Socio-economic development of communities around
radioactive sites in Kyrgyzstan
Presentation of the project in Kemin town
with participation of community representatives
of Ak-Tyuz and Orlovka
April 29, 2015
1
Location of radioactive sites
(according to the Ministry of Emergency Situations in the Kyrgyz Republic)
2
Radioactive waste disposal sites
Toxic waste disposal sites
Potential contamination area
Ak-Tyuz
Thorium
4 tailings
Concentrating mill
Active period 1942-1995
Min-Kush
Uranium
4 tailings
4 dumps, shops, ore
stockpiles, mines
Active period 1955-1969
Kadji-Sai
Uranium
1 tailing
dumps, mines, plant
Active period 1949-1967
Orlovka
Thorium
Bordu tailing,
technological maps
Active period 1953-1994
Project priority: supporting sustainable development of
local communities around uranium tailings
 UN General Assembly Resolution “The role of the
international community in the prevention of the
radiation threat in Central Asia” (December 20, 2013);
 Strategic Action Plan of the CGULS Coordination Group,
2013;
 International Conference “Uranium tailings in Central Asia:
Joint efforts to reduce risks”, Bishkek, October 24-25,
2012;
 International High Level Forum “Uranium tailings in
Central Asia: Local problems, regional consequences,
global solution”, Geneva, June 2009;
3
The project developed based on the following:
The National Strategy for Sustainable Development of
the Kyrgyz Republic in the period of 2013-2017;
Programmes and Action Plans of the Ministry of
Emergency Situations of the Kyrgyz Republic;
Interstate Special Programme ‘Remediation of
EurAsEC Member State Territories Affected by
Uranium Mining Industries” for 2013-2018;
Regional and local development plans, needs of
target communities;
Experience from area-based development projects of
UNDP
4
Brief information about the project
Project budget – USD 1.5 million;
Donor – Russian Federation;
Duration – 2 years;
Project objective – creating environment for
sustainable human development in Min-Kush,
Ak-Tyuz, Kadji-Sai, and Orlovka through
rehabilitation of socio-economic infrastructure
and fostering income-generating activities;
5
Target local communities
6
Challenges of target local communities around
uranium tailings (1)
radioactive pollution (non-rehabilitated
dumps, problems with maintenance of
tailings, closed and suspended mines);
difficult ecological conditions and lack of
reliable information on background radiation;
lack of information on quality and usability of
water for drinking and household needs; lack
of access to drinking water;
threats to public health;
7
Challenges of target local communities around
uranium tailings (2)
 common challenges of communities:
- decline in living standards and quality of life;
- high level of unemployment and migration of youth
to large cities;
- old and unusable infrastructure (power supply
network, water supply and sanitation infrastructure, roads);
- aging housing stock;
 predominance of subsistence production and limited
opportunities for business expansion;
 lack of access to financial resources for enterprise
development, difficulties in receiving loans
8
Major components of the project
1. Increasing awareness of local population and
creating a system of regular environmental
monitoring;
2. Rehabilitating the social and economic
infrastructure and developing income-
generating activities;
3. Supporting local initiatives through small
grants/investment fund;
4. Capacity building of local authorities and
communities
9
Component 1. Increasing awareness of local
population and creating a system of regular
environmental monitoring
feasibility study and establishing the comprehensive
system for risk assessment and monitoring;
capacity building of local authorities in risk
assessment and monitoring of hazards;
improve public awareness on hazards;
creating rapid response forces and local early
warning systems at the community level
Partners: Ministry of Emergency Situations of the
Kyrgyz Republic , Ministry of Emergency Situations of
the Russian Federation, State Corporation «Rosatom»,
IAEA, local authorities and communities, mass media
10
Component 2. Rehabilitating the social and
economic infrastructure and developing
income-generating activities
rehabilitation of public infrastructure (roads,
houses, social facilities, sewage and power
supply system);
provision of access to clean water;
development of small business and farming
targeting local needs;
development of entrepreneurship oriented on
producing goods and services for larger markets
Partners: local authorities and communities,
entrepreneurs and farmers, NGOs
11
Component 3. Supporting local initiatives through
small grants/investment fund
 Small grants/investment fund will:
a) supplement resources of local budgets allocated for
development projects (socio-economic infrastructure);
b) support projects of entrepreneurs/farmers in:
- increasing agricultural productivity and processing of
agricultural products;
- procurement of advanced low-power equipment
including alternative sources of power;
- creating start-up capital for small business
Partners: local authorities and communities, entrepreneurs
and farmers, local people
12
Component 4. Capacity building of local
authorities and communities
Improving partnership of local authorities, local
communities, entrepreneurs, and NGOs:
- joint identification of priorities, design and
implementation of development plans;
- joint implementation of projects focusing
on improving living standards and quality of life
Partners: local authorities and communities,
entrepreneurs and farmers, local people, NGOs
13
Synergy of cooperation in the interest of people
and for sustainable development
secure conservation, remediation, and
rehabilitation of tailings;
socio-economic development, health
protection, improving living standards and
raising awareness of local communities living
next to tailings and hazardous sites;
Improvement of coordination
14
Благодарю за внимание!
15

