Integrated Township at Atali-Dahej Phase II


                                                       Integrated Township on the
                                                       banks of Narmada River




                    Investor’s Conclave

                                                                 presented by

      Gujarat Industrial Infrastructure Project Development Company Limited

 Gujarat Industrial
 Development Corporation      6th March 2010
Background

• Gujarat Industrial Infrastructure Project Development Company
  Limited (GIIPDCL)
   o   GIDC have incorporated a Joint Venture Company (JVC) named “Gujarat
       Industrial Infrastructure Project Development Company Limited” (GIIPDCL) with
       IL&FS Trust Company Limited & IL&FS Infrastructure Development Corporation
       Ltd.

   o   The JVC has been mandated to develop industrial infrastructure projects in
       Gujarat on Public Private Partnership Format.

• The Project
   o   Integrated, self-sufficient township with quality housing, healthy living and state
       of art infrastructure is proposed to be developed in a planned manner

   o   The integrated township of around 1000 ha having following breakup:

        · Township at Ekal, Keshrol & Manad – 714 ha

        •   Atali township Phase II – 294 ha (To be developed in Phase I)
Project Location & Connectivity
Regional Advantages
      o      7 notified SEZs within the catchment area, including functional Dahej SEZ of 1,719
             ha with processing area of 1698 ha without any provision for housing

      o      DMIC corridor is passing through Bharuch (Bharuch-Dahej Investment Region and
             Vadodara-Ankleshwar Industrial Area are planned for development)

                                                                       To, Delhi                   Notified SEZs within 25-30 km radius
                                                                                                     of Project Sites (Bharuch District)
                 Jambusar SEZ                                                                                                      Land
                                                                                                   Location          Type
                                                                                                                                    (Ha)
                                                                                                  Jambusar Multi-product           3,380
                                                                                                  Dahej        Multi-product       1,719
                                                          Vilayat                                 Vilayat      Hydrocarbon          450
                                                          SEZs (3)                                Jhagadia    Ceramic & Glass      197
                Atali Township
                 Phase I (146 Ha)              VAGRA                                              Vilayat     Chemicals            160
                                                                                                  Panoli      Pharmaceuticals      130
  Dahej
Industrial
                                    PCPIR               BHARUCH
                                                                                                              Agro based
                                                                                                  Vilayat                          118
  Estate          Dahej                        SH - 6                                                         (Chemical)
                                                                                   Jhagadia SEZ                                   6154
                                                                                      JHAGADIA
  Dahej SEZ Dahej SEZ
                   Atali Township
                                                                     ANKLESHWAR
  Functional       Phase II (294 Ha)

                             Township at                             Dahej PCPIR
                           Keshrol, Mannad       PANOLI
                           & Eksal (714 ha)                          • 7 Notified SEZs

                                                                     • Project Site
                                            Panoli SEZ
                                                                     • Important Towns
                                                  To, Mumbai
Dahej Economic Profile
Dahej PCPIR – One of the country’s largest Petrochemical Region
o   Dahej Industrial Estate (spread across 4500 ha with large manufacturing units)

o   Dahej SEZ (notified and functional multi product SEZ spread over 1719 ha).
    Dahej SEZ, a multiproduct SEZ, is being developed by Dahej SEZ Ltd (DSL), a JV
    company of GIDC and ONGC.

o   Dahej Industrial Estate – Phase II (spread across 4200 ha is under development)

o   Dahej Port (for transportation of solid, liquid and LNG facilities including first
    LNG Terminal in the country)

Major Industrial Players                                 Mega industrial projects in pipeline:

•   Reliance (earlier IPCL)                              (i) 7 SEZs in Bharuch District
                                                             within 25-30 km from Atali
•   Gujarat Alkalies & Chemicals Limited (GACL)              village

•   Birla Copper, Petronet LNG , Welspun                 (ii) Bharuch-Dahej Investment
                                                              Region and Vadodara-
•   Chemical Port Terminal Company Limited                    Ankleshwar Industrial Area
                                                              under Delhi Mumbai Industrial
•   BASF                                                      Corridor (DMIC)
Project Location within PCPIR
                                                           Project Location
Legend
  1         PCPIR Area
  2         Vagra-Vilayat Industrial Estate                o       Project site is strategically located in Vagra Taluka, Dahej
  3         Dahej II
  4         Dahej Housing (Atali Phase I)
                                                                   along 4 lane SH-6 in Dahej PCPIR , Bharuch district,
  5         Eksal, Keshrol & Manad                                 Gujarat
  6         Dahej Housing (Atali Phase II)                 o       Offsite trunk infrastructure already in place.
  7         Vagra-Vilayat (Bhersam, Argam, Ankot, Juner)
  8         Vagra-Vilayat (Bharsum)
  9         Dahej Extension (Amod Road)
  10        Dahej Industrial Estate                                         1

                                                                                                                       7
                                                                                                                       2
                                                                                                       8

                                         9
                                                                 Atali Phase I
                                                                4 Township
                                                               (under development)
                                          Dahej II

            Dahej
                                          3                                                       5                     SH - 6
                                                                        Kaladar

       10
                                                               6        a
                    Dahej SEZ                               Koliad
                                                                                                                     To Bharuch

                                                                                     Keshrol, Manad
   Dahej    Dahej Industrial Estate                        Atali Phase II                & Eksal
    SEZ                                   Area      Township                            Township
                                                  Site – 292 ha                       Site – 714 ha
                                           Site Area is 294 Ha                        Phase II
Site Appreciation
            Site for Atali Phase II                                                   o Site Details
                                                                     Towards
                                                                     Bharuch             • Site Area is 292.93 Ha
Towards
 Dahej                                                     11 KVA Power
                                                                                         • Area under canals – 5.3 Ha
                                            Pond
                                                         Transmission Line
                                                                                         • Developable Area -

