CHANGE CHAMPIONS – MEETING # 7



UNE FLEXIBLE AND ONLINE UPDATE

28 FEBRUARY, 2011
CONTENTS


•    Welcome to meeting #7!
•    Program Status Overview
•    PMO Changes
•    Project Update - Approvals Project
•    Project Update - Revitalising Learning
•    Quiz!




                                               CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  
PROJECT 2012 FOL – THE PORTFOLIO


                                                    ExecuLve	
  Sponsor               	
  Prof.	
  Graham	
  Webb	
  

                       Flexible	
  &	
              Academic	
  Lead:	
               	
  Helen	
  Carter	
  
                         Online	
                   Program	
  Director:              	
  Sam	
  Austrin-­‐Miner	
  




                Revitalised	
                       Transforming	
                                      Working	
  
                 Learning	
                          Technology	
                                       Together	
  



      Prog	
  Mgr:	
  Myles	
  Carrick	
     Prog	
  Mgr:	
  Lorraine	
  Jenkyn	
              Prog	
  Mgr:	
  Norma	
  Abey	
  




                                                                                                                   CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  
PROJECT FOL – THE PORTFOLIO


                                    ExecuLve	
  Sponsor            	
  Prof.	
  Graham	
  Webb	
  

               Flexible	
  &	
      Academic	
  Lead:	
            	
  Helen	
  Carter	
  
                 Online	
           Program	
  Director:           	
  Sam	
  Austrin-­‐Miner	
  




         Revitalised	
              Transforming	
                                   Working	
  
          Learning	
                 Technology	
                                    Together	
  



                                   Web	
  Cluster	
  Project	
                    Approvals	
  Project	
  
                                   Backup	
  Project	
                            Workforce	
  Planning	
  




                                                                                                CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  
PROJECT FOL – THE PORTFOLIO


       •    One year through two year implementation (50% time)
       •    75% Delivered on project numbers
       •    Most of the effort in R/L
       •    Projects Delivered:

             –    @Task Project Management Tool/Reporting     
             –    Load and Revenue Forecasting
             –    New Support Model (Productivity Assist) 
             –    Program Management/ Benefits Realisation     
             –                                
                  Cloud Email/Calendar Strategy
             –    Disaster Recovery Project - IAM 
             –                            
                  Hosting Strategy – Phase 1
             –                            
                  IT Budget Rebuild Strategy
             –    IT Design New Organisational Model  
             –                        
                  IT Strategy Deployment
             –    Skype Roll Out 
             –               
                  Voice Over IP
             –    Learning Models, Quality and Standards
                                                                  •    Cancelled Projects:
                                                                        –  Business Process Adaptation!
                                                                        –  Information Strategy



                                                                        CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  
THE NEW LOOK, NEW FEEL PROGRAM"




                              CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  
PMO CHANGES"
WHY PROGRAM MANAGEMENT OFFICE? [PMO]


   •    Provision of centre of excellence/rigour for project delivery and change
        management (Prince 2; Agile/Scrum)
   •    Provides a standardised approach to delivery of projects and change
         –  Business analysis – business case development
         –  Adequate Scoping of project deliverables, resources and timelines
         –  Delivery of discreet projects and portfolio transformation etc
         –  Management/mitigation of project risks/issues/interdependencies
         –  Provision of best practice for benefits realisation methodology
         –  Communications and change-management practice
   •    Transparency of the delivery/change process to all areas of the
        business
   •    Adequate reporting to allow senior executive to make key business
        decisions and prioritisation
   •    Management of Budgets (where appropriate)



                                                  VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                                                C S STRATEGIC PLANNING 	
   ESSION 23-FEB
PMO STRUCTURE, RESOURCES, & SERVICES

                                                                VC	
  


   SERVICES	
               COO	
  

 Business	
  Analysis	
  
  Business	
  Case	
  
  Development	
                                              Prog	
                            Prog	
  
                                                            Director	
                         Office	
  
                                                                                                Mgr	
  

   Porolio	
  Mgt	
  
   Program	
  Mgt	
  
    Project	
  Mgt	
                                                                                         Comms/
                            Program	
                       Program	
                        Program	
  