Contenu connexe

Tendances

Treatment plant relocation
Treatment plant relocationTreatment plant relocation
Treatment plant relocationDacia Johnson
 
Overview of water sector development in nigeria hackathon wb project
Overview of  water sector development in nigeria hackathon wb projectOverview of  water sector development in nigeria hackathon wb project
Overview of water sector development in nigeria hackathon wb projectFemi Longe
 
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping StudyHawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping StudyNeil Dufty
 
Sustainable closter initative update
Sustainable closter initative   updateSustainable closter initative   update
Sustainable closter initative updateCharles Graham
 
Sustainable Cities: Race, Class, and Environmental Justice
Sustainable Cities: Race, Class, and Environmental JusticeSustainable Cities: Race, Class, and Environmental Justice
Sustainable Cities: Race, Class, and Environmental JusticeAnuradha Mukherji
 
Socio-Cultural Sustainability of Housing Environments in Kuwait
Socio-Cultural Sustainability of Housing Environments in KuwaitSocio-Cultural Sustainability of Housing Environments in Kuwait
Socio-Cultural Sustainability of Housing Environments in KuwaitGalala University
 
Upos Jan 10
Upos Jan 10Upos Jan 10
Upos Jan 10UPOS
 
Reasontorescind 130201005411-phpapp02
Reasontorescind 130201005411-phpapp02Reasontorescind 130201005411-phpapp02
Reasontorescind 130201005411-phpapp02Louisette Lanteigne
 
Week Five Capstone Assignment C_Roy
Week Five Capstone Assignment C_RoyWeek Five Capstone Assignment C_Roy
Week Five Capstone Assignment C_RoyChristine Roy
 
Stratford Area Watershed Improvement Plan
Stratford Area Watershed Improvement PlanStratford Area Watershed Improvement Plan
Stratford Area Watershed Improvement PlanTown of Stratford, PEI
 
2016-21 State of the Environment Report for Councils in the Greater Central W...
2016-21 State of the Environment Report for Councils in the Greater Central W...2016-21 State of the Environment Report for Councils in the Greater Central W...
2016-21 State of the Environment Report for Councils in the Greater Central W...Neil Dufty
 
2016-21 State of the Environment report for Moree Plains and Narrabri Councils
2016-21 State of the Environment report for Moree Plains and Narrabri Councils2016-21 State of the Environment report for Moree Plains and Narrabri Councils
2016-21 State of the Environment report for Moree Plains and Narrabri CouncilsNeil Dufty
 
