The Operation of Heavy Equipment in
the Presence of Personnel On the
Ground

01/24/14

1
01/24/14

2
Foreword
Many types of Mobile Construction Equipment are
available for use by contractors doing a wide variety of
work. Many, if not all these machines, have to operate
within a close proximity to persons on foot. They all
however, present similar types of known hazards.
This training session is devoted to attempt to identify,
and hopefully better educate those who must work
around or operate these types of equipment, since they
all possess the capability to cause serous injury or
death.
01/24/14

3
These Include but Are Not
Limited To:
Front-end loaders; Rubber-tired and tracked
Crawler tractors/bulldozers, skid steer bobcats
Wheel tractor-scrapers, elevating scrapers, tandem powered scrapers
Rubber-tired backhoes and tracked hydraulic excavators
On and off-road haulage vehicles
Asphalt Pavers and associated support equipment - pavement rollers
Vibratory rollers and compactors
Motor graders, grade tractors, industrial tractors
Concrete mixers and pump trucks
Special use construction equipment: grinding,
Pulverizing, milling, water trucks, etc

01/24/14

4
PERSONS PUT AT RISK BY WORKING AROUND, OR
BEING NEAR, HEAVY EQUIPMENT WHILE IT IS
OPERATING.
DIRECT PARTICIPANTS: (Need to be on site on regular basis)
Signal Persons, Observers, Flaggers, Grade Checkers, Dump Persons.
Equipment Operators, Teamsters.
Laborers, Iron Workers and Carpenters.
Foremen, Supervisors, and other related contractor staff.
Surveyors, Rodmen, Layout Crews.
Mechanics and oilers.
Any Other Crafts and/or Trades working
on the Project, or Passing
through the work areas.

01/24/14

5
PERSONS PUT AT RISK BY WORKING
AROUND, OR BEING NEAR, HEAVY
EQUIPMENT WHILE IT IS OPERATING.
PARTICIPANTS WHO NEED TO BE ON SITE: (On a Periodic Basis)
Delivery Trucks, Service Providers, (of any kind) - Unescorted on the site.
Concrete Mixers, Pump Trucks.
Contracted Services; Crane Rental, Concrete Saw Cutting, Port-to-let Service Persons, etc.
Union/Labor Officials.
Roach Coach Drivers.
Trash Removal Vehicles..
Architects and Engineers, Inspectors, Client’s Staff/Owner’s Reps./Guests/VIPs.
Engineering Service Providers: Concrete Testing, Compaction Testing, Air Monitoring, etc.
City, County, State and Federal Officials: (Of all types).
Vendor Sales Personnel or Product Installation Specialist(s).
Other Utility Service Providers & Locators: Phone, Gas. Electric, Water, Sewer, Cable, etc.
Transportation Industry; Trucking, Buses, Taxicabs, Rail, Ships, Aircraft.

01/24/14

6
PERSONS PUT AT RISK BY WORKING
AROUND, OR BEING NEAR, HEAVY
EQUIPMENT WHILE IT IS OPERATING.
NON-PARTICIPANTS, NO DIRECT NEED TO BE ON SITE:
Pedestrians, Spectators, On-lookers, Sidewalk Superintendents and
the Just Plain Curious!
Children (of all ages).
Job Seekers, (all types).
Joggers, Bicycle Riders, Skate Boarders, All Terrain Vehicles, Power
Walkers.
Environmentalists independently reviewing compliance with
Laws/Restrictions..
Scavengers, Wood collectors, Junk Collectors, Dumpster Divers.
Lawyers, Investigators, Thieves, Burglars and Law Breakers.
The Media: (Depending on circumstances).

01/24/14

7
CONCERNS FOR
SAFETY
PROBLEM:
YOU HAVE A CONGESTED CONSTRUCTION
SITE WITH PERSONNEL ON FOOT, AND
MOBILE MACHINES WORKING IN THE SAME
AREA, AT THE SAME TIME!

01/24/14

8
Vision Statement
TO PROVIDE A SAFE
WORKPLACE, FREE
FROM ALL RECOGNIZED
HAZARDS...

01/24/14

9
Goal and Objective
PREVENT WORKPLACE
ACCIDENTS!
PREVENT PERSONAL INJURIES
BETWEEN MOVING EQUIPMENT
AND THOSE WORKERS WHO
ARE ON FOOT.
YOU MUST SEE AND BE SEEN!!!

