KPI Familiarisation
KPI = Key Performance Indicator
Objectives

• Improve personnel’s understanding of KPIs and what
  they indicate.




              +                     =

• Improve personnel’s awareness of maintenance
  performance.
What is a KPI?
           KPIs track performance against established key success factors.

•    KPIs are directly linked to the overall goals of the company.
•    Business Objectives are defined at corporate, regional and site level. These goals
     determine critical activities (Key Success Factors) that must be done well for
     a particular operation to succeed.
•    KPIs are utilised to track or measure actual performance against key success
     factors.
      – Key Success Factors (KSFs) only change if there is a fundamental shift in business objectives.
      – Key Performance Indicators (KPIs) change as objectives are met, or management focus shifts.


       Business                        Key Success                              Key Performance
      Objectives                       Factors (KSFs)                           Indicators (KPIs)
                         Determine.                             Tracked by.



      No Injuries                            Safety                             LTI, LTIFR, LTISR.
How do I interpret a KPI?
                        Interpretation of KPIs is KPI dependent.
    KPIs do NOT give answers, rather they raise questions and direct attention.

       Business                       Key Success                              Key Performance
      Objectives                      Factors (KSFs)                           Indicators (KPIs)
                        Determine.                             Tracked by.



      No Injuries                           Safety                             LTI, LTIFR, LTISR.


•    If LTI, LTIFR or LTISR increase, this indicates that the business objective,
     “No Injuries”, is NOT being fulfilled.
      – This should direct attention to the SAFETY key success factor.
      – Problems / Issues should be identified and resolved with a view to decreasing safety KPIs and
        therefore achieving the business objective.

•    If LTI, LTIFR or LTISR decrease, this indicates that the business objective,
     “No Injuries”, is being fulfilled.
      – This indicates safety practices / mechanisms are proving successful.
What influence do I have on KPIs?
Every person on-site has an influence on certain KPIs and business objectives.


     Senior Foremen                                              Crew
• LTIFR                                            • LTIFR
• Incidents                                        • Incidents
• Property damage ($)                              • Property damage ($)
• Cost / unit                                      • Mean time to repair
• Cost / hour
• Cost of quality
• Maintenance effectiveness
• Maintenance efficiency
• Mean time between failure
• Mean time to repair
Maintenance KPIs
Seventeen (17) primary maintenance KPIs to be utilised.
    – These KPIs will be utilised across the site’s Maintenance Departments.

                                         KPIs
  • LTIFR (both production and maintenance)          • Backlog
  • Maintenance Cost per Unit vs. Budget             • % Scheduled Man Hours Planned
  • Maintenance Cost per Hour vs. Budget             • % Schedule Compliance
  • Cost of Quality                                  • % Planning Effectiveness
  • Maintenance Effectiveness                        • % Man Hours Available
  • Maintenance Efficiency                           • % Rework
  • Mean Time Between Failure (MTBF)                 • % Failures Investigated
  • Mean Time to Repair (MTTR)                       • MIP Process Effectiveness
  • Preventive Inspection Effectiveness
  • Ratio of Preventive to Breakdown Maintenance
LTIFR
                             Lost Time Injury Frequency Rate
•   LTIFR is a measure of overall safety performance, and indicates the frequency
    of Lost Time Injuries (LTIs).

                    LTIFR = 
                              Number of Lost Time Injuries 
Formula                                                    x 1,000,000
                                 Total Man Hours          

–   Total man hours includes wages, staff and contractor hours associated with both production and
    maintenance operations.




                                       • Personnel are getting injured.
                                       • Safety practices / mechanisms are ineffective.
                                       • Incident reporting is increasing.


Interpretation                                           LTIFR < 55
                                                          LTIFR <
                                       • Personnel are NOT getting injured.
                                       • Safety practices / mechanisms are effective.
                                       • Incident reporting is reducing.
Maintenance Cost per Unit vs. Budget
•   A measure of the maintenance effort required for a piece of equipment (or
    plant) to generate a unit of production.
                                                                    T otal M aintenance C ost
Formula                   M aintenance C ost per U nit =
                                                                       U nit of P roduction

–   Total maintenance cost includes total costed maintenance man hours, parts and any other costs
    associated with the maintenance effort (preventive and corrective).
–   Unit of production will match the associated departments current unit.



                                        •   Maintenance effort required is increasing.
                                        •   Maintenance practices / mechanisms are ineffective.
                                        •   Operating conditions are deteriorating.
                                        •   Equipment is being over maintained.
                                        •   Maintenance cost budgeting was inaccurate.
                                        •   Maintenance requirements changed during the fiscal year.
Interpretation
                                     Maintenance Cost per Unit vs. Budget
                                     Maintenance Cost per Unit vs. Budget
                                        •   Maintenance effort required is decreasing.
                                        •   Maintenance practices / mechanisms are effective.
                                        •   Operating conditions are improving.
                                        •   Maintenance cost budgeting was inaccurate.
                                        •   Maintenance requirements changed during the fiscal year.
Maintenance Cost per Hour vs. Budget
•   A measure of the maintenance effort required to generate production time from
    a piece of equipment (or plant).
                                                                     T otal M aintenance C ost
Formula                   M aintenance C ost per H our =
                                                                          O perating T im e

–   Total maintenance cost includes total costed maintenance man hours, parts and any other costs
    associated with the maintenance effort (preventive and corrective).
–   Operating time is productive time plus production delays.


                                        •   Maintenance effort required is increasing.
                                        •   Maintenance practices / mechanisms are ineffective.
                                        •   Operating conditions are deteriorating.
                                        •   Equipment is being over maintained.
                                        •   Maintenance cost budgeting was inaccurate.
                                        •   Maintenance requirements changed during the fiscal year.
                                        •   Budgeted operating time reduced.

