Author: Tikeshwar Mahto,
Dy. Director of Mines Safety,
Bilaspur Region (India).
+917898033693
tikeshwarmahto@yahoo.co.in
ECONOMICAL AND SAFE DESIGN OF ROOF BAR (GIRDER) FOR STRATA CONTROL
IN UNDERGROUND MINES TO EXTRACT THICK SEAMS-
-A Case Study of Blasting Gallery- Method
Abstract
Blasting Gallery is a method of working to extract thick seams ( 8m - 15m ) in single lift.
Strata control mechanism is a very critical aspect of BG-method, as the height of working is
more than 10m. Natural support has very important role in overcoming dynamic load created
by the hanging goaf, particularly in case of massive sand stone roof. Artificial supports are
only for resisting separation of immediate roof. Hence, design of natural support as well as
temporary supports are very- very important for the strata control point of view. In this
paper, the author is concentrating on the temporary supports used in Blasting Gallery
Method. The author has critically diagnosed about the drawbacks and failure of existing
supporting system (roof bar) and also suggested a modification for effective utilization of
supports. If, the design of roof bar as suggested by the author is implemented effectively, a
huge amount of rupees will be saved in purchase of roof bar every year and also an effective
support resistance can be developed for the safe working of BG-method.
CRITICAL STUDY OF FAILURE (OR PREMATURE YIELDING) OF ROOF BAR USED IN
BLASTING GALLERY
The roof bar of I- section used in BG working is loaded with different stresses like direct
stress(compressive stress), shear stress, bending stresses etc. and failure of which is
caused by either any one of these or due to combined effect of these stresses. The roof bar
of I – section is made of two different load bearing components, web and flanges. Flanges
are for bearing bending moment and bending stresses and web is for resisting shear stress
and direct stress (compressive stress). Case study made by the author reveals that the
failure of roof bar is due to bending of flanges in centre and failure of web at the edges of the
roof bar. The above-mentioned failures of roof bar are due to faulty design & selection of
roof bar. The author has critically diagnosed about it, and has made some modification in
design of roof bar, which is mentioned below.
2
Failuare of roof bar due to faulty supporting system:
Support assembly being practiced in BG- method is shown here.
Free body load diagram of support assembly of Fig.3 can be drawn in the following
ways for clear representation of diffirent forces acting on support assembly
Where, AB a M.S. roof bar
L1, L2 concentrated reactive forces (loads) on the roof bar, and
R1, R2 support resistances offered by the O.C Props (15-20Tons, )
3
Drawing shear force and bending moment diagram for the normal suppoeting system:
(i) Loaded roof bar
(ii) S.F.Diagram
(iii) B.M. Diagram
X
V
+ve
-ve
A B
A1
B1
R1
R2
+ve
-ve
x
Mb
A
BA1 B1
R1C R1C
4
We can see from the free body load diagram and fig-3 in which the support resistances (R1
& R2) offered by the Open Circuit props are directly acting on the steel roof bar and not on
the roof of the gallery, because there is no contact between roof and roof bar. In this case
total support resistance is utilized for bending the roof bar and not for resisting rock load.
When R1 & R2 increases, L1 & L2 also increases which tries to bend the roof bar.
From, Fig-4, R1 + R2 = L1 + L2
It means total support resistances offered by O.C props are inversely transferred on the roof
bar, which tend to bend the bar. After yielding of roof bar, support resistance decreases and
adverse situations like, bed separation, side spalling, overriding, props dislodgment etc., are
created.
The roof bar assembly in yielded condition is shown in Fig.5
5
Flexural strength calculation
This is for calculation of bending stresses in flanges of the roof bar due to bending moment
as calculated above.
The section of the roof bar and stresses in flanges of the bar can be drawn in the following
ways;
From the theory of simple bending;
M/I = α/y =E/R
Where, b= flange width,
d= distance between the two flanges,
t1= thickness of flange,
t2= thickness of web,
αt = bending stress(tensile),
αc = bending stress (compressive) ,
N1- N2 = neutral line
M = moment of resistance or bending moment,
I = moment of inertia,
y = distance from neutral axis,
E = Young’s modulus, and
R = radius of curvature of internal surface of the deformed beam(roof bar).
Here, M/I = α/y
Or, α = M*y/I
So `α ` will be maximum or minimum when ` y` is maximum or minimum.
Thus , for y= 0 , α = 0 i.e. bending stress at neutral line is zero and bending stresses at
flanges are maximum.
Also ymax = d/2
αmax = (M/I) *ymax , or, αmax = Md/2I
Thus, maximum bending stress is at flanges of the roof bar, as shown in the figure above.
b
d
t1
t2
αc
αt
Neutral line N1-N2
ymax = d/2
6
Moment of inertia(I) of I – section beam:
First, we will calculate moment of inertia of rectangular section beam of same dimension.
Moment of inertia of rectangular section = b*d3
/12
Where, b= width of section of the rectangular beam,
d = height of section of beam.
t1 = thickness of flange of I- section beam,
t2 = thickness of web of beam.
N1-N2 = neutral line
Now cutting the dotted portion of the rectangular section, as shown in the above figure for
calculating moment of inertia (I) of I- section beam.
Hence, section of cut portion of the rectangular beam will be;
So, M.I. of two cut portions about N1- N2 = 2* (b- t2/2)(d-2t1)3
/12
= (b-t2)(d- 2t1)3
/12
Thus, M. I. of I – section beam (girder) will be;
I = M.I. of rectangular beam – M.I. of cut portions.
Or, I = b*d3
/12 – (b- t2)(d-2t1)3
/12
Or, I = [ b*d3
– ( b- t2)(d-2t1)3
]/12
Moment of resistance( bending moment ) can be taken from bending moment
diagram(B.M.D.), as drawn in previous page.
d
b
t2
t1
N2
N1
d - 2t1
b-t2/2
N1
N2
7
So, maximum bending moment is at centre of the beam(or roof bar );
Or, M = R*C
Where, M = bending moment
R = support resistance by O.C. props, and
C = mid- distance of cogs from the edge of roof bar.
Thickness of web (t2) : 7mm
Cross- section of the web[(d-2t1)*t2)] : 180mm*7mm
MODIFICATION IN SUPPORTING SYSTEM SUGGESTED BY THE AUTHOR:
The author has done nothing extra, but has made some changes after deep study in BG
method of working. In the changed system of supporting, the wooden lagging are exactly
above the O.C. Props to make direct contact of the O.C. props with the roof of the galleries.
The support capacity or strength of the O.C. props are directly transferred to the roof of the
galleries and not to the roof bar, which eliminates the chances of bending of roof bar and the
O.C. props remain always tightened against the roof. Also, support resistance increases,
which can improve strata condition.
The modified system of support assembly is shown in Fig.6, given below. The support
resistance can further be increased by strengthening roof bars properly at both ends.
Modified supporting system
8

