CHAPTER 3
METHODOLOGY
This chapter attempts to explain the methods used in carrying out the study. In view of this, the
chapter lays more emphasis on the description of the study are, theoretical framework, sampling
procedures, data collection and method data analysis.

3.1 Theoretical framework
Cost-benefit analysis in the area of economics is the most appropriate and popular method of
appraising project from the national viewpoint.
Cost benefit analysis (CBA), sometimes called benefit–cost analysis (BCA), is a systematic
process for calculating and comparing benefits and costs of a project, decision or government
policy (hereafter, "project"). CBA has two purposes:

1. To determine if it is a sound investment/decision (justification/feasibility),
2. To provide a basis for comparing projects. It involves comparing the total expected cost
of each option against the total expected benefits, to see whether the benefits outweigh
the costs, and by how much.

CBA is related to, but distinct from cost-effectiveness analysis. In CBA, benefits and costs are
expressed in monetary terms, and are adjusted for the time value of money, so that all flows of
benefits and flows of project costs over time (which tend to occur at different points in time) are
expressed on a common basis in terms of their "net present value."
Cost is seen as the value of the inputs needed to produce any good or service. This has to be
measured in some units or numeric usually money. Cost includes the fixed cost or overhead cost
and variable cost. Fixed cost must be incurred if any output is produced. Cost also includes the
social cost, which includes external cost of an enterprise such as the value of smoke, damage,
noise and river pollution. Benefit is seen as an addition to the flow of output accruing to a
project.

The concept of Cost-Benefit analysis dates back to an 1848 article by Jules Dupuit and was
formalized in subsequent works by Alfred Marshall. The Corps of Engineers initiated the use of
Cost-Benefit analysis in the US, after the Federal Navigation Act of 1936 effectively required
cost–benefit analysis for proposed federal waterway infrastructure. The Flood Control Act of
1939 was instrumental in establishing Cost-Benefit analysis as federal policy. It demanded that
"the benefits to whomever they accrue [be] in excess of the estimated costs.

Cost-benefit analysis is the area in economics that attempts to compare the total social costs and
benefits of any activity, usually expressed in money terms. The cost and benefits concerned
includes not only direct pecuniary costs and benefits, but also externalities, that are external
effects, not traded in the, markets. This encompasses external cost such as pollution, noise and
disturbance to wildlife and external benefits such as reduction in traveling time or traffic
accidents (John Black, 2005)
Cost-benefit is also seen as the most scientific and useful criterion for project evaluation. It helps
in making correct investment decision to achieve optimum resource allocation by maximizing
the difference between the present value of benefits and cost of a project. It implies the weighing
of the returns against the cost involved in a project. Cost-benefit analysis purports to describe
and quantify the social advantages and disadvantages of a policy in terms of a common monetary
unit. This is the establishment of net social benefit which can be expressed as NSB= Benefits
minus cost. The benefits and costs are measured in terms of shadow or accounting prices of
inputs and output instead of in actual market prices (Jinghan, 2002)

Todaro and Smith (2005) saw cost benefit analysis as a basic tool of economic analysis in which
the actual and potential private and social cost of various economic decisions are weighed
against actual and potential private and social benefits. Decisions or projects that yield the
highest ratio of benefits to costs are usually thought to be most desirable. Cost-benefits analysis
is seen as the basic tool of project analysis. If the total benefits (which includes social benefits)
of any activity exceeds total cost (including social cost) then the projects involved are profitable.
On the other hand, if total cost exceeds total benefits, these would prevent project from springing
up or discourage investors from investing in such projects. Because non- marketed costs and
benefits are difficult to measure and evaluate, the results of cost-benefit analysis can be highly
controversial. In other words, cost-benefit analysis in agriculture means value of inputs needed to
produce agricultural products and the gains to be expected from the sales of such goods. Costs
incurred include expenditure on the initial processing, handling, reduction in wastage, grading ,
quality control, sales transactions and holding inventory to match concentrated harvest seasons
which the continuing demands of consumers (Ezenwa, 1987).
Cost-benefit analysis is a highly dynamic subject in the appraisal of a project. There are several
criteria to analyzing cost- benefit, which is given by Jinghan (2002). They include;
1) B - C

Benefit- cost;

2) B – C/I

Benefit – cost/ investment
3) ΔB/ΔC

ΔBenefit/Δcost

4) B/C

Benefit/ Cost

Where:
B: Benefit
C: Cost
I: Investment
Δ: Incremental or Marginal
1.