Hydropower Development and Management Thinking Ahead - 22-March 2017
Hydropower Development and Management Thinking Ahead - 22-March 2017Hydropower Development and Management Thinking Ahead - 22-March 2017
Hydropower Development and Management Thinking Ahead - 22-March 2017IWRS Society
 
Utilizing our Natural Resources in the Environmental Way
Utilizing our Natural Resources in the Environmental WayUtilizing our Natural Resources in the Environmental Way
Utilizing our Natural Resources in the Environmental WayFernando Penarroyo
 
2013.dec.13 14 318-f_downspout disconnection final complete
2013.dec.13 14 318-f_downspout disconnection final complete2013.dec.13 14 318-f_downspout disconnection final complete
2013.dec.13 14 318-f_downspout disconnection final completeBerwyn Residents
 

Tendances (20)

Treatment plant relocation
Treatment plant relocationTreatment plant relocation
Treatment plant relocation
 
Overview of water sector development in nigeria hackathon wb project
Overview of  water sector development in nigeria hackathon wb projectOverview of  water sector development in nigeria hackathon wb project
Overview of water sector development in nigeria hackathon wb project
 
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping StudyHawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
 
Sustainable closter initative update
Sustainable closter initative   updateSustainable closter initative   update
Sustainable closter initative update
 
PWP & Water Sector Reforms
PWP & Water Sector ReformsPWP & Water Sector Reforms
PWP & Water Sector Reforms
 
Sustainable Cities: Race, Class, and Environmental Justice
Sustainable Cities: Race, Class, and Environmental JusticeSustainable Cities: Race, Class, and Environmental Justice
Sustainable Cities: Race, Class, and Environmental Justice
 
Raceway
RacewayRaceway
Raceway
 
Reason to rescind OMB decision
Reason to rescind OMB decisionReason to rescind OMB decision
Reason to rescind OMB decision
 
Jakarta case presentation edited
Jakarta case presentation editedJakarta case presentation edited
Jakarta case presentation edited
 
Socio-Cultural Sustainability of Housing Environments in Kuwait
Socio-Cultural Sustainability of Housing Environments in KuwaitSocio-Cultural Sustainability of Housing Environments in Kuwait
Socio-Cultural Sustainability of Housing Environments in Kuwait
 
Upos Jan 10
Upos Jan 10Upos Jan 10
Upos Jan 10
 
Reasontorescind 130201005411-phpapp02
Reasontorescind 130201005411-phpapp02Reasontorescind 130201005411-phpapp02
Reasontorescind 130201005411-phpapp02
 
Week Five Capstone Assignment C_Roy
Week Five Capstone Assignment C_RoyWeek Five Capstone Assignment C_Roy
Week Five Capstone Assignment C_Roy
 
Stratford Area Watershed Improvement Plan
Stratford Area Watershed Improvement PlanStratford Area Watershed Improvement Plan
Stratford Area Watershed Improvement Plan
 
2016-21 State of the Environment Report for Councils in the Greater Central W...
2016-21 State of the Environment Report for Councils in the Greater Central W...2016-21 State of the Environment Report for Councils in the Greater Central W...
2016-21 State of the Environment Report for Councils in the Greater Central W...
 
2016-21 State of the Environment report for Moree Plains and Narrabri Councils
2016-21 State of the Environment report for Moree Plains and Narrabri Councils2016-21 State of the Environment report for Moree Plains and Narrabri Councils
2016-21 State of the Environment report for Moree Plains and Narrabri Councils
 
Nelson quarry lanteigne
Nelson quarry lanteigneNelson quarry lanteigne
Nelson quarry lanteigne
 
Hydropower Development and Management Thinking Ahead - 22-March 2017
Hydropower Development and Management Thinking Ahead - 22-March 2017Hydropower Development and Management Thinking Ahead - 22-March 2017
Hydropower Development and Management Thinking Ahead - 22-March 2017
 