Interpretation                       Maintenance Cost per Hour vs. Budget
                                     Maintenance Cost per Hour vs. Budget
                                        •   Maintenance effort required is decreasing.
                                        •   Maintenance practices / mechanisms are effective.
                                        •   Operating conditions are improving.
                                        •   Maintenance cost budgeting was inaccurate.
                                        •   Maintenance requirements changed during the fiscal year.
                                        •   Budgeted operating time increased.
Cost of Quality
•   A measure of preventive maintenance effect on corrective and total
    maintenance costs.

Concept
Cost of Quality (cont.)
–   Total maintenance cost, or cost of quality, is the sum of preventive and corrective maintenance
    costs.
–   Preventive maintenance cost is the cost associated with maintenance carried out at predetermined
    intervals or other prescribed criteria intended to reduce the probability of failure or degradation of
    performance of equipment (or plant).
–   Corrective maintenance cost is the cost associated with maintenance carried out on a defect which
    has caused equipment (or plant) to be taken out of service during scheduled operating time.
    Corrective maintenance can be either planned or unplanned.




                                    •       Preventive maintenance effort decreasing.
                                    •       Corrective maintenance effort increasing.
                                    •       Preventive maintenance effort excessive (beyond optimum).
                                    •       Maintenance practices / mechanisms are ineffective.

Interpretation                                              Cost of Quality
                                                            Cost of Quality
                                        •    Preventive maintenance effort is increasing.
                                        •    Corrective maintenance effort in decreasing.
                                        •    Preventive to corrective maintenance ratio optimised.
                                        •    Maintenance practices / mechanisms are effective.
Maintenance Effectiveness
•   A measure of the amount of maintenance downtime required to keep
    equipment (or plant) operating.
                                                       Operating Time      
Formula           M aintenance Effectiveness =                              x 100%
                                                Operating Time + Down Time 

–   Operating time is productive time plus production delays.
–   Down time is the total time equipment (or plant) is down for maintenance work (preventive and
    corrective).




                                        • Maintenance effort required is decreasing.
                                        • Maintenance practices / mechanisms are effective.
                                        • Operating conditions are improving.


Interpretation                          Maintenance Effectiveness > 95%
                                        Maintenance Effectiveness > 95%
                                        •   Maintenance effort required is increasing.
                                        •   Maintenance practices / mechanisms are ineffective.
                                        •   Operating conditions are deteriorating.
                                        •   Equipment is being over maintained.
Maintenance Efficiency
•   A measure of the maintenance effort required to deliver required performance
    levels from equipment (or plant).
                                                 M aintenance M an H ours 
Formula               M aintenance Efficiency =                            x 100%
                                                     O perating Tim e     

–   Maintenance man hours is the actual maintenance man hours spent maintaining an item of
    equipment (or plant). Maintenance man hours includes maintenance wages, staff and contractor
    hours (preventive and corrective).
–   Operating time is productive time plus production delays.



                                        •   Maintenance effort required is increasing.
                                        •   Maintenance practices / mechanisms are ineffective.
                                        •   Operating conditions are deteriorating.
                                        •   Equipment is being over maintained.

Interpretation                                  Maintenance Efficiency
                                                Maintenance Efficiency
                                        • Maintenance effort required is decreasing.
                                        • Maintenance practices / mechanisms are effective.
                                        • Operating conditions are improving.
MTBF
                               Mean Time Between Failure
•   The average amount of operating time between consecutive breakdowns for an
    item of equipment (or plant).
                                                    O perating T im e
Formula                      M TBF =
                                       N um ber of Failures or B reakdow n E vents

–   Operating time is productive time plus production delays.
–   Number of failures or breakdown events is the number of failures on an item of equipment (or
    plant).



                                       •   Maintenance effort required is decreasing.
                                       •   Maintenance practices / mechanisms are effective.
                                       •   Failure frequency is decreasing.
                                       •   Operating conditions are improving.

Interpretation                                               MTBF
                                                             MTBF
                                       •   Maintenance effort required is increasing.
                                       •   Maintenance practices / mechanisms are ineffective.
                                       •   Failure frequency is increasing.
                                       •   Operating conditions are deteriorating.
MTTR
                                   Mean Time To Repair
•   The average maintenance time required to keep an item of equipment (or plant)
    operational.
                                                          D o w n T im e
Formula                     M TTR =
                                       N u m b er o f F ailu res or B reak d ow n E ven ts

–   Down time is the total time equipment (or plant) is down for maintenance work (preventive and
    corrective).
–   Number of failures or breakdown events is the number of failures on an item of equipment (or
    plant).



                                       • Maintenance practices / mechanisms are ineffective.
                                       • Poor clean-up (work preparation) practices.
                                       • Ineffective work practices.

Interpretation                                             MTTR
                                                           MTTR
                                       • Maintenance practices / mechanisms are effective.
                                       • Clean-up (work preparation) practices effective.
                                       • Effective work practices.
Preventive Inspection Effectiveness
    Ratio of Preventive Repair Man Hours to Preventive Inspection Man Hours.
•    A measure of preventive inspection effectiveness.
                                                                                   P re v e n tiv e R e p a ir M a n H o u rs
Formula               P re v e n tiv e In sp e c tio n E ffe c tiv e n e ss =
                                                                                P re v e n tiv e In sp e c tio n M a n H o u rs

–    Preventive repair man hours is maintenance that is performed as a result of a preventive inspection.
–    Preventive inspection man hours is work performed that originates from equipment maintenance
     strategies; ie. planned services and inspections.




                                                • Preventive inspections are effective.
                                                • Inspection frequency to low.
                                                • Preventive inspection conducted effectively.


