Introduction to Alstom Power


                                Theo Molamu
Local Supplier Manager : Sourcing & Tendering
                              25 November 2010
Agenda

   Our Group:                                      A major industry player

   Our Market: Power generation

   Our Strategy: The cleanest integrated solutions

   Our Teams: Present where the market is




Theo Molamu - 25 11 2010 - P 2
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Alstom Group: Three sectors
                                                                                  Power
   Grid                                 19%                                       13.9 €bn                              Grid                           21%
   3.5 €bn                                                                                                              20,300
   (2009)                                                             51%


                                                                                                                                                                                     52%
Transport                         30%                                                                                                           27%
                                                                                                                                                                                                 Power
5.8 €bn                                                                                                         Transport
                                                                                                                                                                                                 50,200
                                                                                                                26,000

             Sales by Sector (proforma figures)                                                                                              Employees by Sector
Source: Alstom 2009/10



Rail transport infrastructure                                               Power generation infrastructure                                             Power transmission infrastructure




 Supplier of 1 metro/tram in each 4                                            Major supplier in 25% of worldwide                                               Leadership in key markets and
                                                                                        installed base                                                            fast-growing technologies
Theo Molamu - 25 11 2010 - P 3
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Alstom: 96,500 employees in over 70 countries



                                                                                                                                                        58%

                                    11%               12%                                                                   62%




                                                                                                            4% 1%                                                                                22%
                                                           6%           7%                                                                                                  17%




        Group

        Power Sector



Theo Molamu - 25 11 2010 - P 4
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Transport Sector

N°2                                                                                                                          N°1
in urban transportation (metro/tram)                                                                                         in high and very high speed

DISTANCE                                                                                      Locomotives                                                                       Very High Speed




                                                                                       Regional
                                     Tram                     Interurban
                                     Train
        Metro




                                                                                                                                    High Speed




                                                                                                                                                                                         SPEED



                                     Alstom Transport, a leader in the railway sector
Theo Molamu - 25 11 2010 - P 5
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Grid sector
● New growth potential for the Group
          • Among the Top 3 in Transmission business
          • 20,000 employees, over €3.5 bn in sales,
            over 50 locations worldwide
          • Leader in key markets and fast-growing
            technologies (disconnectors, GIS, HVDC…)



● Strategic offering including Power Generation
  and Transmission




         Alstom creates a third Sector by acquiring Areva’s Transmission business
Theo Molamu - 25 11 2010 - P 6
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Alstom Power:
Technologies adapted to all energy sources



                           Gas                                                                                                                                                   Hydro

                                                                                        Life Cycle
                                                                                       Management

              Coal                                                                                                                                                          Nuclear (Conv.Island)




                           Oil                                                                                                                                                     Wind




Theo Molamu - 25 11 2010 - P 7          Geothermal                                                                                                       Solar
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
                                                                                                Biomass
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Agenda

  Our Group:                                       A major industry player

  Our Market in SA: current and future projects

   Our Strategy: The cleanest integrated solutions

   Our Teams: Present where the market is




Theo Molamu - 25 11 2010 - P 8
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Current Projects

  • Medupi Power Station: Turbine Hall & BOP
            C&I

  • Kusile Power Station :Turbine Hall & BOP, C & I &
    WFGD


  • Koeberg Nuclear Power station : Refurbishment &
    maintanance




Theo Molamu - 25 11 2010 - P 9
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Future Projects – unique Turnkey capabilities

  • Gas Power Plants : Combined-Cycles Power Plants ,
    Simple Cycle;

  • Steam Power Plants : Circulating Fluidized Bed Boiler;

  • Solar Thermal Plants;

  • Wind Projects;

  • Nuclear Power Plants (Conventional part)



Theo Molamu - 25 11 2010 - P 10
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Agenda

  Our Group:                                       A major industry player

   Our Market: Power generation

  Our Tender Sourcing Strategy: Project Specific

   Our Teams: Present where the market is




Theo Molamu - 25 11 2010 - P 11
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Tender Sourcing Strategy

  • Sourcing Strategy : Equipment Target Price, Targeted Countries, LCC
           Opportunities, Local content/Suppliers, Turnkey Packages foreseen, reference
           Projects & Tenders;

  • Customer requirements : Imposed black listed                                                                                         suppliers, Incoterms, etc.