Utilizing our Natural Resources in the Environmental Way
Utilizing our Natural Resources in the Environmental WayUtilizing our Natural Resources in the Environmental Way
Utilizing our Natural Resources in the Environmental Way
 
2013.dec.13 14 318-f_downspout disconnection final complete
2013.dec.13 14 318-f_downspout disconnection final complete2013.dec.13 14 318-f_downspout disconnection final complete
2013.dec.13 14 318-f_downspout disconnection final complete
 

En vedette

Public Participation in Urban Design and Planning
Public Participation in Urban Design and PlanningPublic Participation in Urban Design and Planning
Public Participation in Urban Design and PlanningNicholas Socrates
 
Leighninger slides for stuttgart presentation
Leighninger slides for stuttgart presentationLeighninger slides for stuttgart presentation
Leighninger slides for stuttgart presentationMatt Leighninger
 
Community participation in tourism planning : Thandaunggyi, Kayin State - Phi...
Community participation in tourism planning : Thandaunggyi, Kayin State - Phi...Community participation in tourism planning : Thandaunggyi, Kayin State - Phi...
Community participation in tourism planning : Thandaunggyi, Kayin State - Phi...Ethical Sector
 
Community Participation In Primary Health Care
Community Participation In Primary Health CareCommunity Participation In Primary Health Care
Community Participation In Primary Health Carecphe
 
Community participation
Community participationCommunity participation
Community participationcollinschimuti
 

En vedette (6)

Public Participation in Urban Design and Planning
Public Participation in Urban Design and PlanningPublic Participation in Urban Design and Planning
Public Participation in Urban Design and Planning
 
Leighninger slides for stuttgart presentation
Leighninger slides for stuttgart presentationLeighninger slides for stuttgart presentation
Leighninger slides for stuttgart presentation
 
Community participation in tourism planning : Thandaunggyi, Kayin State - Phi...
Community participation in tourism planning : Thandaunggyi, Kayin State - Phi...Community participation in tourism planning : Thandaunggyi, Kayin State - Phi...
Community participation in tourism planning : Thandaunggyi, Kayin State - Phi...
 
Community Participation In Cost Effective Housing.
Community  Participation In Cost Effective Housing. Community  Participation In Cost Effective Housing.
Community Participation In Cost Effective Housing.
 
Community Participation In Primary Health Care
Community Participation In Primary Health CareCommunity Participation In Primary Health Care
Community Participation In Primary Health Care
 
Community participation
Community participationCommunity participation
Community participation
 

Similaire à Supporting people living around uranium tailings in Kyrgyzstan

Smart Growth: The Wolf At Your Front Door
Smart Growth: The Wolf At Your Front DoorSmart Growth: The Wolf At Your Front Door
Smart Growth: The Wolf At Your Front DoorPatti Gettinger
 
Presentation on solid waste management for Sylhet City Corporation
Presentation on solid waste management for Sylhet City CorporationPresentation on solid waste management for Sylhet City Corporation
Presentation on solid waste management for Sylhet City CorporationMd. Jisan Ahmed
 
120502 Nam Ngum Basin Committee
120502 Nam Ngum Basin Committee120502 Nam Ngum Basin Committee
120502 Nam Ngum Basin CommitteeRuurdKuiper
 
Social and Cultural impacts of Large Dam: the case study of the Merowe dam in...
Social and Cultural impacts of Large Dam: the case study of the Merowe dam in...Social and Cultural impacts of Large Dam: the case study of the Merowe dam in...
Social and Cultural impacts of Large Dam: the case study of the Merowe dam in...Jean-Gabriel Leturcq
 
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxE1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxRuiMendes93783
 
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptxE1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptxRuiMendes93783
 
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxE1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxRuiMendes93783
 
Cacadu District Municipality energy planning – Wendy McCallum
Cacadu District Municipality energy planning – Wendy McCallumCacadu District Municipality energy planning – Wendy McCallum
Cacadu District Municipality energy planning – Wendy McCallumIIED
 