                                                                                                             Change	
  
                             Mgr	
  1	
                      Mgr	
  2	
                       Mgr	
  3	
  
                                                                                                               Mgr	
  


Benefits	
  RealisaLon	
            Cross	
  FuncLonal	
  Team	
  –	
  Project	
  Managers	
  8	
  	
            AA	
  
 Business	
  Process	
                                     XFTE	
  
   AdaptaLon	
  




                                                    VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                                                  C S STRATEGIC PLANNING 	
   ESSION 23-FEB
PMO STRUCTURE, RESOURCES, & SERVICES

                                                                VC	
  


   SERVICES	
               COO	
  

 Business	
  Analysis	
  
  Business	
  Case	
  
  Development	
                                              Prog	
                            Prog	
  
                                                            Director	
                         Office	
  
                                                                                                Mgr	
  

   Porolio	
  Mgt	
  
   Program	
  Mgt	
  
    Project	
  Mgt	
                                                                                         Comms/
                            Program	
                       Program	
                        Program	
  
                                                                                                             Change	
  
                             Mgr	
  1	
                      Mgr	
  2	
                       Mgr	
  3	
  
                                                                                                               Mgr	
  


Benefits	
  RealisaLon	
            Cross	
  FuncLonal	
  Team	
  –	
  Project	
  Managers	
  8	
  	
            AA	
  
 Business	
  Process	
                                     XFTE	
  
   AdaptaLon	
  




                                                    VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                                                  C S STRATEGIC PLANNING 	
   ESSION 23-FEB
GOVERNANCE MODEL/REPORTING



                                                                             VC	
  
       VCC	
  
    Two	
  Weekly	
  

                           ExecuLve	
  Sponsor	
     COO	
     SDVC	
       CDO	
        DVCR	
       PVCSS	
  
Steering	
  Commi_ee	
  
      Monthly	
  


                                                                 PMO	
  
   Project	
  Team	
  
  Usually	
  Weekly	
  




                                                               VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                                                             C S STRATEGIC PLANNING 	
   ESSION 23-FEB
GOVERNANCE MODEL/REPORTING



                                                                                     VC	
  
       VCC	
  
    Two	
  Weekly	
  

                                   ExecuLve	
  Sponsor	
     COO	
     SDVC	
       CDO	
        DVCR	
       PVCSS	
  
Steering	
  Commi_ee	
  
      Monthly	
  


                                                                         PMO	
  
   Project	
  Team	
  
     Project	
  Team	
  
  Usually	
  Weekly	
  
        Project	
  Team	
  
    Usually	
  Weekly	
  
             Project	
  Team	
  
       Usually	
  Weekly	
  
          Usually	
  Weekly	
  




                                                                       VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                                                                     C S STRATEGIC PLANNING 	
   ESSION 23-FEB
GOVERNANCE MODEL/REPORTING



                                                                                             VC	
  
       VCC	
  
    Two	
  Weekly	
  

                                   ExecuLve	
  Sponsor	
     COO	
          SDVC	
         CDO	
          DVCR	
         PVCSS	
  
Steering	
  Commi_ee	
  
      Monthly	
  
                                                                                           Projects	
     Projects	
  

                                                             Projects	
                                                  Projects	
  
   Project	
  Team	
  
     Project	
  Team	
  
  Usually	
  Weekly	
  
        Project	
  Team	
  
    Usually	
  Weekly	
  
             Project	
  Team	
                                              Projects	
  
       Usually	
  Weekly	
  
          Usually	
  Weekly	
  




                                                                             VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                                                                           C S STRATEGIC PLANNING 	
   ESSION 23-FEB
GOVERNANCE MODEL/REPORTING-DOCUMENTATION


INITIATION	
  	
  
                     •    Scope, Governance, Delivery Approach
   Project	
         •    Budget, Benefits Realisation ROI Model
                     •    Key Milestones
  IniLaLon	
  
                     •    Risks
  Document	
         •    Definition of Success




                     •    Key Messages
                     •    Stakeholders
   Comms	
  
                     •    Delivery Change Channels/Tools
   Change	
  
                     •    Actions and Deliverables
   Strategy	
  




                                                             VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                                                           C S STRATEGIC PLANNING 	
   ESSION 23-FEB
GOVERNANCE MODEL/REPORTING-DOCUMENTATION