Interpretation                                  Preventive Inspection Effectiveness
                                                 Preventive Inspection Effectiveness
                                                • Preventive inspections are ineffective.
                                                • Preventive inspections are conducted ineffectively.
                                                • Inspection frequency to high.
Ratio of Preventive to Breakdown Maintenance

             Ratio of Preventive Man Hours to Breakdown Man Hours.
•   A measure of planning / scheduling process effectiveness and its influence on
    breakdown maintenance.
                     R a tio o f P r e v e n tiv e
Formula              to B r e a k d o w n M a in te n a n c e =
                                                                P r e v e n t iv e R e p a ir M a n H o u r s + P r e v e n t iv e I n s p e c tio n M a n H o u r s
                                                                                                 B re a k d o w n M a n H o u rs


–   Preventive repair man hours is maintenance that is performed as a result of a preventive inspection.
–   Preventive inspection man hours is work performed that originates from equipment maintenance
    strategies; ie. planned services and inspections.
–   Breakdown man hours is unplanned corrective maintenance that must occur due to a defect causing
    equipment (or plant) to be taken out of service during scheduled operating time (NOT corrective
    maintenance man hours).


                                                         • Over maintaining equipment.
                                                         • Preventive maintenance practices / strategies are too
                                                           effective and should be optimised (optimise costs).

Interpretation                              Ratio of Preventive to Breakdown Maintenance = 16
                                            Ratio of Preventive to Breakdown Maintenance = 16
                                                         • Preventive inspections are ineffective.
                                                         • Faults not being reported.
                                                         • Preventive maintenance practices / strategies are ineffective.
Backlog
•   All maintenance work identified to be done, but as yet incomplete. Indicates
    how much outstanding maintenance work exists compared to the resources
    available to complete the work.
•   Formula      B a c k lo g = T o ta l M a in te n a n c e M a n H o u rs o n O u ts ta n d in g W o rk O rd e rs


–   Total maintenance man hours on outstanding work orders currently includes both backlog and
    forward log.




                                              •   Build up of jobs.
                                              •   Insufficient labour.
                                              •   Maintenance practices / mechanisms are ineffective.
                                              •   Preventive inspections are effective (Work identified).

Interpretation                                       Backlog < 1,800 man hours
                                                     Backlog < 1,800 man hours
                                              • Preventive inspections are ineffective (No work identified).
                                              • Too much labour.
                                              • Maintenance practices / mechanisms are effective.
% Scheduled Man Hours Planned
•   The percentage of scheduled man hours that appear on the weekly schedule
    that have been planned. A measure of planning process effectiveness.
•   Formula                                                            P la n n e d M a n H o u rs o n W e e k ly S c h e d u le 
                 % S c h e d u le d M a n H o u rs P la n n e d =                                                                   x 100%
                                                                          T o ta l W e e k ly S c h e d u le d M a n H o u rs   

–   Planned man hours on weekly schedule is the total planned maintenance hours on the weekly
    maintenance schedule.
–   Total weekly scheduled man hours is the total maintenance man hours scheduled for the week
    (NOT total maintenance man hours available).



                                                      •   High level of planned work in backlog.
                                                      •   Minimal job delays.
                                                      •   Maintenance practices / mechanisms are effective.
                                                      •   Too much labour.

Interpretation                                  % Scheduled Man Hours Planned > 80%
                                                % Scheduled Man Hours Planned > 80%
                                                      •   Priority work not being planned.
                                                      •   Lack of planned work in backlog.
                                                      •   Maintenance practices / mechanisms are ineffective.
                                                      •   Insufficient labour.
% Scheduled Compliance
•   A measure of scheduling process compliance.
                                                       S c h e d u le d M a n H o u rs C o m p le te d 
Formula        % S c h e d u le d C o m p lia n c e =                                                       x 100%
                                                       T o ta l W e e k ly S c h e d u le d M a n H o u rs 

–   Scheduled man hours completed is the actual man hours spent performing scheduled
    maintenance.
–   Total weekly scheduled man hours is the total maintenance man hours scheduled for the week
    (NOT total maintenance man hours available).

                                            • Priority jobs being completed.
                                            • Planned repairs, PM’s being executed.
                                            • Maintenance practices / mechanisms are effective.
                                            • Too much labour.
                                            • Effective work practices.
                                            • Maintenance / Production Department communication /
                                              cooperation effective (Access to equipment).
                                            • Insufficient scheduled man hours to conduct maintenance.


Interpretation                                      % Scheduled Compliance > 80%
                                                    % Scheduled Compliance > 80%
                                                • High level of breakdowns / interruptions.
                                                • Maintenance practices / mechanisms are ineffective.
                                                • Insufficient labour.
                                                • Maintenance / Production Department communication /
                                                  cooperation ineffective (Access to equipment).
                                                • Ineffective work practices.
                                                • To many scheduled man hours to conduct maintenance.
% Planning Effectiveness
•   A measure of planning process compliance.
                                                              N u m b e r o f S c h e d u le d J o b s C o m p le te d w ith C o m m e n ts 
Formula          % P la n n in g E ffe c tiv e n e s s =                                                                                       x 100%
                                                                     T o ta l N u m b e r o f S c h e d u le d J o b s C o m p le te d     


–   Number of scheduled jobs completed with comments is the number of scheduled jobs completed
    with comments on the job ticket identifying issues / problems with the planning process.




                                                       •   Minimum requirements for a planned job not understood.
                                                       •   Schedule compliance low.
                                                       •   High level of job delays.
                                                       •   Maintenance practices / mechanisms are ineffective.
                                                       •   Maintenance / Production Department communication /
                                                           cooperation ineffective (Access to equipment).


