Introduction
It is inevitable: At some point during the annual planning cycle most organizations will face difficult decisions regarding
the multitude of projects up for consideration. The challenge involves which projects to fund and implement, which
ones to postpone, and which should be rejected outright. Hands down, an overall project portfolio management frame-
work is proven to be the most effective way to make these decisions.
Getting started requires a crucial phase: the use of a structured methodology to prioritize the laundry list of potential
projects. This involves two parts:
1. Understand the overall priorities of an organization, which are really its strategic objectives.
2. Assess how each individual project in the potential portfolio impacts or contributes to these priorities.
1. Sorting Out and Understanding the Priorities
 Step 1: Defining the organization’s priorities
The first step toward prioritizing projects is to identify and define its key strategic objectives - the organization’s priori-
ties. Objectives must be specific in scope, action-oriented, and high-level goals for an individual project.
Ideally, these objectives should follow a consensus approach whereby agreement is reached by as many senior manag-
ers and stakeholders as realistically possible. To get a handle on these objectives, categorize them into three areas:
1. Demand management (e.g., sales effectiveness, increased revenue)
2. Supply management (e.g., operational efficiency, customer responsiveness)
3. Support services (e.g., infrastructure, regulatory requirements)
The most important factor to enable decision makers to monitor and control successful delivery in real terms requires
every objective to be measurable.
 Step 2: Prioritizing the organizations priorities
Once a sound foundation is
in place -- by identifying and
defining individual priorities,
as well as establishing met-
rics to measure achieve-
ment -- you must establish
the relative importance of
each individual objective vis
-a-vis the organization’s
overall priorities.
Evaluate the Relative Importance
of Each Business Driver
Review and Agree on Business
Objectives
The most effective approach to this prioritization exercise is to use a method similar to conjoint analysis, which ranks
the objectives in pairs against one another, in order to generate a normalized weights vector. A key advantage to this
approach is that it also helps facilitate consensus. Usually, the exercise is conducted via a workshop, which by nature
creates transparency and forces decision makers to choose and explain their priorities.
2. Linking Projects to Priorities
Once the organization’s objectives are fully defined, it is time to relate the projects back to the objectives.
 Step 3: Prioritizing projects against the objectives
Whereas the business drivers described in Step 1 are used to measure the organization's progress toward achieving
its strategic objectives, it is actually the summation of individual projects that lead an organization to achieve its tar-
get goals.
Measurable project benefits and the positive outcome of specific projects, drive and are ultimately represented by,
the organization’s objectives. The challenge is to create a mechanism that will link, using the same units of measure-
ment, each individual project’s benefits to the overall objectives.
In linking project benefits, it is necessary to establish bands, or threshold levels, that will enable project sponsors to
determine how strongly their project supports each one of the objectives. The threshold levels are then translated
into standardized numerical bands, where "Extreme" might mean that a project will contribute 10%-12% of the tar-
get, "Strong" 8%-10%, etc.
Once each project has been accurately evaluated, it can be assigned a "Strategic Value," which represents the level of
support a project is expected to provide to the organization’s objectives. Strategic Value is calculated using both the
weights of the relevant objectives the project is supporting and the "strength" of this support (i.e., Extreme, Strong,
etc.).
 Step 4: The prioritized project list
Strategic Value can also be used as a proxy for the priority of the project within the organization’s portfolio. Once a
value has been mathematically derived for each project, creating the prioritized project list is simply a matter of ar-
ranging the projects in descending order of Strategic Value. Projects with the greatest Strategic Value contribute the
most to the overall objectives of an organization and should be given higher priority.
SUMMARY
An organization’s future is greatly dependent on prioritizing investment decisions. More often than not, these are
usually made in a subjective "verbal" process, where whoever shouts the most also gets the necessary approvals.
A transparent, objective framework, as outlined in this article is required to ensure that the best project set is select-
ed for implementation and the proper projects are appropriately postponed or killed. In addition, such a process en-
sures that priorities are being communicated to all decision makers and all players are continuously working to move
the organization in the same direction.
# # #
1 Battery Park Plaza, 4th Floor, New York, NY 10004, (212) 965-0550, www.umt.com

Contenu connexe

En vedette

Project Status Report for Resume
Project Status Report for ResumeProject Status Report for Resume
Project Status Report for ResumeAshton Woods
 
Evaluating Usability Of Commercial Software Applications
Evaluating Usability Of Commercial Software ApplicationsEvaluating Usability Of Commercial Software Applications
Evaluating Usability Of Commercial Software ApplicationsJen Hocko
 
Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708Carolyn Reid
 
How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?MakeItRational
 
15. Assessing Risk In Erp Projects Identify And Prioritize The Factors
15. Assessing Risk In Erp Projects Identify And Prioritize The Factors15. Assessing Risk In Erp Projects Identify And Prioritize The Factors
15. Assessing Risk In Erp Projects Identify And Prioritize The FactorsDonovan Mulder
 
Distinguishing, Evaluating, and Selecting Cloud Service Providers
Distinguishing, Evaluating, and Selecting Cloud Service ProvidersDistinguishing, Evaluating, and Selecting Cloud Service Providers
Distinguishing, Evaluating, and Selecting Cloud Service ProvidersGartnerJessica
 
How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?MakeItRational
 

En vedette (9)

Project Status Report for Resume
Project Status Report for ResumeProject Status Report for Resume
Project Status Report for Resume
 
Evaluating Usability Of Commercial Software Applications
Evaluating Usability Of Commercial Software ApplicationsEvaluating Usability Of Commercial Software Applications
Evaluating Usability Of Commercial Software Applications
 
5 project prioritization
5 project prioritization5 project prioritization
5 project prioritization
 
Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708
 
How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?
 
15. Assessing Risk In Erp Projects Identify And Prioritize The Factors
15. Assessing Risk In Erp Projects Identify And Prioritize The Factors15. Assessing Risk In Erp Projects Identify And Prioritize The Factors
15. Assessing Risk In Erp Projects Identify And Prioritize The Factors
 
Distinguishing, Evaluating, and Selecting Cloud Service Providers
Distinguishing, Evaluating, and Selecting Cloud Service ProvidersDistinguishing, Evaluating, and Selecting Cloud Service Providers
Distinguishing, Evaluating, and Selecting Cloud Service Providers
 
Prioritization Matrix
Prioritization MatrixPrioritization Matrix
Prioritization Matrix
 
How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?How to choose the right projects to meet your objectives and resources?
How to choose the right projects to meet your objectives and resources?
 

Plus de UMT

Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROIBen Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROIUMT
 
Dianne Wyllie, Brocade: Transforming the Annual Planning Process
Dianne Wyllie, Brocade: Transforming the Annual Planning ProcessDianne Wyllie, Brocade: Transforming the Annual Planning Process
Dianne Wyllie, Brocade: Transforming the Annual Planning ProcessUMT
 
Carl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
Carl Souchereau, SNC Lavalin T&D: Both Sides of the FenceCarl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
Carl Souchereau, SNC Lavalin T&D: Both Sides of the FenceUMT
 
Baird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State GovernmentBaird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State GovernmentUMT
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT
 
Bridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and ExecutionBridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and ExecutionUMT
 
UMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment StatusUMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment StatusUMT
 
PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM UMT
 
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...UMT
 
IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...UMT
 
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...UMT
 
What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 UMT
 
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...UMT
 
The Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management ImplementationsThe Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management ImplementationsUMT
 
Enterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the RevolutionEnterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the RevolutionUMT
 
Measure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio SelectionMeasure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio SelectionUMT
 
Project and Portfolio Management in a Federated Governance Model
Project and Portfolio Management in a Federated Governance ModelProject and Portfolio Management in a Federated Governance Model
Project and Portfolio Management in a Federated Governance ModelUMT
 
Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...
Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...
Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...UMT
 
Major Financial Institution Rationlizes Project Budgeting Process
Major Financial Institution Rationlizes Project Budgeting ProcessMajor Financial Institution Rationlizes Project Budgeting Process
Major Financial Institution Rationlizes Project Budgeting ProcessUMT
 

Plus de UMT (20)

Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROIBen Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
 
Dianne Wyllie, Brocade: Transforming the Annual Planning Process
Dianne Wyllie, Brocade: Transforming the Annual Planning ProcessDianne Wyllie, Brocade: Transforming the Annual Planning Process
Dianne Wyllie, Brocade: Transforming the Annual Planning Process
 
Carl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
Carl Souchereau, SNC Lavalin T&D: Both Sides of the FenceCarl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
Carl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
 
Baird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State GovernmentBaird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State Government
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio Management
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio Management
 
Bridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and ExecutionBridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and Execution
 
UMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment StatusUMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment Status
 
PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM
 
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
 
IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...
 
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
 
What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 What's New in Microsoft Project 2013
What's New in Microsoft Project 2013
 
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
 
The Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management ImplementationsThe Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management Implementations
 
Enterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the RevolutionEnterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the Revolution
 
Measure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio SelectionMeasure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio Selection
 
Project and Portfolio Management in a Federated Governance Model
Project and Portfolio Management in a Federated Governance ModelProject and Portfolio Management in a Federated Governance Model
Project and Portfolio Management in a Federated Governance Model
 
Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...
Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...
Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...
 