Housing - habitat agenda , global housing challenges
Housing  - habitat agenda , global housing challengesHousing  - habitat agenda , global housing challenges
Housing - habitat agenda , global housing challengesJOSIN MATHEW
 
Tsibudeeva D. Federal Agency of water resources Ulan-Ude Republic of Buryatia...
Tsibudeeva D. Federal Agency of water resources Ulan-Ude Republic of Buryatia...Tsibudeeva D. Federal Agency of water resources Ulan-Ude Republic of Buryatia...
Tsibudeeva D. Federal Agency of water resources Ulan-Ude Republic of Buryatia...RESTORE
 
Future watch development_banks_and_greenmining
Future watch development_banks_and_greenminingFuture watch development_banks_and_greenmining
Future watch development_banks_and_greenminingTeam Finland Future Watch
 
Future of waste management in Russian megacities
Future of waste management in Russian megacitiesFuture of waste management in Russian megacities
Future of waste management in Russian megacitiesTeam Finland Future Watch
 
Session 3 - Transition to a sustainable mining: a regional perspective
Session 3 - Transition to a sustainable mining: a regional perspectiveSession 3 - Transition to a sustainable mining: a regional perspective
Session 3 - Transition to a sustainable mining: a regional perspectiveOECD Environment
 
Sustainable Practices of E-Waste Management: Keyactors, Obstacles and Way-for...
Sustainable Practices of E-Waste Management: Keyactors, Obstacles and Way-for...Sustainable Practices of E-Waste Management: Keyactors, Obstacles and Way-for...
Sustainable Practices of E-Waste Management: Keyactors, Obstacles and Way-for...4Ventures Legacy (4VL)
 
10 EU Mining Regions Kickoff Event Proceedings.pdf
10 EU Mining Regions Kickoff Event Proceedings.pdf10 EU Mining Regions Kickoff Event Proceedings.pdf
10 EU Mining Regions Kickoff Event Proceedings.pdfOECDregions
 

Similaire à Supporting people living around uranium tailings in Kyrgyzstan (20)

Smart Growth: The Wolf At Your Front Door
Smart Growth: The Wolf At Your Front DoorSmart Growth: The Wolf At Your Front Door
Smart Growth: The Wolf At Your Front Door
 
Tlp ravi forum
Tlp ravi forumTlp ravi forum
Tlp ravi forum
 
Presentation on solid waste management for Sylhet City Corporation
Presentation on solid waste management for Sylhet City CorporationPresentation on solid waste management for Sylhet City Corporation
Presentation on solid waste management for Sylhet City Corporation
 
120502 Nam Ngum Basin Committee
120502 Nam Ngum Basin Committee120502 Nam Ngum Basin Committee
120502 Nam Ngum Basin Committee
 
Social and Cultural impacts of Large Dam: the case study of the Merowe dam in...
Social and Cultural impacts of Large Dam: the case study of the Merowe dam in...Social and Cultural impacts of Large Dam: the case study of the Merowe dam in...
Social and Cultural impacts of Large Dam: the case study of the Merowe dam in...
 
Jean Gabriel Leturcq Ppt
Jean Gabriel Leturcq PptJean Gabriel Leturcq Ppt
Jean Gabriel Leturcq Ppt
 
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxE1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
 
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptxE1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
 
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxE1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
 
Magdy Salah El-Dein • 2017 IFPRI Egypt Seminar in partnership with WorldFish:...
Magdy Salah El-Dein • 2017 IFPRI Egypt Seminar in partnership with WorldFish:...Magdy Salah El-Dein • 2017 IFPRI Egypt Seminar in partnership with WorldFish:...
Magdy Salah El-Dein • 2017 IFPRI Egypt Seminar in partnership with WorldFish:...
 