                                                                                      o Land Status
                                                               Approach road             • Land acquisition is under
                                                                     to
                                                               Kaladara Village             progress
                                          Part of
                                      Kaladara Village




                                                                   Kaladara Village
    Scale

                                                   Narmada River
Site Appreciation… Cont’d

Site Features                                    Towards
                                              Dahej Industrial
                                                  Estate                 Electricity Line
•   11 KVA Transmission line along the SH-6        Water supply Line     Atali                    Towards
                                                                                                  Bharuch

•   Gas pipeline passing through the site                  Narmada
                                                            Canal

•   ONGC pipeline passing through the site

•   Water supply line along SH-6 (8 MGD-
                                                                                                   Narmada
    additional 17 MGD pipeline is along the                                            Kaladara     Canal

    other side of SH-6)

•   Narmada Canal passing through the site(



                                                                                                  North
                                                                 Not to Scale
Housing Need in the Region
   Only Industrial township project within PCPIR to be developed on PPP format.
o Considering a catchment area of 20-25 km(4 notified SEZs, PCPIR region and Dahej
  Industrial Estate including functional SEZ in Dahej), there is a dire need of housing in
  Dahej due to following reasons

    o Large no of Employees working in Industries within Dahej PCPIR commute from
      nearby urban areas like Bharuch (42 km), Ankleshwar (56 km) and Vadodara (111
      km)

    The proposed Atali Township will substantially reduce their commuting time.

o Initially township of 293 ha has been earmarked at Atali and Kaladara villages for
  residential and other supporting facilities to fulfill the housing requirement of the entire
  PCPIR region of 453 sq km.

o As per PCPIR Master Plan, the total investments worth Rs. 50,000 crores are expected to
  generate employment of around 8 lakh people and housing demand of 1 lakh Dwelling
  Units.

   This township is proposed to accommodate around 15000 Dwelling Units
Housing Demand & Typology - 2021
o Total housing demand of around 25000 Dwelling housing units in base case scenario and
  39000 DU’s in optimistic scenario. This demand has been estimated based on primary
  market survey, stakeholder consultations, and industry assessment, analysis of
  employment pattern in existing and upcoming industries within PCPIR region. However
  The proposed Township (293 ha) shall accommodate around 15000 Dwelling Units

    This demand does not include the current demand of Atali Township Phase I (146 ha)

o This demand is spread across various housing typology : 4 BHK Bungalows, 3 BHK
  Bungalows, 3 BHK Row Houses, 2 BHK Apartments, 1 BHK Apartments, Economic Housing
  (hostel/dormitory / 1 RK apartment/ Studio Apartment)




Source: Demand study conducted by Jones Lang LaSalle Meghraj
Project Components
    Integrated, self-sufficient township for more
    than 15,000 households in a planned manner

    Residential : Housing for all income category

     o   Bungalows to EWS housing (HIG, MIG,          Integrated Township on the banks of Narmada River

         LIG & EWS)

    Commercial: Markets, offices, shopping
    centres, hotel & restaurants

    Social Infrastructure : Education & health
    facilities and other public utilities

    Recreation : leisure & entertainment
    facilities, parks/gardens/open-spaces,
    landscaped areas

    Support Infrastructure : Efficient transport
    system, road network, quality water supply,
    sewerage & drainage facilities, security etc.
Self-sufficient Township with quality housing, healthy living and world class infrastructure
Project USP – Eco City
•   Energy efficient building – green architecture
    •   Encourage use of green architecture in building
        design for important buildings.

•   Eco-friendly transport System
    • Central Green Space and continuous green belt
      along major transport corridor (Cycle Track &             Central Green Park
      Jogging Track)

    • Encourage Pedestrian Movement

    • Eco friendly public transport

•   Zero Waster Disposal
    • Sustainable treatment of solid wastes               Cycle Track / Jogging Track
    • Use of recycled water for gardening (non-potable
      water)

•   Community based Neighborhood Planning
    • Social Amenities and public places within walking
      distance
Green City Model
           Concept Development                             Eco City – Concept Development

                                    Public                                                  Public
                                    utilities                                               utilities


                       Sector                                                Sector
                                                                Sector
              Sector




Central                                         Central                                        Central
                                                township                                       township
Business     Sector         Sector                                                 Sector      Open
                                                Open
District                                        Space
                                                                 Sector                        Space




                           Sector
                  Sector                        Spine                              Sector      Spine
                                                Roads
                                                                          Sector               Roads
                                                Sector
                                                Roads


           Transport Hierarchy & Sector Planning                         Green Connectivity
Planning considerations
CONTOURS
                                         Narmada River

                                      Proposed Coastal Road to Dahej Port
                        Kaladara
                        Village
                                                                   T0 Dahej Port

           Proposed link road
           to Coastal Road to
           Dahej Road

  WIND        GRID                                                    T0 Dahej



                                                         4 Lane SH – 6
                                                         Bharuch to
                                                         Dahej
                                T0 Bharuch   Regional Connectivity
Conceptual Master Plan - Layout
     Legend
Conceptual Master Plan – Area Statement
 S.No.         Particulars                                      Area (Ha)     % of area

