USACE Infrastructure
 Financing Potential

   Gary Loew
   Asst to Director, Civil Works
   HQUSACE

   13 October 2011




US Army Corps of Engineers
BUILDING STRONG®
Questions
 What does Recapitalization mean?

 What is USACE doing?

 Legislation?




                     2        BUILDING STRONG®
Life Cycle Asset Management
(Senior Oversight Group (SOG))
 Create Asset (Capitalization)

 Operate and Maintain

 Recapitalize or Divest (Deauthorize)



                     3            BUILDING STRONG®
Life Cycle Asset Management
   CAPITALIZATION
                   Enablers
    ►   Planning—More deliberate selection of studies to meet program objectives.
        More efficient studies, esp for navigation
    ►   Engineering—Improved Program and Project Management (See IWUB Report
        for list of 18 improvements
 OPERATIONS AND MAINTENANCE
    ►   Risk-Informed, Systems-based Asset Management to prioritize work
 RECAPITALIZATION
    ►   More funds—long term
    ►   Stakeholder and Partner relations
    ►   Development of a Long Term Capital Budget Plan
         •   NOTE: Capital Plans exist now for Dams (Dam Safety Report), Inland Waterways (IWUB Report) and
             Hydropower (HMI Report)
    ►   Review of projects, esp. reservoirs, for updated needs and uses
 DIVESTITURE
    ►   Legislation to create a process to deauthorized operating projects no longer
        required. It can mirror existing legislation used to deauthorize projects never
        constructed and not funded for 5 years

                                                     4                                BUILDING STRONG®
RECAPITALIZATION OF USACE CW
                   INFRASTRUCTURE
                  OBSERVATIONS (1/3)

•Funding potential is specific to Infrastructure type
•Consider funding both for recapitalization and for O&M
•Recapitalization costs include planning, design, construction
•Alternative financing must consider change in traditional cost share
•Funding solutions must consider both local/partner cost and federal costs
     •Assisting local costs implies increase in federal cost-share
•Alternative financing may include advanced contributions, contributions in
excess of existing cost share amount, donations, credits, loans, grants,
infrastructure bank loans, bonding authority
    •Loan incentives include direct loans and loan guarantees
    •States have bonding authority now




                                       5                        BUILDING STRONG®
RECAPITALIZATION OF USACE CW
                  INFRASTRUCTURE
                 OBSERVATIONS (2/3)
•All PPP solutions require a long term, low risk source of funds to
repay the capital loaned. Loan period may be 10-30+ years.
Examples:
    •Highway tolls to repay cost of construction and/or maintenance
    •Tipping fees for disposal of dredged material, use of port facilities
    •Recreation, Water Supply, Electricity fees
    •Bonds that fund state/local cost of facility construction or O&M
•USACE will likely need to revisit boundary between Recap and
Maintenance
•There are other incentives to enable Recap e.g. the Energy
Savings Performance Contracts (ESPCs—enable PPP for energy
saving projects and operations)
    •The savings generally cover 100% of costs
    •Federal revenue is still required to repay the PPP capital



                                        6                         BUILDING STRONG®
RECAPITALIZATION OF USACE CW
                  INFRASTRUCTURE
                 OBSERVATIONS (3/3)
•Solutions might range from cash to complete facility transfer
•General solutions should enable local variations
    •Give Districts authority to negotiate local solutions
    •As a incentive for Districts to generate project savings, allow them to
    reallocate funds to high priority requirements at the District or MSC.
•Recapitalized projects may be „repurposed‟
•Revenue possibilities should include current uses and
beneficiaries; not just currently „authorized‟ purposes
    •Multiple purpose projects present a challenge
•Life cycle solutions include:
    •Careful selection of new projects (planning, design and construction)
    •Financing/Alternative Financing for
        •Recapitalization
        •O&M
    •Divestiture of projects that no longer serve authorized purposes or are
    no longer consistent with national priorities

                                        7                       BUILDING STRONG®
RECAPITALIZATION OF USACE CW
                   INFRASTRUCTURE
                INFRASTRUCTURE TYPES

•NAVIGATION (Recapitalization & O&M)
    •COASTAL
    •INLAND
•FLOOD RISK MANAGEMENT
    •COASTAL
    •INLAND
•ACQUATIC ECOSYSTEM RESTORATION
    •Not Applicable—projects are self-sustaining
•HYDROPOWER
•WATER SUPPLY
•RECREATION

