. K., Vishwakarma, S. K., Narulkar, S. M., Tomar, S.
M., 2001, performance of gully plug structure(gabion) in black clay soil
region-A case study. indian journal of soil conservation 29 (1):88-90
Goel, P. K., Samra, J. S., Bansal, R.C., 1996,sediment retention by gabion
structure in bunga watershed. indian journal of soil conservation 27
(2):107-110
Gabion s are used as :-
Gully control structure
As wellas decoration
purposes.
Thank you
Thank you
Thank you

Contenu connexe

Tendances

Tendances (20)

Earth pressure
Earth pressureEarth pressure
Earth pressure
 
Plastic as a soil stabilizer by yashwanth sagar
Plastic as a soil stabilizer by yashwanth sagarPlastic as a soil stabilizer by yashwanth sagar
Plastic as a soil stabilizer by yashwanth sagar
 
Dewatering by well point system
Dewatering by well point systemDewatering by well point system
Dewatering by well point system
 
Geopolymer concrete ppt
Geopolymer concrete pptGeopolymer concrete ppt
Geopolymer concrete ppt
 
minor and micro irrigation
 minor and micro irrigation minor and micro irrigation
minor and micro irrigation
 
Gel space ratio
Gel space ratioGel space ratio
Gel space ratio
 
Doubly R C Beam
Doubly R C BeamDoubly R C Beam
Doubly R C Beam
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Plate load test ppt
Plate load test pptPlate load test ppt
Plate load test ppt
 
Concrete mineral admixtures
Concrete mineral admixturesConcrete mineral admixtures
Concrete mineral admixtures
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Vibration method for ground improvement technique
Vibration method for ground improvement techniqueVibration method for ground improvement technique
Vibration method for ground improvement technique
 
Role of geosynthetics in civil Engineering
Role of geosynthetics in civil EngineeringRole of geosynthetics in civil Engineering
Role of geosynthetics in civil Engineering
 
Plastic as a soil stabilizer
Plastic as a soil stabilizerPlastic as a soil stabilizer
Plastic as a soil stabilizer
 
Soil Compaction
Soil CompactionSoil Compaction
Soil Compaction
 
Ground Improvement Techniques
Ground Improvement TechniquesGround Improvement Techniques
Ground Improvement Techniques
 
Limit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptLimit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed Concept
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 

En vedette

Gabion information manufacturing & installation
Gabion information manufacturing  & installationGabion information manufacturing  & installation
Gabion information manufacturing & installationmanufabindia
 
Gabions installation guideline
Gabions installation guidelineGabions installation guideline
Gabions installation guidelineMadhav Jung Karki
 
Sachpazis gabion retaining wall analysis & design bs8002-1994
Sachpazis gabion retaining wall analysis & design bs8002-1994Sachpazis gabion retaining wall analysis & design bs8002-1994
Sachpazis gabion retaining wall analysis & design bs8002-1994Dr.Costas Sachpazis
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureMoudud Hasan
 
Sedimentary structures group presentation
Sedimentary structures group presentationSedimentary structures group presentation
Sedimentary structures group presentationCyprian Ozigbo
 
Slope stabilty
Slope stabiltySlope stabilty
Slope stabiltyRiyaz Bhat
 
Soil nailing ppt by ankush choudhury
Soil nailing ppt by ankush choudhurySoil nailing ppt by ankush choudhury
Soil nailing ppt by ankush choudhuryAnkush Choudhury
 
Soil nailing/Soil Reinforcement Technique
Soil nailing/Soil Reinforcement TechniqueSoil nailing/Soil Reinforcement Technique
Soil nailing/Soil Reinforcement TechniqueAnandu Aravind
 
Soil and Water Conservation
Soil and Water ConservationSoil and Water Conservation
Soil and Water ConservationSubham Dwivedi
 
Soil Erosion and Conservation
Soil Erosion and ConservationSoil Erosion and Conservation
Soil Erosion and ConservationAisling O Connor
 
Properties of water ppt
Properties of water pptProperties of water ppt
Properties of water pptkleinkea
 
jQuery in TYPO3 nutzen
jQuery in TYPO3 nutzenjQuery in TYPO3 nutzen
jQuery in TYPO3 nutzenAlex Kellner
 

En vedette (20)

Gabion information manufacturing & installation
Gabion information manufacturing  & installationGabion information manufacturing  & installation
Gabion information manufacturing & installation
 