Interpretation                                             % Planning Effectiveness < 20%
                                                           % Planning Effectiveness < 20%
                                                       • Planned requirements well understood.
                                                       • Schedule compliance high.
                                                       • Maintenance practices / mechanisms are effective.
                                                       • Maintenance / Production Department communication /
                                                         cooperation effective (Access to equipment).
                                                       • Job ticket comments not being completed.
% Man Hours Available
•   Primarily a measure of attendance, but also a useful tool to track training and
    future manpower requirements. Indicates effective utilisation of man power.
•   Formula % Man Hours Available =  Total Man Hours Paid
                                    
                                                                       - Absence from Work 
                                                                                            x 100%
                                                            Total Man Hours Paid          

–   Absence from work is man hours associated with absenteeism, training and any other diversion
    from an employees primary function.




                                      • Lack of employee development.
                                      • Lack of training.
                                      • Reduction in absenteeism.
                                      • Core function (maintenance) being fulfilled.

Interpretation                                 % Man Hours Available
                                               % Man Hours Available
                                      • Absenteeism.
                                      • Excessive training.
                                      • Core function (maintenance) not being fulfilled.
% Rework
•   Maintenance action that is a repeat of a previous, ineffective effort. The work
    could have been ineffective due to poor workmanship, poor design, or
    improper procedures.
                          % Rework = 
•   Formula                               Rework M an Hours 
                                                                x 100%
                                      M aintenance W ork Hours 

–   Rework man hours is man hours associated with a maintenance action that is a repeat of a
    previous, ineffective effort.
–   Maintenance man hours is the actual maintenance man hours spent maintaining an item of
    equipment (or plant). Maintenance man hours includes maintenance wages, staff and contractor
    hours (preventive and corrective).



                                          •   Maintenance practices / mechanisms are ineffective.
                                          •   Poor design.
                                          •   Poor operating practices.
                                          •   Ineffective work practices.
Interpretation
                                                         % Rework < 20%
                                                         % Rework < 20%
                                          • Maintenance practices / mechanisms are effective.
                                          • Effective work practices.
                                          • Good design.
% Failures Investigated
•   Measure of the Maintenance Department’s effort to continuously improve.
              % F ailu res In v estig ated = 
                                               N u m b er o f C o rrectiv e Jo b T ick ets In v estig ated 
Formula                                                                                                    x 100%
                                                  T o tal N u m b er o f C o rrectiv e Jo b T ick ets     


–   Number of corrective job tickets investigated is the number of job tickets investigated, root cause
    found, and solutions investigated to prevent future occurrences. Job tickets that are associated with
    maintenance work performed on defects which caused equipment (or plant) to be taken out of
    service during scheduled operating time.
–   Total number of corrective job tickets is the total number of job tickets associated with
    maintenance work performed on defects which caused equipment (or plant) to be taken out of
    service during scheduled operating time.



                                          • Improved equipment reliability.
                                          • Continuously improving maintenance
                                            practices / mechanisms.
Interpretation                               % Failures Investigated > 80%
                                             % Failures Investigated > 80%
                                          • Repetitive equipment failures.
                                          • Repetitive job delays.
                                          • Continuous improvement of maintenance practices /
                                            mechanisms is not occurring.
MIP Process Effectiveness
•   Measure of the Maintenance Department’s effort to continuously improve.
Concept

–   MIP process effectiveness is a combination of the maintenance KPIs, schedule compliance,
    planning effectiveness and backlog.




                                     •   Maintenance effort is improving.
                                     •   Maintenance mechanisms / practices are improving.
                                     •   Improved equipment reliability.
                                     •   Backlog is decreasing.

Interpretation                           MIP Process Effectiveness > 80%
                                         MIP Process Effectiveness > 80%
                                     •   Maintenance effort is deteriorating.
                                     •   Maintenance mechanisms / practices are not improving.
                                     •   Equipment reliability is deteriorating.
                                     •   Backlog is increasing.
Summary
       KPIs track performance against established key success factors.


                      Interpretation of KPIs is KPI dependent.
 KPIs do NOT give answers, rather they raise questions and direct attention.


Every person on-site has an influence on certain KPIs and business objectives.


Seventeen (17) primary maintenance KPIs to be utilised.
      –These KPIs will be utilised across the site’s Maintenance Departments.




•   Systems and mechanism implemented to address business objectives (key
    success factors) can always be improved.
     – A continuous improvement (CI) philosophy should be adopted.

Contenu connexe

Tendances

Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?Ricky Smith CMRP, CMRT
 
Understanding Hierarchical Asset Structures in CMMS
Understanding Hierarchical Asset Structures in CMMSUnderstanding Hierarchical Asset Structures in CMMS
Understanding Hierarchical Asset Structures in CMMSeMaint Enterprises
 
Business Continuity Management
Business Continuity ManagementBusiness Continuity Management
Business Continuity ManagementECC International
 
Hints & Tips For Foundational Data For Your CMMS
Hints & Tips For Foundational Data For Your CMMSHints & Tips For Foundational Data For Your CMMS
Hints & Tips For Foundational Data For Your CMMSeMaint Enterprises
 
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Julie Rampello
 
Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Ricky Smith CMRP, CMRT
 
Effective cost management for global suppliers
Effective cost management for global suppliersEffective cost management for global suppliers
Effective cost management for global supplierskkukor
 
JNTUH B.TECH R16 FM subject Controlling Unit Ppt by PREM KAMAL
JNTUH B.TECH R16 FM subject  Controlling Unit Ppt by PREM KAMAL JNTUH B.TECH R16 FM subject  Controlling Unit Ppt by PREM KAMAL
JNTUH B.TECH R16 FM subject Controlling Unit Ppt by PREM KAMAL prem kamal
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyWaseem Akram
 
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolutionD3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolutionMannyjg5
 
Business Continuity Workshop Final
Business Continuity Workshop   FinalBusiness Continuity Workshop   Final
Business Continuity Workshop FinalBill Lisse
 
Presentation maintenence management
Presentation maintenence managementPresentation maintenence management
Presentation maintenence managementVaisakh S Babu
 
Business continuity overview slideshare
Business continuity overview slideshareBusiness continuity overview slideshare
Business continuity overview slideshareChris Greenhill
 
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Maturity Matrix   2013 versionPreventive Maintenance Maturity Matrix   2013 version
Preventive Maintenance Maturity Matrix 2013 versionRicky Smith CMRP, CMRT
 
Business Continuity Planning Presentation Overview
Business Continuity Planning Presentation OverviewBusiness Continuity Planning Presentation Overview
Business Continuity Planning Presentation OverviewBob Winkler
 
Bcm Roadmap
Bcm RoadmapBcm Roadmap
Bcm Roadmapbtrmuray
 

Tendances (20)

Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?
 