Notes:
    •Most projects are multiple purpose
    •Users Pay Principle implies that funding solutions are specific to beneficiaries
    of each infrastructure type—no silver bullet


                                            8                           BUILDING STRONG®
RECAPITALIZATION OF USACE CW
      INFRASTRUCTURE
 CURRENT SOURCES OF FUNDS
                     CAP
         Coastal
                     O&M
                    (100%)
NAV
                     CAP
                    (50%)
          Inland
                    O&M          8 of 14 Infrastructure Types are already
                                 funded to either repay capital costs or
                    CAP          pay for O&M or both
         Coastal
                    O&M
FRM
                     CAP
                    (50%)
         Inland
                    O&M

            CAP                                         CAP
           (100%)                                      (~30%)
Hydro                                  Recreation
            O&M                                         O&M
           (100%)                                      (~30%)
            CAP
Water      (100%)
Supply      O&M              9                      BUILDING STRONG®
           (100%)
RECAPITALIZATION OF USACE CW
                         INFRASTRUCTURE
                       STATUS OF SOLUTIONS
       INFRASTRUCTURE TYPE                      COMMENTS                                         STATUS
NAV-COASTAL (CAP)                                                              No solution at this time
  (O&M)                                                                        Cost 100% funded;
                                                                               Industry proposed HMTF solution

NAV-INLAND (CAP)               Range of projects is 103 (max) – 26(min)        Capital costs 50% funded
                               Need to clarify Recap/O&M                       Admin and Industry proposals active.
                                                                               Include user fees, increased fuel tax
  (O&M)                                                                        Admin proposal includes O&M?

FRM-COASTAL (CAP)                                                              No solution at this time
  (O&M)                        N/A                                             N/A
FRM INLAND (CAP)               About 300+ projects?                            No solution at this time
                               Need to clarify Recap/O&M
                               Need to improve prioritization methodology

  (O&M)                                                                        No solution at this time
HYDROPOWER (CAP)               PMA concurrence req’d                           Cost 100% reimbursed
                               N/A to Bonneville System                        PMA’s verbal to fund more
                                                                               Pvt Firm seeking ESPC legislation
  (O&M)                        PMA concurrence req’d                           Cost 100% funded now; not to USACE.
                               N/A to Bonneville System                        PMA’s already funding some and verbal to
                                                                               fund more
WATER SUPPLY                   Emerging payee; esp in southwest/west           Cost ~ 30% reimbursed now;

AQUATIC ECOSYSTEM RESTORAION   N/A for CAP – Projects are self sustaining      N/A
                               (Some O&M)
RECREATION                     User fees collected, but into Treasury; other   Legislation has been proposed
                               Fed agencies retain 50% collections;


                                                      10                                           BUILDING STRONG®
RECAPITALIZATION OF USACE CW INFRASTRUCTURE
      ALTERNATIVE FUNDING SOLUTIONS AND THEIR
       APPLICABILITY TO USACE INFRASTRUCTURE
                                                NAV*                FRM*   HYDRO         WATER            AER
                                                                                         SUPPLY
                    ADVANCED
                    CONTRIBUTIONS
                    DONATIONS                     (Miami, Corpus)           (PMAs)
                    BONDING AUTHORITY
                    RECAP BANK
                    LOAN GUARANTEE
                    GRANTS
                    USER FEES                   HMTF 100% for              100%            - 100%
                                                Coastal Nav O&M            reimbursed    reimbursed for
                                                IWTF 50% for CAP           for CAP and   CAP and O&M
                                                                           O&M
                    SPECIAL TAXING
                    DISTRICT
                    CREDITS
                    ASSUMPTION OF
                    PLNG/DESIGN/CONTRUC
                    TION/O&M
                    PPP-(LOAN)                                               ESPC
                                                                           could fully
                                                                           fund some
                                                                           projects
                    REVISE COST SHARE
                    REPURPOSE PROJECT;
                    REVISE COST SHARE

                    DIVESTITURE


* Need to identify potential revenue sources and determine how to   11                                    BUILDING STRONG®
apply to multiple purpose projects
Examples of Financing Alternatives
   Working: HMTF, IWTF, Hydropower Contributions, Hydropower ESPCs,
    Retention of Rec User Fees
   Hydropower: Take Hydropower off-line, e.g. Bonneville Power, TVA
   “Donations” (Miami Harbor, Corpus Christi)
   Credits for WIK or for Plng/Design/Construction in excess of cost-share
   Water Supply: Non-federal-funded studies
   Water Supply: Contributions towards Recap Projects that would extend
    project life]
   Water Supply: Expand authority for USACE to execute projects for
    sedimentation management and dredging
   Water Supply: Refine, clarify cost of storage methodology to enable
    reallocation
   Multiple Purpose: Authorize USACE to provide credit to non-fed sponsors
    for work related to O&M acivities