01/24/14

10
Today’s Situation
BEING STRUCK BY, OR CAUGHT INBETWEEN, ARE TWO OF THE
LEADING CAUSE OF INJURIES AND
FATALITIES ON CONSTRUCTION
SITES!
STRUCK BY (22%)
01/24/14
CAUGHT

IN-BETWEEN (18%)

11
How Did We Get Here?
A NATION-WIDE, PAST HISTORY OF
PERSONS BEING STRUCK OR
CRUSHED BY OPERATING OR MOVING
EQUIPMENT.
THE IMPRESSION THAT THE
EQUIPMENT OPERATOR ALWAYS
KNOWS WHERE THE GROUND
PERSONNEL ARE LOCATED.
01/24/14

12
Available Solutions
Management Commitment
Employee Involvement
Pre-construction Work-Site Analysis
Hazard Prevention and Controls
Equipment Maintenance
Employee Awareness Training
Periodically Review Procedures
01/24/14

13
Management Commitment
Restrict entry onto site of non-essential
personnel.
Establish Controlled Entry Points to site.
Coordinate Operations of Various Trades
Working in the Same Areas.
Provide Fundamental Site Rules and
Training to all Persons at Risk.
Adequate Lay-Down Areas Established.
01/24/14

14
Employee Involvement
All employees who are at risk must
receive basic indoctrination.
Absolute need to address problem with
employees on a regular basis. (Toolbox
Safety Meetings).
Employees must learn, follow, and obey
established rules.
Realize that they must see, and be seen.
01/24/14

15
Pre-Construction WorkSite Analysis
Identify Potential Known Hazards.
Job Conditions: Haul Roads, Access Points.
Lay down/Storage Areas.
Office, Tool, Storage and Change Trailers.
Methods of Construction, (increases Risk?)
Also Consider: Unwanted side effects of the Job
Schedule.

01/24/14

16
HAZARD PREVENTION and
CONTROLS
Perimeter Fencing, Enclosures, signs.
Spotters Provided for in-the-blind, backing
machines and/or equipment.
Poor Planing Forces Workers to Commit
Unsafe Acts! (office trailers, change
trailers, haul roads, parking areas).
Be Alert; Stay Clear; Hear Warnings.
Temporary Barricades around Hazards.
01/24/14

17
PROPER EQUIPMENT
MAINTENANCE
Machine in Proper Working Order.
Back-up Alarm, Horn, Lights, Mirrors.
Cab Glass not Cracked or Broken.
Machine Windows, Mirrors, kept Clean.
Pre-Operational Inspection conducted by
Operator.
Prompt Repair of Any Noted Deficiencies!
01/24/14

18
EMPLOYEE AWARENESS
TRAINING
Does Your Job Require You To Approach
Moving or Backing Machines?
How does the Operator Know Where You
Are?
Do You Understand all Signs, Markers
and Flags? KNOW WHAT THEY MEAN!
You Must Always Be Alert to Changing
Job Conditions and Your Particular
Situation.
01/24/14
19
EQUIPMENT OPERATOR
RESPONSIBILITIES
GENERAL GUIDELINES:
Safety Features On Equipment, Know How
They Operate, and Use Them Properly.
Systematic Maintenance and Repair.
Trained Operators.
Trained Repair Personnel.
Pre-Operational Inspection of Equipment.
Review Manufacturer’s Operating Manual.
01/24/14

20
EQUIPMENT OPERATOR
RESPONSIBILITIES
SPECIFIC:
The Most Dangerous Movement is
Backing!
Know Where your Blind Spots Are.
Look For People on Foot Around You.
STOP! When Signaled; When Waived at
Violently; Or If You Are In Doubt….
Maintain a Safe Operating Speed.