B–C/I is for determining the total annual returns on a particular investment in the
economy as a whole irrespective of whom these accrue. The investment (I) here does not
include the private investment that may be incurred by the beneficiaries of the project
such as the cultivators from an irrigation project. A high value of B–C/I may be less
beneficial to the economy even if the private investment happens to be very large. The
problem with this criterion is that it does not put into consideration the private
investment.

2.

ΔB/ΔC. The second criterion of ΔB/ΔC is aimed at determining the size of a project but

can only determine a selected project.
3.

B – C: the B – C criterion would favour large projects and make small and medium size

projects less beneficial. This criterion can only help in determining the scale of the project on the
basis of the maximization of the difference between benefit and cost.
4.

B/C: This is the best and most reliable criterion for project evaluation is. This criterion

(benefit to cost ratio) is the measure for the evaluation of a project.
If B/C =1, then the project is marginal, it is just covering its cost.
If B/C>1, then benefits are more than cost and it is beneficial to undertake the project.
If B/C<1, then the benefits are less than cost and the project cannot be undertaken,

The higher the benefit- cost ratio, the higher will be the profit attached to a project.
This criterion does not take into account the time horizon of the project. The fact is that future
benefits and costs cannot be treated at par with present benefits and cost. Therefore, the appraisal
rule for project evaluation requires discounting of future benefits and costs because the society
prefers the present to the future.
Due to the flaws above, new criteria were developed, they include;
a.

Net present value (NPV)

b.

Internal rate of return criterion (IRR)

3.1.1 Net Present Value (NPV)
The net present value criterion is vital in project evaluation. It is equal to the present value of
benefits minus the present value of operating and maintenance cost minus initial outlay. The
NPV is also expressed as Net Present Value of benefits (NPVB) criterion, which equals: Gross
Present Value of Benefits – Gross Present value of costs.
A project is socially profitable if the NPVB> 0. In a case where there are a number of mutually
exclusive projects and the project with the highest net present value of benefits will be chosen.

This criterion in terms of benefits and costs is not a correct method for project evaluation as it
neglected also the time horizon. Capital investments give benefits over a period of time. Hence,
future benefits and cost cannot be equated with present benefits and costs. Since preference is
given to the present over the future, then future benefits and costs of projects are to be
discounted.
The discounted factor is expressed as D= 1/ (1+i) t
Where i is the social discount rate
t is the time period
The NPV will therefore be
NPV=

B1

….. Bn

B2

+

+

(1+i)2

(1+i)

(1+i)n

C1
-

C2

+

+

(1+i)2

(1+i)

….Cn
(1+i)n

B1, B2…Bn- series of gross present benefit in years 1 ton
C1, C2…Cn- series of gross present cost in years 1 to n
i-

Social rate of discount for annual compounding.

When choice is to be made on project, one of these two rules can be followed.
1.

B1

+ B2

+ ... Bn

(1+i) 2

(1+i)

C1
>

(1+i) n

(1+i)

+

C2

+

(1+i)2 2

….Cn
(1+i)n

Only the projects, which the present value benefits exceeds the present value of cost should be
selected.
2.

B1
(1+i)

B2

+

+

(1+i) 2

... Bn
(1+i) n

>1
C1

C2

+
(1+i)

(1+i) 2

...Cn

+

(1+i) n

All projects where the ratio of the present value of benefits divided by the ratio of the present
value of cost is greater than one.
The NPV criterion is considered as the most appropriate rule for perfect evaluation.
3.1.2 The Internal Rate of Return criterion
The criterion refers to the percentage rate of return of implicit in the flows of benefit and cost of
projects
The internal rate of returns (IRR) is the discount rate at which the present value of returns minus
cost is zero. The formula for the calculation of IRR is

B1-C1
(1+i)

B2-C2
+
((

…Bn-…..Cn

+
(1+i)

2

=0
n

(1+i)

`

`

Where ‘r’ is the internal rate of returns

3.2. Study area
This research would be carried out in Akure metropolis, Ondo state Nigeria so as to make the
results useful for farmers and intending fish farmers in the state. The farms to be studied include:

3.3 Sampling Procedure.
The sampling procedure used in this study is called the purposive sampling where the study was
aimed at gathering information from particular farms as a representative of similar sized farms.
The reason for this is due to little or no record keeping by other fish farmers. Hence, a farm with
considerable record of expenditure and income within the year was chosen.