                     PROJECT	
  
INITIATION	
  	
  
                      TEAM	
  
                                        •  Detailed planning of all deliverables arising
   Project	
                               from the key milestones including comms
                      Project	
  	
        change and benefit realisation actions.
  IniLaLon	
  
                       Plan	
  
  Document	
  




                                         •  Ongoing analysis, mitigation of Risks
   Comms	
  
                      Risks	
            •  Risk template includes Probability and Impact
   Change	
  
                     Register	
             Assessment, tolerance levels
   Strategy	
  




                                         •  Management of all arising issues in the project
                                         •  Project managers will automatically escalate
                      Issues	
              issues that cannot be resolved at the project
                        Log	
               team level




                                                             VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                                                           C S STRATEGIC PLANNING 	
   ESSION 23-FEB
GOVERNANCE MODEL/REPORTING-DOCUMENTATION

                     PROJECT	
          GOVERNANCE	
  
INITIATION	
  	
  
                      TEAM	
              LEVEL	
  
                                                             •  Project and Program Managers Report on the
   Project	
                               Project	
  	
        status of the project
                      Project	
  	
        Status	
          •  RAG Status of project
  IniLaLon	
  
                       Plan	
                                •  Financial Outturn
  Document	
                               Report	
  
                                                             •  Key Milestones
                                                             •  Risks & Issues
                                                             •  Reported monthly to Steering Committee


                                                             •    Vice Chancellors Committee Report
   Comms	
                                                   •    Exec Sponsors Portfolio overview of all projects
                      Risks	
               VCC	
            •    Financial Outturn of portfolio
   Change	
                                Report	
  
                     Register	
                              •    Status of each project
   Strategy	
  
                                                             •    Key Milestones delivery
                                                             •    Major Issues/Risks for escalation




                      Issues	
  
                        Log	
  




                                                                    VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                                                                  C S STRATEGIC PLANNING 	
   ESSION 23-FEB
GOVERNANCE MODEL/REPORTING-DOCUMENTATION




                           VICE CHANCELLOR’HANGE	
  CHAMPIONSSUPDATE	
  #7	
   -11
                                         C S STRATEGIC PLANNING 	
   ESSION 23-FEB
PROJECT UPDATE – APPROVALS PROJECT

•    Project Objectives:
      –  Simplify and Standardise the approvals process for new courses and units within
         Schools, Faculties, Portfolio Group, UPMP, APC (Academic Board, UNE Council)
      –  Improve the quality of data submitted
      –  Introduce controlled stage-gating workflow (systems)
      –  Reduce time to market where possible
      –  Close off the loop in the process on the financial viability/sustainability of new courses
         and units 


•    Delivery To date:
      –  Defined current state process (overly complex/fragmented/inaccurate/messy)
      –  Defined current state data requirements
      –  Defined current state process owners and stakeholders
      –  Consulted 
           •    Microsoft
           •    Callista
           •    UWS, UWA, USQ, ECU, UWA, Deakin, Monash
      –  Established principles of future state process


                                                                CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  
PROJECT UPDATE – APPROVALS PROJECT


•  Next Steps:
   –    Review principles of future state process
   –    Build new process map and stakeholders
   –    Approve new Process
   –    Implementation Phase
         •  Current Process refining – standardisation/simplification of process and all
            documentation
         •  Implement full new process – paper based with central support model
         •  Implement systems changes/upgrades
         •  Implement Units in new process/workflow model with new system
         •  Implement Courses in new process/workflow model with new system         




                                                            CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  
Project Update – Revitalising Learning



 •    Training and unit support and progress
 •    New and Revitalised units
 •    Systems update




                                                CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  
QUIZ TIME!!"
     CORRECT ANSWERS MEAN POINTS AND PRIZES
•     What was the name of the music played at the beginning of
      today’s session? 
•     Name two of the projects already delivered by FOL to date?
•     Explain two of the benefits that changes to the PMO will bring?
      Why the change?
•     Name three of the business functions that PMO will be able to
      assist with?
•     What documentation is required for each project the PMO
      undertakes?
•     Tell the group about two of the objectives of the Approvals
      Project?
•     Which Unit of study was used as the Moodle example?
•     Name three of UNE’s current systems, that will be integrated into
      Moodle?