Free body load diagram of the modified system of supporting is shown below in Fig.7
Where,
AB is roof bar
R1 & R2 are support resistances offered by OC props
L1 & L2 are reactive support resistances transferred to the
roof rock, and
L3 , L4 & L5 are concentrated reactive support resistances offered
by roof bar to the roof rock
L1
L3 L4 L5
L2
BA
Fig. 7
R2
R1
9
Drawing shear force and bending moment diagram for modified supporting system:
FREE BODY LOAD DIAGRAM
(i) Loaded beam
(ii) S.F.Diagram
(iii) B.M.Diagram
L1
L3 L4 L5
L2
BA
X
V
A
BA3
A2
A1
+ve
-ve
R1-L1
R2-L2
X
Mb
A
BA1 A2 A3
W (R1-L1)/2 - L3*C
10
Failure of roof bar due to faulty design of roof bar:
The author has studied about the failure of roof bar in the BG- panel, which is only due to
faulty design of roof bar. Roof bar used in early years was of 150mm * 150mm section.
Currently BG- panel is using 200mm*200mm girder of I – section. The thickness of web is
about 7mm. It has become use and throw i.e. after using once; it is being thrown in scrap,
because after failure of web there is no further use in supporting. It has been observed that,
using such type of roof bar is not only wastage of money, but also creating unsafe conditions
and increasing heap of scrap in the mine.
Mode of failure of roof bar observed by the author:
The I-section roof bar( 200mm* 200mm), which is failing in its web due to faulty design of
roof bar and also due to improper strengthening at its ends. The web failure observed by the
author is shown in figure given below.
Section of the failed roof bar (web failure )
11
MODIFICATION IN DESIGN OF ROOF BAR SUGGESTED BY THE AUTHOR
Design of web of roof bar:
Design of web is very important for resisting shear stress and compressive stress. When
roof bar is tightened against the roof, the web is under compression. Therefore, the strength
of web should be such that, it can bear a load upto designed capacity of the O.C. props
(about 30t).
For the designing of web, two things are important. One is web thickness (t2) and another is
its height (h).
So, if we increase the web thickness (t2), the strength of web will increase and, if we
increase the height of web (h), the strength of web will decrease.
Section of web of the roof bar
The strength of web can be expressed mathematically in the following ways;
S α t2, and
S α 1/hn
,so combining these two equations we get;
S α t2/hn
where `α` is proportionality constant.
Or, S =K*t2/hn
where
S = strength of web,
K = proportionality constant,
t2 = web thickness, and
h = height of web.
P = Load on web (value of P
Varies in between 10t and 30t)
n= exponent to `h`
t2
h
P (Load on Web)
P
t2h
12
Here, S should be greater than P, and for this the web shall be strengthened as shown in
figure below.
The author hase observed that the value of web thickness (t2 ) should not be less than
10mm and distance between two flanges (d) not more than 150mm.
Therefore, minimum thickness of web (t2) = 10mm, and
Maximum height of web (h) = d – 2*t1
= (150- 2*10) mm
= 130mm
Design of flanges of roof bar:
As the author has compared the loading parameters of old roof bars and new roof bar, the
bending stresses are less in new type of the bar, which is because of its larger width of
flange.
Design of flange of roof bar includes the design of flange thickness (t1) and width of
flange (b).
Hence, minimum thickness of flange (t1) = 10mm , and
Minimum width of flange (b) = 200mm.
Final design sample of roof bar:
The author has done only thing in modified design, that the web thickness (t2) has been
increased from 7mm to 10mm and distance between two flanges has been decreased from
200mm to 150mm.
Proper Strengthening of Roof Bar:
Strengthening of roof bar is very important and essential for the strata control point of view.
Strata load is transferred vertically on the O.C. props through the roof bar at both ends.
Capacity of the O.C. prop is 40tons; therefore roof bar should be capable to bear the load
coming on the O.C. props. For this the roof bar is to be strengthened properly, otherwise the
roof bar will yield prematurely at the ends and the support assembly will be ineffective.
Thickness of
flange (t1)
b
150mm
200m
m
10mm
10 mm
13
The scheme of proper strengthening of roof bar is shown in the figure given below:
Section of Roof Bar Longitudinal view of the Roof Bar
Section of the strengthened roof bar longitudinal view of the
Strengthened roof bar :
Flange of the bar Web of the girder Edge of the web strengthened
with pieces of C- channel
(2``× 4`` or 3``× 6``)
Plan view of the longitudinal section of the strengthened roof bar
14
COMPAISION OF DESIGN PARAMETERS OF DIFFERENT TYPES OF ROOF BARS
Design
Parameters
Old type of Roof Bars
150mm*150mm 150mm*200mm
Currently using
Roof Bar
200mm*200mm
Modified Roof
Bar
200mm*150mm
Web thickness
(t2)
9 – 10mm 7mm 7mm 10mm
Thickness of
Flange (t1)
10.5mm 10.5mm 10mm 10mm
Width of
Flange (b)
150mm 150mm 200mm 200mm
Distance between
Flanges (d)
150mm 200mm 200mm 150mm
Moment of
Inertia(I) of Roof
Bar
1714.28cm4
3050.2cm4
3953.53cm4
2146.42cm4
Cross- section of
Roof Bar
4525mm2
4403mm2
5260mm2
5300mm2
Cross- section of
Web
1240mm2
1218mm2
1260mm2
1300mm2
15
Advantages of the modified supporting system and modified design of roof bar:
 It eliminates the bending of roof bar, which can be re –utilized ;
 Strengthened roof bar can bear a minimum of 30t (compressive) load;
 fully utilization of strength of OC props, because props are tightened against the roof and not
to the roof bar ;
 support resistance offered by OC props are improved tremendously after modification in
supporting system and design of roof bar. Hence less chances of bed separation ;
 rock load will be resisted by the OC props and not by the roof bar, hence abutment pressure
at side will be less which will minimize side spalling ;
 props will be tightly intact with roof, therefore no chances of props dislodgment by hitting
side spalled boulders ;
 overriding of pillars and stooks will be reduced ;
 It will provide safe working conditions for men, machinery and property.
 It will be very- very economical and purposeful;
 Saving of wastage of money in purchasing roof bar every year.
Conclusion:
The author has given valuable suggestion regarding supporting system in BG working After
applying the author’s suggestion, support resistance has improved in BG working. The
improvement in support resistance has decreased the chances of layer separation and over
riding of pillars. It is very economical and purposeful. It can save about Rs. 50 Lacs per
annum on purchase of roof bar.
Declaration:
The above observations and comments are of author and not necessarily to the
organization.
Signature of author
(Tikeshwar Mahto )
Date- 11. 8.15 Dy. Director of Mines Safety,
Bilaspur Region (India)
+917898033693
tikeshwarmahto@yahoo.co.in