3.4 Data collection
As a result of the kind of study that was researched, the data collection instrument that was used
to gather information was the primary source, this was done by the use of personal interview.
The interview was designed to reflect the general information, construction information, and
production information. The fish farmer was able to relate directly with the researcher and gave
some vital information that were not even in the records in the farm. The researcher was able to
get direct answers from the farm owner as questions were flexible enough and were poised to
elicit direct answers.

3.5

Method of data analysis

In order to achieve our stated objectives of the study, the following tools for analyzing the data
collected were employed:

3.5.1 Benefit-cost ratio (b-c ratio):
This is the ratio obtained when the present worth of the benefit stream is divided by the present
worth of the cost stream. It is used to directly note how much cost could rise without making the
project economically unattractive. Cost- benefit ratio is usually computed by using gross cost and
gross benefit.
More specifically, using the present worth of the gross benefit less the associated cost and then
comparing it with the present worth of the project is mathematically computed as:
B-C RATIO = Benefit
Cost
If B/C =1, then the project is marginal, it is just covering its cost.
If B/C>1, then benefits are more than cost and it is beneficial to undertake the project.
If B/C<1, then the benefits are less than cost and the project cannot be undertaken,
3.5.2 Net benefit-investment ratio (NBI ratio):
This is the present worth of the net benefit divided by the present worth of the investment. It is a
form of the benefit-cost ratio and has been infrequently used in project analysis. Net benefitinvestment ratio is used to determine an incremental net benefit or cash flow calculation for a
project. The net benefit-investment ratio is calculated by:

NBI RATIO = Present worth of net benefit
Present worth of investment

3.5.3 Net Present Worth (NPW):
It is the most straightforward discounted cash flow measure of project worth. It is the present
worth of incremental cash flow stream.
Calculation of the NPW requires the determination of the appropriate discount rate, which is also
used in the calculation of B-C ratio and the NBI. :
NPW = Discounted Benefit –Discounted Cost.

3.5.4 Internal Rate of Returns (IRR)
In computing the internal rate of returns, the following rules are needed
1. Two discount rates are involved in the calculation
2. The net present value of the higher discount rate must give a negative figure
The calculation of the IRR is given as
LDR + DIFFERENCE IN 2DR (NPV AT LDR/ SUM OF NPV OF THE 2DR)
Where
NPV: NET PRESENT VALUE
LDR: LOWER DISCOUNT RATE
2DR: TWO DISCOUNT RATES

3.5.5 The Decision Rule:
If the project has an IRR that is equal to or greater than the lending rate, then the project should
be accepted. Hence accept the project if it is greater than the cut off rate or that is higher than the
cost of borrowing

3.5.6 Sensitivity analysis
Sensitivity analysis is a measure used to determine the how viable a project can be when some
variables are changed. This means that it is a method that is used to know how profitable it is to
embark on a project when there are changes in some factors that enhances the viability of the
project. In most cases, these factors could either be change in cost of production, revenue or
both. This is usually calculated using percentage. In this study, a 20percent provision was made
with respect to cost over-run or fall in revenue.

Contenu connexe

Tendances

Topic 13 - Social Cost & Social Benefits
Topic 13 - Social Cost & Social BenefitsTopic 13 - Social Cost & Social Benefits
Topic 13 - Social Cost & Social BenefitsFatin Nazihah Aziz
 
Economic benefits and social benefits
Economic benefits and social benefitsEconomic benefits and social benefits
Economic benefits and social benefitstassawarshahzad2
 
The basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mbaThe basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mbaBabasab Patil
 
Cost Benifit Analysis
Cost Benifit AnalysisCost Benifit Analysis
Cost Benifit AnalysisTareq Zarouni
 
Investment Analysis for private and Public sector projects
Investment Analysis for private and Public sector projectsInvestment Analysis for private and Public sector projects
Investment Analysis for private and Public sector projectsjimsd
 
Cost benefit analysis
Cost benefit analysisCost benefit analysis
Cost benefit analysisaryan_raj
 