01/24/14

21
EQUIPMENT OPERATOR
RESPONSIBILITIES
Keep Machine Under Control at all Times.
Take Machine “Out of Service”, if it is
Unsafe to Operate.
Make Sure You Are Familiar with the
Operating Characteristics of your
Machine.
Be On The Look-Out For Other Trades
Working in the Same Area.
01/24/14

22
Where’s Waldo?

01/24/14

23
EQUIPMENT OPERATOR
RESPONSIBILITIES
Be Aware of Other Machines Operating In
the Area. Frequently check for the
Location of other Machines. Keep Lights
and Backup Alarm in Operating Condition.
Allow NO ONE to Ride Outside the Cab
for Any Reason!
Clean Windows and Adjust Mirrors.
01/24/14

24
EQUIPMENT OPERATOR
RESPONSIBILIES
Always inform Appropriate Personnel of
any Abnormal Conditions, Defects, or
Changes made in Machine and/or Job
Procedure or Conditions.
Report Unsafe Workers to Supervision.
Talk-up Safety with Those Who Work with
You. Maintain “Constant Awareness”.
01/24/14

25
EQUIPMENT OPERATOR
RESPONSIBILITIES
Do Not Attempt Repairs or Maintenance
that You Do Not Understand.
Always Check the Mirror on the Blind
Side, making Sure of Your Clearance.
(Backing on the Blind Side should be
Avoided if at all Possible).
Learn and Follow Safe Work Practices!
01/24/14

26
MANUFACTURER’S
RECOMENDATIONS
CATERPILLAR STATES :
Clear all Personnel from the Machine and
the Area.
The Operator Must be Satisfied that No
One will be Endangered Before Moving
the Machine.
Look Behind Machine Before Backing.
01/24/14

27
MANUFACTURER’S
RECOMENDATIONS
Have a Signalman Present when Moving
In or Out of a Building (or structure).
Stop Machine Frequently at Night, Walk
Around and Inspect Machine, Stay Alert.
Clear All Obstacles from the Path of the
Machine, Beware of Hazards such as
Wires, Ditches, etc..
01/24/14

28
OBSERVATIONS
Small Machines have small blind spots,
where large machines have large blind
spots, both can cause serious injury or
death!
The taller and wider the machine, the
bigger the blind spot area.
All Involved must give Constant Attention
to what they are Doing!
01/24/14

29
THE DANGER OF BEING
STRUCK-BY
ITEMS TO CONSIDER:
Revolving Machines; Cranes & Backhoes.
Struck By Attachments of Machines.
Drawbar Related Accidents, Hooking and
Unhooking.
Articulated Machines - Pinch Points.
Attaching Home Made Devices to a
Machine, Not Approved by Mfg., (Hooks).

01/24/14

30
STANDING ON THE
OPERATOR’S BLIND SIDE

01/24/14

31
THE DANGER OF BEING
STRUCK-BY
The Hazard of a Water Cooler Mounted
on a piece of Equipment.
Storing Crew Lunch Boxes on Equipment.
Hand Tools Placed or Stored on Mobile
Equipment Platforms or Decks.
Environmental Design of the Machine;
Noise Suppression-Vs-Hearing
Protection.
01/24/14

32
IN DEFENSE OF THE
EQUIPMENT OPERATOR
Where Do All these People Come From?
Machine Design; Not Much Thought given
to Persons on Foot in the Working Area.
Faster and Bigger Machines; Not as
Forgiving as Older, Slower, Machines.
Can’t See Everything that Goes on
Around the Machine.
Do Persons on Foot Realize the Danger?
01/24/14

33
IN DEFENSE OF THE
EQUIPMENT OPERATOR
The Operation of the Machine Requires
Constant Attention.
Who is Responsible for Whom?
What about when I have to Work in Close
Proximity to Persons on Foot.
Persons or Vehicles that Approach the
Equipment in My Blind Spots.
Do People on Foot Look Out for Us?
01/24/14

34
Rubber-tired Backhoes Known Hazards
Ground personnel caught in “pinch
points” of machine or struck by moving
machine attachments; buckets,
backhoe boom, outriggers.
Loose or missing pins and keepers in
loader linkages, cracks in lift arms,
bucket attachments and the condition
of the bucket itself.
01/24/14

35
Rubber-tired Backhoes
Traveling at excessive speeds, loss of
control.
Loose, sliding or bad ground conditions.
Using machine as a crane or the bucket as
an aerial work platform.
Seat belt not worn by operator
Transporting personnel in Bucket.