Retaining Walls
Retaining WallsRetaining Walls
Retaining Walls
 
Types of retaining walls
Types of retaining wallsTypes of retaining walls
Types of retaining walls
 
soil erosion
soil erosionsoil erosion
soil erosion
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Gabions installation guideline
Gabions installation guidelineGabions installation guideline
Gabions installation guideline
 
Sachpazis gabion retaining wall analysis & design bs8002-1994
Sachpazis gabion retaining wall analysis & design bs8002-1994Sachpazis gabion retaining wall analysis & design bs8002-1994
Sachpazis gabion retaining wall analysis & design bs8002-1994
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structure
 
Sedimentary structures group presentation
Sedimentary structures group presentationSedimentary structures group presentation
Sedimentary structures group presentation
 
Slope stabilty
Slope stabiltySlope stabilty
Slope stabilty
 
Soil nailing ppt by ankush choudhury
Soil nailing ppt by ankush choudhurySoil nailing ppt by ankush choudhury
Soil nailing ppt by ankush choudhury
 
Soil nailing/Soil Reinforcement Technique
Soil nailing/Soil Reinforcement TechniqueSoil nailing/Soil Reinforcement Technique
Soil nailing/Soil Reinforcement Technique
 
Soil and Water Conservation
Soil and Water ConservationSoil and Water Conservation
Soil and Water Conservation
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Watershed management
Watershed managementWatershed management
Watershed management
 
Soil erosion
Soil erosionSoil erosion
Soil erosion
 
Soil Erosion and Conservation
Soil Erosion and ConservationSoil Erosion and Conservation
Soil Erosion and Conservation
 
Properties of water ppt
Properties of water pptProperties of water ppt
Properties of water ppt
 
jQuery in TYPO3 nutzen
jQuery in TYPO3 nutzenjQuery in TYPO3 nutzen
jQuery in TYPO3 nutzen
 
Water education ppt
Water education pptWater education ppt
Water education ppt
 

Similaire à Gabion structures ppt

68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
68254fb9-e555-4275-91bd-16e4c9550bdc.pptx68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
68254fb9-e555-4275-91bd-16e4c9550bdc.pptxBenjaminSebastian10
 
IRJET- Engineering Feasibility of Gabion Structures Over Reinforced Concrete ...
IRJET- Engineering Feasibility of Gabion Structures Over Reinforced Concrete ...IRJET- Engineering Feasibility of Gabion Structures Over Reinforced Concrete ...
IRJET- Engineering Feasibility of Gabion Structures Over Reinforced Concrete ...IRJET Journal
 
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...IRJET Journal
 
Uplift Capacity of Single Pile Under Vertical Loading in Black Cotton Soil
Uplift Capacity of Single Pile Under Vertical Loading in Black Cotton SoilUplift Capacity of Single Pile Under Vertical Loading in Black Cotton Soil
Uplift Capacity of Single Pile Under Vertical Loading in Black Cotton SoilIRJET Journal
 
Design construction and behavior of bored cast in situ concrete
Design construction and behavior of bored cast in situ concreteDesign construction and behavior of bored cast in situ concrete
Design construction and behavior of bored cast in situ concreteLữ Phát
 
Evolution of Properties of Pavers Blocks using Nylon Fiber Fly Ash and Rice H...
Evolution of Properties of Pavers Blocks using Nylon Fiber Fly Ash and Rice H...Evolution of Properties of Pavers Blocks using Nylon Fiber Fly Ash and Rice H...
Evolution of Properties of Pavers Blocks using Nylon Fiber Fly Ash and Rice H...IJSRD
 
Experimental Characterization of Mortar Made From Local Fine Aggregate Used F...
Experimental Characterization of Mortar Made From Local Fine Aggregate Used F...Experimental Characterization of Mortar Made From Local Fine Aggregate Used F...
Experimental Characterization of Mortar Made From Local Fine Aggregate Used F...ijceronline
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sectionsjuwes
 
IRJET- Behaviour of Circular Skirted Footing Resting on Sea Sand
IRJET- Behaviour of Circular Skirted Footing Resting on Sea SandIRJET- Behaviour of Circular Skirted Footing Resting on Sea Sand
IRJET- Behaviour of Circular Skirted Footing Resting on Sea SandIRJET Journal
 
pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifaSUNILPRASAD68
 
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptxHORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptxSamirsinh Parmar
 