      1       Total Land Area                                      293             100
      2       Under Narmada Canal                                  5.4               2
      3       Total Developable Area                              287.6             98
                                                      % of
S.No.     Particulars                     Area (Ha)
                                                      area
  1       Area Under Sectors                 222        77
                                                                              Area % of
  2       Central Business District          6.0        2     Sectors
                                                                              (Ha) area
          Roads                                               Sector 1         40   18
  3                                         19.5        7
          (Arterial & Sub-arterial)                           Sector 2         40   18
  4       Social Infrastructure             20.8        7     Sector 3
          Physical Infrastructure                             (Reserved for
                                                                              22         9
  5       (STP, WTP, Crematorium, Solid      4.5        2     future
          Waste Dumping Yard)                                 development
  6       Open Space/Parks & Gardens        14.0        5     Sector 4        40          18
                                                              Sector 5        40          18
  6.1     Public Green                       4.0
                                                              Sector 6        40          18
  6.2     Golf course ( Driving Range)       10.0
                                                             Total            222        100
          Total Area                        287.6      100
Sector Level Standard Landuse Pattern

     Landuse Category                                         % of total area

     Residential *                                            60
     Commercial                                               2–3
     Public and Semi-Public                                   6–8
     Recreational                                             12 – 14
     Roads                                                    10 –12

     Open areas/parks/gardens/Water bodies                    Balance

      Total                                                   100
  Source – Urban Development Plans Formulation and Implementation Guidelines (UDPFI)

  * As per Regulation for Residential Township 2009 – Gujarat Government Notification
  (Department of Urban Development & Urban Housing, GoG)
Draft Area Statement
S.No. Land Use                 Land area (Ha) % of total Area Non-Saleable (%)

   1   Roads                       41.59           14.20           14.20

   2   Residential                 178.33          60.89
       Commercial, hotel and
   3                                6.19           2.11
       retail
   4   Utilities                    4.65           1.59             1.59
   5   Parks and open spaces       26.00           8.88             5.46
       Social
   6   Infrastructure/public       36.10           12.33            1.81
       and semi public

        Total                      292.86           100             23.06
City Level Social Infrastructure & Utilities
Components                                                         Saleable   Non-Saleable

Education
Integrated school without hostel facility                            3.50
College                                                              4.00
Technical education centre (ITI/polytechnic)                         4.00
School for handicapped                                                            0.50
Health
Intermediate Hospital                                                3.70
Nursing home, Child & maternity centre                               0.60
Parks and Recreation
Major Recreational Club (Outdoor - swimming pool, lawn
tennis, jogging track & indoor sports facilities - table tennis,     1.00
badminton court etc including parking)
Socio-Cultural Centre
(Music, Dance & Drama Centre/Meditation & Spiritual                  0.20
Centre/Arts & Craft Centre/Auditorium)
Mini Golf Course (Driving Range)                                    10.00
City Park                                                                         4.00
City Level Social Infrastructure & Utilities – Cont’d

Components                                                Saleable   Non-Saleable

Social Amenities
Community centre                                            1.00
Taxi stand including repair shop etc.                       0.10
Police Station                                                           1.50
Fire sub station                                                         0.60
Post Office & telegraph office                                           0.10
Bus Terminal                                                             0.20
Utilities and Services
Electric sub station (33/66 KV)                                          0.05
WTP with reservoir                                                       1.50
STP                                                                      1.50
Solid waste dumping unit                                                 1.00
Crematorium/burial ground/cemetery                                       0.50
Total                                                      28.10        10.45




                                    Total Area 38.55 ha
Sector Level Social Infrastructure & Utilities
                                               Area in         Total Area (Ha) per sector
                               Proposed
          Facilities                           ha (per
                                (in no.)                     Saleable        Non-Saleable
                                                unit)

Pre-primary, nursery school                5      0.40         0.40
Secondary/senior
                                           1      0.60         1.60
secondary School
Shopping cum Service
Centres (milk booth and                    1      0.20         0.20
other venders etc.)
Dispensary                                 0      0.50                           0.10

Community Hall and library                 1      0.20                           0.20
Parks, open space and tot-
                                           4      0.60                           2.00
lots
Electric sub station                       1      0.00                           0.05

Over Head Tank                             1      0.00                           0.05

Religious place                            1      0.10                           0.10
Total                                                          2.20               2.5

                              Total Area 4.7 ha per sector
Physical Infrastructure Assessment
Physical          infrastructure
                                                  Units
assessment
Water Demand
Potable Water supply (MLD)                 13.1       MLD
Non- potable Water supply (MLD)             3.4       MLD
Total                                      16.5       MLD
Sewerage Generation
Sewage (MLD)                               13.2       MLD
Power Demand (KVA)                         7855

                                   S.No. Assumptions for provision of Infrastructure
                                      I      Population to be Served
                                      A      Township Level                         75,000
                                      B      Sector Level                           15,000
                                      II     Density (Person Per Ha)*
                                      A      Township Level                           255
                                      B      Sector Level                             375

                                                                 * Assuming Household size of 5
Bidding Process
                   Event Description                        Estimated Date
                                QUALIFICATION STAGE
Issue of RFQ document                                               D
Last date for receiving queries                                D+15 days
Project Briefing Meeting(Developers’ Conclave)*                D+15 days
Authority response to queries latest by                        D+20 days
Application Due Date                                           D+30 days
Due date for opening of RFQs                                   D+35 days
Announcement of short-listed Bidders                           D+45 days
                                        BID STAGE
Sale of Bid Documents                             To be specified in RFP document
Last date for receiving queries
Pre-Bid meeting – 1
Authority response to queries latest by
Pre-Bid meeting – 2
Bid Due Date(s)
Opening of Bids
Letter of Award (LOA)
Validity of Bids
Signing of Lease Agreement
Project Categories & Qualifications
Sr. Project           Minimum Development Obligations                 Minimum Technical
No. Category                                                          Experience
1.   Residential      Residential units and other incidental          Developed real estate projects
     Sectors          facilities (commercial, social, recreational)   of at least 1 million sq.ft. in a
                      and supporting (internal) infrastructure        maximum of 5 projects during
                      within each Residential Sector                  last 5 years
                                                                                     OR
2    Central          Markets, offices, shopping centers/Malls,
                                                                      Completed development of at
     Business         hotels & restaurants, Multiplexes,
                                                                      least one Special Area Project
     District/ City   Education, Health and other supporting
                                                                      of at least 50 acres during last
     Centre           facilities and supporting (internal)
                                                                      5 years
                      infrastructure within CBD/City Centre