Understanding Hierarchical Asset Structures in CMMS
Understanding Hierarchical Asset Structures in CMMSUnderstanding Hierarchical Asset Structures in CMMS
Understanding Hierarchical Asset Structures in CMMS
 
Business Continuity Management
Business Continuity ManagementBusiness Continuity Management
Business Continuity Management
 
World Class Maintenance WebEx Slides
World Class Maintenance WebEx SlidesWorld Class Maintenance WebEx Slides
World Class Maintenance WebEx Slides
 
Hints & Tips For Foundational Data For Your CMMS
Hints & Tips For Foundational Data For Your CMMSHints & Tips For Foundational Data For Your CMMS
Hints & Tips For Foundational Data For Your CMMS
 
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
 
Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System
 
Effective cost management for global suppliers
Effective cost management for global suppliersEffective cost management for global suppliers
Effective cost management for global suppliers
 
JNTUH B.TECH R16 FM subject Controlling Unit Ppt by PREM KAMAL
JNTUH B.TECH R16 FM subject  Controlling Unit Ppt by PREM KAMAL JNTUH B.TECH R16 FM subject  Controlling Unit Ppt by PREM KAMAL
JNTUH B.TECH R16 FM subject Controlling Unit Ppt by PREM KAMAL
 
Rcm
RcmRcm
Rcm
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case Study
 
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolutionD3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
 
Business Continuity Workshop Final
Business Continuity Workshop   FinalBusiness Continuity Workshop   Final
Business Continuity Workshop Final
 
Presentation maintenence management
Presentation maintenence managementPresentation maintenence management
Presentation maintenence management
 
Business continuity overview slideshare
Business continuity overview slideshareBusiness continuity overview slideshare
Business continuity overview slideshare
 
Chap21
Chap21Chap21
Chap21
 
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Maturity Matrix   2013 versionPreventive Maintenance Maturity Matrix   2013 version
Preventive Maintenance Maturity Matrix 2013 version
 
Business Continuity Planning Presentation Overview
Business Continuity Planning Presentation OverviewBusiness Continuity Planning Presentation Overview
Business Continuity Planning Presentation Overview
 
Precision Maintenance Presentation
Precision Maintenance PresentationPrecision Maintenance Presentation
Precision Maintenance Presentation
 
Bcm Roadmap
Bcm RoadmapBcm Roadmap
Bcm Roadmap
 

Similaire à Kpi 101223064832 Phpapp02

Reliability and Maintenance in production Management
Reliability and Maintenance in production ManagementReliability and Maintenance in production Management
Reliability and Maintenance in production ManagementNazneen sheikh
 
Building Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptxBuilding Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptxsaru92sarathsivadas
 
Audit Efficiency and Effectiveness
Audit Efficiency and EffectivenessAudit Efficiency and Effectiveness
Audit Efficiency and EffectivenessManny Rosenfeld
 
Basics of maintenance processes
Basics of maintenance processesBasics of maintenance processes
Basics of maintenance processesGangaSumanth
 
ATS Overview For Linked In
ATS Overview For Linked InATS Overview For Linked In
ATS Overview For Linked Inpaltenbe
 
Maintenance Strategies for SMEs
Maintenance Strategies for SMEs Maintenance Strategies for SMEs
Maintenance Strategies for SMEs Patrick Chester
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraDurga Prasad Mishra
 
Tpm total productive maintenance
Tpm  total productive maintenanceTpm  total productive maintenance
Tpm total productive maintenanceKULDEEP MATHUR
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.fxudegbu
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 

Similaire à Kpi 101223064832 Phpapp02 (20)

Kpi familiarization
Kpi familiarizationKpi familiarization
Kpi familiarization
 
Maintenance_KPI.pdf
Maintenance_KPI.pdfMaintenance_KPI.pdf
Maintenance_KPI.pdf
 
KPI.ppt
KPI.pptKPI.ppt
KPI.ppt
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
 
Reliability and Maintenance in production Management
Reliability and Maintenance in production ManagementReliability and Maintenance in production Management
Reliability and Maintenance in production Management
 
Building Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptxBuilding Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptx
 
Audit Efficiency and Effectiveness
Audit Efficiency and EffectivenessAudit Efficiency and Effectiveness
Audit Efficiency and Effectiveness
 
Basics of maintenance processes
Basics of maintenance processesBasics of maintenance processes
Basics of maintenance processes
 
Maintenance
MaintenanceMaintenance
Maintenance
 
ATS Overview For Linked In
ATS Overview For Linked InATS Overview For Linked In
ATS Overview For Linked In
 
Let's face it
Let's face itLet's face it
Let's face it
 
Maintenance Strategies for SMEs
Maintenance Strategies for SMEs Maintenance Strategies for SMEs
Maintenance Strategies for SMEs
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishra
 
Tpm total productive maintenance
Tpm  total productive maintenanceTpm  total productive maintenance
Tpm total productive maintenance
 
document (1).pdf
document (1).pdfdocument (1).pdf
document (1).pdf
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 
Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Maintenance KPI
Maintenance KPIMaintenance KPI
Maintenance KPI
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 