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...IRJET Journal
 
Deep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewDeep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewR K DHIMAN
 
Effect of encasement length on geosynthetic reinforced stone columns
Effect of encasement length on geosynthetic reinforced stone columnsEffect of encasement length on geosynthetic reinforced stone columns
Effect of encasement length on geosynthetic reinforced stone columnseSAT Publishing House
 
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...IJERD Editor
 
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goaCh rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goamaccaferriindia
 

Similaire à Gabion structures ppt (20)

68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
68254fb9-e555-4275-91bd-16e4c9550bdc.pptx68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
 
IRJET- Engineering Feasibility of Gabion Structures Over Reinforced Concrete ...
IRJET- Engineering Feasibility of Gabion Structures Over Reinforced Concrete ...IRJET- Engineering Feasibility of Gabion Structures Over Reinforced Concrete ...
IRJET- Engineering Feasibility of Gabion Structures Over Reinforced Concrete ...
 
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
 
Uplift Capacity of Single Pile Under Vertical Loading in Black Cotton Soil
Uplift Capacity of Single Pile Under Vertical Loading in Black Cotton SoilUplift Capacity of Single Pile Under Vertical Loading in Black Cotton Soil
Uplift Capacity of Single Pile Under Vertical Loading in Black Cotton Soil
 
Design construction and behavior of bored cast in situ concrete
Design construction and behavior of bored cast in situ concreteDesign construction and behavior of bored cast in situ concrete
Design construction and behavior of bored cast in situ concrete
 
Evolution of Properties of Pavers Blocks using Nylon Fiber Fly Ash and Rice H...
Evolution of Properties of Pavers Blocks using Nylon Fiber Fly Ash and Rice H...Evolution of Properties of Pavers Blocks using Nylon Fiber Fly Ash and Rice H...
Evolution of Properties of Pavers Blocks using Nylon Fiber Fly Ash and Rice H...
 
Experimental Characterization of Mortar Made From Local Fine Aggregate Used F...
Experimental Characterization of Mortar Made From Local Fine Aggregate Used F...Experimental Characterization of Mortar Made From Local Fine Aggregate Used F...
Experimental Characterization of Mortar Made From Local Fine Aggregate Used F...
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
IRJET- Behaviour of Circular Skirted Footing Resting on Sea Sand
IRJET- Behaviour of Circular Skirted Footing Resting on Sea SandIRJET- Behaviour of Circular Skirted Footing Resting on Sea Sand
IRJET- Behaviour of Circular Skirted Footing Resting on Sea Sand
 
pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifa
 
1115
11151115
1115
 
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptxHORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
 
Soil nailing
Soil nailingSoil nailing
Soil nailing
 
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...IRJET-  	  Optimum Utilisation of Continuous Miner used for Pillar Extraction...
IRJET- Optimum Utilisation of Continuous Miner used for Pillar Extraction...
 
Deep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewDeep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over view
 
Effect of encasement length on geosynthetic reinforced stone columns
Effect of encasement length on geosynthetic reinforced stone columnsEffect of encasement length on geosynthetic reinforced stone columns
Effect of encasement length on geosynthetic reinforced stone columns
 
www.ijerd.com
www.ijerd.comwww.ijerd.com
www.ijerd.com
 
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
 
Laminar box
Laminar boxLaminar box
Laminar box
 
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goaCh rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
Ch rockfall protection_works_along_konkan_railway_route_maharashtra_and_goa
 

Dernier

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Dernier (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