01/24/14

36
Rubber-tired Backhoes
Overloading the capacity of the machine.
Poorly-trained operator, [or] anyone on the
crew is allowed to operate the machine.
Abuse or Misuse of the equipment.
Poor, or non-existing maintenance - [Wait
till it breaks before problems are fixed].
01/24/14

37

Contenu connexe

Tendances

12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
17 Traffic Operations - Working on live roads Risk Assessment Templates.docxDwarika Bhushan Sharma
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IAtlantic Training, LLC.
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of RiggerMajid Hussain
 
TBT on Working at Height.ppt
TBT on Working at Height.pptTBT on Working at Height.ppt
TBT on Working at Height.pptmohammadillias
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training PresentationFAIZ FAREED
 
Forklift safety
Forklift safetyForklift safety
Forklift safetyshree
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templatesDwarika Bhushan Sharma
 
10. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-210. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-2Sergio Augusto Esteves
 
Forklift Operator Safety Training by Platteville
Forklift Operator Safety Training by PlattevilleForklift Operator Safety Training by Platteville
Forklift Operator Safety Training by PlattevilleAtlantic Training, LLC.
 

Tendances (20)

12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates
 
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
 
FORKLIFT SAFETY
FORKLIFT SAFETYFORKLIFT SAFETY
FORKLIFT SAFETY
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Forklift training
Forklift trainingForklift training
Forklift training
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&I
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Mounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump SafetyMounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump Safety
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of Rigger
 
TBT on Working at Height.ppt
TBT on Working at Height.pptTBT on Working at Height.ppt
TBT on Working at Height.ppt
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
Safety man and machine presentation
Safety man and machine presentation Safety man and machine presentation
Safety man and machine presentation
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
Forklift safety
Forklift safetyForklift safety
Forklift safety
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates
 
Safe operating of forklift
Safe operating of forkliftSafe operating of forklift
Safe operating of forklift
 
10. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-210. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-2
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Forklift Operator Safety Training by Platteville
Forklift Operator Safety Training by PlattevilleForklift Operator Safety Training by Platteville
Forklift Operator Safety Training by Platteville
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 

Similaire à Heavy Equipment Safety Around Personnel

Mobile_Equipment_1.ppt
Mobile_Equipment_1.pptMobile_Equipment_1.ppt
Mobile_Equipment_1.pptImran Khan
 
Operation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrOperation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrSidhanath Singh
 
oshaconstructionsafetyformobileequipment.ppt
oshaconstructionsafetyformobileequipment.pptoshaconstructionsafetyformobileequipment.ppt
oshaconstructionsafetyformobileequipment.pptHSE1
 
Arabtec safety man and machine presentation june 2019 rev-1
Arabtec safety man and machine presentation june 2019 rev-1Arabtec safety man and machine presentation june 2019 rev-1
Arabtec safety man and machine presentation june 2019 rev-1Dwarika Bhushan Sharma
 
The Operation O Heavy Equipment++Including+Large+Trucks
The Operation O Heavy Equipment++Including+Large+TrucksThe Operation O Heavy Equipment++Including+Large+Trucks
The Operation O Heavy Equipment++Including+Large+Truckskangaro10a
 
Mechanical Handling updated.ppt
Mechanical Handling updated.pptMechanical Handling updated.ppt
Mechanical Handling updated.pptCheDillon1
 
6 Mechanical handling Hazards.138148015055350.OS
6 Mechanical handling Hazards.138148015055350.OS6 Mechanical handling Hazards.138148015055350.OS
6 Mechanical handling Hazards.138148015055350.OSEiyla Hamdan
 
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docxDwarika Bhushan Sharma
 
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdffy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdfAlexSandroBorgesPere
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docxDwarika Bhushan Sharma
 
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
5 Forklift Hazardsto Eliminate from the Workplace - By RandstadForklift Trucks in Minnesota
 
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Safety Awareness.pptx
Safety Awareness.pptxSafety Awareness.pptx
Safety Awareness.pptxzoredatta1
 

Similaire à Heavy Equipment Safety Around Personnel (20)

Mobile_Equipment_1.ppt
Mobile_Equipment_1.pptMobile_Equipment_1.ppt
Mobile_Equipment_1.ppt
 