                                       12                     BUILDING STRONG®
RECAPITALIZATION OF USACE CW
                    INFRASTRUCTURE
                        SUMMARY

•Beneficiaries of each infrastructure type vary
•Funding solution for each type is different
•Some funding initiatives would work for several types (e.g. advanced funding,
contributed funds, donations, etc.)
•DA should seek authorities that provide options whenever possible as
opposed to authorities that dictate solutions, e.g. option to contribute funds.
•Multiple use FRM projects are the challenge—to define potential revenue
sources that could repay loans
•Some USACE activities are already 100% funding (hydropower, water
supply, coastal navigation O&M). Users will not agree to these solutions in
the future unless they retain control of the use of funds (e.g. PMAs)
     •The corollary is that users will want complete control or oversight of any voluntary
     or legislated solution that involves their money.
     •USACE will need to identify what it must control and what it can let go.
•FRM/Multiple Purpose Projects are the challenge
•Suite of solutions/funding authorities/funding sources will be required
•Divestiture of infrastructure is an important part of the total program
                                             13                          BUILDING STRONG®
The Way Ahead
 Continue to Engage Industry and Stakeholders
   ►   CH2M Hill/Shaw Group/Industry Forums
   ►   NRC Colloquium
   ► Workshops  with interagency partners
   ► LBG Workshop and White Paper on PPP Alternatives
 State of USACE Infrastructure Report
 Synchronize with CW Transformation/FY13 and FY14
  Budgets
 Go to Next Level and Propose
   ►   Legislation
   ►   Policy and Program Management Changes




                                 14            BUILDING STRONG®

Contenu connexe

Plus de The Texas Network, LLC

WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017The Texas Network, LLC
 
TWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleTWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleThe Texas Network, LLC
 
Pass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesPass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesThe Texas Network, LLC
 
Methods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayMethods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayThe Texas Network, LLC
 
The Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Texas Network, LLC
 
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT The Texas Network, LLC
 
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasU.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasThe Texas Network, LLC
 
Individual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersIndividual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersThe Texas Network, LLC
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Texas Network, LLC
 
Pecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part IIPecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part IIThe Texas Network, LLC
 
Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...The Texas Network, LLC
 
Groundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and BraggGroundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and BraggThe Texas Network, LLC
 

Plus de The Texas Network, LLC (20)

WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017
 
WHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIPWHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIP
 
WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015
 
TWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleTWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” Rule
 
Pass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesPass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal Challenges
 
Professional Ethics
Professional EthicsProfessional Ethics
Professional Ethics
 
Methods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayMethods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda Bay
 
The Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on Reuse
 
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
 
TWCA Speech – Rep. James Frank
TWCA Speech – Rep. James FrankTWCA Speech – Rep. James Frank
TWCA Speech – Rep. James Frank
 
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasU.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
 
Individual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersIndividual liability for Water Authority Board Members
Individual liability for Water Authority Board Members
 
From Projectile to Pump Station
From Projectile to Pump StationFrom Projectile to Pump Station
From Projectile to Pump Station
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
 
Pecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part IIPecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part II
 
Update on ERCOT Activities
Update on ERCOT ActivitiesUpdate on ERCOT Activities
Update on ERCOT Activities
 
National Floodplain Policy: FFRMS
National Floodplain Policy: FFRMSNational Floodplain Policy: FFRMS
National Floodplain Policy: FFRMS
 
San Antonio Vista Ridge Project
San Antonio Vista Ridge ProjectSan Antonio Vista Ridge Project
San Antonio Vista Ridge Project
 
Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...
 
Groundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and BraggGroundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and Bragg
 

Dernier

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 

Dernier (20)

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 

USACE Infrastructure Financing Potential TWCA 10/13/2011

  • 1. USACE Infrastructure Financing Potential Gary Loew Asst to Director, Civil Works HQUSACE 13 October 2011 US Army Corps of Engineers BUILDING STRONG®
  • 2. Questions  What does Recapitalization mean?  What is USACE doing?  Legislation? 2 BUILDING STRONG®
  • 3. Life Cycle Asset Management (Senior Oversight Group (SOG))  Create Asset (Capitalization)  Operate and Maintain  Recapitalize or Divest (Deauthorize) 3 BUILDING STRONG®
  • 4. Life Cycle Asset Management  CAPITALIZATION Enablers ► Planning—More deliberate selection of studies to meet program objectives. More efficient studies, esp for navigation ► Engineering—Improved Program and Project Management (See IWUB Report for list of 18 improvements  OPERATIONS AND MAINTENANCE ► Risk-Informed, Systems-based Asset Management to prioritize work  RECAPITALIZATION ► More funds—long term ► Stakeholder and Partner relations ► Development of a Long Term Capital Budget Plan • NOTE: Capital Plans exist now for Dams (Dam Safety Report), Inland Waterways (IWUB Report) and Hydropower (HMI Report) ► Review of projects, esp. reservoirs, for updated needs and uses  DIVESTITURE ► Legislation to create a process to deauthorized operating projects no longer required. It can mirror existing legislation used to deauthorize projects never constructed and not funded for 5 years 4 BUILDING STRONG®
  • 5. RECAPITALIZATION OF USACE CW INFRASTRUCTURE OBSERVATIONS (1/3) •Funding potential is specific to Infrastructure type •Consider funding both for recapitalization and for O&M •Recapitalization costs include planning, design, construction •Alternative financing must consider change in traditional cost share •Funding solutions must consider both local/partner cost and federal costs •Assisting local costs implies increase in federal cost-share •Alternative financing may include advanced contributions, contributions in excess of existing cost share amount, donations, credits, loans, grants, infrastructure bank loans, bonding authority •Loan incentives include direct loans and loan guarantees •States have bonding authority now 5 BUILDING STRONG®
  • 6. RECAPITALIZATION OF USACE CW INFRASTRUCTURE OBSERVATIONS (2/3) •All PPP solutions require a long term, low risk source of funds to repay the capital loaned. Loan period may be 10-30+ years. Examples: •Highway tolls to repay cost of construction and/or maintenance •Tipping fees for disposal of dredged material, use of port facilities •Recreation, Water Supply, Electricity fees •Bonds that fund state/local cost of facility construction or O&M •USACE will likely need to revisit boundary between Recap and Maintenance •There are other incentives to enable Recap e.g. the Energy Savings Performance Contracts (ESPCs—enable PPP for energy saving projects and operations) •The savings generally cover 100% of costs •Federal revenue is still required to repay the PPP capital 6 BUILDING STRONG®
  • 7. RECAPITALIZATION OF USACE CW INFRASTRUCTURE OBSERVATIONS (3/3) •Solutions might range from cash to complete facility transfer •General solutions should enable local variations •Give Districts authority to negotiate local solutions •As a incentive for Districts to generate project savings, allow them to reallocate funds to high priority requirements at the District or MSC. •Recapitalized projects may be „repurposed‟ •Revenue possibilities should include current uses and beneficiaries; not just currently „authorized‟ purposes •Multiple purpose projects present a challenge •Life cycle solutions include: •Careful selection of new projects (planning, design and construction) •Financing/Alternative Financing for •Recapitalization •O&M •Divestiture of projects that no longer serve authorized purposes or are no longer consistent with national priorities 7 BUILDING STRONG®
  • 8. RECAPITALIZATION OF USACE CW INFRASTRUCTURE INFRASTRUCTURE TYPES •NAVIGATION (Recapitalization & O&M) •COASTAL •INLAND •FLOOD RISK MANAGEMENT •COASTAL •INLAND •ACQUATIC ECOSYSTEM RESTORATION •Not Applicable—projects are self-sustaining •HYDROPOWER •WATER SUPPLY •RECREATION Notes: •Most projects are multiple purpose •Users Pay Principle implies that funding solutions are specific to beneficiaries of each infrastructure type—no silver bullet 8 BUILDING STRONG®