Gabion structures ppt

  • 4. OUT LINE 1.General Information About Gabion 2.Introduction 3.Characteristics 4.Uses Of Gabion 5.Gabion Structures Employment 6.Advantages Of Gabions 7.Construction Of Gabion Structure 8.Construction Steps 9.Computation Of Construction Cost Of Gabion. 10.Computation Procedure . 11.case study 12.reference
  • 5. general information about gabion OriginatedINITALY. Basicallyrectangularwiremesh. Filledwithstones. Sizeofthestonesfilledisalwaysgreater thanthemeshopening.
  • 6. INTRODUCTION Accordingtooxforddictionary :: Acylindricalbasketor containerfilledwith earth,stones,orothermaterialandin civilengineeringworks. Isawiremeshcageorbasketfilledwithstones. Agabionisabigwireboxfullofsmallstone. .
  • 9. GABION STRUCTURES ARE EMPLOYED(Gupta&dalre 1967 As a retaining wall Gabionstructureusedasretainingwalliscalledasgabionretaining wall. USES - Unstable condition Constructed to any height and shape.
  • 10.  As a spur: For controlling stream bank erosion. Depth of spur’s foundation should be kept deeper towards upstream side. As a drop structure: Gabion structure used as a drop structure are called as gabion drop structure. Reduces gully gradient. to serve as silt trip. It is used where the drop height is more than 1 m. 5 cm thick concrete should be furnished after settlement
  • 11.  As a flexible apron: Gabion aprons are extensively used as flexible apron to act as a revetment , retaining wall to protect the existing structure.
  • 12. Gabion structure as revetment Its main function is to provide the blanket type protection to the affected surface. Gabion structure for lining The gabion also employed for lining the beds and banks of the water cores Maximum slope for the channel lining is1:1 or 1.5:1.
  • 13. Advantages of gabions 1)Efficient 2)Permanent 3)Easy to construct 4)Economical Special features which proves as advantages 1)It is flexible structure 2It is a permanent structure 3)It is a stable structure 4)It is a economical structure
  • 14. Construction of gabion structure Material required – 1.Galvanised wire 2.Hexagonal triple twisted mesh in the size ranging from 7.5to15cm 3.Wire no-8 gauge, less than10 gauge is not used
  • 15. Construction steps 1)Assembled each gabion unit by binding there vertical edges with the help of about 12-15 cm long wire ties. it is good to make 5 ties per metre height. 2) As per plane place, few empty unit on position and tie them with the adjacent boxes, using at lest 5 wire per metre.
  • 16. 3) With the help of standard fence stretcher, stretch the box before filling the stones, to provide effective alignment after they are tied together. 4)Filled the rocks into stretched boxes and also insert connecting in each cell. When the box is filled by its 1/3 portion, the first four wires, two in each direction in each cell are placed. repeat the procedure until the box is filled by its2/3rd portion
  • 17. Contd.. 5.when filling operation of stones to construct the gabion boxes has been completed ,then tie the lid from sides and the end portions. A half meter long ‘pinch bar ’ can be used.
  • 18. Computation of construction cost of gabion parameter considered: 1.size of gabion box(length, width and depth) 2.capacity of box (m³) 3.area of wire mesh in each gabion (m²) 4.density of wire used (kg/m³) 5.cost of mesh construction (Rs/kg) 6.labour charge per box including construction cost of wire mesh. 7.cost of rock filling (Rs/m³)
  • 19. computation procedure : step(1): find out the area of mesh involved in each gabion box. Step(2) : calculate the weight of wire needed per box. it is given as weight= density of wire x area of mesh in each box. Step(3) : calculate cost per box. it is obtained as: weigh of box x cost. step(4) : estimate labour charge per box including construction cost of wire mesh, which is computed as: labour charge x area of wire mesh of one gabion box. step(5) : compute the cost of rock filling per 100m³ . It is given as cost of rock filing x capacity of gabion. Step(6) : find the total cost of construction which is the sum of Step(3), Step(4) , Step(5).
  • 20. CASE STUDY : PERFORMANCE OF GULLY PLUG STRUCTURE(GABION) IN BLACK CLAY SOIL. D. H. RANADE, L. K. JAIN, S. K. VISHWAKARMA S.M NARULKAR and A. S .TOMAR AICRP On Dry land Agriculture, College of Agriculture , J .N. K. V. V campus, Indore INDIA Published in INDIAN JOURNAL OF SOIL CONSERVATION Volume 29 -2001
