OR Barrier Management Dashboard
Mintra Competence Days 30.04.14
Do we know the
status of our barriers?
A rig or a drillship is a very complex piece of
machinery, with many interdependent areas
working together.
We should not commence any operations
without knowing if safety barriers are in place
and functional.
This knowledge depends on information from
many various sources.
You wouldn’t drive a car if you knew the
brakes were out of order?
Background - Overview
When bringing the Leiv Eiriksson to Norway
the Petroleum Safety Authority underlined the
regulatory requirements in relation to Barriers.
The consultancy firm SafeTec were tasked with
assessing the various areas and operations
and identified the 17 barrier functions.
The IT-developers Presight were tasked with
developing a dashboard solution for the
barriers. Based on input from Ocean Rig
Presight designed a tool collating information
from Star, OCS and Mintra into a graphic
interphase.
Regulatory requirements
The industry must comply with the requirements in the Management Regulation so
that relationships between risk assessments and barrier management are made clear.
Robust and specific barrier strategies and performance requirements must be
developed.
Operational, organisational and technical barrier elements must be highlighted in the
risk assessments.
Codes and Standards Ocean Rig Internal Procedures
• ISO 31000 Risk management – Principles and
guidelines
• ISO 13702 Petroleum and natural gas industries:
Control and mitigation of fires and explosions on
offshore production installations - Requirements and
guidelines
• NORSOK Z-013 Risk and emergency preparedness
assessment
• NORSOK S-001 Technical safety (Ref. 6)
• PSA Principles for barrier management in the
petroleum activity
• CO-PRO/8-10: USE OF HES ANALYSIS
• CO-PRO/8-12 : SAFE JOB ANALYSIS & RISK
ASSESSMENT
• CO-POL-HSEQ: HEALTH, ENVIRONMENT, SAFETY
AND QUALITY POLICY
• CO-POL-MMM: MAINTENANCE POLICY
Measuring and verifying performance
The regulations specify that non-functioning or
impaired barriers must be identified.
This requires the responsible party to establish
systems and processes which verify that
established barrier functions and associated barrier
elements have the intended properties.
This means that routines and practice for verifying
conformity with the established context must be in
place, along with routines to assess the
consequences of changes.
Experience in recent years from serious petroleum-
industry incidents, nationally and internationally,
shows that substantial improvement is required in
operational and organisational conditions.
Norwegian Petroleum Safety Authority
The PSA:
We will follow up in 2014 that the industry
acquires a better understanding of the
interaction between operational,
organisational and technical elements in
barriers.
We will help to strengthen the industry’s work
on producing-life extensions, and contribute to
industry collaboration and experience transfer
between the players.
During 2014, we will give particular emphasis
to well integrity and control, hydrocarbon
leaks, the integrity of structures and marine
systems, the early phase of development
projects, and the uncertainty and knowledge
dimensions in risk assessments.
Occupational accident vs Major accident
Occupational accident Major accident
• Simple causation
• Generally limited consequences
• Single barrier breach
• Complex causation
• Potentially catastrophic consequences
• Multiple barrier breaches
• Potential for spread/escalation
Identify potential
hazards and accidents
Identification of potential hazards and accidents
must be carried out with a sufficient degree of detail,
in order to identify all the situations which a specific
barrier element could play a role in.
In most cases, this means that identification must
take place at an area level (by fire area, for
instance) and that the assessment covers:
a) all incidents which might occur in the specific
area and
b) incidents occurring in other areas which could
expose the specific area.
For certain types of hazard, it could be more
appropriate to adopt an exposure perspective and
not necessarily an area one.
Seventee
n
Identified
Barrier
Functions
BF01: Prevent well control problem
BF02: Prevent blowout
BF03: Limit size of HC leaks
BF04: Prevent ignition
BF05: Prevent escalation due to fire or explosion
BF06: Prevent fatalities during escape, evacuation and rescue
BF07: Prevent and limit damage to external environment
BF08: Prevent fire in well test area
BF09: Prevent dropped objects
BF10: Prevent damage to subsea equipment and pipelines
BF11: Prevent toxic release
BF12: Prevent non-hydrocarbon fires
BF13: Prevent loss of structural integrity
BF14: Prevent reduction and re-establish stability
BF15: Prevent helicopter accidents
BF16: Prevent and limit impact from ship collision
BF17: Prevent loss of and reestablish position
Structure of barriers
The term barrier function e.g. “avoid ignition” or “keep contained”, is
used to explain the role of the barrier, i.e. risk the barrier is to mitigate.
Barrier functions are fulfilled by defined barrier elements e.g. “gas
detectors”, “procedures” or “manually shut down”,
Barrier elements are classed into three groups:
Technical: e.g. Deluge system
Operational: e.g. Helideck familiarisation
Organisational: e.g. Fire team certification
A barrier function will almost always consist
of a number different barrier elements.
STAR
‘Star Information & Planning System’ (IPS) is
Ocean Rigs Computerized Maintenance
Management System.
Star consists of several integrated modules used
for the administration of Maintenance & Repairs,
Spare-parts & Logistics and QHSE Events &
Issues.
Overdue PMs and Corrective work orders for
Safety Critical Elements are linked to the Barrier
Dashboard.
Important to ensure correct entry of data.
Use of ‘Barrier
Verification Jobs’ in Star:
In order to ensure that all Systems & Equipment
(Technical Accounts) which (by the Performance
Standards) are defined as Safety Critical
Elements, Scheduled Jobs which cover the
defined Verification Activities are made and
coded with the words BARRIER VERIFICATION
added to the initial Job IDs. These verification
jobs may be combined with long term class, or
major overhaul jobs, or created solely for barrier
verification.
The Barrier Dashboard will monitor all ‘BARRIER
VERIFICATION’ ‘Sch. Jobs’ and ‘Planned
Maintenance Work Orders’, and will count and
display all such jobs which are not completed
within the ‘Due Date’ specified in Star:
The affected Barriers will be displayed as
threatened in the dashboard.
OCS
Ocean Rig uses the HR-management
software OCS to monitor mandatory
training.
Training matrix indicates organisational
barriers.
Certificates relevant for barrier functions
are fed to the dashboard.
In addition OCS feeds the dashboard with
crew rotation, indicating status on board
at present date and in future.
Quality of data in OCS is essential for
indication in dashboard. Missing
certificates will indicate impaired barrier
function.
Mintra Trainingportal
System for managing internal training and
competence.
Training in Mintra identified as relevant to Barrier
Functions is transferred to Dashboard.
Deficiencies in relation to set benchmarks will be
highlighted in dashboard.
PreSight
Company tasked with developing the tool for harvesting
information from management systems.
Based on information from QHSE, Technical Support, HR
and Training & Development.
Web based application, visualisation only. No information
is stored in the dashboard, updating the mother systems
will change the output.
The dashboard is updated every 24 hours.
Displaying the status of barriers
Colour coding
All measured elements have defined standards.
Green = Function at or above benchmark
Yellow = Acceptable
Red = Not functioning
A red barrier element will influence the status signal
for the barrier function.
A red light does not mean that operations
cannot be executed, but it highlights needs to
repair the barrier.
Function, element, measurement
Measurements are aggregated
toward the top level.
If a Safety Critical Element
signals as red the whole barrier
function may be signalled as
deficient.
Depending on importance,
deficient barrier elements may
render the entire barrier function
as deficient.
Aggregation into Area
Barrier functions may be
aggregated into Areas.
6 different areas have been
defined:
• Living Quarter
• Helideck
• Drilling area
• Open deck
• Pontoons and columns
• Machinery spaces
• Well Test Area
Dashboard displays status
for Areas.
Drill down into the areas for
more information.
4 main indicators
Overall score
Technical barriers (SCE)
Organisational barriers (OCS)
Operational barriers (Mintra)
List of
indicators
OIM dashboard
This view gives the whole picture before drilling down into the barrier functions.
Shows status 30 days forward.