  • 9. RECAPITALIZATION OF USACE CW INFRASTRUCTURE CURRENT SOURCES OF FUNDS CAP Coastal O&M (100%) NAV CAP (50%) Inland O&M 8 of 14 Infrastructure Types are already funded to either repay capital costs or CAP pay for O&M or both Coastal O&M FRM CAP (50%) Inland O&M CAP CAP (100%) (~30%) Hydro Recreation O&M O&M (100%) (~30%) CAP Water (100%) Supply O&M 9 BUILDING STRONG® (100%)
  • 10. RECAPITALIZATION OF USACE CW INFRASTRUCTURE STATUS OF SOLUTIONS INFRASTRUCTURE TYPE COMMENTS STATUS NAV-COASTAL (CAP) No solution at this time (O&M) Cost 100% funded; Industry proposed HMTF solution NAV-INLAND (CAP) Range of projects is 103 (max) – 26(min) Capital costs 50% funded Need to clarify Recap/O&M Admin and Industry proposals active. Include user fees, increased fuel tax (O&M) Admin proposal includes O&M? FRM-COASTAL (CAP) No solution at this time (O&M) N/A N/A FRM INLAND (CAP) About 300+ projects? No solution at this time Need to clarify Recap/O&M Need to improve prioritization methodology (O&M) No solution at this time HYDROPOWER (CAP) PMA concurrence req’d Cost 100% reimbursed N/A to Bonneville System PMA’s verbal to fund more Pvt Firm seeking ESPC legislation (O&M) PMA concurrence req’d Cost 100% funded now; not to USACE. N/A to Bonneville System PMA’s already funding some and verbal to fund more WATER SUPPLY Emerging payee; esp in southwest/west Cost ~ 30% reimbursed now; AQUATIC ECOSYSTEM RESTORAION N/A for CAP – Projects are self sustaining N/A (Some O&M) RECREATION User fees collected, but into Treasury; other Legislation has been proposed Fed agencies retain 50% collections; 10 BUILDING STRONG®
  • 11. RECAPITALIZATION OF USACE CW INFRASTRUCTURE ALTERNATIVE FUNDING SOLUTIONS AND THEIR APPLICABILITY TO USACE INFRASTRUCTURE NAV* FRM* HYDRO WATER AER SUPPLY ADVANCED CONTRIBUTIONS DONATIONS (Miami, Corpus) (PMAs) BONDING AUTHORITY RECAP BANK LOAN GUARANTEE GRANTS USER FEES HMTF 100% for 100% - 100% Coastal Nav O&M reimbursed reimbursed for IWTF 50% for CAP for CAP and CAP and O&M O&M SPECIAL TAXING DISTRICT CREDITS ASSUMPTION OF PLNG/DESIGN/CONTRUC TION/O&M PPP-(LOAN) ESPC could fully fund some projects REVISE COST SHARE REPURPOSE PROJECT; REVISE COST SHARE DIVESTITURE * Need to identify potential revenue sources and determine how to 11 BUILDING STRONG® apply to multiple purpose projects
  • 12. Examples of Financing Alternatives  Working: HMTF, IWTF, Hydropower Contributions, Hydropower ESPCs, Retention of Rec User Fees  Hydropower: Take Hydropower off-line, e.g. Bonneville Power, TVA  “Donations” (Miami Harbor, Corpus Christi)  Credits for WIK or for Plng/Design/Construction in excess of cost-share  Water Supply: Non-federal-funded studies  Water Supply: Contributions towards Recap Projects that would extend project life]  Water Supply: Expand authority for USACE to execute projects for sedimentation management and dredging  Water Supply: Refine, clarify cost of storage methodology to enable reallocation  Multiple Purpose: Authorize USACE to provide credit to non-fed sponsors for work related to O&M acivities 12 BUILDING STRONG®
  • 13. RECAPITALIZATION OF USACE CW INFRASTRUCTURE SUMMARY •Beneficiaries of each infrastructure type vary •Funding solution for each type is different •Some funding initiatives would work for several types (e.g. advanced funding, contributed funds, donations, etc.) •DA should seek authorities that provide options whenever possible as opposed to authorities that dictate solutions, e.g. option to contribute funds. •Multiple use FRM projects are the challenge—to define potential revenue sources that could repay loans •Some USACE activities are already 100% funding (hydropower, water supply, coastal navigation O&M). Users will not agree to these solutions in the future unless they retain control of the use of funds (e.g. PMAs) •The corollary is that users will want complete control or oversight of any voluntary or legislated solution that involves their money. •USACE will need to identify what it must control and what it can let go. •FRM/Multiple Purpose Projects are the challenge •Suite of solutions/funding authorities/funding sources will be required •Divestiture of infrastructure is an important part of the total program 13 BUILDING STRONG®
  • 14. The Way Ahead  Continue to Engage Industry and Stakeholders ► CH2M Hill/Shaw Group/Industry Forums ► NRC Colloquium ► Workshops with interagency partners ► LBG Workshop and White Paper on PPP Alternatives  State of USACE Infrastructure Report  Synchronize with CW Transformation/FY13 and FY14 Budgets  Go to Next Level and Propose ► Legislation ► Policy and Program Management Changes 14 BUILDING STRONG®