  • 21. INTRODUCTION The study was carried out in the year 2000 to assess the cause of failure in gully reclamation in the black soils of malwa region of village pipliyatapha. Gabions had been constructed in the lower reaches of river gambhir under hingoia pipliyatapha watershed area during the year 1991-92 The soils of experimental area are highly erodible(clay 55 percent). The average annual rainfall of area is 958mm. The total length of gully is found to be 216m in the year 2000(which was only 195m in the year1992).
  • 22. MATERIALS AND METHODS Two structures were constructed at vertical interval of 2m i.e. at distance of 44m and 140m from gully head. It was observed that the gabion were constructed in narrow sections of the gully in order to reduce cost of construction. It was also noticed that the height of the first gabion was 1m but is increased to 2m in case of second gabion.
  • 23. Solar Wonders, ©2007 Florida Solar Energy Center • SI No. Design of the existing structure Dimensions(m) Structure -1 Structure-2 A Hydrological design details i) Length of crest 3.00 2.65 ii) Head over the crest 0.50 1.00 B) Hydraulic design details i) Depth of cut-off wall 0.00 0.00 ii) Depth of head wall 1.00 2.00 iii) Length of head wall extension(on one side) 1.00 1.00 Iv Depth of toe wall 0.00 0.00 V Length of apron 0.00 0.00 Vi Length of side wall 0.00 0.00 vii Length of wing wall 0.00 0.00
  • 24. DETAILS OF EXISTING GULLY PLUG STRUCTURES
  • 25. It was observed that when runoff water entered from the wider section to narrow section(3.00 to 2.65m width) Its velocity increased tremendously an and crossed the erosive velocity limit. Instead of reclaiming the gully, it increased in gully width and depth. In this case the gully bed deepening up to 16m (0.4m) from second structure while it was limited to 9.50m(.73m)in the first structure.
  • 26. Results and discussion even after structural failure, The head wall of gabion remained at its location this indicates that the gabion is very stable structure. From the above study, it is observed that the gabion structure should be constructed in a fairly reasonable uniform section of gully instead of narrow section.
  • 27. SEDIMENT RETENTION BY GABION STRUCTURE IN BUNGA WATERSHED P.K. GOEL, J.S.SAMRA AND R.C. BANSAL Central soil and water conservation research and training institute, research centre, chandigarh. Published in INDIAN JOURNAL OF SOIL CONSERVATION Volume 24 -1996
  • 28. INTRODUCTION The cost of gabion construction is almost ½ to 2/3rd of the cement masonry( juyal et al.,1992).  gabion structures have relatively long life (20-25 years) in comparison to cement masonry permanent structure
  • 29. STUDY AREA  bunga-II watershed project area is located in bunga, Ambala (Haryana) and situated at 30ᵒ 42’N latitude and 77ᵒ 10’ E longitude. Average rainfall o area is 1100mm. Eight crate wire stone check dams constructed in the catchment of water harvesting dam of bunga-II watershed project in ambala district of haryana were selected for the assessment of their effectiveness in retaining sediment.
  • 30. DESIGN DETAILS OF CRATE WIRE STONE CHECK DAM IN THE CATCHMENT OF BUNG-II dam Structure Number Capacity of the structure up To crest level(cum) Capacity lost in (cum) Percentag e of capacity lost in two years At the time Of(june199 1) constructio n After one year(1991) After two year(1992) One year Two year 1 642.2 537.2 290.0 105.0 352.2 54.84 2 550.9 464.5 65.2 86.4 485.7 88.15 3 380.4 298.5 32.6 81.9 347.8 91.43 4 295.9 198.2 * 97.7 * * 5 207.5 200.3 164.3 7.2 43.2 20.81 6 1603.9 1132.2 837.0 471.7 766.9 47.81 7 543.3 425.3 315.2 118.0 228.1 41.98 8 134.6 112.2 43.7 22.4 85.9 63.81
  • 31. Within a short span of two years, loss in retention capacity of structures ranged from minimum 20.18 percent to maximum 91.43pecent with average loss of 58.40 percent . Out of eight structures under study, two(structure number2&3)lost almost 90% of their capacity due to sediment deposition The detained sediment was found conducive supporting the growth of vegetation which in tern further improved control of erosion. This indicate that the crate wire stone check dams are very much effective in retaining the sediment which would have found its way to reservoir resulting in loss of valuable storage capacity.
  • 32. REFERENCES Text book of SOIL AND WATER CONSERVATION ENGINEERING by : R. Suresh Google images. Ranade, D. H., Jain, L. K., Vishwakarma, S. K., Narulkar, S. M., Tomar, S. M., 2001, performance of gully plug structure(gabion) in black clay soil region-A case study. indian journal of soil conservation 29 (1):88-90 Goel, P. K., Samra, J. S., Bansal, R.C., 1996,sediment retention by gabion structure in bunga watershed. indian journal of soil conservation 27 (2):107-110
  • 33. Gabion s are used as :- Gully control structure As wellas decoration purposes.