Dam guide for communities
Dam guide for communitiesDam guide for communities
Dam guide for communities
 
Cacadu District Municipality energy planning – Wendy McCallum
Cacadu District Municipality energy planning – Wendy McCallumCacadu District Municipality energy planning – Wendy McCallum
Cacadu District Municipality energy planning – Wendy McCallum
 
Gold mining in ecuador
Gold mining in ecuadorGold mining in ecuador
Gold mining in ecuador
 
Housing - habitat agenda , global housing challenges
Housing  - habitat agenda , global housing challengesHousing  - habitat agenda , global housing challenges
Housing - habitat agenda , global housing challenges
 
Tsibudeeva D. Federal Agency of water resources Ulan-Ude Republic of Buryatia...
Tsibudeeva D. Federal Agency of water resources Ulan-Ude Republic of Buryatia...Tsibudeeva D. Federal Agency of water resources Ulan-Ude Republic of Buryatia...
Tsibudeeva D. Federal Agency of water resources Ulan-Ude Republic of Buryatia...
 
Future watch development_banks_and_greenmining
Future watch development_banks_and_greenminingFuture watch development_banks_and_greenmining
Future watch development_banks_and_greenmining
 
Future of waste management in Russian megacities
Future of waste management in Russian megacitiesFuture of waste management in Russian megacities
Future of waste management in Russian megacities
 
Session 3 - Transition to a sustainable mining: a regional perspective
Session 3 - Transition to a sustainable mining: a regional perspectiveSession 3 - Transition to a sustainable mining: a regional perspective
Session 3 - Transition to a sustainable mining: a regional perspective
 
Sustainable Practices of E-Waste Management: Keyactors, Obstacles and Way-for...
Sustainable Practices of E-Waste Management: Keyactors, Obstacles and Way-for...Sustainable Practices of E-Waste Management: Keyactors, Obstacles and Way-for...
Sustainable Practices of E-Waste Management: Keyactors, Obstacles and Way-for...
 
10 EU Mining Regions Kickoff Event Proceedings.pdf
10 EU Mining Regions Kickoff Event Proceedings.pdf10 EU Mining Regions Kickoff Event Proceedings.pdf
10 EU Mining Regions Kickoff Event Proceedings.pdf
 

Plus de UNDP in Kyrgyzstan // ПРООН в Кыргызстане.

Поддержка людей, живущих вокруг урановых хвостохранилищ в Кыргызстане
Поддержка людей, живущих вокруг урановых хвостохранилищ в КыргызстанеПоддержка людей, живущих вокруг урановых хвостохранилищ в Кыргызстане
Поддержка людей, живущих вокруг урановых хвостохранилищ в КыргызстанеUNDP in Kyrgyzstan // ПРООН в Кыргызстане.
 
Управление рисками стихийных бедствий: основные результаты за 2014 г.
Управление рисками стихийных бедствий: основные результаты за 2014 г.Управление рисками стихийных бедствий: основные результаты за 2014 г.
Управление рисками стихийных бедствий: основные результаты за 2014 г.UNDP in Kyrgyzstan // ПРООН в Кыргызстане.
 
Охрана окружающей среды и энергетика: основные результаты за 2014 г.
Охрана окружающей среды и энергетика: основные результаты за 2014 г.Охрана окружающей среды и энергетика: основные результаты за 2014 г.
Охрана окружающей среды и энергетика: основные результаты за 2014 г.UNDP in Kyrgyzstan // ПРООН в Кыргызстане.
 
Программа "Комплексное развитие Нарынской области": итоги за 2014 г.
Программа "Комплексное развитие Нарынской области": итоги за 2014 г.Программа "Комплексное развитие Нарынской области": итоги за 2014 г.
Программа "Комплексное развитие Нарынской области": итоги за 2014 г.UNDP in Kyrgyzstan // ПРООН в Кыргызстане.
 