Operation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrOperation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel Rr
 
oshaconstructionsafetyformobileequipment.ppt
oshaconstructionsafetyformobileequipment.pptoshaconstructionsafetyformobileequipment.ppt
oshaconstructionsafetyformobileequipment.ppt
 
warehouse.pdf
warehouse.pdfwarehouse.pdf
warehouse.pdf
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Arabtec safety man and machine presentation june 2019 rev-1
Arabtec safety man and machine presentation june 2019 rev-1Arabtec safety man and machine presentation june 2019 rev-1
Arabtec safety man and machine presentation june 2019 rev-1
 
The Operation O Heavy Equipment++Including+Large+Trucks
The Operation O Heavy Equipment++Including+Large+TrucksThe Operation O Heavy Equipment++Including+Large+Trucks
The Operation O Heavy Equipment++Including+Large+Trucks
 
Mechanical Handling updated.ppt
Mechanical Handling updated.pptMechanical Handling updated.ppt
Mechanical Handling updated.ppt
 
6 Mechanical handling Hazards.138148015055350.OS
6 Mechanical handling Hazards.138148015055350.OS6 Mechanical handling Hazards.138148015055350.OS
6 Mechanical handling Hazards.138148015055350.OS
 
Cis58
Cis58Cis58
Cis58
 
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
 
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdffy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
 
update 20feb1
update 20feb1update 20feb1
update 20feb1
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
 
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
Safety Awareness.pptx
Safety Awareness.pptxSafety Awareness.pptx
Safety Awareness.pptx
 
Sample risk assessment roadhaulage
Sample risk assessment   roadhaulageSample risk assessment   roadhaulage
Sample risk assessment roadhaulage
 

Plus de دكتور تامر عبدالله شراكى

Plus de دكتور تامر عبدالله شراكى (20)

New crude oil tank farm project
New crude oil tank farm projectNew crude oil tank farm project
New crude oil tank farm project
 
المصطلحات الفنية لعلوم الحريق والاطفاء
المصطلحات الفنية لعلوم الحريق والاطفاءالمصطلحات الفنية لعلوم الحريق والاطفاء
المصطلحات الفنية لعلوم الحريق والاطفاء
 
Permit to confined_space_work
Permit to confined_space_workPermit to confined_space_work
Permit to confined_space_work
 
Risk management booklet
Risk management bookletRisk management booklet
Risk management booklet
 
How to achieve a safe workplace-e book
How to achieve a safe workplace-e bookHow to achieve a safe workplace-e book
How to achieve a safe workplace-e book
 
What to consider in planning for workplace
What to consider in planning for workplaceWhat to consider in planning for workplace
What to consider in planning for workplace
 
Workplace safety and health guidelines
Workplace safety and health guidelinesWorkplace safety and health guidelines
Workplace safety and health guidelines
 
Nebosh oil-and-gas-certificate-e book
Nebosh oil-and-gas-certificate-e bookNebosh oil-and-gas-certificate-e book
Nebosh oil-and-gas-certificate-e book
 
International technical certificate in oil and gas operational safety revisio...
International technical certificate in oil and gas operational safety revisio...International technical certificate in oil and gas operational safety revisio...
International technical certificate in oil and gas operational safety revisio...
 
Unit ia book part 2
Unit ia book part 2Unit ia book part 2
Unit ia book part 2
 
Management of international health and safety igc1 revision english
Management of international health and safety igc1 revision englishManagement of international health and safety igc1 revision english
Management of international health and safety igc1 revision english
 
Igc1 assessment arabic
Igc1 assessment arabicIgc1 assessment arabic
Igc1 assessment arabic
 
Nebosh international certificate distance learning
Nebosh international certificate distance learningNebosh international certificate distance learning
Nebosh international certificate distance learning
 
Igc1 arabic-1
Igc1  arabic-1Igc1  arabic-1
Igc1 arabic-1
 
Nebosh international diploma syllabus guide
Nebosh international diploma syllabus guideNebosh international diploma syllabus guide
Nebosh international diploma syllabus guide
 
Portable fire extinguishers
Portable fire extinguishersPortable fire extinguishers
Portable fire extinguishers
 
Arc flash guidebook
Arc flash guidebookArc flash guidebook
Arc flash guidebook
 
Niosh extramural research and training program
Niosh extramural research and training programNiosh extramural research and training program
Niosh extramural research and training program
 
Steps to using a fire extinguisher pass.infographic
Steps to using a fire extinguisher pass.infographicSteps to using a fire extinguisher pass.infographic
Steps to using a fire extinguisher pass.infographic
 