Contenu connexe

Tendances

Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and DevelopmentAnurag Jha
 
Mine rescue and recovery
Mine rescue and recoveryMine rescue and recovery
Mine rescue and recoverySafdar Ali
 
Reopening of sealed off area
Reopening of sealed off areaReopening of sealed off area
Reopening of sealed off areaNeelesh Pandey
 
2.pressure arch theory (longwall) copy
2.pressure arch theory (longwall)  copy2.pressure arch theory (longwall)  copy
2.pressure arch theory (longwall) copyVinay Chary
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall MiningVR M
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drillpavan kumar
 
Metal Mines Blasting
Metal Mines BlastingMetal Mines Blasting
Metal Mines Blastingpartha sharma
 
Armoured face conveyor
Armoured face conveyorArmoured face conveyor
Armoured face conveyorAnkit Narain
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesaashutosh chhirolya
 
Underground mining methods
Underground mining methodsUnderground mining methods
Underground mining methodsTayyab Anwar
 

Tendances (20)

Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and Development
 
strata monitoring Instrumentation
strata monitoring Instrumentationstrata monitoring Instrumentation
strata monitoring Instrumentation
 
Mine waste dump
Mine waste dumpMine waste dump
Mine waste dump
 
Pillar design in coal mines
Pillar design in coal minesPillar design in coal mines
Pillar design in coal mines
 