Социально-экономическое развитие: результаты проектов за 2014 г.
Социально-экономическое развитие: результаты проектов за 2014 г.Социально-экономическое развитие: результаты проектов за 2014 г.
Социально-экономическое развитие: результаты проектов за 2014 г.UNDP in Kyrgyzstan // ПРООН в Кыргызстане.
 
Демократическо управление: результаты проектов за 2014 г. и планы на 2015 г.
Демократическо управление: результаты проектов за 2014 г. и планы на 2015 г.Демократическо управление: результаты проектов за 2014 г. и планы на 2015 г.
Демократическо управление: результаты проектов за 2014 г. и планы на 2015 г.UNDP in Kyrgyzstan // ПРООН в Кыргызстане.
 

Plus de UNDP in Kyrgyzstan // ПРООН в Кыргызстане. (7)

Поддержка людей, живущих вокруг урановых хвостохранилищ в Кыргызстане
Поддержка людей, живущих вокруг урановых хвостохранилищ в КыргызстанеПоддержка людей, живущих вокруг урановых хвостохранилищ в Кыргызстане
Поддержка людей, живущих вокруг урановых хвостохранилищ в Кыргызстане
 
Стратегический план проон на 2014-2017 гг
Стратегический план проон на 2014-2017 ггСтратегический план проон на 2014-2017 гг
Стратегический план проон на 2014-2017 гг
 
Управление рисками стихийных бедствий: основные результаты за 2014 г.
Управление рисками стихийных бедствий: основные результаты за 2014 г.Управление рисками стихийных бедствий: основные результаты за 2014 г.
Управление рисками стихийных бедствий: основные результаты за 2014 г.
 
Охрана окружающей среды и энергетика: основные результаты за 2014 г.
Охрана окружающей среды и энергетика: основные результаты за 2014 г.Охрана окружающей среды и энергетика: основные результаты за 2014 г.
Охрана окружающей среды и энергетика: основные результаты за 2014 г.
 
Программа "Комплексное развитие Нарынской области": итоги за 2014 г.
Программа "Комплексное развитие Нарынской области": итоги за 2014 г.Программа "Комплексное развитие Нарынской области": итоги за 2014 г.
Программа "Комплексное развитие Нарынской области": итоги за 2014 г.
 
Социально-экономическое развитие: результаты проектов за 2014 г.
Социально-экономическое развитие: результаты проектов за 2014 г.Социально-экономическое развитие: результаты проектов за 2014 г.
Социально-экономическое развитие: результаты проектов за 2014 г.
 
Демократическо управление: результаты проектов за 2014 г. и планы на 2015 г.
Демократическо управление: результаты проектов за 2014 г. и планы на 2015 г.Демократическо управление: результаты проектов за 2014 г. и планы на 2015 г.
Демократическо управление: результаты проектов за 2014 г. и планы на 2015 г.
 

Dernier

2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 

Dernier (20)