  • Finance, Legal & Trade :Customs duties & Tax issues, Local Law restrictions,
           Trade agreements, etc;

  • Tender Supplier List(TSL): Mandatory suppliers from Client, suuplier
           information to be supplied in TSL, etc:

  • Top Critical Equipments(Steam/Gasnt) : Water/Air Cooled Condenser,
           Pumps, Heat Exchangers, Feedwater Tanks, Feedwater Pumps,
           Demineralisation Plant, Water Treatment Plants, Coal Handling, Ash
           Handling, Transformers, HV Switchyard, etc;



Theo Molamu - 25 11 2010 - P 12
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Agenda

  Our Group:                                       A major industry player

   Our Market: Power generation

   Our Strategy: The cleanest integrated solutions

    Our Supplier Development :Local Suppliers Opportunities




Theo Molamu - 25 11 2010 - P 13
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Suppliers Development Opportunities
•       High Voltage Switchyard;
•       High Voltage & Medium Voltage Cables;
•       Auxiliary Transformers;
•       Water Treatment Plant - done
•       HP Pressure Heat Exchangers – Thermal/ Mechanical
        design;
•       HVAC Systems;
•       HP Pipes and Fittings;
•       Metallic Expansion Joints, Supports and Spring Hangers;
•       Cross Over Piping;
•       Water/Air Cooled Condenser;
•       Dampers & Compensators;
•       HV & MV Switchgears, etc



Theo Molamu - 25 11 2010 - P 14
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Challenges

  • To pre-qualify local suppliers (assess): Commercial,
    Technical & Quality;

  • Supplier Capabilities and Capacities: turnkey
              - Power Stations 20 years;

  • Alstom Power requirements: T&C’s, SPIQ and Quality
    requirements;

  • New Projects :Equipments suppliers of Wind , Solar &
    Nuclear.


Theo Molamu - 25 11 2010 - P 15
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Next Steps



  • Identify & pre-assessment of local suppliers;

  • Draw a qualification plan;

  • Project specific – Gas and Steam On/Off – shore split;

  • Compile ZA Market Study for all key commodities.




Theo Molamu - 25 11 2010 - P 16
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
www.power.alstom.com

Contenu connexe

Tendances

ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingUNIFE2012
 
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewUNIFE2012
 
EU transport policy and situation of Latvia
EU transport policy and situation of LatviaEU transport policy and situation of Latvia
EU transport policy and situation of LatviaRoberts Zīle
 
Signing of the definitive agreements relative to the Veolia Transport - Trans...
Signing of the definitive agreements relative to the Veolia Transport - Trans...Signing of the definitive agreements relative to the Veolia Transport - Trans...
Signing of the definitive agreements relative to the Veolia Transport - Trans...ve-finance
 
ERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trainsERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trainsUNIFE2012
 
ERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsUNIFE2012
 
Cenex Gas For Transport
Cenex Gas For TransportCenex Gas For Transport
Cenex Gas For TransportEggfuel
 
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...UNIFE2012
 
VTA LRT Efficiency December 10, 2012
VTA LRT Efficiency December 10, 2012VTA LRT Efficiency December 10, 2012
VTA LRT Efficiency December 10, 2012VTA
 
Amtrak
AmtrakAmtrak
Amtrakanxora
 
Duke_Energy_2003_Annual_Report
Duke_Energy_2003_Annual_ReportDuke_Energy_2003_Annual_Report
Duke_Energy_2003_Annual_Reportfinance21
 
Sustainable Communities SA - presentation by Professor Peter Newman
Sustainable Communities SA - presentation by Professor Peter NewmanSustainable Communities SA - presentation by Professor Peter Newman
Sustainable Communities SA - presentation by Professor Peter NewmanSustainableCommunitiesSA
 
Investment Catalog
Investment Catalog Investment Catalog
Investment Catalog Yusuf Özcan
 
Invest in Primorsko-goranska County
Invest in Primorsko-goranska CountyInvest in Primorsko-goranska County
Invest in Primorsko-goranska CountyWebmaster@Porin
 