Social Cost Benefit Analysis
Social Cost Benefit Analysis Social Cost Benefit Analysis
Social Cost Benefit Analysis Azam FA
 
Cost analysis
Cost analysisCost analysis
Cost analysisdeep_anuj
 
Social Cost Benefit Analysis
Social Cost Benefit AnalysisSocial Cost Benefit Analysis
Social Cost Benefit AnalysisSaurabh Sood
 
Cost benefit analysis converted
Cost benefit analysis convertedCost benefit analysis converted
Cost benefit analysis convertedsaheli chakraborty
 
Cost benefit analysis for food industry
Cost benefit analysis for food industryCost benefit analysis for food industry
Cost benefit analysis for food industryMdMuhaiminulIslamRab
 
Assessing the perception of contractors on overhead cost allocation using act...
Assessing the perception of contractors on overhead cost allocation using act...Assessing the perception of contractors on overhead cost allocation using act...
Assessing the perception of contractors on overhead cost allocation using act...Nuhu Bamalli Polytechnic Zaria
 
UNIT – I.ppt
UNIT – I.pptUNIT – I.ppt
UNIT – I.pptAsha A
 
Social cost benefit analysis: a way to optimize net economic benefits
Social cost benefit analysis: a way to optimize net economic benefitsSocial cost benefit analysis: a way to optimize net economic benefits
Social cost benefit analysis: a way to optimize net economic benefitsGlobal Risk Forum GRFDavos
 
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...SPREP
 
16806_ARUN B SOCIAL COST BENEFIT ANALYSIS PPT(PUBLIC I SEM).pdf
16806_ARUN B SOCIAL COST BENEFIT ANALYSIS PPT(PUBLIC I SEM).pdf16806_ARUN B SOCIAL COST BENEFIT ANALYSIS PPT(PUBLIC I SEM).pdf
16806_ARUN B SOCIAL COST BENEFIT ANALYSIS PPT(PUBLIC I SEM).pdfK T Vigneswara Rao
 

Tendances (20)

Topic 13 - Social Cost & Social Benefits
Topic 13 - Social Cost & Social BenefitsTopic 13 - Social Cost & Social Benefits
Topic 13 - Social Cost & Social Benefits
 
Economic benefits and social benefits
Economic benefits and social benefitsEconomic benefits and social benefits
Economic benefits and social benefits
 
The basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mbaThe basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mba
 
Cost Benifit Analysis
Cost Benifit AnalysisCost Benifit Analysis
Cost Benifit Analysis
 
Investment Analysis for private and Public sector projects
Investment Analysis for private and Public sector projectsInvestment Analysis for private and Public sector projects
Investment Analysis for private and Public sector projects
 
Cost benefit analysis
Cost benefit analysisCost benefit analysis
Cost benefit analysis
 
Social Cost Benefit Analysis
Social Cost Benefit Analysis Social Cost Benefit Analysis
Social Cost Benefit Analysis
 
Cost analysis
Cost analysisCost analysis
Cost analysis
 
Social Cost Benefit Analysis
Social Cost Benefit AnalysisSocial Cost Benefit Analysis
Social Cost Benefit Analysis
 
Cost benefit analysis converted
Cost benefit analysis convertedCost benefit analysis converted
Cost benefit analysis converted
 
Cost benefit analysis for food industry
Cost benefit analysis for food industryCost benefit analysis for food industry
Cost benefit analysis for food industry
 
Assessing the perception of contractors on overhead cost allocation using act...
Assessing the perception of contractors on overhead cost allocation using act...Assessing the perception of contractors on overhead cost allocation using act...
Assessing the perception of contractors on overhead cost allocation using act...
 