2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 

Supporting people living around uranium tailings in Kyrgyzstan

  • 1. Socio-economic development of communities around radioactive sites in Kyrgyzstan Presentation of the project in Kemin town with participation of community representatives of Ak-Tyuz and Orlovka April 29, 2015 1
  • 2. Location of radioactive sites (according to the Ministry of Emergency Situations in the Kyrgyz Republic) 2 Radioactive waste disposal sites Toxic waste disposal sites Potential contamination area Ak-Tyuz Thorium 4 tailings Concentrating mill Active period 1942-1995 Min-Kush Uranium 4 tailings 4 dumps, shops, ore stockpiles, mines Active period 1955-1969 Kadji-Sai Uranium 1 tailing dumps, mines, plant Active period 1949-1967 Orlovka Thorium Bordu tailing, technological maps Active period 1953-1994
  • 3. Project priority: supporting sustainable development of local communities around uranium tailings  UN General Assembly Resolution “The role of the international community in the prevention of the radiation threat in Central Asia” (December 20, 2013);  Strategic Action Plan of the CGULS Coordination Group, 2013;  International Conference “Uranium tailings in Central Asia: Joint efforts to reduce risks”, Bishkek, October 24-25, 2012;  International High Level Forum “Uranium tailings in Central Asia: Local problems, regional consequences, global solution”, Geneva, June 2009; 3
  • 4. The project developed based on the following: The National Strategy for Sustainable Development of the Kyrgyz Republic in the period of 2013-2017; Programmes and Action Plans of the Ministry of Emergency Situations of the Kyrgyz Republic; Interstate Special Programme ‘Remediation of EurAsEC Member State Territories Affected by Uranium Mining Industries” for 2013-2018; Regional and local development plans, needs of target communities; Experience from area-based development projects of UNDP 4
  • 5. Brief information about the project Project budget – USD 1.5 million; Donor – Russian Federation; Duration – 2 years; Project objective – creating environment for sustainable human development in Min-Kush, Ak-Tyuz, Kadji-Sai, and Orlovka through rehabilitation of socio-economic infrastructure and fostering income-generating activities; 5
  • 7. Challenges of target local communities around uranium tailings (1) radioactive pollution (non-rehabilitated dumps, problems with maintenance of tailings, closed and suspended mines); difficult ecological conditions and lack of reliable information on background radiation; lack of information on quality and usability of water for drinking and household needs; lack of access to drinking water; threats to public health; 7
  • 8. Challenges of target local communities around uranium tailings (2)  common challenges of communities: - decline in living standards and quality of life; - high level of unemployment and migration of youth to large cities; - old and unusable infrastructure (power supply network, water supply and sanitation infrastructure, roads); - aging housing stock;  predominance of subsistence production and limited opportunities for business expansion;  lack of access to financial resources for enterprise development, difficulties in receiving loans 8
  • 9. Major components of the project 1. Increasing awareness of local population and creating a system of regular environmental monitoring; 2. Rehabilitating the social and economic infrastructure and developing income- generating activities; 3. Supporting local initiatives through small grants/investment fund; 4. Capacity building of local authorities and communities 9
  • 10. Component 1. Increasing awareness of local population and creating a system of regular environmental monitoring feasibility study and establishing the comprehensive system for risk assessment and monitoring; capacity building of local authorities in risk assessment and monitoring of hazards; improve public awareness on hazards; creating rapid response forces and local early warning systems at the community level Partners: Ministry of Emergency Situations of the Kyrgyz Republic , Ministry of Emergency Situations of the Russian Federation, State Corporation «Rosatom», IAEA, local authorities and communities, mass media 10
  • 11. Component 2. Rehabilitating the social and economic infrastructure and developing income-generating activities rehabilitation of public infrastructure (roads, houses, social facilities, sewage and power supply system); provision of access to clean water; development of small business and farming targeting local needs; development of entrepreneurship oriented on producing goods and services for larger markets Partners: local authorities and communities, entrepreneurs and farmers, NGOs 11
  • 12. Component 3. Supporting local initiatives through small grants/investment fund  Small grants/investment fund will: a) supplement resources of local budgets allocated for development projects (socio-economic infrastructure); b) support projects of entrepreneurs/farmers in: - increasing agricultural productivity and processing of agricultural products; - procurement of advanced low-power equipment including alternative sources of power; - creating start-up capital for small business Partners: local authorities and communities, entrepreneurs and farmers, local people 12
  • 13. Component 4. Capacity building of local authorities and communities Improving partnership of local authorities, local communities, entrepreneurs, and NGOs: - joint identification of priorities, design and implementation of development plans; - joint implementation of projects focusing on improving living standards and quality of life Partners: local authorities and communities, entrepreneurs and farmers, local people, NGOs 13
  • 14. Synergy of cooperation in the interest of people and for sustainable development secure conservation, remediation, and rehabilitation of tailings; socio-economic development, health protection, improving living standards and raising awareness of local communities living next to tailings and hazardous sites; Improvement of coordination 14