Subsidence in coal mines
Subsidence in coal minesSubsidence in coal mines
Subsidence in coal mines
 
Mine rescue and recovery
Mine rescue and recoveryMine rescue and recovery
Mine rescue and recovery
 
Reopening of sealed off area
Reopening of sealed off areaReopening of sealed off area
Reopening of sealed off area
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 
2.pressure arch theory (longwall) copy
2.pressure arch theory (longwall)  copy2.pressure arch theory (longwall)  copy
2.pressure arch theory (longwall) copy
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
Extraction of developed pillars by opencast mine: acase study
Extraction of developed pillars by opencast mine:   acase studyExtraction of developed pillars by opencast mine:   acase study
Extraction of developed pillars by opencast mine: acase study
 
Metal Mines Blasting
Metal Mines BlastingMetal Mines Blasting
Metal Mines Blasting
 
Longwall mining
Longwall miningLongwall mining
Longwall mining
 
Armoured face conveyor
Armoured face conveyorArmoured face conveyor
Armoured face conveyor
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal mines
 
Underground mining methods
Underground mining methodsUnderground mining methods
Underground mining methods
 
Longwall
LongwallLongwall
Longwall
 
High Wall Mining
High Wall MiningHigh Wall Mining
High Wall Mining
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 

En vedette

Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visUlimella Siva Sankar
 
strata control in wide stall.ppt by pathan NIT Rourkela
strata control in wide stall.ppt by pathan NIT Rourkelastrata control in wide stall.ppt by pathan NIT Rourkela
strata control in wide stall.ppt by pathan NIT Rourkelapmgsa
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof supportUlimella Siva Sankar
 
Dolphin System Selling Points
Dolphin System Selling PointsDolphin System Selling Points
Dolphin System Selling Pointsguest17cd6
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesVR M
 
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEAnurag Jha
 
Mining Methods
Mining MethodsMining Methods
Mining MethodsVR M
 
Prediction of Surface Subsidence and Its Monitoring
Prediction of Surface Subsidence and Its MonitoringPrediction of Surface Subsidence and Its Monitoring
Prediction of Surface Subsidence and Its MonitoringVR M
 
Magnetita project - UM
Magnetita  project - UMMagnetita  project - UM
Magnetita project - UMjscallon646
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLAnkit Narain
 
Overburden moment and abutment pressure in longwall mining
Overburden moment and abutment pressure in longwall miningOverburden moment and abutment pressure in longwall mining
Overburden moment and abutment pressure in longwall miningEr.Sunil Wasade
 
Numerical modelling in Geomechanics
Numerical modelling in GeomechanicsNumerical modelling in Geomechanics
Numerical modelling in GeomechanicsUlimella Siva Sankar
 
Mines act
Mines actMines act
Mines actStudent
 

En vedette (17)

Design of openings
Design of openingsDesign of openings
Design of openings
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
 
Rock burst presentation
Rock burst presentationRock burst presentation
Rock burst presentation
 
strata control in wide stall.ppt by pathan NIT Rourkela
strata control in wide stall.ppt by pathan NIT Rourkelastrata control in wide stall.ppt by pathan NIT Rourkela
strata control in wide stall.ppt by pathan NIT Rourkela
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof support
 
Dolphin System Selling Points
Dolphin System Selling PointsDolphin System Selling Points
Dolphin System Selling Points
 
modification of rmr system for indian coal mines
 modification of rmr system for indian coal mines modification of rmr system for indian coal mines
modification of rmr system for indian coal mines
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
 
Mining ppt 2014
Mining ppt 2014Mining ppt 2014
Mining ppt 2014
 
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
 
Mining Methods
Mining MethodsMining Methods
Mining Methods
 
Prediction of Surface Subsidence and Its Monitoring
Prediction of Surface Subsidence and Its MonitoringPrediction of Surface Subsidence and Its Monitoring
Prediction of Surface Subsidence and Its Monitoring
 
Magnetita project - UM
Magnetita  project - UMMagnetita  project - UM
Magnetita project - UM
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDL
 
Overburden moment and abutment pressure in longwall mining
Overburden moment and abutment pressure in longwall miningOverburden moment and abutment pressure in longwall mining
Overburden moment and abutment pressure in longwall mining
 
Numerical modelling in Geomechanics
Numerical modelling in GeomechanicsNumerical modelling in Geomechanics
Numerical modelling in Geomechanics
 
Mines act
Mines actMines act
Mines act
 

Similaire à Critical Study of Roof Bar Design in Underground Mines

Reinforced concrete Course Assignments, 2023
Reinforced concrete Course Assignments, 2023Reinforced concrete Course Assignments, 2023
Reinforced concrete Course Assignments, 2023JanneHanka
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C BeamAr. Aakansha
 
Design of Beam- RCC Singly Reinforced Beam
Design of Beam- RCC Singly Reinforced BeamDesign of Beam- RCC Singly Reinforced Beam
Design of Beam- RCC Singly Reinforced BeamSHAZEBALIKHAN1
 
rectangular and section analysis in bending and shear
rectangular and section analysis in bending and shearrectangular and section analysis in bending and shear
rectangular and section analysis in bending and shearqueripan
 
Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019JanneHanka
 
IRJET- Effect of Lateral Load on Moment Resisting Frame and Shear Wall in Mul...
IRJET- Effect of Lateral Load on Moment Resisting Frame and Shear Wall in Mul...IRJET- Effect of Lateral Load on Moment Resisting Frame and Shear Wall in Mul...
IRJET- Effect of Lateral Load on Moment Resisting Frame and Shear Wall in Mul...IRJET Journal
 
IRJET - Experimental Investigation of flexural member of Beam Opening in ...
IRJET -  	  Experimental Investigation of flexural member of Beam Opening in ...IRJET -  	  Experimental Investigation of flexural member of Beam Opening in ...
IRJET - Experimental Investigation of flexural member of Beam Opening in ...IRJET Journal
 
T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102Sadia Mitu
 
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET Journal
 
IRJET- Static and Dynamic Behaviour of Post Tensioned Skew Bridges by usi...
IRJET-  	  Static and Dynamic Behaviour of Post Tensioned Skew Bridges by usi...IRJET-  	  Static and Dynamic Behaviour of Post Tensioned Skew Bridges by usi...
IRJET- Static and Dynamic Behaviour of Post Tensioned Skew Bridges by usi...IRJET Journal
 
Special moment frames aci 318 - اطارات مقاومة للعزوم
Special moment frames aci   318 - اطارات مقاومة للعزوم Special moment frames aci   318 - اطارات مقاومة للعزوم
Special moment frames aci 318 - اطارات مقاومة للعزوم Dr.Youssef Hammida
 
Seismic Behavior Of Double Steel Plate Composite Wall Under Cyclic Loading
Seismic Behavior Of Double Steel Plate Composite Wall Under Cyclic LoadingSeismic Behavior Of Double Steel Plate Composite Wall Under Cyclic Loading
Seismic Behavior Of Double Steel Plate Composite Wall Under Cyclic LoadingIRJET Journal
 
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with TowerIRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with TowerIRJET Journal
 
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdfDiv_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdfLandelSmith1
 
Reinforced concrete Course Assignments, 2021
Reinforced concrete Course Assignments, 2021Reinforced concrete Course Assignments, 2021
Reinforced concrete Course Assignments, 2021JanneHanka
 
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...IRJET Journal
 
Lec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-rLec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-rCivil Zone
 

Similaire à Critical Study of Roof Bar Design in Underground Mines (20)

Roof bar design
Roof bar designRoof bar design
Roof bar design
 
Reinforced concrete Course Assignments, 2023
Reinforced concrete Course Assignments, 2023Reinforced concrete Course Assignments, 2023
Reinforced concrete Course Assignments, 2023
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C Beam
 
Design of Beam- RCC Singly Reinforced Beam
Design of Beam- RCC Singly Reinforced BeamDesign of Beam- RCC Singly Reinforced Beam
Design of Beam- RCC Singly Reinforced Beam
 
rectangular and section analysis in bending and shear
rectangular and section analysis in bending and shearrectangular and section analysis in bending and shear
rectangular and section analysis in bending and shear
 
Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019
 
IRJET- Effect of Lateral Load on Moment Resisting Frame and Shear Wall in Mul...
IRJET- Effect of Lateral Load on Moment Resisting Frame and Shear Wall in Mul...IRJET- Effect of Lateral Load on Moment Resisting Frame and Shear Wall in Mul...
IRJET- Effect of Lateral Load on Moment Resisting Frame and Shear Wall in Mul...
 
IRJET - Experimental Investigation of flexural member of Beam Opening in ...
IRJET -  	  Experimental Investigation of flexural member of Beam Opening in ...IRJET -  	  Experimental Investigation of flexural member of Beam Opening in ...
IRJET - Experimental Investigation of flexural member of Beam Opening in ...
 
T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102
 
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
 
IRJET- Static and Dynamic Behaviour of Post Tensioned Skew Bridges by usi...
IRJET-  	  Static and Dynamic Behaviour of Post Tensioned Skew Bridges by usi...IRJET-  	  Static and Dynamic Behaviour of Post Tensioned Skew Bridges by usi...
IRJET- Static and Dynamic Behaviour of Post Tensioned Skew Bridges by usi...
 