3    Trunk            Trunk water supply network & water              Implemented
     Infrastructure   treatment plant, sewerage system                Civil/infrastructure projects
                      (including Sewerage Treatment Plant &           worth at least Rs. 1500 million
                      Pumping stations), road network, Storm          during last 5 years
                      water drainage system, Solid waste
                      management & utilities
Role of Stakeholders
S.No.    Stakeholder                                       Role

   I    Gujarat        •   Provide Land free of all encumbrances on lease
        Industrial     •   Facilitate provision of water supply, power supply upto the township
        Development    •   Approve layout plans & monitor/ regulate enforcement of GDCR
        Corporation    •   Facilitate government approvals
                       •   Act as a nodal agency to resolve disputes among developers

  II    Developers     • Payment of land premium, lease rental as per GIDC land allocation
                         policy
                       • Development (planning, detailed engineering & designing, financing,
                         construction, marketing & O&M) of the proposed project categories
                       • Development of internal infrastructure under each project categories for
                         respective sectors/ city centre(physical infrastructure, sector/internal
                         roads/public amenities, social infrastructure, parks & open spaces etc.)
                       • Comply to statutory /regulatory requirements

  III   GIIPDCL        • Project Development & Transaction Advisory for the project
                            • Relevant project studies
                            • Project Structuring & financial Modeling
                            • Bid process management & Selection of developers
Thank You

Contenu connexe

Tendances

46721953 magarpatta-city
46721953 magarpatta-city46721953 magarpatta-city
46721953 magarpatta-city
Bhairavi Gupta
 
anna nagar cluster
anna nagar clusteranna nagar cluster
anna nagar cluster
richa_15b
 
Critical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad CityCritical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad City
Maitreyi Yellapragada
 

Tendances (20)

Mysore Town Planning By Akash Thottarath
Mysore Town Planning By Akash ThottarathMysore Town Planning By Akash Thottarath
Mysore Town Planning By Akash Thottarath
 
Chandigarh city planning by Le Corbusier
Chandigarh city planning by Le CorbusierChandigarh city planning by Le Corbusier
Chandigarh city planning by Le Corbusier
 
Dholera Smart City and SIR Prospects
Dholera Smart City and SIR ProspectsDholera Smart City and SIR Prospects
Dholera Smart City and SIR Prospects
 
46721953 magarpatta-city
46721953 magarpatta-city46721953 magarpatta-city
46721953 magarpatta-city
 
Kalkaji slum, delhi
Kalkaji slum, delhi Kalkaji slum, delhi
Kalkaji slum, delhi
 
Urban studies case study townships
Urban studies case study townshipsUrban studies case study townships
Urban studies case study townships
 
Overview of Godrej Garden city Township
Overview of Godrej Garden city TownshipOverview of Godrej Garden city Township
Overview of Godrej Garden city Township
 
Kathputli colony slum development
Kathputli colony slum developmentKathputli colony slum development
Kathputli colony slum development
 
IRJET- A Review on Self Sustainable Integrated Township
IRJET- A Review on Self Sustainable Integrated TownshipIRJET- A Review on Self Sustainable Integrated Township
IRJET- A Review on Self Sustainable Integrated Township
 
anna nagar cluster
anna nagar clusteranna nagar cluster
anna nagar cluster
 
Development Plan- Planning Intervention By (COEP) College of Engineering Pune
Development Plan- Planning Intervention By (COEP) College of Engineering Pune Development Plan- Planning Intervention By (COEP) College of Engineering Pune
Development Plan- Planning Intervention By (COEP) College of Engineering Pune
 
gandhinagar town planning literature study
  gandhinagar town planning literature study  gandhinagar town planning literature study
gandhinagar town planning literature study
 
Critical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad CityCritical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad City
 
Road Network heirarchy of Ahmedabad
Road Network heirarchy of AhmedabadRoad Network heirarchy of Ahmedabad
Road Network heirarchy of Ahmedabad
 
Planning concept of chandigrah city
Planning concept of chandigrah cityPlanning concept of chandigrah city
Planning concept of chandigrah city
 
Banglore city
Banglore cityBanglore city
Banglore city
 
Urban study of Adyar
Urban study of AdyarUrban study of Adyar
Urban study of Adyar
 
Gandhinagar city case study
Gandhinagar city case studyGandhinagar city case study
Gandhinagar city case study
 
Gurugram casestudy
Gurugram casestudyGurugram casestudy
Gurugram casestudy
 
Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad
 

En vedette

Theories and Concepts of town planning
Theories and Concepts of town planningTheories and Concepts of town planning
Theories and Concepts of town planning
Srishti Mehta
 
PPT with Master Plan- PE copy (1)
PPT with Master Plan- PE copy (1)PPT with Master Plan- PE copy (1)
PPT with Master Plan- PE copy (1)
Primary Estates
 
Mahindra World City Jaipur, Special Economic Zone, Domestic Tariff Area, Engi...
Mahindra World City Jaipur, Special Economic Zone, Domestic Tariff Area, Engi...Mahindra World City Jaipur, Special Economic Zone, Domestic Tariff Area, Engi...
Mahindra World City Jaipur, Special Economic Zone, Domestic Tariff Area, Engi...
Prashant Yadav
 

En vedette (14)

Self Sustainable Integrated Township : A resource-based planning to improve t...
Self Sustainable Integrated Township : A resource-based planning to improve t...Self Sustainable Integrated Township : A resource-based planning to improve t...
Self Sustainable Integrated Township : A resource-based planning to improve t...
 