Contenu connexe

Tendances

Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
 
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future toolsAOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future toolsNick Bentley
 
Ari Setiawan Curriculum Vitae & Photograph
Ari Setiawan Curriculum Vitae & PhotographAri Setiawan Curriculum Vitae & Photograph
Ari Setiawan Curriculum Vitae & PhotographAri Setiawan
 
Collegiate air travel safety whitepaper updated 010611
Collegiate air travel safety whitepaper updated 010611Collegiate air travel safety whitepaper updated 010611
Collegiate air travel safety whitepaper updated 010611jmcki60811
 
Wong KM resume 10-08-16
Wong KM resume 10-08-16Wong KM resume 10-08-16
Wong KM resume 10-08-16Koon Meng Wong
 
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)PMI-Montréal
 
Jumaa d alkishi's_resume
Jumaa d alkishi's_resumeJumaa d alkishi's_resume
Jumaa d alkishi's_resumeJUMAA ALKISHI
 
CURRICULUM_VITAE_BC_Botes dated 8 October 2014 for Maintenance Specialist E I
CURRICULUM_VITAE_BC_Botes dated 8 October 2014 for Maintenance Specialist E  ICURRICULUM_VITAE_BC_Botes dated 8 October 2014 for Maintenance Specialist E  I
CURRICULUM_VITAE_BC_Botes dated 8 October 2014 for Maintenance Specialist E IBernardus Cornelius Botes
 
Enefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approvalEnefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approvalSbremkamp
 
ARP-4754A Training - Civil Aircraft and Systems : Tonex
ARP-4754A Training - Civil Aircraft and Systems : TonexARP-4754A Training - Civil Aircraft and Systems : Tonex
ARP-4754A Training - Civil Aircraft and Systems : TonexBryan Len
 
Aircraft certification authorisation
Aircraft certification authorisationAircraft certification authorisation
Aircraft certification authorisationS P Singh
 
Aeronautic awareness: Certification
Aeronautic awareness: CertificationAeronautic awareness: Certification
Aeronautic awareness: CertificationGeert Appeltans
 
Colin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryColin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryUKTI2014
 

Tendances (18)

Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
 
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future toolsAOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
 
Aviation Audits
Aviation AuditsAviation Audits
Aviation Audits
 
Ari Setiawan Curriculum Vitae & Photograph
Ari Setiawan Curriculum Vitae & PhotographAri Setiawan Curriculum Vitae & Photograph
Ari Setiawan Curriculum Vitae & Photograph
 
Risk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islamRisk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islam
 
Collegiate air travel safety whitepaper updated 010611
Collegiate air travel safety whitepaper updated 010611Collegiate air travel safety whitepaper updated 010611
Collegiate air travel safety whitepaper updated 010611
 
Wong KM resume 10-08-16
Wong KM resume 10-08-16Wong KM resume 10-08-16
Wong KM resume 10-08-16
 
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
 
Jumaa d alkishi's_resume
Jumaa d alkishi's_resumeJumaa d alkishi's_resume
Jumaa d alkishi's_resume
 
CURRICULUM_VITAE_BC_Botes dated 8 October 2014 for Maintenance Specialist E I
CURRICULUM_VITAE_BC_Botes dated 8 October 2014 for Maintenance Specialist E  ICURRICULUM_VITAE_BC_Botes dated 8 October 2014 for Maintenance Specialist E  I
CURRICULUM_VITAE_BC_Botes dated 8 October 2014 for Maintenance Specialist E I
 
Mike L. Gomez general resume
Mike L. Gomez general resumeMike L. Gomez general resume
Mike L. Gomez general resume
 
Enefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approvalEnefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approval
 
ARP-4754A Training - Civil Aircraft and Systems : Tonex
ARP-4754A Training - Civil Aircraft and Systems : TonexARP-4754A Training - Civil Aircraft and Systems : Tonex
ARP-4754A Training - Civil Aircraft and Systems : Tonex
 
ISPM Risk Assessment
ISPM Risk AssessmentISPM Risk Assessment
ISPM Risk Assessment
 
Aircraft certification authorisation
Aircraft certification authorisationAircraft certification authorisation
Aircraft certification authorisation
 
Miranda.Osvaldo_Resume
Miranda.Osvaldo_ResumeMiranda.Osvaldo_Resume
Miranda.Osvaldo_Resume
 
Aeronautic awareness: Certification
Aeronautic awareness: CertificationAeronautic awareness: Certification
Aeronautic awareness: Certification
 
Colin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryColin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th January
 

En vedette

Politicas y procedimientos administrativos y financieros
Politicas y procedimientos administrativos y financierosPoliticas y procedimientos administrativos y financieros
Politicas y procedimientos administrativos y financierosAdonay Rojas Ortiz
 
Zoologist- Prairie Dogs
Zoologist-  Prairie DogsZoologist-  Prairie Dogs
Zoologist- Prairie Dogskkriner72
 
2011 GMC Terrain For Sale In Marshfield WI | Wheelers Automotive
2011 GMC Terrain For Sale In Marshfield WI | Wheelers Automotive2011 GMC Terrain For Sale In Marshfield WI | Wheelers Automotive
2011 GMC Terrain For Sale In Marshfield WI | Wheelers AutomotiveWheelers Automotive
 
Oster ripley primavera -nov2010
Oster ripley primavera -nov2010Oster ripley primavera -nov2010
Oster ripley primavera -nov2010Apoyo Publicitario
 
Brandon Montney Profile2010
Brandon Montney Profile2010Brandon Montney Profile2010
Brandon Montney Profile2010Brandon Montney
 
Planificación lingüística
Planificación lingüísticaPlanificación lingüística
Planificación lingüísticaSusana Ferreiro
 

En vedette (20)

Trainingportal #hms2013 kriseberedskap - hvordan bli bedre - weatherford - ...
Trainingportal #hms2013   kriseberedskap - hvordan bli bedre - weatherford - ...Trainingportal #hms2013   kriseberedskap - hvordan bli bedre - weatherford - ...
Trainingportal #hms2013 kriseberedskap - hvordan bli bedre - weatherford - ...
 