Tendances (20)

ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
 
Integrated Public Transport System SITP- Bogotá
Integrated Public Transport System SITP- BogotáIntegrated Public Transport System SITP- Bogotá
Integrated Public Transport System SITP- Bogotá
 
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
 
EU transport policy and situation of Latvia
EU transport policy and situation of LatviaEU transport policy and situation of Latvia
EU transport policy and situation of Latvia
 
Signing of the definitive agreements relative to the Veolia Transport - Trans...
Signing of the definitive agreements relative to the Veolia Transport - Trans...Signing of the definitive agreements relative to the Veolia Transport - Trans...
Signing of the definitive agreements relative to the Veolia Transport - Trans...
 
ERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trainsERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trains
 
Germany
GermanyGermany
Germany
 
ERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levels
 
Cenex Gas For Transport
Cenex Gas For TransportCenex Gas For Transport
Cenex Gas For Transport
 
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
 
Ncomms2255 s1
Ncomms2255 s1Ncomms2255 s1
Ncomms2255 s1
 
VTA LRT Efficiency December 10, 2012
VTA LRT Efficiency December 10, 2012VTA LRT Efficiency December 10, 2012
VTA LRT Efficiency December 10, 2012
 
Amtrak
AmtrakAmtrak
Amtrak
 
Duke_Energy_2003_Annual_Report
Duke_Energy_2003_Annual_ReportDuke_Energy_2003_Annual_Report
Duke_Energy_2003_Annual_Report
 
Mic 9
Mic 9Mic 9
Mic 9
 
Sustainable Communities SA - presentation by Professor Peter Newman
Sustainable Communities SA - presentation by Professor Peter NewmanSustainable Communities SA - presentation by Professor Peter Newman
Sustainable Communities SA - presentation by Professor Peter Newman
 
Mic 11
Mic 11Mic 11
Mic 11
 
Book #3
Book #3Book #3
Book #3
 
Investment Catalog
Investment Catalog Investment Catalog
Investment Catalog
 
Invest in Primorsko-goranska County
Invest in Primorsko-goranska CountyInvest in Primorsko-goranska County
Invest in Primorsko-goranska County
 

Similaire à Alstom introduction theo molamu 2010

Collaboration to ensure the next generation of networks_sept2011
Collaboration to ensure the next generation of networks_sept2011Collaboration to ensure the next generation of networks_sept2011
Collaboration to ensure the next generation of networks_sept2011Sylwia Boguszewska
 
TIM FIber Day Presentation
TIM FIber Day PresentationTIM FIber Day Presentation
TIM FIber Day PresentationTIM RI
 
Profitability of Optical Component Suppliers - CIOE 2012
Profitability of Optical Component Suppliers - CIOE 2012Profitability of Optical Component Suppliers - CIOE 2012
Profitability of Optical Component Suppliers - CIOE 2012LightCounting
 
Enst lte small cell - Tutorial - 2012
Enst   lte small cell - Tutorial - 2012Enst   lte small cell - Tutorial - 2012
Enst lte small cell - Tutorial - 2012Thierry Lestable
 
Resource efficiency and resource-policy aspects of the electro-mobility syste...
Resource efficiency and resource-policy aspects of the electro-mobility syste...Resource efficiency and resource-policy aspects of the electro-mobility syste...
Resource efficiency and resource-policy aspects of the electro-mobility syste...Oeko-Institut
 
Troika Dialog Russia Forum Jan-Feb 2012
Troika Dialog Russia Forum Jan-Feb 2012Troika Dialog Russia Forum Jan-Feb 2012
Troika Dialog Russia Forum Jan-Feb 2012MRSK Centre
 
BubbleMotion automated rickshaws (Apr 2013)
BubbleMotion automated rickshaws (Apr 2013)BubbleMotion automated rickshaws (Apr 2013)
BubbleMotion automated rickshaws (Apr 2013)BM Design Oy
 
Russian and Ukrainian internet market: major verticals
Russian and Ukrainian internet market: major verticalsRussian and Ukrainian internet market: major verticals
Russian and Ukrainian internet market: major verticalsInna Ponomarenko
 