Nfpa 10 infographic
Nfpa 10 infographicNfpa 10 infographic
Nfpa 10 infographic
 

Dernier

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 

Dernier (20)

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 

Heavy Equipment Safety Around Personnel

  • 1. The Operation of Heavy Equipment in the Presence of Personnel On the Ground 01/24/14 1
  • 3. Foreword Many types of Mobile Construction Equipment are available for use by contractors doing a wide variety of work. Many, if not all these machines, have to operate within a close proximity to persons on foot. They all however, present similar types of known hazards. This training session is devoted to attempt to identify, and hopefully better educate those who must work around or operate these types of equipment, since they all possess the capability to cause serous injury or death. 01/24/14 3
  • 4. These Include but Are Not Limited To: Front-end loaders; Rubber-tired and tracked Crawler tractors/bulldozers, skid steer bobcats Wheel tractor-scrapers, elevating scrapers, tandem powered scrapers Rubber-tired backhoes and tracked hydraulic excavators On and off-road haulage vehicles Asphalt Pavers and associated support equipment - pavement rollers Vibratory rollers and compactors Motor graders, grade tractors, industrial tractors Concrete mixers and pump trucks Special use construction equipment: grinding, Pulverizing, milling, water trucks, etc 01/24/14 4
  • 5. PERSONS PUT AT RISK BY WORKING AROUND, OR BEING NEAR, HEAVY EQUIPMENT WHILE IT IS OPERATING. DIRECT PARTICIPANTS: (Need to be on site on regular basis) Signal Persons, Observers, Flaggers, Grade Checkers, Dump Persons. Equipment Operators, Teamsters. Laborers, Iron Workers and Carpenters. Foremen, Supervisors, and other related contractor staff. Surveyors, Rodmen, Layout Crews. Mechanics and oilers. Any Other Crafts and/or Trades working on the Project, or Passing through the work areas. 01/24/14 5
  • 6. PERSONS PUT AT RISK BY WORKING AROUND, OR BEING NEAR, HEAVY EQUIPMENT WHILE IT IS OPERATING. PARTICIPANTS WHO NEED TO BE ON SITE: (On a Periodic Basis) Delivery Trucks, Service Providers, (of any kind) - Unescorted on the site. Concrete Mixers, Pump Trucks. Contracted Services; Crane Rental, Concrete Saw Cutting, Port-to-let Service Persons, etc. Union/Labor Officials. Roach Coach Drivers. Trash Removal Vehicles.. Architects and Engineers, Inspectors, Client’s Staff/Owner’s Reps./Guests/VIPs. Engineering Service Providers: Concrete Testing, Compaction Testing, Air Monitoring, etc. City, County, State and Federal Officials: (Of all types). Vendor Sales Personnel or Product Installation Specialist(s). Other Utility Service Providers & Locators: Phone, Gas. Electric, Water, Sewer, Cable, etc. Transportation Industry; Trucking, Buses, Taxicabs, Rail, Ships, Aircraft. 01/24/14 6
  • 7. PERSONS PUT AT RISK BY WORKING AROUND, OR BEING NEAR, HEAVY EQUIPMENT WHILE IT IS OPERATING. NON-PARTICIPANTS, NO DIRECT NEED TO BE ON SITE: Pedestrians, Spectators, On-lookers, Sidewalk Superintendents and the Just Plain Curious! Children (of all ages). Job Seekers, (all types). Joggers, Bicycle Riders, Skate Boarders, All Terrain Vehicles, Power Walkers. Environmentalists independently reviewing compliance with Laws/Restrictions.. Scavengers, Wood collectors, Junk Collectors, Dumpster Divers. Lawyers, Investigators, Thieves, Burglars and Law Breakers. The Media: (Depending on circumstances). 01/24/14 7
  • 8. CONCERNS FOR SAFETY PROBLEM: YOU HAVE A CONGESTED CONSTRUCTION SITE WITH PERSONNEL ON FOOT, AND MOBILE MACHINES WORKING IN THE SAME AREA, AT THE SAME TIME! 01/24/14 8
  • 9. Vision Statement TO PROVIDE A SAFE WORKPLACE, FREE FROM ALL RECOGNIZED HAZARDS... 01/24/14 9