                                                           CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  
CHANGE CHAMPIONS MEETINGS – 2011"

NOON    – 1.30PM AT OORALA
                                •    Choice and Flexibility
                                •    A Seamless Student Experience
                                •    Regionally Based – Globally Connected
•    March 28th
                •    Driving Innovation
•    April 18th
•    May 30th
•    June 27th
•    July 25th
•    August 29th
•    September 26th
•    October 31st
•    November 28th
•    December (tba)




                                                 CHANGE	
  CHAMPIONS	
  UPDATE	
  #7	
  

Contenu connexe

Tendances

Project Management Silibus
Project Management SilibusProject Management Silibus
Project Management SilibusIzah Asmadi
 
What Jisc Wants 10.12.08
What Jisc Wants 10.12.08What Jisc Wants 10.12.08
What Jisc Wants 10.12.08Heather Price
 
Not a VLE, but a virtual learning environment
Not a VLE, but a virtual learning environmentNot a VLE, but a virtual learning environment
Not a VLE, but a virtual learning environmentJisc
 
Top 10 Microsoft Project Problems
Top 10 Microsoft Project ProblemsTop 10 Microsoft Project Problems
Top 10 Microsoft Project ProblemsMark Corker
 
Introduction To Project Management
Introduction To Project Management Introduction To Project Management
Introduction To Project Management Nada Abandah, OPM3
 
Reporting Workshop 10.12.08 B
Reporting Workshop 10.12.08 BReporting Workshop 10.12.08 B
Reporting Workshop 10.12.08 BHeather Price
 
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & OrganisationsTraditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & OrganisationsBarry O'Reilly
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment Mark Ritchie
 
Large-scale curriculum change through technology
Large-scale curriculum change through technologyLarge-scale curriculum change through technology
Large-scale curriculum change through technologyJisc RSC East Midlands
 

Tendances (12)

Project Management Silibus
Project Management SilibusProject Management Silibus
Project Management Silibus
 
PMExpo2017slide Eureka Service - Oracle Prime
PMExpo2017slide Eureka Service - Oracle PrimePMExpo2017slide Eureka Service - Oracle Prime
PMExpo2017slide Eureka Service - Oracle Prime
 
Agile & Lean PMO
Agile & Lean PMOAgile & Lean PMO
Agile & Lean PMO
 
What Jisc Wants 10.12.08
What Jisc Wants 10.12.08What Jisc Wants 10.12.08
What Jisc Wants 10.12.08
 
Not a VLE, but a virtual learning environment
Not a VLE, but a virtual learning environmentNot a VLE, but a virtual learning environment
Not a VLE, but a virtual learning environment
 
Organizational Project Management; short workshop
Organizational Project Management; short workshopOrganizational Project Management; short workshop
Organizational Project Management; short workshop
 
Top 10 Microsoft Project Problems
Top 10 Microsoft Project ProblemsTop 10 Microsoft Project Problems
Top 10 Microsoft Project Problems
 
Introduction To Project Management
Introduction To Project Management Introduction To Project Management
Introduction To Project Management
 
Reporting Workshop 10.12.08 B
Reporting Workshop 10.12.08 BReporting Workshop 10.12.08 B
Reporting Workshop 10.12.08 B
 
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & OrganisationsTraditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment
 
Large-scale curriculum change through technology
Large-scale curriculum change through technologyLarge-scale curriculum change through technology
Large-scale curriculum change through technology
 

Similaire à Change Champions #7

Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Brian Phillips
 
IM04 - BI Project Management
IM04 - BI Project ManagementIM04 - BI Project Management
IM04 - BI Project ManagementKelvin Chan
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9John Streit
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentHelene Heller, PMP
 
Kepner Tregoe Developing Your Hr Project Management Skills
Kepner Tregoe  Developing Your Hr Project Management SkillsKepner Tregoe  Developing Your Hr Project Management Skills
Kepner Tregoe Developing Your Hr Project Management SkillsJessica Booth
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsJayesh Khatri
 
Visa Prince2 Presentation
Visa Prince2 PresentationVisa Prince2 Presentation
Visa Prince2 Presentationsundong
 
Project/Program Manager
Project/Program ManagerProject/Program Manager
Project/Program ManagerKevinJosephFox
 
Creating value from Software Development though Project management
Creating value from Software Development though Project managementCreating value from Software Development though Project management
Creating value from Software Development though Project managementCharles Muzonzini
 