Dernier

Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 

Dernier (20)

Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 

Kpi 101223064832 Phpapp02

  • 2. KPI = Key Performance Indicator
  • 3. Objectives • Improve personnel’s understanding of KPIs and what they indicate. + = • Improve personnel’s awareness of maintenance performance.
  • 4. What is a KPI? KPIs track performance against established key success factors. • KPIs are directly linked to the overall goals of the company. • Business Objectives are defined at corporate, regional and site level. These goals determine critical activities (Key Success Factors) that must be done well for a particular operation to succeed. • KPIs are utilised to track or measure actual performance against key success factors. – Key Success Factors (KSFs) only change if there is a fundamental shift in business objectives. – Key Performance Indicators (KPIs) change as objectives are met, or management focus shifts. Business Key Success Key Performance Objectives Factors (KSFs) Indicators (KPIs) Determine. Tracked by. No Injuries Safety LTI, LTIFR, LTISR.
  • 5. How do I interpret a KPI? Interpretation of KPIs is KPI dependent. KPIs do NOT give answers, rather they raise questions and direct attention. Business Key Success Key Performance Objectives Factors (KSFs) Indicators (KPIs) Determine. Tracked by. No Injuries Safety LTI, LTIFR, LTISR. • If LTI, LTIFR or LTISR increase, this indicates that the business objective, “No Injuries”, is NOT being fulfilled. – This should direct attention to the SAFETY key success factor. – Problems / Issues should be identified and resolved with a view to decreasing safety KPIs and therefore achieving the business objective. • If LTI, LTIFR or LTISR decrease, this indicates that the business objective, “No Injuries”, is being fulfilled. – This indicates safety practices / mechanisms are proving successful.
  • 6. What influence do I have on KPIs? Every person on-site has an influence on certain KPIs and business objectives. Senior Foremen Crew • LTIFR • LTIFR • Incidents • Incidents • Property damage ($) • Property damage ($) • Cost / unit • Mean time to repair • Cost / hour • Cost of quality • Maintenance effectiveness • Maintenance efficiency • Mean time between failure • Mean time to repair
  • 7. Maintenance KPIs Seventeen (17) primary maintenance KPIs to be utilised. – These KPIs will be utilised across the site’s Maintenance Departments. KPIs • LTIFR (both production and maintenance) • Backlog • Maintenance Cost per Unit vs. Budget • % Scheduled Man Hours Planned • Maintenance Cost per Hour vs. Budget • % Schedule Compliance • Cost of Quality • % Planning Effectiveness • Maintenance Effectiveness • % Man Hours Available • Maintenance Efficiency • % Rework • Mean Time Between Failure (MTBF) • % Failures Investigated • Mean Time to Repair (MTTR) • MIP Process Effectiveness • Preventive Inspection Effectiveness • Ratio of Preventive to Breakdown Maintenance
  • 8. LTIFR Lost Time Injury Frequency Rate • LTIFR is a measure of overall safety performance, and indicates the frequency of Lost Time Injuries (LTIs). LTIFR =  Number of Lost Time Injuries  Formula   x 1,000,000  Total Man Hours  – Total man hours includes wages, staff and contractor hours associated with both production and maintenance operations. • Personnel are getting injured. • Safety practices / mechanisms are ineffective. • Incident reporting is increasing. Interpretation LTIFR < 55 LTIFR < • Personnel are NOT getting injured. • Safety practices / mechanisms are effective. • Incident reporting is reducing.
  • 9. Maintenance Cost per Unit vs. Budget • A measure of the maintenance effort required for a piece of equipment (or plant) to generate a unit of production. T otal M aintenance C ost Formula M aintenance C ost per U nit = U nit of P roduction – Total maintenance cost includes total costed maintenance man hours, parts and any other costs associated with the maintenance effort (preventive and corrective). – Unit of production will match the associated departments current unit. • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Operating conditions are deteriorating. • Equipment is being over maintained. • Maintenance cost budgeting was inaccurate. • Maintenance requirements changed during the fiscal year. Interpretation Maintenance Cost per Unit vs. Budget Maintenance Cost per Unit vs. Budget • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Operating conditions are improving. • Maintenance cost budgeting was inaccurate. • Maintenance requirements changed during the fiscal year.
  • 10. Maintenance Cost per Hour vs. Budget • A measure of the maintenance effort required to generate production time from a piece of equipment (or plant). T otal M aintenance C ost Formula M aintenance C ost per H our = O perating T im e – Total maintenance cost includes total costed maintenance man hours, parts and any other costs associated with the maintenance effort (preventive and corrective). – Operating time is productive time plus production delays. • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Operating conditions are deteriorating. • Equipment is being over maintained. • Maintenance cost budgeting was inaccurate. • Maintenance requirements changed during the fiscal year. • Budgeted operating time reduced. Interpretation Maintenance Cost per Hour vs. Budget Maintenance Cost per Hour vs. Budget • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Operating conditions are improving. • Maintenance cost budgeting was inaccurate. • Maintenance requirements changed during the fiscal year. • Budgeted operating time increased.
  • 11. Cost of Quality • A measure of preventive maintenance effect on corrective and total maintenance costs. Concept
  • 12. Cost of Quality (cont.) – Total maintenance cost, or cost of quality, is the sum of preventive and corrective maintenance costs. – Preventive maintenance cost is the cost associated with maintenance carried out at predetermined intervals or other prescribed criteria intended to reduce the probability of failure or degradation of performance of equipment (or plant). – Corrective maintenance cost is the cost associated with maintenance carried out on a defect which has caused equipment (or plant) to be taken out of service during scheduled operating time. Corrective maintenance can be either planned or unplanned. • Preventive maintenance effort decreasing. • Corrective maintenance effort increasing. • Preventive maintenance effort excessive (beyond optimum). • Maintenance practices / mechanisms are ineffective. Interpretation Cost of Quality Cost of Quality • Preventive maintenance effort is increasing. • Corrective maintenance effort in decreasing. • Preventive to corrective maintenance ratio optimised. • Maintenance practices / mechanisms are effective.