  • 10. Goal and Objective PREVENT WORKPLACE ACCIDENTS! PREVENT PERSONAL INJURIES BETWEEN MOVING EQUIPMENT AND THOSE WORKERS WHO ARE ON FOOT. YOU MUST SEE AND BE SEEN!!! 01/24/14 10
  • 11. Today’s Situation BEING STRUCK BY, OR CAUGHT INBETWEEN, ARE TWO OF THE LEADING CAUSE OF INJURIES AND FATALITIES ON CONSTRUCTION SITES! STRUCK BY (22%) 01/24/14 CAUGHT IN-BETWEEN (18%) 11
  • 12. How Did We Get Here? A NATION-WIDE, PAST HISTORY OF PERSONS BEING STRUCK OR CRUSHED BY OPERATING OR MOVING EQUIPMENT. THE IMPRESSION THAT THE EQUIPMENT OPERATOR ALWAYS KNOWS WHERE THE GROUND PERSONNEL ARE LOCATED. 01/24/14 12
  • 13. Available Solutions Management Commitment Employee Involvement Pre-construction Work-Site Analysis Hazard Prevention and Controls Equipment Maintenance Employee Awareness Training Periodically Review Procedures 01/24/14 13
  • 14. Management Commitment Restrict entry onto site of non-essential personnel. Establish Controlled Entry Points to site. Coordinate Operations of Various Trades Working in the Same Areas. Provide Fundamental Site Rules and Training to all Persons at Risk. Adequate Lay-Down Areas Established. 01/24/14 14
  • 15. Employee Involvement All employees who are at risk must receive basic indoctrination. Absolute need to address problem with employees on a regular basis. (Toolbox Safety Meetings). Employees must learn, follow, and obey established rules. Realize that they must see, and be seen. 01/24/14 15
  • 16. Pre-Construction WorkSite Analysis Identify Potential Known Hazards. Job Conditions: Haul Roads, Access Points. Lay down/Storage Areas. Office, Tool, Storage and Change Trailers. Methods of Construction, (increases Risk?) Also Consider: Unwanted side effects of the Job Schedule. 01/24/14 16
  • 17. HAZARD PREVENTION and CONTROLS Perimeter Fencing, Enclosures, signs. Spotters Provided for in-the-blind, backing machines and/or equipment. Poor Planing Forces Workers to Commit Unsafe Acts! (office trailers, change trailers, haul roads, parking areas). Be Alert; Stay Clear; Hear Warnings. Temporary Barricades around Hazards. 01/24/14 17
  • 18. PROPER EQUIPMENT MAINTENANCE Machine in Proper Working Order. Back-up Alarm, Horn, Lights, Mirrors. Cab Glass not Cracked or Broken. Machine Windows, Mirrors, kept Clean. Pre-Operational Inspection conducted by Operator. Prompt Repair of Any Noted Deficiencies! 01/24/14 18
  • 19. EMPLOYEE AWARENESS TRAINING Does Your Job Require You To Approach Moving or Backing Machines? How does the Operator Know Where You Are? Do You Understand all Signs, Markers and Flags? KNOW WHAT THEY MEAN! You Must Always Be Alert to Changing Job Conditions and Your Particular Situation. 01/24/14 19
  • 20. EQUIPMENT OPERATOR RESPONSIBILITIES GENERAL GUIDELINES: Safety Features On Equipment, Know How They Operate, and Use Them Properly. Systematic Maintenance and Repair. Trained Operators. Trained Repair Personnel. Pre-Operational Inspection of Equipment. Review Manufacturer’s Operating Manual. 01/24/14 20
  • 21. EQUIPMENT OPERATOR RESPONSIBILITIES SPECIFIC: The Most Dangerous Movement is Backing! Know Where your Blind Spots Are. Look For People on Foot Around You. STOP! When Signaled; When Waived at Violently; Or If You Are In Doubt…. Maintain a Safe Operating Speed. 01/24/14 21
  • 22. EQUIPMENT OPERATOR RESPONSIBILITIES Keep Machine Under Control at all Times. Take Machine “Out of Service”, if it is Unsafe to Operate. Make Sure You Are Familiar with the Operating Characteristics of your Machine. Be On The Look-Out For Other Trades Working in the Same Area. 01/24/14 22
  • 24. EQUIPMENT OPERATOR RESPONSIBILITIES Be Aware of Other Machines Operating In the Area. Frequently check for the Location of other Machines. Keep Lights and Backup Alarm in Operating Condition. Allow NO ONE to Ride Outside the Cab for Any Reason! Clean Windows and Adjust Mirrors. 01/24/14 24