Discussion Paper PMO And Merger Projects
Discussion Paper   PMO And Merger ProjectsDiscussion Paper   PMO And Merger Projects
Discussion Paper PMO And Merger Projectstheteflonpm
 
Functional Experience Jeff Magnuson, Pmp
Functional Experience   Jeff Magnuson, PmpFunctional Experience   Jeff Magnuson, Pmp
Functional Experience Jeff Magnuson, PmpJeffMagnuson
 
Cadence Presentation Eng 2011
Cadence Presentation Eng 2011Cadence Presentation Eng 2011
Cadence Presentation Eng 2011FrankKooijmans
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions SA
 

Similaire à Change Champions #7 (20)

Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2
 
IM04 - BI Project Management
IM04 - BI Project ManagementIM04 - BI Project Management
IM04 - BI Project Management
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT Investment
 
Resume Summary 2016
Resume Summary 2016Resume Summary 2016
Resume Summary 2016
 
Kepner Tregoe Developing Your Hr Project Management Skills
Kepner Tregoe  Developing Your Hr Project Management SkillsKepner Tregoe  Developing Your Hr Project Management Skills
Kepner Tregoe Developing Your Hr Project Management Skills
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standards
 
Visa Prince2 Presentation
Visa Prince2 PresentationVisa Prince2 Presentation
Visa Prince2 Presentation
 
T355
T355T355
T355
 
T355
T355T355
T355
 
Project/Program Manager
Project/Program ManagerProject/Program Manager
Project/Program Manager
 
Creating value from Software Development though Project management
Creating value from Software Development though Project managementCreating value from Software Development though Project management
Creating value from Software Development though Project management
 
Discussion Paper PMO And Merger Projects
Discussion Paper   PMO And Merger ProjectsDiscussion Paper   PMO And Merger Projects
Discussion Paper PMO And Merger Projects
 
Pmo
PmoPmo
Pmo
 
T349 Asmi Web
T349 Asmi WebT349 Asmi Web
T349 Asmi Web
 
Functional Experience Jeff Magnuson, Pmp
Functional Experience   Jeff Magnuson, PmpFunctional Experience   Jeff Magnuson, Pmp
Functional Experience Jeff Magnuson, Pmp
 
Cadence Presentation Eng 2011
Cadence Presentation Eng 2011Cadence Presentation Eng 2011
Cadence Presentation Eng 2011
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
 

Plus de UNE Flexible and Online

Plus de UNE Flexible and Online (6)

Change champions #6
Change champions #6Change champions #6
Change champions #6
 
Moodle-ing 15 nov 2010
Moodle-ing 15 nov 2010Moodle-ing 15 nov 2010
Moodle-ing 15 nov 2010
 
Presentation at School Meeting (BEPP)
Presentation at School Meeting (BEPP)Presentation at School Meeting (BEPP)
Presentation at School Meeting (BEPP)
 
Change Champions Slidepack 2
Change Champions Slidepack 2Change Champions Slidepack 2
Change Champions Slidepack 2
 
Change Champions Presentation 3
Change Champions Presentation 3Change Champions Presentation 3
Change Champions Presentation 3
 
Change Champions Presentation to HR
Change Champions Presentation to HRChange Champions Presentation to HR
Change Champions Presentation to HR
 