Tcd 2014 pecha_kucha 06 kystlab
Tcd 2014 pecha_kucha 06 kystlabTcd 2014 pecha_kucha 06 kystlab
Tcd 2014 pecha_kucha 06 kystlab
 
Politicas y procedimientos administrativos y financieros
Politicas y procedimientos administrativos y financierosPoliticas y procedimientos administrativos y financieros
Politicas y procedimientos administrativos y financieros
 
ASP.NET Core 101
ASP.NET Core 101ASP.NET Core 101
ASP.NET Core 101
 
Trainingportal Competence Days 2013 - Bjarte Bøe - Proactima
Trainingportal Competence Days 2013 - Bjarte Bøe - ProactimaTrainingportal Competence Days 2013 - Bjarte Bøe - Proactima
Trainingportal Competence Days 2013 - Bjarte Bøe - Proactima
 
Zoologist- Prairie Dogs
Zoologist-  Prairie DogsZoologist-  Prairie Dogs
Zoologist- Prairie Dogs
 
2011 GMC Terrain For Sale In Marshfield WI | Wheelers Automotive
2011 GMC Terrain For Sale In Marshfield WI | Wheelers Automotive2011 GMC Terrain For Sale In Marshfield WI | Wheelers Automotive
2011 GMC Terrain For Sale In Marshfield WI | Wheelers Automotive
 
Trainingportal #hms2013 forebygging av støyskader - beerenberg - roar høydal
Trainingportal #hms2013   forebygging av støyskader - beerenberg - roar høydalTrainingportal #hms2013   forebygging av støyskader - beerenberg - roar høydal
Trainingportal #hms2013 forebygging av støyskader - beerenberg - roar høydal
 
Trainingportal #hms2013 klatring i oljebransjen vs. energibransjen - aak as...
Trainingportal #hms2013   klatring i oljebransjen vs. energibransjen - aak as...Trainingportal #hms2013   klatring i oljebransjen vs. energibransjen - aak as...
Trainingportal #hms2013 klatring i oljebransjen vs. energibransjen - aak as...
 
Android
AndroidAndroid
Android
 
Budget
BudgetBudget
Budget
 
Oster ripley primavera -nov2010
Oster ripley primavera -nov2010Oster ripley primavera -nov2010
Oster ripley primavera -nov2010
 
Brandon Montney Profile2010
Brandon Montney Profile2010Brandon Montney Profile2010
Brandon Montney Profile2010
 
Planificación lingüística
Planificación lingüísticaPlanificación lingüística
Planificación lingüística
 
Esperanzas
EsperanzasEsperanzas
Esperanzas
 
budget 2012 13
 budget 2012 13 budget 2012 13
budget 2012 13
 
Trainingportal Competence Days 2013 - Klaus Myklebust - Dom Group
Trainingportal Competence Days 2013 - Klaus Myklebust  - Dom GroupTrainingportal Competence Days 2013 - Klaus Myklebust  - Dom Group
Trainingportal Competence Days 2013 - Klaus Myklebust - Dom Group
 
Tcd 2014 pecha_kucha 03 vestteknikk
Tcd 2014 pecha_kucha 03 vestteknikkTcd 2014 pecha_kucha 03 vestteknikk
Tcd 2014 pecha_kucha 03 vestteknikk
 
Tcd2015 transocean verifikasjon av kompetanse
Tcd2015 transocean verifikasjon av kompetanseTcd2015 transocean verifikasjon av kompetanse
Tcd2015 transocean verifikasjon av kompetanse
 
Tcd 2014 pecha_kucha 05 mintra tp_kambodjsa
Tcd 2014 pecha_kucha 05 mintra tp_kambodjsaTcd 2014 pecha_kucha 05 mintra tp_kambodjsa
Tcd 2014 pecha_kucha 05 mintra tp_kambodjsa
 

Similaire à Tcd 2014 onsdag_03 ocean rig_presight_tp i risikoovervaaking

Final MPCL KOM Presentation-22-Nov -2021.pptx
Final MPCL KOM Presentation-22-Nov -2021.pptxFinal MPCL KOM Presentation-22-Nov -2021.pptx
Final MPCL KOM Presentation-22-Nov -2021.pptxMoeidIqbal2
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
IMP & WBS - Getting Both Right is Paramount
IMP & WBS - Getting Both Right is ParamountIMP & WBS - Getting Both Right is Paramount
IMP & WBS - Getting Both Right is ParamountGlen Alleman
 
Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)Bouchaib Dolla
 
Risk Based Design & SCE
Risk Based Design & SCERisk Based Design & SCE
Risk Based Design & SCEadepp
 
ADEPP Monitor & Risk Based Design
ADEPP Monitor & Risk Based DesignADEPP Monitor & Risk Based Design
ADEPP Monitor & Risk Based DesignFabienne Salimi
 
Redkite OSQAR2 - Brochure - One Stop Quality Assurance, Risk Management, Busi...
Redkite OSQAR2 - Brochure - One Stop Quality Assurance, Risk Management, Busi...Redkite OSQAR2 - Brochure - One Stop Quality Assurance, Risk Management, Busi...
Redkite OSQAR2 - Brochure - One Stop Quality Assurance, Risk Management, Busi...David Arber
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFPieter van Asten
 
Using Technical Performance Progress
Using Technical Performance ProgressUsing Technical Performance Progress
Using Technical Performance ProgressGlen Alleman
 
Alert Plus PIOGA Presentation - oct'15
Alert Plus PIOGA Presentation - oct'15Alert Plus PIOGA Presentation - oct'15
Alert Plus PIOGA Presentation - oct'15Matt Murdock
 
CV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedCV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedAyman Morshed
 
Deployment of Debug and Trace for features in RISC-V Core
Deployment of Debug and Trace for features in RISC-V CoreDeployment of Debug and Trace for features in RISC-V Core
Deployment of Debug and Trace for features in RISC-V CoreIRJET Journal
 
öZlem özkiliç makale - en
öZlem özkiliç  makale - enöZlem özkiliç  makale - en
öZlem özkiliç makale - enÖzlem ÖZKILIÇ
 
Reliability Instrumented System | Arrelic Insights
Reliability Instrumented System | Arrelic InsightsReliability Instrumented System | Arrelic Insights
Reliability Instrumented System | Arrelic InsightsArrelic
 
Understanding DO-178: Importance and How It Affects Your Company
Understanding DO-178: Importance and How It Affects Your CompanyUnderstanding DO-178: Importance and How It Affects Your Company
Understanding DO-178: Importance and How It Affects Your CompanyAversan Inc.
 
ADEPP & Configuration Management
ADEPP & Configuration ManagementADEPP & Configuration Management
ADEPP & Configuration ManagementFabienne Salimi
 
The larger picture – an icao update
The larger picture – an icao updateThe larger picture – an icao update
The larger picture – an icao updatealban_sylaj
 

Similaire à Tcd 2014 onsdag_03 ocean rig_presight_tp i risikoovervaaking (20)

Final MPCL KOM Presentation-22-Nov -2021.pptx
Final MPCL KOM Presentation-22-Nov -2021.pptxFinal MPCL KOM Presentation-22-Nov -2021.pptx
Final MPCL KOM Presentation-22-Nov -2021.pptx
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
IMP & WBS - Getting Both Right is Paramount
IMP & WBS - Getting Both Right is ParamountIMP & WBS - Getting Both Right is Paramount
IMP & WBS - Getting Both Right is Paramount
 
Gopal Safety officer
Gopal  Safety officerGopal  Safety officer
Gopal Safety officer
 
Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)
 
Risk Based Design & SCE
Risk Based Design & SCERisk Based Design & SCE
Risk Based Design & SCE
 
ADEPP Monitor & Risk Based Design
ADEPP Monitor & Risk Based DesignADEPP Monitor & Risk Based Design
ADEPP Monitor & Risk Based Design
 
Redkite OSQAR2 - Brochure - One Stop Quality Assurance, Risk Management, Busi...
Redkite OSQAR2 - Brochure - One Stop Quality Assurance, Risk Management, Busi...Redkite OSQAR2 - Brochure - One Stop Quality Assurance, Risk Management, Busi...
Redkite OSQAR2 - Brochure - One Stop Quality Assurance, Risk Management, Busi...
 
iWIT-A4-Brochure
iWIT-A4-BrochureiWIT-A4-Brochure
iWIT-A4-Brochure
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
Using Technical Performance Progress
Using Technical Performance ProgressUsing Technical Performance Progress
Using Technical Performance Progress
 
Alert Plus PIOGA Presentation - oct'15
Alert Plus PIOGA Presentation - oct'15Alert Plus PIOGA Presentation - oct'15
Alert Plus PIOGA Presentation - oct'15
 
CV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedCV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman Morshed
 