  • 25. EQUIPMENT OPERATOR RESPONSIBILIES Always inform Appropriate Personnel of any Abnormal Conditions, Defects, or Changes made in Machine and/or Job Procedure or Conditions. Report Unsafe Workers to Supervision. Talk-up Safety with Those Who Work with You. Maintain “Constant Awareness”. 01/24/14 25
  • 26. EQUIPMENT OPERATOR RESPONSIBILITIES Do Not Attempt Repairs or Maintenance that You Do Not Understand. Always Check the Mirror on the Blind Side, making Sure of Your Clearance. (Backing on the Blind Side should be Avoided if at all Possible). Learn and Follow Safe Work Practices! 01/24/14 26
  • 27. MANUFACTURER’S RECOMENDATIONS CATERPILLAR STATES : Clear all Personnel from the Machine and the Area. The Operator Must be Satisfied that No One will be Endangered Before Moving the Machine. Look Behind Machine Before Backing. 01/24/14 27
  • 28. MANUFACTURER’S RECOMENDATIONS Have a Signalman Present when Moving In or Out of a Building (or structure). Stop Machine Frequently at Night, Walk Around and Inspect Machine, Stay Alert. Clear All Obstacles from the Path of the Machine, Beware of Hazards such as Wires, Ditches, etc.. 01/24/14 28
  • 29. OBSERVATIONS Small Machines have small blind spots, where large machines have large blind spots, both can cause serious injury or death! The taller and wider the machine, the bigger the blind spot area. All Involved must give Constant Attention to what they are Doing! 01/24/14 29
  • 30. THE DANGER OF BEING STRUCK-BY ITEMS TO CONSIDER: Revolving Machines; Cranes & Backhoes. Struck By Attachments of Machines. Drawbar Related Accidents, Hooking and Unhooking. Articulated Machines - Pinch Points. Attaching Home Made Devices to a Machine, Not Approved by Mfg., (Hooks). 01/24/14 30
  • 31. STANDING ON THE OPERATOR’S BLIND SIDE 01/24/14 31
  • 32. THE DANGER OF BEING STRUCK-BY The Hazard of a Water Cooler Mounted on a piece of Equipment. Storing Crew Lunch Boxes on Equipment. Hand Tools Placed or Stored on Mobile Equipment Platforms or Decks. Environmental Design of the Machine; Noise Suppression-Vs-Hearing Protection. 01/24/14 32
  • 33. IN DEFENSE OF THE EQUIPMENT OPERATOR Where Do All these People Come From? Machine Design; Not Much Thought given to Persons on Foot in the Working Area. Faster and Bigger Machines; Not as Forgiving as Older, Slower, Machines. Can’t See Everything that Goes on Around the Machine. Do Persons on Foot Realize the Danger? 01/24/14 33
  • 34. IN DEFENSE OF THE EQUIPMENT OPERATOR The Operation of the Machine Requires Constant Attention. Who is Responsible for Whom? What about when I have to Work in Close Proximity to Persons on Foot. Persons or Vehicles that Approach the Equipment in My Blind Spots. Do People on Foot Look Out for Us? 01/24/14 34
  • 35. Rubber-tired Backhoes Known Hazards Ground personnel caught in “pinch points” of machine or struck by moving machine attachments; buckets, backhoe boom, outriggers. Loose or missing pins and keepers in loader linkages, cracks in lift arms, bucket attachments and the condition of the bucket itself. 01/24/14 35
  • 36. Rubber-tired Backhoes Traveling at excessive speeds, loss of control. Loose, sliding or bad ground conditions. Using machine as a crane or the bucket as an aerial work platform. Seat belt not worn by operator Transporting personnel in Bucket. 01/24/14 36
  • 37. Rubber-tired Backhoes Overloading the capacity of the machine. Poorly-trained operator, [or] anyone on the crew is allowed to operate the machine. Abuse or Misuse of the equipment. Poor, or non-existing maintenance - [Wait till it breaks before problems are fixed]. 01/24/14 37