Change Champions #7

  • 1. CHANGE CHAMPIONS – MEETING # 7 UNE FLEXIBLE AND ONLINE UPDATE 28 FEBRUARY, 2011
  • 2. CONTENTS •  Welcome to meeting #7! •  Program Status Overview •  PMO Changes •  Project Update - Approvals Project •  Project Update - Revitalising Learning •  Quiz! CHANGE  CHAMPIONS  UPDATE  #7  
  • 3. PROJECT 2012 FOL – THE PORTFOLIO ExecuLve  Sponsor  Prof.  Graham  Webb   Flexible  &   Academic  Lead:    Helen  Carter   Online   Program  Director:  Sam  Austrin-­‐Miner   Revitalised   Transforming   Working   Learning   Technology   Together   Prog  Mgr:  Myles  Carrick   Prog  Mgr:  Lorraine  Jenkyn   Prog  Mgr:  Norma  Abey   CHANGE  CHAMPIONS  UPDATE  #7  
  • 4. PROJECT FOL – THE PORTFOLIO ExecuLve  Sponsor  Prof.  Graham  Webb   Flexible  &   Academic  Lead:    Helen  Carter   Online   Program  Director:  Sam  Austrin-­‐Miner   Revitalised   Transforming   Working   Learning   Technology   Together   Web  Cluster  Project   Approvals  Project   Backup  Project   Workforce  Planning   CHANGE  CHAMPIONS  UPDATE  #7  
  • 5. PROJECT FOL – THE PORTFOLIO •  One year through two year implementation (50% time) •  75% Delivered on project numbers •  Most of the effort in R/L •  Projects Delivered: –  @Task Project Management Tool/Reporting –  Load and Revenue Forecasting –  New Support Model (Productivity Assist) –  Program Management/ Benefits Realisation –  Cloud Email/Calendar Strategy –  Disaster Recovery Project - IAM –  Hosting Strategy – Phase 1 –  IT Budget Rebuild Strategy –  IT Design New Organisational Model –  IT Strategy Deployment –  Skype Roll Out –  Voice Over IP –  Learning Models, Quality and Standards •  Cancelled Projects: –  Business Process Adaptation! –  Information Strategy CHANGE  CHAMPIONS  UPDATE  #7  
  • 6. THE NEW LOOK, NEW FEEL PROGRAM" CHANGE  CHAMPIONS  UPDATE  #7  
  • 7. PMO CHANGES" WHY PROGRAM MANAGEMENT OFFICE? [PMO] •  Provision of centre of excellence/rigour for project delivery and change management (Prince 2; Agile/Scrum) •  Provides a standardised approach to delivery of projects and change –  Business analysis – business case development –  Adequate Scoping of project deliverables, resources and timelines –  Delivery of discreet projects and portfolio transformation etc –  Management/mitigation of project risks/issues/interdependencies –  Provision of best practice for benefits realisation methodology –  Communications and change-management practice •  Transparency of the delivery/change process to all areas of the business •  Adequate reporting to allow senior executive to make key business decisions and prioritisation •  Management of Budgets (where appropriate) VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 8. PMO STRUCTURE, RESOURCES, & SERVICES VC   SERVICES   COO   Business  Analysis   Business  Case   Development   Prog   Prog   Director   Office   Mgr   Porolio  Mgt   Program  Mgt   Project  Mgt   Comms/ Program   Program   Program   Change   Mgr  1   Mgr  2   Mgr  3   Mgr   Benefits  RealisaLon   Cross  FuncLonal  Team  –  Project  Managers  8     AA   Business  Process   XFTE   AdaptaLon   VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 9. PMO STRUCTURE, RESOURCES, & SERVICES VC   SERVICES   COO   Business  Analysis   Business  Case   Development   Prog   Prog   Director   Office   Mgr   Porolio  Mgt   Program  Mgt   Project  Mgt   Comms/ Program   Program   Program   Change   Mgr  1   Mgr  2   Mgr  3   Mgr   Benefits  RealisaLon   Cross  FuncLonal  Team  –  Project  Managers  8     AA   Business  Process   XFTE   AdaptaLon   VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 10. GOVERNANCE MODEL/REPORTING VC   VCC   Two  Weekly   ExecuLve  Sponsor   COO   SDVC   CDO   DVCR   PVCSS   Steering  Commi_ee   Monthly   PMO   Project  Team   Usually  Weekly   VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 11. GOVERNANCE MODEL/REPORTING VC   VCC   Two  Weekly   ExecuLve  Sponsor   COO   SDVC   CDO   DVCR   PVCSS   Steering  Commi_ee   Monthly   PMO   Project  Team   Project  Team   Usually  Weekly   Project  Team   Usually  Weekly   Project  Team   Usually  Weekly   Usually  Weekly   VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 12. GOVERNANCE MODEL/REPORTING VC   VCC   Two  Weekly   ExecuLve  Sponsor   COO   SDVC   CDO   DVCR   PVCSS   Steering  Commi_ee   Monthly   Projects   Projects   Projects   Projects   Project  Team   Project  Team   Usually  Weekly   Project  Team   Usually  Weekly   Project  Team   Projects   Usually  Weekly   Usually  Weekly   VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 13. GOVERNANCE MODEL/REPORTING-DOCUMENTATION INITIATION     •  Scope, Governance, Delivery Approach Project   •  Budget, Benefits Realisation ROI Model •  Key Milestones IniLaLon   •  Risks Document   •  Definition of Success •  Key Messages •  Stakeholders Comms   •  Delivery Change Channels/Tools Change   •  Actions and Deliverables Strategy   VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 14. GOVERNANCE MODEL/REPORTING-DOCUMENTATION PROJECT   INITIATION     TEAM   •  Detailed planning of all deliverables arising Project   from the key milestones including comms Project     change and benefit realisation actions. IniLaLon   Plan   Document   •  Ongoing analysis, mitigation of Risks Comms   Risks   •  Risk template includes Probability and Impact Change   Register   Assessment, tolerance levels Strategy   •  Management of all arising issues in the project •  Project managers will automatically escalate Issues   issues that cannot be resolved at the project Log   team level VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 15. GOVERNANCE MODEL/REPORTING-DOCUMENTATION PROJECT   GOVERNANCE   INITIATION     TEAM   LEVEL   •  Project and Program Managers Report on the Project   Project     status of the project Project     Status   •  RAG Status of project IniLaLon   Plan   •  Financial Outturn Document   Report   •  Key Milestones •  Risks & Issues •  Reported monthly to Steering Committee •  Vice Chancellors Committee Report Comms   •  Exec Sponsors Portfolio overview of all projects Risks   VCC   •  Financial Outturn of portfolio Change   Report   Register   •  Status of each project Strategy   •  Key Milestones delivery •  Major Issues/Risks for escalation Issues   Log   VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 16. GOVERNANCE MODEL/REPORTING-DOCUMENTATION VICE CHANCELLOR’HANGE  CHAMPIONSSUPDATE  #7   -11 C S STRATEGIC PLANNING   ESSION 23-FEB
  • 17. PROJECT UPDATE – APPROVALS PROJECT •  Project Objectives: –  Simplify and Standardise the approvals process for new courses and units within Schools, Faculties, Portfolio Group, UPMP, APC (Academic Board, UNE Council) –  Improve the quality of data submitted –  Introduce controlled stage-gating workflow (systems) –  Reduce time to market where possible –  Close off the loop in the process on the financial viability/sustainability of new courses and units •  Delivery To date: –  Defined current state process (overly complex/fragmented/inaccurate/messy) –  Defined current state data requirements –  Defined current state process owners and stakeholders –  Consulted •  Microsoft •  Callista •  UWS, UWA, USQ, ECU, UWA, Deakin, Monash –  Established principles of future state process CHANGE  CHAMPIONS  UPDATE  #7  
  • 18. PROJECT UPDATE – APPROVALS PROJECT •  Next Steps: –  Review principles of future state process –  Build new process map and stakeholders –  Approve new Process –  Implementation Phase •  Current Process refining – standardisation/simplification of process and all documentation •  Implement full new process – paper based with central support model •  Implement systems changes/upgrades •  Implement Units in new process/workflow model with new system •  Implement Courses in new process/workflow model with new system CHANGE  CHAMPIONS  UPDATE  #7  
  • 19. Project Update – Revitalising Learning •  Training and unit support and progress •  New and Revitalised units •  Systems update CHANGE  CHAMPIONS  UPDATE  #7  
  • 20. QUIZ TIME!!" CORRECT ANSWERS MEAN POINTS AND PRIZES •  What was the name of the music played at the beginning of today’s session? •  Name two of the projects already delivered by FOL to date? •  Explain two of the benefits that changes to the PMO will bring? Why the change? •  Name three of the business functions that PMO will be able to assist with? •  What documentation is required for each project the PMO undertakes? •  Tell the group about two of the objectives of the Approvals Project? •  Which Unit of study was used as the Moodle example? •  Name three of UNE’s current systems, that will be integrated into Moodle? CHANGE  CHAMPIONS  UPDATE  #7  
  • 21. CHANGE CHAMPIONS MEETINGS – 2011" NOON – 1.30PM AT OORALA •  Choice and Flexibility •  A Seamless Student Experience •  Regionally Based – Globally Connected •  March 28th •  Driving Innovation •  April 18th •  May 30th •  June 27th •  July 25th •  August 29th •  September 26th •  October 31st •  November 28th •  December (tba) CHANGE  CHAMPIONS  UPDATE  #7