Integrated Township
Integrated TownshipIntegrated Township
Integrated Township
 
TATA Housing La Montano, Pune Brochure
TATA Housing La Montano, Pune BrochureTATA Housing La Montano, Pune Brochure
TATA Housing La Montano, Pune Brochure
 
Sustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial UseSustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial Use
 
Theories and Concepts of town planning
Theories and Concepts of town planningTheories and Concepts of town planning
Theories and Concepts of town planning
 
KUL Ecoloch - An Integrated Township in Baner, Pune
KUL Ecoloch - An Integrated Township in Baner, PuneKUL Ecoloch - An Integrated Township in Baner, Pune
KUL Ecoloch - An Integrated Township in Baner, Pune
 
PPT with Master Plan- PE copy (1)
PPT with Master Plan- PE copy (1)PPT with Master Plan- PE copy (1)
PPT with Master Plan- PE copy (1)
 
Mahindra World City Jaipur, Special Economic Zone, Domestic Tariff Area, Engi...
Mahindra World City Jaipur, Special Economic Zone, Domestic Tariff Area, Engi...Mahindra World City Jaipur, Special Economic Zone, Domestic Tariff Area, Engi...
Mahindra World City Jaipur, Special Economic Zone, Domestic Tariff Area, Engi...
 
LBA Ruthless Rules Of Advertising
LBA  Ruthless Rules Of AdvertisingLBA  Ruthless Rules Of Advertising
LBA Ruthless Rules Of Advertising
 
Calculating tax millages for journalists
Calculating tax millages for journalistsCalculating tax millages for journalists
Calculating tax millages for journalists
 
Cities, townships, schools
Cities, townships, schoolsCities, townships, schools
Cities, townships, schools
 
Тель-Авив
Тель-АвивТель-Авив
Тель-Авив
 
Weil arets
Weil aretsWeil arets
Weil arets
 
Nanded City Presentation
Nanded City PresentationNanded City Presentation
Nanded City Presentation
 

Plus de Outlook Menia

New Development at Ambaji
New Development at AmbajiNew Development at Ambaji
New Development at Ambaji
Outlook Menia
 
New Issue of Majanu Ganit
New Issue of Majanu GanitNew Issue of Majanu Ganit
New Issue of Majanu Ganit
Outlook Menia
 
GIDC Corporate Presentation Feb 2012
GIDC Corporate Presentation Feb 2012GIDC Corporate Presentation Feb 2012
GIDC Corporate Presentation Feb 2012
Outlook Menia
 
Gidc corporate presentation june 2011
Gidc corporate presentation june 2011Gidc corporate presentation june 2011
Gidc corporate presentation june 2011
Outlook Menia
 
Chemtech & Pharma World Expo, Mumbai
Chemtech & Pharma World Expo, MumbaiChemtech & Pharma World Expo, Mumbai
Chemtech & Pharma World Expo, Mumbai
Outlook Menia
 
Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR)
Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR)Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR)
Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR)
Outlook Menia
 
Trade and Industry Mahasammelan, Baroda
Trade and Industry Mahasammelan, BarodaTrade and Industry Mahasammelan, Baroda
Trade and Industry Mahasammelan, Baroda
Outlook Menia
 
New Sanand Phase - II Estate Map ( Tentative)
New Sanand Phase - II Estate Map ( Tentative)New Sanand Phase - II Estate Map ( Tentative)
New Sanand Phase - II Estate Map ( Tentative)
Outlook Menia
 
MSMEs: GROWTH STRATEGIES
MSMEs: GROWTH STRATEGIESMSMEs: GROWTH STRATEGIES
MSMEs: GROWTH STRATEGIES
Outlook Menia
 
Strengths of German SMEs
Strengths of German SMEsStrengths of German SMEs
Strengths of German SMEs
Outlook Menia
 

Plus de Outlook Menia (20)

Girnar
GirnarGirnar
Girnar
 
Yatradham
YatradhamYatradham
Yatradham
 
Sidhapur - Developing Projects
Sidhapur - Developing ProjectsSidhapur - Developing Projects
Sidhapur - Developing Projects
 
Ramatrail -Developing Projects
Ramatrail -Developing ProjectsRamatrail -Developing Projects
Ramatrail -Developing Projects
 
Somnath -Developing Projects
Somnath -Developing ProjectsSomnath -Developing Projects
Somnath -Developing Projects
 
Dwarka -Developing Projects
Dwarka -Developing ProjectsDwarka -Developing Projects
Dwarka -Developing Projects
 
Shamlaji -Developing Projects
Shamlaji -Developing ProjectsShamlaji -Developing Projects
Shamlaji -Developing Projects
 
Dakor -Developing Projects
Dakor -Developing ProjectsDakor -Developing Projects
Dakor -Developing Projects
 
New Development at Ambaji
New Development at AmbajiNew Development at Ambaji
New Development at Ambaji
 
Ambaji Roshni
Ambaji RoshniAmbaji Roshni
Ambaji Roshni
 
New Issue of Majanu Ganit
New Issue of Majanu GanitNew Issue of Majanu Ganit
New Issue of Majanu Ganit
 
Aithore-gidc
Aithore-gidcAithore-gidc
Aithore-gidc
 
GIDC Corporate Presentation Feb 2012
GIDC Corporate Presentation Feb 2012GIDC Corporate Presentation Feb 2012
GIDC Corporate Presentation Feb 2012
 