Case Study : Pricing Plan on Tight Competition
Case Study : Pricing Plan on Tight CompetitionCase Study : Pricing Plan on Tight Competition
Case Study : Pricing Plan on Tight CompetitionDjadja Sardjana
 
Impact assessment of active safety systems within the field operational test ...
Impact assessment of active safety systems within the field operational test ...Impact assessment of active safety systems within the field operational test ...
Impact assessment of active safety systems within the field operational test ...euroFOT
 
Vietnam Airlines - India new route plan
Vietnam Airlines - India new route planVietnam Airlines - India new route plan
Vietnam Airlines - India new route plantrungthanh224
 
2010 farnborough presentation
2010 farnborough presentation2010 farnborough presentation
2010 farnborough presentationxiongjianvlsi
 
Wolfgang müller pietralla latest developents ind the mobility industry road-w...
Wolfgang müller pietralla latest developents ind the mobility industry road-w...Wolfgang müller pietralla latest developents ind the mobility industry road-w...
Wolfgang müller pietralla latest developents ind the mobility industry road-w...World Tourism Forum Lucerne
 
2010.gada Latvijas mediju reklāmas tirgus prognozes
2010.gada Latvijas mediju reklāmas tirgus prognozes2010.gada Latvijas mediju reklāmas tirgus prognozes
2010.gada Latvijas mediju reklāmas tirgus prognozesStarcom
 

Similaire à Alstom introduction theo molamu 2010 (20)

Collaboration to ensure the next generation of networks_sept2011
Collaboration to ensure the next generation of networks_sept2011Collaboration to ensure the next generation of networks_sept2011
Collaboration to ensure the next generation of networks_sept2011
 
TIM FIber Day Presentation
TIM FIber Day PresentationTIM FIber Day Presentation
TIM FIber Day Presentation
 
Profitability of Optical Component Suppliers - CIOE 2012
Profitability of Optical Component Suppliers - CIOE 2012Profitability of Optical Component Suppliers - CIOE 2012
Profitability of Optical Component Suppliers - CIOE 2012
 
ARMTechCon 2011 Embedded Software Store Launch
ARMTechCon 2011 Embedded Software Store LaunchARMTechCon 2011 Embedded Software Store Launch
ARMTechCon 2011 Embedded Software Store Launch
 
Enst lte small cell - Tutorial - 2012
Enst   lte small cell - Tutorial - 2012Enst   lte small cell - Tutorial - 2012
Enst lte small cell - Tutorial - 2012
 
Resource efficiency and resource-policy aspects of the electro-mobility syste...
Resource efficiency and resource-policy aspects of the electro-mobility syste...Resource efficiency and resource-policy aspects of the electro-mobility syste...
Resource efficiency and resource-policy aspects of the electro-mobility syste...
 
Energías renovables y eficiencie energética en Marruecos
Energías renovables y eficiencie energética en MarruecosEnergías renovables y eficiencie energética en Marruecos
Energías renovables y eficiencie energética en Marruecos
 
Troika Dialog Russia Forum Jan-Feb 2012
Troika Dialog Russia Forum Jan-Feb 2012Troika Dialog Russia Forum Jan-Feb 2012
Troika Dialog Russia Forum Jan-Feb 2012
 
Transport Solutions
Transport SolutionsTransport Solutions
Transport Solutions
 
BubbleMotion automated rickshaws (Apr 2013)
BubbleMotion automated rickshaws (Apr 2013)BubbleMotion automated rickshaws (Apr 2013)
BubbleMotion automated rickshaws (Apr 2013)
 
Contact Center Benchmark 2012
Contact Center Benchmark 2012 Contact Center Benchmark 2012
Contact Center Benchmark 2012
 
Russian and Ukrainian internet market: major verticals
Russian and Ukrainian internet market: major verticalsRussian and Ukrainian internet market: major verticals
Russian and Ukrainian internet market: major verticals
 
Case Study : Pricing Plan on Tight Competition
Case Study : Pricing Plan on Tight CompetitionCase Study : Pricing Plan on Tight Competition
Case Study : Pricing Plan on Tight Competition
 
Impact assessment of active safety systems within the field operational test ...
Impact assessment of active safety systems within the field operational test ...Impact assessment of active safety systems within the field operational test ...
Impact assessment of active safety systems within the field operational test ...
 