Deployment of Debug and Trace for features in RISC-V Core
Deployment of Debug and Trace for features in RISC-V CoreDeployment of Debug and Trace for features in RISC-V Core
Deployment of Debug and Trace for features in RISC-V Core
 
Importance of O&M
Importance of O&MImportance of O&M
Importance of O&M
 
öZlem özkiliç makale - en
öZlem özkiliç  makale - enöZlem özkiliç  makale - en
öZlem özkiliç makale - en
 
Reliability Instrumented System | Arrelic Insights
Reliability Instrumented System | Arrelic InsightsReliability Instrumented System | Arrelic Insights
Reliability Instrumented System | Arrelic Insights
 
Understanding DO-178: Importance and How It Affects Your Company
Understanding DO-178: Importance and How It Affects Your CompanyUnderstanding DO-178: Importance and How It Affects Your Company
Understanding DO-178: Importance and How It Affects Your Company
 
ADEPP & Configuration Management
ADEPP & Configuration ManagementADEPP & Configuration Management
ADEPP & Configuration Management
 
The larger picture – an icao update
The larger picture – an icao updateThe larger picture – an icao update
The larger picture – an icao update
 

Plus de Mintra Trainingportal - Training for the Oil and Gas Industry

Plus de Mintra Trainingportal - Training for the Oil and Gas Industry (20)

Tcd2015 teekay bruk av trainingportal
Tcd2015 teekay bruk av trainingportalTcd2015 teekay bruk av trainingportal
Tcd2015 teekay bruk av trainingportal
 
Tcd2015 sots ombordtrening
Tcd2015 sots ombordtreningTcd2015 sots ombordtrening
Tcd2015 sots ombordtrening
 
Tcd2015 pecha kucha_proactima_blended learning
Tcd2015 pecha kucha_proactima_blended learningTcd2015 pecha kucha_proactima_blended learning
Tcd2015 pecha kucha_proactima_blended learning
 
Tcd2015 pecha kucha_mintra_kostnadsreduksjoner
Tcd2015 pecha kucha_mintra_kostnadsreduksjonerTcd2015 pecha kucha_mintra_kostnadsreduksjoner
Tcd2015 pecha kucha_mintra_kostnadsreduksjoner
 
Tcd2015 pecha kucha_mintra_fast track_fse
Tcd2015 pecha kucha_mintra_fast track_fseTcd2015 pecha kucha_mintra_fast track_fse
Tcd2015 pecha kucha_mintra_fast track_fse
 
Tcd2015 pecha kucha_eni_arbeid i kalde omgivelser
Tcd2015 pecha kucha_eni_arbeid i kalde omgivelserTcd2015 pecha kucha_eni_arbeid i kalde omgivelser
Tcd2015 pecha kucha_eni_arbeid i kalde omgivelser
 
Tcd2015 lars voigt djelert er det godt nok
Tcd2015 lars voigt djelert er det godt nokTcd2015 lars voigt djelert er det godt nok
Tcd2015 lars voigt djelert er det godt nok
 
Tcd2015 brukerforum ny funksjonalitet
Tcd2015 brukerforum ny funksjonalitetTcd2015 brukerforum ny funksjonalitet
Tcd2015 brukerforum ny funksjonalitet
 
Tcd2015 brukerforum lage innhold selv
Tcd2015 brukerforum lage innhold selvTcd2015 brukerforum lage innhold selv
Tcd2015 brukerforum lage innhold selv
 
Tcd2015 brukerforum kostnadsbesparelser
Tcd2015 brukerforum kostnadsbesparelserTcd2015 brukerforum kostnadsbesparelser
Tcd2015 brukerforum kostnadsbesparelser
 
Tcd2015 brukerforum road map trainingportal
Tcd2015 brukerforum  road map trainingportalTcd2015 brukerforum  road map trainingportal
Tcd2015 brukerforum road map trainingportal
 
Tcd2015 mintra uk competency management
Tcd2015 mintra uk competency managementTcd2015 mintra uk competency management
Tcd2015 mintra uk competency management
 
Tcd 2014 pecha_kucha 02 mintra tp_lessonlearn_1
Tcd 2014 pecha_kucha 02 mintra tp_lessonlearn_1Tcd 2014 pecha_kucha 02 mintra tp_lessonlearn_1
Tcd 2014 pecha_kucha 02 mintra tp_lessonlearn_1
 
Tcd 2014 tirsdag_02 aibel_fra 0 til 5000
Tcd 2014 tirsdag_02 aibel_fra 0 til 5000Tcd 2014 tirsdag_02 aibel_fra 0 til 5000
Tcd 2014 tirsdag_02 aibel_fra 0 til 5000
 