Gidc corporate presentation june 2011
Gidc corporate presentation june 2011Gidc corporate presentation june 2011
Gidc corporate presentation june 2011
 
Chemtech & Pharma World Expo, Mumbai
Chemtech & Pharma World Expo, MumbaiChemtech & Pharma World Expo, Mumbai
Chemtech & Pharma World Expo, Mumbai
 
Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR)
Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR)Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR)
Gujarat Petroleum, Chemical and Petrochemical Investment Region (PCPIR)
 
Trade and Industry Mahasammelan, Baroda
Trade and Industry Mahasammelan, BarodaTrade and Industry Mahasammelan, Baroda
Trade and Industry Mahasammelan, Baroda
 
New Sanand Phase - II Estate Map ( Tentative)
New Sanand Phase - II Estate Map ( Tentative)New Sanand Phase - II Estate Map ( Tentative)
New Sanand Phase - II Estate Map ( Tentative)
 
MSMEs: GROWTH STRATEGIES
MSMEs: GROWTH STRATEGIESMSMEs: GROWTH STRATEGIES
MSMEs: GROWTH STRATEGIES
 
Strengths of German SMEs
Strengths of German SMEsStrengths of German SMEs
Strengths of German SMEs
 

Integrated township- atali-dahej-phase-II

  • 1. Integrated Township at Atali-Dahej Phase II Integrated Township on the banks of Narmada River Investor’s Conclave presented by Gujarat Industrial Infrastructure Project Development Company Limited Gujarat Industrial Development Corporation 6th March 2010
  • 2. Background • Gujarat Industrial Infrastructure Project Development Company Limited (GIIPDCL) o GIDC have incorporated a Joint Venture Company (JVC) named “Gujarat Industrial Infrastructure Project Development Company Limited” (GIIPDCL) with IL&FS Trust Company Limited & IL&FS Infrastructure Development Corporation Ltd. o The JVC has been mandated to develop industrial infrastructure projects in Gujarat on Public Private Partnership Format. • The Project o Integrated, self-sufficient township with quality housing, healthy living and state of art infrastructure is proposed to be developed in a planned manner o The integrated township of around 1000 ha having following breakup: · Township at Ekal, Keshrol & Manad – 714 ha • Atali township Phase II – 294 ha (To be developed in Phase I)
  • 3. Project Location & Connectivity
  • 4. Regional Advantages o 7 notified SEZs within the catchment area, including functional Dahej SEZ of 1,719 ha with processing area of 1698 ha without any provision for housing o DMIC corridor is passing through Bharuch (Bharuch-Dahej Investment Region and Vadodara-Ankleshwar Industrial Area are planned for development) To, Delhi Notified SEZs within 25-30 km radius of Project Sites (Bharuch District) Jambusar SEZ Land Location Type (Ha) Jambusar Multi-product 3,380 Dahej Multi-product 1,719 Vilayat Vilayat Hydrocarbon 450 SEZs (3) Jhagadia Ceramic & Glass 197 Atali Township Phase I (146 Ha) VAGRA Vilayat Chemicals 160 Panoli Pharmaceuticals 130 Dahej Industrial PCPIR BHARUCH Agro based Vilayat 118 Estate Dahej SH - 6 (Chemical) Jhagadia SEZ 6154 JHAGADIA Dahej SEZ Dahej SEZ Atali Township ANKLESHWAR Functional Phase II (294 Ha) Township at Dahej PCPIR Keshrol, Mannad PANOLI & Eksal (714 ha) • 7 Notified SEZs • Project Site Panoli SEZ • Important Towns To, Mumbai
  • 5. Dahej Economic Profile Dahej PCPIR – One of the country’s largest Petrochemical Region o Dahej Industrial Estate (spread across 4500 ha with large manufacturing units) o Dahej SEZ (notified and functional multi product SEZ spread over 1719 ha). Dahej SEZ, a multiproduct SEZ, is being developed by Dahej SEZ Ltd (DSL), a JV company of GIDC and ONGC. o Dahej Industrial Estate – Phase II (spread across 4200 ha is under development) o Dahej Port (for transportation of solid, liquid and LNG facilities including first LNG Terminal in the country) Major Industrial Players Mega industrial projects in pipeline: • Reliance (earlier IPCL) (i) 7 SEZs in Bharuch District within 25-30 km from Atali • Gujarat Alkalies & Chemicals Limited (GACL) village • Birla Copper, Petronet LNG , Welspun (ii) Bharuch-Dahej Investment Region and Vadodara- • Chemical Port Terminal Company Limited Ankleshwar Industrial Area under Delhi Mumbai Industrial • BASF Corridor (DMIC)
  • 6. Project Location within PCPIR Project Location Legend 1 PCPIR Area 2 Vagra-Vilayat Industrial Estate o Project site is strategically located in Vagra Taluka, Dahej 3 Dahej II 4 Dahej Housing (Atali Phase I) along 4 lane SH-6 in Dahej PCPIR , Bharuch district, 5 Eksal, Keshrol & Manad Gujarat 6 Dahej Housing (Atali Phase II) o Offsite trunk infrastructure already in place. 7 Vagra-Vilayat (Bhersam, Argam, Ankot, Juner) 8 Vagra-Vilayat (Bharsum) 9 Dahej Extension (Amod Road) 10 Dahej Industrial Estate 1 7 2 8 9 Atali Phase I 4 Township (under development) Dahej II Dahej 3 5 SH - 6 Kaladar 10 6 a Dahej SEZ Koliad To Bharuch Keshrol, Manad Dahej Dahej Industrial Estate Atali Phase II & Eksal SEZ Area Township Township Site – 292 ha Site – 714 ha  Site Area is 294 Ha Phase II
  • 7. Site Appreciation Site for Atali Phase II o Site Details Towards Bharuch • Site Area is 292.93 Ha Towards Dahej 11 KVA Power • Area under canals – 5.3 Ha Pond Transmission Line • Developable Area - o Land Status Approach road • Land acquisition is under to Kaladara Village progress Part of Kaladara Village Kaladara Village Scale Narmada River
