The document discusses climate change scenarios and flood modeling. It notes that climate change scenarios are needed for flood mapping and risk planning. Currently, this type of climate change and flood modeling is only done in the city of Pori, and their experiences are being used in Rovaniemi and Kittilä. The document also mentions a flood that occurred in Kittilä in 2005 and shows images related to flood risk mapping and climate change modeling of river flows.
2. New organizations started 1.1.2010
There are 15 Centres for Economic Development,
Transport and the Environment that started
operating on January 1st, 2010.
The tasks of the Centres comprise those of the
former Employment and Economic Centres,
Road Districts, Regional Environmental Centres and
State Provincial Offices.
The Centres operate in close
collaboration with the Regional Councils.
Miikka Halonen 6.8.2012 2
3. Floods and Climate Change
Climate change scenarios are needed for flood
mapping and risk response planning.
Currently, this kind of climate change and flood
modelling is done only in the city of Pori and
experiences and best practise from there are used
also in Rovaniemi and Kittilä.
The local adaptation strategy themes, for example
tourism and flooding, in WP3 are taken into account
in this demonstration project.
Miikka Halonen 6.8.2012 3
4. Flood in Kittilä 2005
Copyright Studio Tunturi Lappi Oy/Sauli Koski 6.8.2012 4
5. The user of the flood information system will be
able to choose the most appropriate flood risk
maps as map layers in the GIS environment, by
using the visualizations made in advance
Miikka Halonen 6.8.2012 5
6. Water level
Ground
level
Vedenpinta
Maanpinta
Tulva-alue, 0m 1.0 m
vesisyvyys
0.5 m
3.0 m
2.0 m
Copyright Mikko Sane/SYKE
Water level zones: 0…0.5 m, 0.5…1 m, WATER
17.6.2005
1…2 m, 2…3 m, 3… m BODY
6
8. 6000
Referenssi tulva 1/250
5000
2011-2040
Maksimiskenaario 1/250
4000 2011-2040
Virtaama (m3/s)
Minimiskenaario 1/250
3000 2041-2070
Maksimiskenaario 1/250
2000
1000
0
1.4. 1.5. 1.6.
Lisää viraston nimi, tekijän nimi ja osasto 6.8.2012 8
9. Visualized land use plan map from Levi
Copyright
FCG/Kittilän kunta
Lisää viraston nimi, tekijän nimi ja osasto 6.8.2012 9
10. What happens after Clim-ATIC (after Feb
2011)?
Risk response planning continues
Land use plans are updated.
Regional council of Lapland is planning to make
climate change strategy for the whole Lapland.
Timescale is to the year 2030.
Results and experiences from Clim-ATIC are used
there.
Miikka Halonen 6.8.2012 10
11. Your top 3 lessons so far?
Vuotos reservoir is big issue in Lapland. Climate
change does not justify it.
Climate change has small affect to floods.
It is a major challenge to give the flood risk maps
such a visual expression that each ”risk layer”
can easily be seen
Miikka Halonen 6.8.2012 11