Vietnam Airlines - India new route plan
Vietnam Airlines - India new route planVietnam Airlines - India new route plan
Vietnam Airlines - India new route plan
 
2010 farnborough presentation
2010 farnborough presentation2010 farnborough presentation
2010 farnborough presentation
 
Wolfgang müller pietralla latest developents ind the mobility industry road-w...
Wolfgang müller pietralla latest developents ind the mobility industry road-w...Wolfgang müller pietralla latest developents ind the mobility industry road-w...
Wolfgang müller pietralla latest developents ind the mobility industry road-w...
 
Transport Solutions
Transport SolutionsTransport Solutions
Transport Solutions
 
2010.gada Latvijas mediju reklāmas tirgus prognozes
2010.gada Latvijas mediju reklāmas tirgus prognozes2010.gada Latvijas mediju reklāmas tirgus prognozes
2010.gada Latvijas mediju reklāmas tirgus prognozes
 
Domestic resource mobilization. Infrastructure
Domestic resource mobilization. InfrastructureDomestic resource mobilization. Infrastructure
Domestic resource mobilization. Infrastructure
 

Plus de UNIDO SA

Dst localisation presentation
Dst localisation presentationDst localisation presentation
Dst localisation presentationUNIDO SA
 
Transnet tpt sd
Transnet tpt sdTransnet tpt sd
Transnet tpt sdUNIDO SA
 
Idc sector workshop presentation_29092011
Idc sector workshop presentation_29092011Idc sector workshop presentation_29092011
Idc sector workshop presentation_29092011UNIDO SA
 
Cbi marketing support
Cbi marketing supportCbi marketing support
Cbi marketing supportUNIDO SA
 
Siemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa projectSiemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa projectUNIDO SA
 
Nuclear bill of materials specification description
Nuclear bill of materials specification descriptionNuclear bill of materials specification description
Nuclear bill of materials specification descriptionUNIDO SA
 
Multiplier presentation march 2011
Multiplier presentation march 2011Multiplier presentation march 2011
Multiplier presentation march 2011UNIDO SA
 
Filter bag sdl presentation v3
Filter bag sdl presentation v3Filter bag sdl presentation v3
Filter bag sdl presentation v3UNIDO SA
 
Eskom supplier dev and localisation unido rhythm 240211
Eskom supplier dev and localisation unido rhythm 240211Eskom supplier dev and localisation unido rhythm 240211
Eskom supplier dev and localisation unido rhythm 240211UNIDO SA
 
Enerkey youth development initiatives to unido 20110208
Enerkey youth development initiatives to unido 20110208 Enerkey youth development initiatives to unido 20110208
Enerkey youth development initiatives to unido 20110208 UNIDO SA
 
UNIDO SA: Supplier development
UNIDO SA: Supplier developmentUNIDO SA: Supplier development
UNIDO SA: Supplier developmentUNIDO SA
 
Wind energy eskom mohsin seedat 2010
Wind energy eskom mohsin seedat 2010Wind energy eskom mohsin seedat 2010
Wind energy eskom mohsin seedat 2010UNIDO SA
 
Unido working group dst localisation 2010
Unido working group dst localisation 2010Unido working group dst localisation 2010
Unido working group dst localisation 2010UNIDO SA
 
Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010UNIDO SA
 
Tap Foundries Intervention - Mintek
Tap Foundries Intervention - Mintek Tap Foundries Intervention - Mintek
Tap Foundries Intervention - Mintek UNIDO SA
 
Naacam roger pitout 2010
Naacam roger pitout 2010Naacam roger pitout 2010
Naacam roger pitout 2010UNIDO SA
 
Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010UNIDO SA
 
Mthombo csdp presentation to rythmic meeting may 10
Mthombo csdp  presentation to rythmic meeting may 10Mthombo csdp  presentation to rythmic meeting may 10
Mthombo csdp presentation to rythmic meeting may 10UNIDO SA
 
Idc moroasereme ntsoane 2010
Idc moroasereme ntsoane 2010Idc moroasereme ntsoane 2010
Idc moroasereme ntsoane 2010UNIDO SA
 