  • 13. Maintenance Effectiveness • A measure of the amount of maintenance downtime required to keep equipment (or plant) operating.  Operating Time  Formula M aintenance Effectiveness =   x 100%  Operating Time + Down Time  – Operating time is productive time plus production delays. – Down time is the total time equipment (or plant) is down for maintenance work (preventive and corrective). • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Operating conditions are improving. Interpretation Maintenance Effectiveness > 95% Maintenance Effectiveness > 95% • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Operating conditions are deteriorating. • Equipment is being over maintained.
  • 14. Maintenance Efficiency • A measure of the maintenance effort required to deliver required performance levels from equipment (or plant).  M aintenance M an H ours  Formula M aintenance Efficiency =   x 100%  O perating Tim e  – Maintenance man hours is the actual maintenance man hours spent maintaining an item of equipment (or plant). Maintenance man hours includes maintenance wages, staff and contractor hours (preventive and corrective). – Operating time is productive time plus production delays. • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Operating conditions are deteriorating. • Equipment is being over maintained. Interpretation Maintenance Efficiency Maintenance Efficiency • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Operating conditions are improving.
  • 15. MTBF Mean Time Between Failure • The average amount of operating time between consecutive breakdowns for an item of equipment (or plant). O perating T im e Formula M TBF = N um ber of Failures or B reakdow n E vents – Operating time is productive time plus production delays. – Number of failures or breakdown events is the number of failures on an item of equipment (or plant). • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Failure frequency is decreasing. • Operating conditions are improving. Interpretation MTBF MTBF • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Failure frequency is increasing. • Operating conditions are deteriorating.
  • 16. MTTR Mean Time To Repair • The average maintenance time required to keep an item of equipment (or plant) operational. D o w n T im e Formula M TTR = N u m b er o f F ailu res or B reak d ow n E ven ts – Down time is the total time equipment (or plant) is down for maintenance work (preventive and corrective). – Number of failures or breakdown events is the number of failures on an item of equipment (or plant). • Maintenance practices / mechanisms are ineffective. • Poor clean-up (work preparation) practices. • Ineffective work practices. Interpretation MTTR MTTR • Maintenance practices / mechanisms are effective. • Clean-up (work preparation) practices effective. • Effective work practices.
  • 17. Preventive Inspection Effectiveness Ratio of Preventive Repair Man Hours to Preventive Inspection Man Hours. • A measure of preventive inspection effectiveness. P re v e n tiv e R e p a ir M a n H o u rs Formula P re v e n tiv e In sp e c tio n E ffe c tiv e n e ss = P re v e n tiv e In sp e c tio n M a n H o u rs – Preventive repair man hours is maintenance that is performed as a result of a preventive inspection. – Preventive inspection man hours is work performed that originates from equipment maintenance strategies; ie. planned services and inspections. • Preventive inspections are effective. • Inspection frequency to low. • Preventive inspection conducted effectively. Interpretation Preventive Inspection Effectiveness Preventive Inspection Effectiveness • Preventive inspections are ineffective. • Preventive inspections are conducted ineffectively. • Inspection frequency to high.
  • 18. Ratio of Preventive to Breakdown Maintenance Ratio of Preventive Man Hours to Breakdown Man Hours. • A measure of planning / scheduling process effectiveness and its influence on breakdown maintenance. R a tio o f P r e v e n tiv e Formula to B r e a k d o w n M a in te n a n c e = P r e v e n t iv e R e p a ir M a n H o u r s + P r e v e n t iv e I n s p e c tio n M a n H o u r s B re a k d o w n M a n H o u rs – Preventive repair man hours is maintenance that is performed as a result of a preventive inspection. – Preventive inspection man hours is work performed that originates from equipment maintenance strategies; ie. planned services and inspections. – Breakdown man hours is unplanned corrective maintenance that must occur due to a defect causing equipment (or plant) to be taken out of service during scheduled operating time (NOT corrective maintenance man hours). • Over maintaining equipment. • Preventive maintenance practices / strategies are too effective and should be optimised (optimise costs). Interpretation Ratio of Preventive to Breakdown Maintenance = 16 Ratio of Preventive to Breakdown Maintenance = 16 • Preventive inspections are ineffective. • Faults not being reported. • Preventive maintenance practices / strategies are ineffective.
  • 19. Backlog • All maintenance work identified to be done, but as yet incomplete. Indicates how much outstanding maintenance work exists compared to the resources available to complete the work. • Formula B a c k lo g = T o ta l M a in te n a n c e M a n H o u rs o n O u ts ta n d in g W o rk O rd e rs – Total maintenance man hours on outstanding work orders currently includes both backlog and forward log. • Build up of jobs. • Insufficient labour. • Maintenance practices / mechanisms are ineffective. • Preventive inspections are effective (Work identified). Interpretation Backlog < 1,800 man hours Backlog < 1,800 man hours • Preventive inspections are ineffective (No work identified). • Too much labour. • Maintenance practices / mechanisms are effective.
  • 20. % Scheduled Man Hours Planned • The percentage of scheduled man hours that appear on the weekly schedule that have been planned. A measure of planning process effectiveness. • Formula  P la n n e d M a n H o u rs o n W e e k ly S c h e d u le  % S c h e d u le d M a n H o u rs P la n n e d =   x 100%  T o ta l W e e k ly S c h e d u le d M a n H o u rs  – Planned man hours on weekly schedule is the total planned maintenance hours on the weekly maintenance schedule. – Total weekly scheduled man hours is the total maintenance man hours scheduled for the week (NOT total maintenance man hours available). • High level of planned work in backlog. • Minimal job delays. • Maintenance practices / mechanisms are effective. • Too much labour. Interpretation % Scheduled Man Hours Planned > 80% % Scheduled Man Hours Planned > 80% • Priority work not being planned. • Lack of planned work in backlog. • Maintenance practices / mechanisms are ineffective. • Insufficient labour.