  • 8. Site Appreciation… Cont’d Site Features Towards Dahej Industrial Estate Electricity Line • 11 KVA Transmission line along the SH-6 Water supply Line Atali Towards Bharuch • Gas pipeline passing through the site Narmada Canal • ONGC pipeline passing through the site • Water supply line along SH-6 (8 MGD- Narmada additional 17 MGD pipeline is along the Kaladara Canal other side of SH-6) • Narmada Canal passing through the site( North Not to Scale
  • 9. Housing Need in the Region Only Industrial township project within PCPIR to be developed on PPP format. o Considering a catchment area of 20-25 km(4 notified SEZs, PCPIR region and Dahej Industrial Estate including functional SEZ in Dahej), there is a dire need of housing in Dahej due to following reasons o Large no of Employees working in Industries within Dahej PCPIR commute from nearby urban areas like Bharuch (42 km), Ankleshwar (56 km) and Vadodara (111 km) The proposed Atali Township will substantially reduce their commuting time. o Initially township of 293 ha has been earmarked at Atali and Kaladara villages for residential and other supporting facilities to fulfill the housing requirement of the entire PCPIR region of 453 sq km. o As per PCPIR Master Plan, the total investments worth Rs. 50,000 crores are expected to generate employment of around 8 lakh people and housing demand of 1 lakh Dwelling Units. This township is proposed to accommodate around 15000 Dwelling Units
  • 10. Housing Demand & Typology - 2021 o Total housing demand of around 25000 Dwelling housing units in base case scenario and 39000 DU’s in optimistic scenario. This demand has been estimated based on primary market survey, stakeholder consultations, and industry assessment, analysis of employment pattern in existing and upcoming industries within PCPIR region. However The proposed Township (293 ha) shall accommodate around 15000 Dwelling Units This demand does not include the current demand of Atali Township Phase I (146 ha) o This demand is spread across various housing typology : 4 BHK Bungalows, 3 BHK Bungalows, 3 BHK Row Houses, 2 BHK Apartments, 1 BHK Apartments, Economic Housing (hostel/dormitory / 1 RK apartment/ Studio Apartment) Source: Demand study conducted by Jones Lang LaSalle Meghraj
  • 11. Project Components Integrated, self-sufficient township for more than 15,000 households in a planned manner Residential : Housing for all income category o Bungalows to EWS housing (HIG, MIG, Integrated Township on the banks of Narmada River LIG & EWS) Commercial: Markets, offices, shopping centres, hotel & restaurants Social Infrastructure : Education & health facilities and other public utilities Recreation : leisure & entertainment facilities, parks/gardens/open-spaces, landscaped areas Support Infrastructure : Efficient transport system, road network, quality water supply, sewerage & drainage facilities, security etc. Self-sufficient Township with quality housing, healthy living and world class infrastructure
  • 12. Project USP – Eco City • Energy efficient building – green architecture • Encourage use of green architecture in building design for important buildings. • Eco-friendly transport System • Central Green Space and continuous green belt along major transport corridor (Cycle Track & Central Green Park Jogging Track) • Encourage Pedestrian Movement • Eco friendly public transport • Zero Waster Disposal • Sustainable treatment of solid wastes Cycle Track / Jogging Track • Use of recycled water for gardening (non-potable water) • Community based Neighborhood Planning • Social Amenities and public places within walking distance
  • 13. Green City Model Concept Development Eco City – Concept Development Public Public utilities utilities Sector Sector Sector Sector Central Central Central township township Business Sector Sector Sector Open Open District Space Sector Space Sector Sector Spine Sector Spine Roads Sector Roads Sector Roads Transport Hierarchy & Sector Planning Green Connectivity
  • 14. Planning considerations CONTOURS Narmada River Proposed Coastal Road to Dahej Port Kaladara Village T0 Dahej Port Proposed link road to Coastal Road to Dahej Road WIND GRID T0 Dahej 4 Lane SH – 6 Bharuch to Dahej T0 Bharuch Regional Connectivity
  • 15. Conceptual Master Plan - Layout Legend
  • 16. Conceptual Master Plan – Area Statement S.No. Particulars Area (Ha) % of area 1 Total Land Area 293 100 2 Under Narmada Canal 5.4 2 3 Total Developable Area 287.6 98 % of S.No. Particulars Area (Ha) area 1 Area Under Sectors 222 77 Area % of 2 Central Business District 6.0 2 Sectors (Ha) area Roads Sector 1 40 18 3 19.5 7 (Arterial & Sub-arterial) Sector 2 40 18 4 Social Infrastructure 20.8 7 Sector 3 Physical Infrastructure (Reserved for 22 9 5 (STP, WTP, Crematorium, Solid 4.5 2 future Waste Dumping Yard) development 6 Open Space/Parks & Gardens 14.0 5 Sector 4 40 18 Sector 5 40 18 6.1 Public Green 4.0 Sector 6 40 18 6.2 Golf course ( Driving Range) 10.0 Total 222 100 Total Area 287.6 100
  • 17. Sector Level Standard Landuse Pattern Landuse Category % of total area Residential * 60 Commercial 2–3 Public and Semi-Public 6–8 Recreational 12 – 14 Roads 10 –12 Open areas/parks/gardens/Water bodies Balance Total 100 Source – Urban Development Plans Formulation and Implementation Guidelines (UDPFI) * As per Regulation for Residential Township 2009 – Gujarat Government Notification (Department of Urban Development & Urban Housing, GoG)