Dti solar park cob pillay 2010
Dti solar park cob pillay 2010Dti solar park cob pillay 2010
Dti solar park cob pillay 2010UNIDO SA
 

Plus de UNIDO SA (20)

Dst localisation presentation
Dst localisation presentationDst localisation presentation
Dst localisation presentation
 
Transnet tpt sd
Transnet tpt sdTransnet tpt sd
Transnet tpt sd
 
Idc sector workshop presentation_29092011
Idc sector workshop presentation_29092011Idc sector workshop presentation_29092011
Idc sector workshop presentation_29092011
 
Cbi marketing support
Cbi marketing supportCbi marketing support
Cbi marketing support
 
Siemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa projectSiemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa project
 
Nuclear bill of materials specification description
Nuclear bill of materials specification descriptionNuclear bill of materials specification description
Nuclear bill of materials specification description
 
Multiplier presentation march 2011
Multiplier presentation march 2011Multiplier presentation march 2011
Multiplier presentation march 2011
 
Filter bag sdl presentation v3
Filter bag sdl presentation v3Filter bag sdl presentation v3
Filter bag sdl presentation v3
 
Eskom supplier dev and localisation unido rhythm 240211
Eskom supplier dev and localisation unido rhythm 240211Eskom supplier dev and localisation unido rhythm 240211
Eskom supplier dev and localisation unido rhythm 240211
 
Enerkey youth development initiatives to unido 20110208
Enerkey youth development initiatives to unido 20110208 Enerkey youth development initiatives to unido 20110208
Enerkey youth development initiatives to unido 20110208
 
UNIDO SA: Supplier development
UNIDO SA: Supplier developmentUNIDO SA: Supplier development
UNIDO SA: Supplier development
 
Wind energy eskom mohsin seedat 2010
Wind energy eskom mohsin seedat 2010Wind energy eskom mohsin seedat 2010
Wind energy eskom mohsin seedat 2010
 
Unido working group dst localisation 2010
Unido working group dst localisation 2010Unido working group dst localisation 2010
Unido working group dst localisation 2010
 
Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010
 
Tap Foundries Intervention - Mintek
Tap Foundries Intervention - Mintek Tap Foundries Intervention - Mintek
Tap Foundries Intervention - Mintek
 
Naacam roger pitout 2010
Naacam roger pitout 2010Naacam roger pitout 2010
Naacam roger pitout 2010
 
Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010
 
Mthombo csdp presentation to rythmic meeting may 10
Mthombo csdp  presentation to rythmic meeting may 10Mthombo csdp  presentation to rythmic meeting may 10
Mthombo csdp presentation to rythmic meeting may 10
 
Idc moroasereme ntsoane 2010
Idc moroasereme ntsoane 2010Idc moroasereme ntsoane 2010
Idc moroasereme ntsoane 2010
 
Dti solar park cob pillay 2010
Dti solar park cob pillay 2010Dti solar park cob pillay 2010
Dti solar park cob pillay 2010
 