UNIT – I.ppt
UNIT – I.pptUNIT – I.ppt
UNIT – I.ppt
 
Social cost benefit analysis: a way to optimize net economic benefits
Social cost benefit analysis: a way to optimize net economic benefitsSocial cost benefit analysis: a way to optimize net economic benefits
Social cost benefit analysis: a way to optimize net economic benefits
 
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
 
Operations of scba
Operations of scbaOperations of scba
Operations of scba
 
16806_ARUN B SOCIAL COST BENEFIT ANALYSIS PPT(PUBLIC I SEM).pdf
16806_ARUN B SOCIAL COST BENEFIT ANALYSIS PPT(PUBLIC I SEM).pdf16806_ARUN B SOCIAL COST BENEFIT ANALYSIS PPT(PUBLIC I SEM).pdf
16806_ARUN B SOCIAL COST BENEFIT ANALYSIS PPT(PUBLIC I SEM).pdf
 
Public projects evaluation cba analysis
Public projects evaluation cba analysisPublic projects evaluation cba analysis
Public projects evaluation cba analysis
 
Benefit cost analysis bca
Benefit cost analysis bcaBenefit cost analysis bca
Benefit cost analysis bca
 
Chapter 6
Chapter 6Chapter 6
Chapter 6
 

En vedette (14)

Vincent chibueze c. full it report
Vincent chibueze c. full it reportVincent chibueze c. full it report
Vincent chibueze c. full it report
 
Vincent 2
Vincent 2Vincent 2
Vincent 2
 
Vincent 1 (1)
Vincent 1 (1)Vincent 1 (1)
Vincent 1 (1)
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Corrected questionaire
Corrected questionaireCorrected questionaire
Corrected questionaire
 
Techgig.com vivek sharma
Techgig.com vivek sharmaTechgig.com vivek sharma
Techgig.com vivek sharma
 
FCFFT New Bussa success story 2013
FCFFT New Bussa success story 2013FCFFT New Bussa success story 2013
FCFFT New Bussa success story 2013
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Cover letters
Cover lettersCover letters
Cover letters
 
Internship manual reviewed
Internship manual reviewedInternship manual reviewed
Internship manual reviewed
 
Industrial training letter format
Industrial training letter formatIndustrial training letter format
Industrial training letter format
 
Industrial Training report on java
Industrial  Training report on javaIndustrial  Training report on java
Industrial Training report on java
 
Indusrial trainning Report presentation
Indusrial trainning Report presentationIndusrial trainning Report presentation
Indusrial trainning Report presentation
 
Industrial Training Report-1
Industrial Training Report-1Industrial Training Report-1
Industrial Training Report-1
 

Similaire à Vincent 3

Project evaluation and cost benefit analysis
Project evaluation and cost benefit analysisProject evaluation and cost benefit analysis
Project evaluation and cost benefit analysisMAHONDO JAMES
 
Cost-benefit analysis
Cost-benefit analysisCost-benefit analysis
Cost-benefit analysisSoniya Balan
 
appraisal of Forestry projects
appraisal of Forestry projects appraisal of Forestry projects
appraisal of Forestry projects Dronak Sahu
 
Dr Brian Mutie on cost benefit analysis on extractives in Kenya
Dr Brian Mutie on  cost benefit analysis on extractives in KenyaDr Brian Mutie on  cost benefit analysis on extractives in Kenya
Dr Brian Mutie on cost benefit analysis on extractives in KenyaBrian Mutie Ph.D.. (Governance)
 
Dr Brian Mutie on Cost Benefit Analysis on Extractives-CBA
Dr Brian Mutie on Cost Benefit Analysis on Extractives-CBADr Brian Mutie on Cost Benefit Analysis on Extractives-CBA
Dr Brian Mutie on Cost Benefit Analysis on Extractives-CBABrian Mutie Ph.D.. (Governance)
 
Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)Neil Mathew
 
Costs and benefits
Costs and benefitsCosts and benefits
Costs and benefitsShweta Iyer
 
Financial &amp; Economic Evaluation of projects
Financial &amp; Economic Evaluation of projectsFinancial &amp; Economic Evaluation of projects
Financial &amp; Economic Evaluation of projectsamanideutsch
 
Cost benefit and cost effective analysis
Cost benefit and cost effective analysis Cost benefit and cost effective analysis
Cost benefit and cost effective analysis Mohamed Sheikh Omar
 
The Roi For The Bix Box Stores Training Program Essay
The Roi For The Bix Box Stores Training Program EssayThe Roi For The Bix Box Stores Training Program Essay
The Roi For The Bix Box Stores Training Program EssayMandy Cross
 
Economics of Climate Change Adaptation Training - Session 2
Economics of Climate Change Adaptation Training - Session 2Economics of Climate Change Adaptation Training - Session 2
Economics of Climate Change Adaptation Training - Session 2UNDP Climate
 