  • 18. Draft Area Statement S.No. Land Use Land area (Ha) % of total Area Non-Saleable (%) 1 Roads 41.59 14.20 14.20 2 Residential 178.33 60.89 Commercial, hotel and 3 6.19 2.11 retail 4 Utilities 4.65 1.59 1.59 5 Parks and open spaces 26.00 8.88 5.46 Social 6 Infrastructure/public 36.10 12.33 1.81 and semi public Total 292.86 100 23.06
  • 19. City Level Social Infrastructure & Utilities Components Saleable Non-Saleable Education Integrated school without hostel facility 3.50 College 4.00 Technical education centre (ITI/polytechnic) 4.00 School for handicapped 0.50 Health Intermediate Hospital 3.70 Nursing home, Child & maternity centre 0.60 Parks and Recreation Major Recreational Club (Outdoor - swimming pool, lawn tennis, jogging track & indoor sports facilities - table tennis, 1.00 badminton court etc including parking) Socio-Cultural Centre (Music, Dance & Drama Centre/Meditation & Spiritual 0.20 Centre/Arts & Craft Centre/Auditorium) Mini Golf Course (Driving Range) 10.00 City Park 4.00
  • 20. City Level Social Infrastructure & Utilities – Cont’d Components Saleable Non-Saleable Social Amenities Community centre 1.00 Taxi stand including repair shop etc. 0.10 Police Station 1.50 Fire sub station 0.60 Post Office & telegraph office 0.10 Bus Terminal 0.20 Utilities and Services Electric sub station (33/66 KV) 0.05 WTP with reservoir 1.50 STP 1.50 Solid waste dumping unit 1.00 Crematorium/burial ground/cemetery 0.50 Total 28.10 10.45 Total Area 38.55 ha
  • 21. Sector Level Social Infrastructure & Utilities Area in Total Area (Ha) per sector Proposed Facilities ha (per (in no.) Saleable Non-Saleable unit) Pre-primary, nursery school 5 0.40 0.40 Secondary/senior 1 0.60 1.60 secondary School Shopping cum Service Centres (milk booth and 1 0.20 0.20 other venders etc.) Dispensary 0 0.50 0.10 Community Hall and library 1 0.20 0.20 Parks, open space and tot- 4 0.60 2.00 lots Electric sub station 1 0.00 0.05 Over Head Tank 1 0.00 0.05 Religious place 1 0.10 0.10 Total 2.20 2.5 Total Area 4.7 ha per sector
  • 22. Physical Infrastructure Assessment Physical infrastructure Units assessment Water Demand Potable Water supply (MLD) 13.1 MLD Non- potable Water supply (MLD) 3.4 MLD Total 16.5 MLD Sewerage Generation Sewage (MLD) 13.2 MLD Power Demand (KVA) 7855 S.No. Assumptions for provision of Infrastructure I Population to be Served A Township Level 75,000 B Sector Level 15,000 II Density (Person Per Ha)* A Township Level 255 B Sector Level 375 * Assuming Household size of 5
  • 23. Bidding Process Event Description Estimated Date QUALIFICATION STAGE Issue of RFQ document D Last date for receiving queries D+15 days Project Briefing Meeting(Developers’ Conclave)* D+15 days Authority response to queries latest by D+20 days Application Due Date D+30 days Due date for opening of RFQs D+35 days Announcement of short-listed Bidders D+45 days BID STAGE Sale of Bid Documents To be specified in RFP document Last date for receiving queries Pre-Bid meeting – 1 Authority response to queries latest by Pre-Bid meeting – 2 Bid Due Date(s) Opening of Bids Letter of Award (LOA) Validity of Bids Signing of Lease Agreement
  • 24. Project Categories & Qualifications Sr. Project Minimum Development Obligations Minimum Technical No. Category Experience 1. Residential Residential units and other incidental Developed real estate projects Sectors facilities (commercial, social, recreational) of at least 1 million sq.ft. in a and supporting (internal) infrastructure maximum of 5 projects during within each Residential Sector last 5 years OR 2 Central Markets, offices, shopping centers/Malls, Completed development of at Business hotels & restaurants, Multiplexes, least one Special Area Project District/ City Education, Health and other supporting of at least 50 acres during last Centre facilities and supporting (internal) 5 years infrastructure within CBD/City Centre 3 Trunk Trunk water supply network & water Implemented Infrastructure treatment plant, sewerage system Civil/infrastructure projects (including Sewerage Treatment Plant & worth at least Rs. 1500 million Pumping stations), road network, Storm during last 5 years water drainage system, Solid waste management & utilities
  • 25. Role of Stakeholders S.No. Stakeholder Role I Gujarat • Provide Land free of all encumbrances on lease Industrial • Facilitate provision of water supply, power supply upto the township Development • Approve layout plans & monitor/ regulate enforcement of GDCR Corporation • Facilitate government approvals • Act as a nodal agency to resolve disputes among developers II Developers • Payment of land premium, lease rental as per GIDC land allocation policy • Development (planning, detailed engineering & designing, financing, construction, marketing & O&M) of the proposed project categories • Development of internal infrastructure under each project categories for respective sectors/ city centre(physical infrastructure, sector/internal roads/public amenities, social infrastructure, parks & open spaces etc.) • Comply to statutory /regulatory requirements III GIIPDCL • Project Development & Transaction Advisory for the project • Relevant project studies • Project Structuring & financial Modeling • Bid process management & Selection of developers