Tcd 2014 tirsdag_01 mintra trainingportal_trender
Tcd 2014 tirsdag_01 mintra trainingportal_trenderTcd 2014 tirsdag_01 mintra trainingportal_trender
Tcd 2014 tirsdag_01 mintra trainingportal_trender
 
Tcd 2014 pecha_kucha 09 ikm testing
Tcd 2014 pecha_kucha 09 ikm testingTcd 2014 pecha_kucha 09 ikm testing
Tcd 2014 pecha_kucha 09 ikm testing
 
Tcd 2014 pecha_kucha 07 altus intervention
Tcd 2014 pecha_kucha 07 altus interventionTcd 2014 pecha_kucha 07 altus intervention
Tcd 2014 pecha_kucha 07 altus intervention
 
Tcd 2014 pecha_kucha 02 safetec
Tcd 2014 pecha_kucha 02 safetecTcd 2014 pecha_kucha 02 safetec
Tcd 2014 pecha_kucha 02 safetec
 
Tcd 2014 pecha_kucha 08 total_safety
Tcd 2014 pecha_kucha 08 total_safetyTcd 2014 pecha_kucha 08 total_safety
Tcd 2014 pecha_kucha 08 total_safety
 
Tcd 2014 onsdag_04 soft_fallsikring
Tcd 2014 onsdag_04 soft_fallsikringTcd 2014 onsdag_04 soft_fallsikring
Tcd 2014 onsdag_04 soft_fallsikring
 

Dernier

Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Scott Andery
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 

Dernier (20)

Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 

Tcd 2014 onsdag_03 ocean rig_presight_tp i risikoovervaaking

  • 1. OR Barrier Management Dashboard Mintra Competence Days 30.04.14
  • 2. Do we know the status of our barriers? A rig or a drillship is a very complex piece of machinery, with many interdependent areas working together. We should not commence any operations without knowing if safety barriers are in place and functional. This knowledge depends on information from many various sources. You wouldn’t drive a car if you knew the brakes were out of order?
  • 3. Background - Overview When bringing the Leiv Eiriksson to Norway the Petroleum Safety Authority underlined the regulatory requirements in relation to Barriers. The consultancy firm SafeTec were tasked with assessing the various areas and operations and identified the 17 barrier functions. The IT-developers Presight were tasked with developing a dashboard solution for the barriers. Based on input from Ocean Rig Presight designed a tool collating information from Star, OCS and Mintra into a graphic interphase.
  • 4. Regulatory requirements The industry must comply with the requirements in the Management Regulation so that relationships between risk assessments and barrier management are made clear. Robust and specific barrier strategies and performance requirements must be developed. Operational, organisational and technical barrier elements must be highlighted in the risk assessments. Codes and Standards Ocean Rig Internal Procedures • ISO 31000 Risk management – Principles and guidelines • ISO 13702 Petroleum and natural gas industries: Control and mitigation of fires and explosions on offshore production installations - Requirements and guidelines • NORSOK Z-013 Risk and emergency preparedness assessment • NORSOK S-001 Technical safety (Ref. 6) • PSA Principles for barrier management in the petroleum activity • CO-PRO/8-10: USE OF HES ANALYSIS • CO-PRO/8-12 : SAFE JOB ANALYSIS & RISK ASSESSMENT • CO-POL-HSEQ: HEALTH, ENVIRONMENT, SAFETY AND QUALITY POLICY • CO-POL-MMM: MAINTENANCE POLICY
  • 5. Measuring and verifying performance The regulations specify that non-functioning or impaired barriers must be identified. This requires the responsible party to establish systems and processes which verify that established barrier functions and associated barrier elements have the intended properties. This means that routines and practice for verifying conformity with the established context must be in place, along with routines to assess the consequences of changes. Experience in recent years from serious petroleum- industry incidents, nationally and internationally, shows that substantial improvement is required in operational and organisational conditions.
  • 6. Norwegian Petroleum Safety Authority The PSA: We will follow up in 2014 that the industry acquires a better understanding of the interaction between operational, organisational and technical elements in barriers. We will help to strengthen the industry’s work on producing-life extensions, and contribute to industry collaboration and experience transfer between the players. During 2014, we will give particular emphasis to well integrity and control, hydrocarbon leaks, the integrity of structures and marine systems, the early phase of development projects, and the uncertainty and knowledge dimensions in risk assessments.
  • 7. Occupational accident vs Major accident Occupational accident Major accident • Simple causation • Generally limited consequences • Single barrier breach • Complex causation • Potentially catastrophic consequences • Multiple barrier breaches • Potential for spread/escalation
  • 8. Identify potential hazards and accidents Identification of potential hazards and accidents must be carried out with a sufficient degree of detail, in order to identify all the situations which a specific barrier element could play a role in. In most cases, this means that identification must take place at an area level (by fire area, for instance) and that the assessment covers: a) all incidents which might occur in the specific area and b) incidents occurring in other areas which could expose the specific area. For certain types of hazard, it could be more appropriate to adopt an exposure perspective and not necessarily an area one.
  • 9. Seventee n Identified Barrier Functions BF01: Prevent well control problem BF02: Prevent blowout BF03: Limit size of HC leaks BF04: Prevent ignition BF05: Prevent escalation due to fire or explosion BF06: Prevent fatalities during escape, evacuation and rescue BF07: Prevent and limit damage to external environment BF08: Prevent fire in well test area BF09: Prevent dropped objects BF10: Prevent damage to subsea equipment and pipelines BF11: Prevent toxic release BF12: Prevent non-hydrocarbon fires BF13: Prevent loss of structural integrity BF14: Prevent reduction and re-establish stability BF15: Prevent helicopter accidents BF16: Prevent and limit impact from ship collision BF17: Prevent loss of and reestablish position
  • 10. Structure of barriers The term barrier function e.g. “avoid ignition” or “keep contained”, is used to explain the role of the barrier, i.e. risk the barrier is to mitigate. Barrier functions are fulfilled by defined barrier elements e.g. “gas detectors”, “procedures” or “manually shut down”, Barrier elements are classed into three groups: Technical: e.g. Deluge system Operational: e.g. Helideck familiarisation Organisational: e.g. Fire team certification A barrier function will almost always consist of a number different barrier elements.
  • 11. STAR ‘Star Information & Planning System’ (IPS) is Ocean Rigs Computerized Maintenance Management System. Star consists of several integrated modules used for the administration of Maintenance & Repairs, Spare-parts & Logistics and QHSE Events & Issues. Overdue PMs and Corrective work orders for Safety Critical Elements are linked to the Barrier Dashboard. Important to ensure correct entry of data.
  • 12. Use of ‘Barrier Verification Jobs’ in Star: In order to ensure that all Systems & Equipment (Technical Accounts) which (by the Performance Standards) are defined as Safety Critical Elements, Scheduled Jobs which cover the defined Verification Activities are made and coded with the words BARRIER VERIFICATION added to the initial Job IDs. These verification jobs may be combined with long term class, or major overhaul jobs, or created solely for barrier verification. The Barrier Dashboard will monitor all ‘BARRIER VERIFICATION’ ‘Sch. Jobs’ and ‘Planned Maintenance Work Orders’, and will count and display all such jobs which are not completed within the ‘Due Date’ specified in Star: The affected Barriers will be displayed as threatened in the dashboard.
  • 13. OCS Ocean Rig uses the HR-management software OCS to monitor mandatory training. Training matrix indicates organisational barriers. Certificates relevant for barrier functions are fed to the dashboard. In addition OCS feeds the dashboard with crew rotation, indicating status on board at present date and in future. Quality of data in OCS is essential for indication in dashboard. Missing certificates will indicate impaired barrier function.
  • 14. Mintra Trainingportal System for managing internal training and competence. Training in Mintra identified as relevant to Barrier Functions is transferred to Dashboard. Deficiencies in relation to set benchmarks will be highlighted in dashboard.
  • 15. PreSight Company tasked with developing the tool for harvesting information from management systems. Based on information from QHSE, Technical Support, HR and Training & Development. Web based application, visualisation only. No information is stored in the dashboard, updating the mother systems will change the output. The dashboard is updated every 24 hours.
  • 16. Displaying the status of barriers
  • 17. Colour coding All measured elements have defined standards. Green = Function at or above benchmark Yellow = Acceptable Red = Not functioning A red barrier element will influence the status signal for the barrier function. A red light does not mean that operations cannot be executed, but it highlights needs to repair the barrier.
  • 18. Function, element, measurement Measurements are aggregated toward the top level. If a Safety Critical Element signals as red the whole barrier function may be signalled as deficient. Depending on importance, deficient barrier elements may render the entire barrier function as deficient.
  • 19. Aggregation into Area Barrier functions may be aggregated into Areas. 6 different areas have been defined: • Living Quarter • Helideck • Drilling area • Open deck • Pontoons and columns • Machinery spaces • Well Test Area Dashboard displays status for Areas. Drill down into the areas for more information.
  • 20. 4 main indicators Overall score Technical barriers (SCE) Organisational barriers (OCS) Operational barriers (Mintra) List of indicators
  • 21. OIM dashboard This view gives the whole picture before drilling down into the barrier functions. Shows status 30 days forward.