Social cost benefit analysis
Social cost benefit analysisSocial cost benefit analysis
Social cost benefit analysisBikramjit Singh
 
Social cost benefit analysis (scba)
Social cost benefit analysis (scba)Social cost benefit analysis (scba)
Social cost benefit analysis (scba)Narayan Gaonkar
 
COST-BENEFIT ANALYSIS (2010)-1.ppt
COST-BENEFIT ANALYSIS (2010)-1.pptCOST-BENEFIT ANALYSIS (2010)-1.ppt
COST-BENEFIT ANALYSIS (2010)-1.pptNamanyaBetrum1
 
Building an Evidence base: Introduction to Economics of Adaptation and Impact...
Building an Evidence base: Introduction to Economics of Adaptation and Impact...Building an Evidence base: Introduction to Economics of Adaptation and Impact...
Building an Evidence base: Introduction to Economics of Adaptation and Impact...FAO
 
Engineering economics ECO-202
Engineering economics ECO-202Engineering economics ECO-202
Engineering economics ECO-202Saqib Imran
 
Engineering economics eco202
Engineering economics eco202Engineering economics eco202
Engineering economics eco202Saqib Imran
 

Similaire à Vincent 3 (20)

Project evaluation and cost benefit analysis
Project evaluation and cost benefit analysisProject evaluation and cost benefit analysis
Project evaluation and cost benefit analysis
 
Cost-benefit analysis
Cost-benefit analysisCost-benefit analysis
Cost-benefit analysis
 
appraisal of Forestry projects
appraisal of Forestry projects appraisal of Forestry projects
appraisal of Forestry projects
 
Dr Brian Mutie on cost benefit analysis on extractives in Kenya
Dr Brian Mutie on  cost benefit analysis on extractives in KenyaDr Brian Mutie on  cost benefit analysis on extractives in Kenya
Dr Brian Mutie on cost benefit analysis on extractives in Kenya
 
Dr Brian Mutie on Cost Benefit Analysis on Extractives-CBA
Dr Brian Mutie on Cost Benefit Analysis on Extractives-CBADr Brian Mutie on Cost Benefit Analysis on Extractives-CBA
Dr Brian Mutie on Cost Benefit Analysis on Extractives-CBA
 
Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)
 
Costs and benefits
Costs and benefitsCosts and benefits
Costs and benefits
 
Financial &amp; Economic Evaluation of projects
Financial &amp; Economic Evaluation of projectsFinancial &amp; Economic Evaluation of projects
Financial &amp; Economic Evaluation of projects
 
Cost benefit and cost effective analysis
Cost benefit and cost effective analysis Cost benefit and cost effective analysis
Cost benefit and cost effective analysis
 
The Roi For The Bix Box Stores Training Program Essay
The Roi For The Bix Box Stores Training Program EssayThe Roi For The Bix Box Stores Training Program Essay
The Roi For The Bix Box Stores Training Program Essay
 
Lecture 5.pdf
Lecture 5.pdfLecture 5.pdf
Lecture 5.pdf
 
Economics of Climate Change Adaptation Training - Session 2
Economics of Climate Change Adaptation Training - Session 2Economics of Climate Change Adaptation Training - Session 2
Economics of Climate Change Adaptation Training - Session 2
 
Social cost benefit analysis
Social cost benefit analysisSocial cost benefit analysis
Social cost benefit analysis
 
Social cost benefit analysis (scba)
Social cost benefit analysis (scba)Social cost benefit analysis (scba)
Social cost benefit analysis (scba)
 
Chapter_13.ppt
Chapter_13.pptChapter_13.ppt
Chapter_13.ppt
 
COST-BENEFIT ANALYSIS (2010)-1.ppt
COST-BENEFIT ANALYSIS (2010)-1.pptCOST-BENEFIT ANALYSIS (2010)-1.ppt
COST-BENEFIT ANALYSIS (2010)-1.ppt
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
 
Building an Evidence base: Introduction to Economics of Adaptation and Impact...
Building an Evidence base: Introduction to Economics of Adaptation and Impact...Building an Evidence base: Introduction to Economics of Adaptation and Impact...
Building an Evidence base: Introduction to Economics of Adaptation and Impact...
 