Rcc Beams
Rcc BeamsRcc Beams
Rcc Beams
 
Special moment frames aci 318 - اطارات مقاومة للعزوم
Special moment frames aci   318 - اطارات مقاومة للعزوم Special moment frames aci   318 - اطارات مقاومة للعزوم
Special moment frames aci 318 - اطارات مقاومة للعزوم
 
Seismic Behavior Of Double Steel Plate Composite Wall Under Cyclic Loading
Seismic Behavior Of Double Steel Plate Composite Wall Under Cyclic LoadingSeismic Behavior Of Double Steel Plate Composite Wall Under Cyclic Loading
Seismic Behavior Of Double Steel Plate Composite Wall Under Cyclic Loading
 
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with TowerIRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
 
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdfDiv_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
 
Reinforced concrete Course Assignments, 2021
Reinforced concrete Course Assignments, 2021Reinforced concrete Course Assignments, 2021
Reinforced concrete Course Assignments, 2021
 
FootingDesign.pptx
FootingDesign.pptxFootingDesign.pptx
FootingDesign.pptx
 
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
 
Lec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-rLec 13-14-15-flexural analysis and design of beams-2007-r
Lec 13-14-15-flexural analysis and design of beams-2007-r
 

Plus de DGMS, Ministry of Labour & Employment, New Delhi (12)

Team building a case study
Team building a case studyTeam building a case study
Team building a case study
 
Hurdles for the india a case study
Hurdles for the india  a case studyHurdles for the india  a case study
Hurdles for the india a case study
 
Design of super elevation :- A case study
Design of super elevation :- A case studyDesign of super elevation :- A case study
Design of super elevation :- A case study
 
Highwall mining – a new approach in india
Highwall mining – a new approach in indiaHighwall mining – a new approach in india
Highwall mining – a new approach in india
 
Pillar design
Pillar designPillar design
Pillar design
 
Energy management 2
Energy management 2Energy management 2
Energy management 2
 
Pillar design
Pillar designPillar design
Pillar design
 
New approch towards support desugn
New approch towards support desugnNew approch towards support desugn
New approch towards support desugn
 
Energy management
Energy managementEnergy management
Energy management
 
Pillar design
Pillar designPillar design
Pillar design
 
Team building
Team buildingTeam building
Team building
 
Pillar design
Pillar designPillar design
Pillar design
 

Dernier

ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 

Dernier (20)

ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 

Critical Study of Roof Bar Design in Underground Mines

  • 1. 1 Author: Tikeshwar Mahto, Dy. Director of Mines Safety, Bilaspur Region (India). +917898033693 tikeshwarmahto@yahoo.co.in ECONOMICAL AND SAFE DESIGN OF ROOF BAR (GIRDER) FOR STRATA CONTROL IN UNDERGROUND MINES TO EXTRACT THICK SEAMS- -A Case Study of Blasting Gallery- Method Abstract Blasting Gallery is a method of working to extract thick seams ( 8m - 15m ) in single lift. Strata control mechanism is a very critical aspect of BG-method, as the height of working is more than 10m. Natural support has very important role in overcoming dynamic load created by the hanging goaf, particularly in case of massive sand stone roof. Artificial supports are only for resisting separation of immediate roof. Hence, design of natural support as well as temporary supports are very- very important for the strata control point of view. In this paper, the author is concentrating on the temporary supports used in Blasting Gallery Method. The author has critically diagnosed about the drawbacks and failure of existing supporting system (roof bar) and also suggested a modification for effective utilization of supports. If, the design of roof bar as suggested by the author is implemented effectively, a huge amount of rupees will be saved in purchase of roof bar every year and also an effective support resistance can be developed for the safe working of BG-method. CRITICAL STUDY OF FAILURE (OR PREMATURE YIELDING) OF ROOF BAR USED IN BLASTING GALLERY The roof bar of I- section used in BG working is loaded with different stresses like direct stress(compressive stress), shear stress, bending stresses etc. and failure of which is caused by either any one of these or due to combined effect of these stresses. The roof bar of I – section is made of two different load bearing components, web and flanges. Flanges are for bearing bending moment and bending stresses and web is for resisting shear stress and direct stress (compressive stress). Case study made by the author reveals that the failure of roof bar is due to bending of flanges in centre and failure of web at the edges of the roof bar. The above-mentioned failures of roof bar are due to faulty design & selection of roof bar. The author has critically diagnosed about it, and has made some modification in design of roof bar, which is mentioned below.
  • 2. 2 Failuare of roof bar due to faulty supporting system: Support assembly being practiced in BG- method is shown here. Free body load diagram of support assembly of Fig.3 can be drawn in the following ways for clear representation of diffirent forces acting on support assembly Where, AB a M.S. roof bar L1, L2 concentrated reactive forces (loads) on the roof bar, and R1, R2 support resistances offered by the O.C Props (15-20Tons, )
  • 3. 3 Drawing shear force and bending moment diagram for the normal suppoeting system: (i) Loaded roof bar (ii) S.F.Diagram (iii) B.M. Diagram X V +ve -ve A B A1 B1 R1 R2 +ve -ve x Mb A BA1 B1 R1C R1C
  • 4. 4 We can see from the free body load diagram and fig-3 in which the support resistances (R1 & R2) offered by the Open Circuit props are directly acting on the steel roof bar and not on the roof of the gallery, because there is no contact between roof and roof bar. In this case total support resistance is utilized for bending the roof bar and not for resisting rock load. When R1 & R2 increases, L1 & L2 also increases which tries to bend the roof bar. From, Fig-4, R1 + R2 = L1 + L2 It means total support resistances offered by O.C props are inversely transferred on the roof bar, which tend to bend the bar. After yielding of roof bar, support resistance decreases and adverse situations like, bed separation, side spalling, overriding, props dislodgment etc., are created. The roof bar assembly in yielded condition is shown in Fig.5
  • 5. 5 Flexural strength calculation This is for calculation of bending stresses in flanges of the roof bar due to bending moment as calculated above. The section of the roof bar and stresses in flanges of the bar can be drawn in the following ways; From the theory of simple bending; M/I = α/y =E/R Where, b= flange width, d= distance between the two flanges, t1= thickness of flange, t2= thickness of web, αt = bending stress(tensile), αc = bending stress (compressive) , N1- N2 = neutral line M = moment of resistance or bending moment, I = moment of inertia, y = distance from neutral axis, E = Young’s modulus, and R = radius of curvature of internal surface of the deformed beam(roof bar). Here, M/I = α/y Or, α = M*y/I So `α ` will be maximum or minimum when ` y` is maximum or minimum. Thus , for y= 0 , α = 0 i.e. bending stress at neutral line is zero and bending stresses at flanges are maximum. Also ymax = d/2 αmax = (M/I) *ymax , or, αmax = Md/2I Thus, maximum bending stress is at flanges of the roof bar, as shown in the figure above. b d t1 t2 αc αt Neutral line N1-N2 ymax = d/2
  • 6. 6 Moment of inertia(I) of I – section beam: First, we will calculate moment of inertia of rectangular section beam of same dimension. Moment of inertia of rectangular section = b*d3 /12 Where, b= width of section of the rectangular beam, d = height of section of beam. t1 = thickness of flange of I- section beam, t2 = thickness of web of beam. N1-N2 = neutral line Now cutting the dotted portion of the rectangular section, as shown in the above figure for calculating moment of inertia (I) of I- section beam. Hence, section of cut portion of the rectangular beam will be; So, M.I. of two cut portions about N1- N2 = 2* (b- t2/2)(d-2t1)3 /12 = (b-t2)(d- 2t1)3 /12 Thus, M. I. of I – section beam (girder) will be; I = M.I. of rectangular beam – M.I. of cut portions. Or, I = b*d3 /12 – (b- t2)(d-2t1)3 /12 Or, I = [ b*d3 – ( b- t2)(d-2t1)3 ]/12 Moment of resistance( bending moment ) can be taken from bending moment diagram(B.M.D.), as drawn in previous page. d b t2 t1 N2 N1 d - 2t1 b-t2/2 N1 N2
  • 7. 7 So, maximum bending moment is at centre of the beam(or roof bar ); Or, M = R*C Where, M = bending moment R = support resistance by O.C. props, and C = mid- distance of cogs from the edge of roof bar. Thickness of web (t2) : 7mm Cross- section of the web[(d-2t1)*t2)] : 180mm*7mm MODIFICATION IN SUPPORTING SYSTEM SUGGESTED BY THE AUTHOR: The author has done nothing extra, but has made some changes after deep study in BG method of working. In the changed system of supporting, the wooden lagging are exactly above the O.C. Props to make direct contact of the O.C. props with the roof of the galleries. The support capacity or strength of the O.C. props are directly transferred to the roof of the galleries and not to the roof bar, which eliminates the chances of bending of roof bar and the O.C. props remain always tightened against the roof. Also, support resistance increases, which can improve strata condition. The modified system of support assembly is shown in Fig.6, given below. The support resistance can further be increased by strengthening roof bars properly at both ends. Modified supporting system