Alstom introduction theo molamu 2010

  • 1. Introduction to Alstom Power Theo Molamu Local Supplier Manager : Sourcing & Tendering 25 November 2010
  • 2. Agenda Our Group: A major industry player Our Market: Power generation Our Strategy: The cleanest integrated solutions Our Teams: Present where the market is Theo Molamu - 25 11 2010 - P 2 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 3. Alstom Group: Three sectors Power Grid 19% 13.9 €bn Grid 21% 3.5 €bn 20,300 (2009) 51% 52% Transport 30% 27% Power 5.8 €bn Transport 50,200 26,000 Sales by Sector (proforma figures) Employees by Sector Source: Alstom 2009/10 Rail transport infrastructure Power generation infrastructure Power transmission infrastructure Supplier of 1 metro/tram in each 4 Major supplier in 25% of worldwide Leadership in key markets and installed base fast-growing technologies Theo Molamu - 25 11 2010 - P 3 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 4. Alstom: 96,500 employees in over 70 countries 58% 11% 12% 62% 4% 1% 22% 6% 7% 17% Group Power Sector Theo Molamu - 25 11 2010 - P 4 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 5. Transport Sector N°2 N°1 in urban transportation (metro/tram) in high and very high speed DISTANCE Locomotives Very High Speed Regional Tram Interurban Train Metro High Speed SPEED Alstom Transport, a leader in the railway sector Theo Molamu - 25 11 2010 - P 5 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 6. Grid sector ● New growth potential for the Group • Among the Top 3 in Transmission business • 20,000 employees, over €3.5 bn in sales, over 50 locations worldwide • Leader in key markets and fast-growing technologies (disconnectors, GIS, HVDC…) ● Strategic offering including Power Generation and Transmission Alstom creates a third Sector by acquiring Areva’s Transmission business Theo Molamu - 25 11 2010 - P 6 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 7. Alstom Power: Technologies adapted to all energy sources Gas Hydro Life Cycle Management Coal Nuclear (Conv.Island) Oil Wind Theo Molamu - 25 11 2010 - P 7 Geothermal Solar © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any Biomass particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 8. Agenda Our Group: A major industry player Our Market in SA: current and future projects Our Strategy: The cleanest integrated solutions Our Teams: Present where the market is Theo Molamu - 25 11 2010 - P 8 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 9. Current Projects • Medupi Power Station: Turbine Hall & BOP C&I • Kusile Power Station :Turbine Hall & BOP, C & I & WFGD • Koeberg Nuclear Power station : Refurbishment & maintanance Theo Molamu - 25 11 2010 - P 9 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 10. Future Projects – unique Turnkey capabilities • Gas Power Plants : Combined-Cycles Power Plants , Simple Cycle; • Steam Power Plants : Circulating Fluidized Bed Boiler; • Solar Thermal Plants; • Wind Projects; • Nuclear Power Plants (Conventional part) Theo Molamu - 25 11 2010 - P 10 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 11. Agenda Our Group: A major industry player Our Market: Power generation Our Tender Sourcing Strategy: Project Specific Our Teams: Present where the market is Theo Molamu - 25 11 2010 - P 11 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 12. Tender Sourcing Strategy • Sourcing Strategy : Equipment Target Price, Targeted Countries, LCC Opportunities, Local content/Suppliers, Turnkey Packages foreseen, reference Projects & Tenders; • Customer requirements : Imposed black listed suppliers, Incoterms, etc. • Finance, Legal & Trade :Customs duties & Tax issues, Local Law restrictions, Trade agreements, etc; • Tender Supplier List(TSL): Mandatory suppliers from Client, suuplier information to be supplied in TSL, etc: • Top Critical Equipments(Steam/Gasnt) : Water/Air Cooled Condenser, Pumps, Heat Exchangers, Feedwater Tanks, Feedwater Pumps, Demineralisation Plant, Water Treatment Plants, Coal Handling, Ash Handling, Transformers, HV Switchyard, etc; Theo Molamu - 25 11 2010 - P 12 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 13. Agenda Our Group: A major industry player Our Market: Power generation Our Strategy: The cleanest integrated solutions Our Supplier Development :Local Suppliers Opportunities Theo Molamu - 25 11 2010 - P 13 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 14. Suppliers Development Opportunities • High Voltage Switchyard; • High Voltage & Medium Voltage Cables; • Auxiliary Transformers; • Water Treatment Plant - done • HP Pressure Heat Exchangers – Thermal/ Mechanical design; • HVAC Systems; • HP Pipes and Fittings; • Metallic Expansion Joints, Supports and Spring Hangers; • Cross Over Piping; • Water/Air Cooled Condenser; • Dampers & Compensators; • HV & MV Switchgears, etc Theo Molamu - 25 11 2010 - P 14 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 15. Challenges • To pre-qualify local suppliers (assess): Commercial, Technical & Quality; • Supplier Capabilities and Capacities: turnkey - Power Stations 20 years; • Alstom Power requirements: T&C’s, SPIQ and Quality requirements; • New Projects :Equipments suppliers of Wind , Solar & Nuclear. Theo Molamu - 25 11 2010 - P 15 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 16. Next Steps • Identify & pre-assessment of local suppliers; • Draw a qualification plan; • Project specific – Gas and Steam On/Off – shore split; • Compile ZA Market Study for all key commodities. Theo Molamu - 25 11 2010 - P 16 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.