  • 21. % Scheduled Compliance • A measure of scheduling process compliance.  S c h e d u le d M a n H o u rs C o m p le te d  Formula % S c h e d u le d C o m p lia n c e =   x 100%  T o ta l W e e k ly S c h e d u le d M a n H o u rs  – Scheduled man hours completed is the actual man hours spent performing scheduled maintenance. – Total weekly scheduled man hours is the total maintenance man hours scheduled for the week (NOT total maintenance man hours available). • Priority jobs being completed. • Planned repairs, PM’s being executed. • Maintenance practices / mechanisms are effective. • Too much labour. • Effective work practices. • Maintenance / Production Department communication / cooperation effective (Access to equipment). • Insufficient scheduled man hours to conduct maintenance. Interpretation % Scheduled Compliance > 80% % Scheduled Compliance > 80% • High level of breakdowns / interruptions. • Maintenance practices / mechanisms are ineffective. • Insufficient labour. • Maintenance / Production Department communication / cooperation ineffective (Access to equipment). • Ineffective work practices. • To many scheduled man hours to conduct maintenance.
  • 22. % Planning Effectiveness • A measure of planning process compliance.  N u m b e r o f S c h e d u le d J o b s C o m p le te d w ith C o m m e n ts  Formula % P la n n in g E ffe c tiv e n e s s =   x 100%  T o ta l N u m b e r o f S c h e d u le d J o b s C o m p le te d  – Number of scheduled jobs completed with comments is the number of scheduled jobs completed with comments on the job ticket identifying issues / problems with the planning process. • Minimum requirements for a planned job not understood. • Schedule compliance low. • High level of job delays. • Maintenance practices / mechanisms are ineffective. • Maintenance / Production Department communication / cooperation ineffective (Access to equipment). Interpretation % Planning Effectiveness < 20% % Planning Effectiveness < 20% • Planned requirements well understood. • Schedule compliance high. • Maintenance practices / mechanisms are effective. • Maintenance / Production Department communication / cooperation effective (Access to equipment). • Job ticket comments not being completed.
  • 23. % Man Hours Available • Primarily a measure of attendance, but also a useful tool to track training and future manpower requirements. Indicates effective utilisation of man power. • Formula % Man Hours Available =  Total Man Hours Paid  - Absence from Work   x 100%  Total Man Hours Paid  – Absence from work is man hours associated with absenteeism, training and any other diversion from an employees primary function. • Lack of employee development. • Lack of training. • Reduction in absenteeism. • Core function (maintenance) being fulfilled. Interpretation % Man Hours Available % Man Hours Available • Absenteeism. • Excessive training. • Core function (maintenance) not being fulfilled.
  • 24. % Rework • Maintenance action that is a repeat of a previous, ineffective effort. The work could have been ineffective due to poor workmanship, poor design, or improper procedures. % Rework =  • Formula Rework M an Hours    x 100%  M aintenance W ork Hours  – Rework man hours is man hours associated with a maintenance action that is a repeat of a previous, ineffective effort. – Maintenance man hours is the actual maintenance man hours spent maintaining an item of equipment (or plant). Maintenance man hours includes maintenance wages, staff and contractor hours (preventive and corrective). • Maintenance practices / mechanisms are ineffective. • Poor design. • Poor operating practices. • Ineffective work practices. Interpretation % Rework < 20% % Rework < 20% • Maintenance practices / mechanisms are effective. • Effective work practices. • Good design.
  • 25. % Failures Investigated • Measure of the Maintenance Department’s effort to continuously improve. % F ailu res In v estig ated =  N u m b er o f C o rrectiv e Jo b T ick ets In v estig ated  Formula   x 100%  T o tal N u m b er o f C o rrectiv e Jo b T ick ets  – Number of corrective job tickets investigated is the number of job tickets investigated, root cause found, and solutions investigated to prevent future occurrences. Job tickets that are associated with maintenance work performed on defects which caused equipment (or plant) to be taken out of service during scheduled operating time. – Total number of corrective job tickets is the total number of job tickets associated with maintenance work performed on defects which caused equipment (or plant) to be taken out of service during scheduled operating time. • Improved equipment reliability. • Continuously improving maintenance practices / mechanisms. Interpretation % Failures Investigated > 80% % Failures Investigated > 80% • Repetitive equipment failures. • Repetitive job delays. • Continuous improvement of maintenance practices / mechanisms is not occurring.
  • 26. MIP Process Effectiveness • Measure of the Maintenance Department’s effort to continuously improve. Concept – MIP process effectiveness is a combination of the maintenance KPIs, schedule compliance, planning effectiveness and backlog. • Maintenance effort is improving. • Maintenance mechanisms / practices are improving. • Improved equipment reliability. • Backlog is decreasing. Interpretation MIP Process Effectiveness > 80% MIP Process Effectiveness > 80% • Maintenance effort is deteriorating. • Maintenance mechanisms / practices are not improving. • Equipment reliability is deteriorating. • Backlog is increasing.
  • 27. Summary KPIs track performance against established key success factors. Interpretation of KPIs is KPI dependent. KPIs do NOT give answers, rather they raise questions and direct attention. Every person on-site has an influence on certain KPIs and business objectives. Seventeen (17) primary maintenance KPIs to be utilised. –These KPIs will be utilised across the site’s Maintenance Departments. • Systems and mechanism implemented to address business objectives (key success factors) can always be improved. – A continuous improvement (CI) philosophy should be adopted.