  • 8. 8 Free body load diagram of the modified system of supporting is shown below in Fig.7 Where, AB is roof bar R1 & R2 are support resistances offered by OC props L1 & L2 are reactive support resistances transferred to the roof rock, and L3 , L4 & L5 are concentrated reactive support resistances offered by roof bar to the roof rock L1 L3 L4 L5 L2 BA Fig. 7 R2 R1
  • 9. 9 Drawing shear force and bending moment diagram for modified supporting system: FREE BODY LOAD DIAGRAM (i) Loaded beam (ii) S.F.Diagram (iii) B.M.Diagram L1 L3 L4 L5 L2 BA X V A BA3 A2 A1 +ve -ve R1-L1 R2-L2 X Mb A BA1 A2 A3 W (R1-L1)/2 - L3*C
  • 10. 10 Failure of roof bar due to faulty design of roof bar: The author has studied about the failure of roof bar in the BG- panel, which is only due to faulty design of roof bar. Roof bar used in early years was of 150mm * 150mm section. Currently BG- panel is using 200mm*200mm girder of I – section. The thickness of web is about 7mm. It has become use and throw i.e. after using once; it is being thrown in scrap, because after failure of web there is no further use in supporting. It has been observed that, using such type of roof bar is not only wastage of money, but also creating unsafe conditions and increasing heap of scrap in the mine. Mode of failure of roof bar observed by the author: The I-section roof bar( 200mm* 200mm), which is failing in its web due to faulty design of roof bar and also due to improper strengthening at its ends. The web failure observed by the author is shown in figure given below. Section of the failed roof bar (web failure )
  • 11. 11 MODIFICATION IN DESIGN OF ROOF BAR SUGGESTED BY THE AUTHOR Design of web of roof bar: Design of web is very important for resisting shear stress and compressive stress. When roof bar is tightened against the roof, the web is under compression. Therefore, the strength of web should be such that, it can bear a load upto designed capacity of the O.C. props (about 30t). For the designing of web, two things are important. One is web thickness (t2) and another is its height (h). So, if we increase the web thickness (t2), the strength of web will increase and, if we increase the height of web (h), the strength of web will decrease. Section of web of the roof bar The strength of web can be expressed mathematically in the following ways; S α t2, and S α 1/hn ,so combining these two equations we get; S α t2/hn where `α` is proportionality constant. Or, S =K*t2/hn where S = strength of web, K = proportionality constant, t2 = web thickness, and h = height of web. P = Load on web (value of P Varies in between 10t and 30t) n= exponent to `h` t2 h P (Load on Web) P t2h
  • 12. 12 Here, S should be greater than P, and for this the web shall be strengthened as shown in figure below. The author hase observed that the value of web thickness (t2 ) should not be less than 10mm and distance between two flanges (d) not more than 150mm. Therefore, minimum thickness of web (t2) = 10mm, and Maximum height of web (h) = d – 2*t1 = (150- 2*10) mm = 130mm Design of flanges of roof bar: As the author has compared the loading parameters of old roof bars and new roof bar, the bending stresses are less in new type of the bar, which is because of its larger width of flange. Design of flange of roof bar includes the design of flange thickness (t1) and width of flange (b). Hence, minimum thickness of flange (t1) = 10mm , and Minimum width of flange (b) = 200mm. Final design sample of roof bar: The author has done only thing in modified design, that the web thickness (t2) has been increased from 7mm to 10mm and distance between two flanges has been decreased from 200mm to 150mm. Proper Strengthening of Roof Bar: Strengthening of roof bar is very important and essential for the strata control point of view. Strata load is transferred vertically on the O.C. props through the roof bar at both ends. Capacity of the O.C. prop is 40tons; therefore roof bar should be capable to bear the load coming on the O.C. props. For this the roof bar is to be strengthened properly, otherwise the roof bar will yield prematurely at the ends and the support assembly will be ineffective. Thickness of flange (t1) b 150mm 200m m 10mm 10 mm
  • 13. 13 The scheme of proper strengthening of roof bar is shown in the figure given below: Section of Roof Bar Longitudinal view of the Roof Bar Section of the strengthened roof bar longitudinal view of the Strengthened roof bar : Flange of the bar Web of the girder Edge of the web strengthened with pieces of C- channel (2``× 4`` or 3``× 6``) Plan view of the longitudinal section of the strengthened roof bar
  • 14. 14 COMPAISION OF DESIGN PARAMETERS OF DIFFERENT TYPES OF ROOF BARS Design Parameters Old type of Roof Bars 150mm*150mm 150mm*200mm Currently using Roof Bar 200mm*200mm Modified Roof Bar 200mm*150mm Web thickness (t2) 9 – 10mm 7mm 7mm 10mm Thickness of Flange (t1) 10.5mm 10.5mm 10mm 10mm Width of Flange (b) 150mm 150mm 200mm 200mm Distance between Flanges (d) 150mm 200mm 200mm 150mm Moment of Inertia(I) of Roof Bar 1714.28cm4 3050.2cm4 3953.53cm4 2146.42cm4 Cross- section of Roof Bar 4525mm2 4403mm2 5260mm2 5300mm2 Cross- section of Web 1240mm2 1218mm2 1260mm2 1300mm2
  • 15. 15 Advantages of the modified supporting system and modified design of roof bar:  It eliminates the bending of roof bar, which can be re –utilized ;  Strengthened roof bar can bear a minimum of 30t (compressive) load;  fully utilization of strength of OC props, because props are tightened against the roof and not to the roof bar ;  support resistance offered by OC props are improved tremendously after modification in supporting system and design of roof bar. Hence less chances of bed separation ;  rock load will be resisted by the OC props and not by the roof bar, hence abutment pressure at side will be less which will minimize side spalling ;  props will be tightly intact with roof, therefore no chances of props dislodgment by hitting side spalled boulders ;  overriding of pillars and stooks will be reduced ;  It will provide safe working conditions for men, machinery and property.  It will be very- very economical and purposeful;  Saving of wastage of money in purchasing roof bar every year. Conclusion: The author has given valuable suggestion regarding supporting system in BG working After applying the author’s suggestion, support resistance has improved in BG working. The improvement in support resistance has decreased the chances of layer separation and over riding of pillars. It is very economical and purposeful. It can save about Rs. 50 Lacs per annum on purchase of roof bar. Declaration: The above observations and comments are of author and not necessarily to the organization. Signature of author (Tikeshwar Mahto ) Date- 11. 8.15 Dy. Director of Mines Safety, Bilaspur Region (India) +917898033693 tikeshwarmahto@yahoo.co.in