Major Financial Institution Rationlizes Project Budgeting Process
Major Financial Institution Rationlizes Project Budgeting ProcessMajor Financial Institution Rationlizes Project Budgeting Process
Major Financial Institution Rationlizes Project Budgeting Process
 

Dernier

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Dernier (20)

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 

Prioritize Projects with a Step-by-Step Methodology

  • 1. Prioritize Projects with a Step-by-Step Methodology A UMT White Paper Introduction It is inevitable: At some point during the annual planning cycle most organizations will face difficult decisions regarding the multitude of projects up for consideration. The challenge involves which projects to fund and implement, which ones to postpone, and which should be rejected outright. Hands down, an overall project portfolio management frame- work is proven to be the most effective way to make these decisions. Getting started requires a crucial phase: the use of a structured methodology to prioritize the laundry list of potential projects. This involves two parts: 1. Understand the overall priorities of an organization, which are really its strategic objectives. 2. Assess how each individual project in the potential portfolio impacts or contributes to these priorities. 1. Sorting Out and Understanding the Priorities  Step 1: Defining the organization’s priorities The first step toward prioritizing projects is to identify and define its key strategic objectives - the organization’s priori- ties. Objectives must be specific in scope, action-oriented, and high-level goals for an individual project. Ideally, these objectives should follow a consensus approach whereby agreement is reached by as many senior manag- ers and stakeholders as realistically possible. To get a handle on these objectives, categorize them into three areas: 1. Demand management (e.g., sales effectiveness, increased revenue) 2. Supply management (e.g., operational efficiency, customer responsiveness) 3. Support services (e.g., infrastructure, regulatory requirements) The most important factor to enable decision makers to monitor and control successful delivery in real terms requires every objective to be measurable.  Step 2: Prioritizing the organizations priorities Once a sound foundation is in place -- by identifying and defining individual priorities, as well as establishing met- rics to measure achieve- ment -- you must establish the relative importance of each individual objective vis -a-vis the organization’s overall priorities. Evaluate the Relative Importance of Each Business Driver Review and Agree on Business Objectives
  • 2. The most effective approach to this prioritization exercise is to use a method similar to conjoint analysis, which ranks the objectives in pairs against one another, in order to generate a normalized weights vector. A key advantage to this approach is that it also helps facilitate consensus. Usually, the exercise is conducted via a workshop, which by nature creates transparency and forces decision makers to choose and explain their priorities. 2. Linking Projects to Priorities Once the organization’s objectives are fully defined, it is time to relate the projects back to the objectives.  Step 3: Prioritizing projects against the objectives Whereas the business drivers described in Step 1 are used to measure the organization's progress toward achieving its strategic objectives, it is actually the summation of individual projects that lead an organization to achieve its tar- get goals. Measurable project benefits and the positive outcome of specific projects, drive and are ultimately represented by, the organization’s objectives. The challenge is to create a mechanism that will link, using the same units of measure- ment, each individual project’s benefits to the overall objectives. In linking project benefits, it is necessary to establish bands, or threshold levels, that will enable project sponsors to determine how strongly their project supports each one of the objectives. The threshold levels are then translated into standardized numerical bands, where "Extreme" might mean that a project will contribute 10%-12% of the tar- get, "Strong" 8%-10%, etc. Once each project has been accurately evaluated, it can be assigned a "Strategic Value," which represents the level of support a project is expected to provide to the organization’s objectives. Strategic Value is calculated using both the weights of the relevant objectives the project is supporting and the "strength" of this support (i.e., Extreme, Strong, etc.).  Step 4: The prioritized project list Strategic Value can also be used as a proxy for the priority of the project within the organization’s portfolio. Once a value has been mathematically derived for each project, creating the prioritized project list is simply a matter of ar- ranging the projects in descending order of Strategic Value. Projects with the greatest Strategic Value contribute the most to the overall objectives of an organization and should be given higher priority. SUMMARY An organization’s future is greatly dependent on prioritizing investment decisions. More often than not, these are usually made in a subjective "verbal" process, where whoever shouts the most also gets the necessary approvals. A transparent, objective framework, as outlined in this article is required to ensure that the best project set is select- ed for implementation and the proper projects are appropriately postponed or killed. In addition, such a process en- sures that priorities are being communicated to all decision makers and all players are continuously working to move the organization in the same direction. # # # 1 Battery Park Plaza, 4th Floor, New York, NY 10004, (212) 965-0550, www.umt.com