Engineering economics ECO-202
Engineering economics ECO-202Engineering economics ECO-202
Engineering economics ECO-202
 
Engineering economics eco202
Engineering economics eco202Engineering economics eco202
Engineering economics eco202
 

Dernier

Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessAPCO
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfHajeJanKamps
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003believeminhh
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfJohnCarloValencia4
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxJemalSeid25
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Reportamberjiles31
 
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfChicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfSourav Sikder
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView
 
Plano de marketing- inglês em formato ppt
Plano de marketing- inglês  em formato pptPlano de marketing- inglês  em formato ppt
Plano de marketing- inglês em formato pptElizangelaSoaresdaCo
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfCharles Cotter, PhD
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024Stephan Koning
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Winbusinessin
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursKaiNexus
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)tazeenaila12
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...AustraliaChapterIIBA
 
A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.mcshagufta46
 
Tata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakTata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakEditores1
 

Dernier (20)

Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdf
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptx
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Report
 
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfChicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
 
Plano de marketing- inglês em formato ppt
Plano de marketing- inglês  em formato pptPlano de marketing- inglês  em formato ppt
Plano de marketing- inglês em formato ppt
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, Ours
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
 
A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.
 
Tata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakTata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerak
 

Vincent 3

  • 1. CHAPTER 3 METHODOLOGY This chapter attempts to explain the methods used in carrying out the study. In view of this, the chapter lays more emphasis on the description of the study are, theoretical framework, sampling procedures, data collection and method data analysis. 3.1 Theoretical framework Cost-benefit analysis in the area of economics is the most appropriate and popular method of appraising project from the national viewpoint. Cost benefit analysis (CBA), sometimes called benefit–cost analysis (BCA), is a systematic process for calculating and comparing benefits and costs of a project, decision or government policy (hereafter, "project"). CBA has two purposes: 1. To determine if it is a sound investment/decision (justification/feasibility), 2. To provide a basis for comparing projects. It involves comparing the total expected cost of each option against the total expected benefits, to see whether the benefits outweigh the costs, and by how much. CBA is related to, but distinct from cost-effectiveness analysis. In CBA, benefits and costs are expressed in monetary terms, and are adjusted for the time value of money, so that all flows of benefits and flows of project costs over time (which tend to occur at different points in time) are expressed on a common basis in terms of their "net present value."
  • 2. Cost is seen as the value of the inputs needed to produce any good or service. This has to be measured in some units or numeric usually money. Cost includes the fixed cost or overhead cost and variable cost. Fixed cost must be incurred if any output is produced. Cost also includes the social cost, which includes external cost of an enterprise such as the value of smoke, damage, noise and river pollution. Benefit is seen as an addition to the flow of output accruing to a project. The concept of Cost-Benefit analysis dates back to an 1848 article by Jules Dupuit and was formalized in subsequent works by Alfred Marshall. The Corps of Engineers initiated the use of Cost-Benefit analysis in the US, after the Federal Navigation Act of 1936 effectively required cost–benefit analysis for proposed federal waterway infrastructure. The Flood Control Act of 1939 was instrumental in establishing Cost-Benefit analysis as federal policy. It demanded that "the benefits to whomever they accrue [be] in excess of the estimated costs. Cost-benefit analysis is the area in economics that attempts to compare the total social costs and benefits of any activity, usually expressed in money terms. The cost and benefits concerned includes not only direct pecuniary costs and benefits, but also externalities, that are external effects, not traded in the, markets. This encompasses external cost such as pollution, noise and disturbance to wildlife and external benefits such as reduction in traveling time or traffic accidents (John Black, 2005) Cost-benefit is also seen as the most scientific and useful criterion for project evaluation. It helps in making correct investment decision to achieve optimum resource allocation by maximizing the difference between the present value of benefits and cost of a project. It implies the weighing of the returns against the cost involved in a project. Cost-benefit analysis purports to describe
  • 3. and quantify the social advantages and disadvantages of a policy in terms of a common monetary unit. This is the establishment of net social benefit which can be expressed as NSB= Benefits minus cost. The benefits and costs are measured in terms of shadow or accounting prices of inputs and output instead of in actual market prices (Jinghan, 2002) Todaro and Smith (2005) saw cost benefit analysis as a basic tool of economic analysis in which the actual and potential private and social cost of various economic decisions are weighed against actual and potential private and social benefits. Decisions or projects that yield the highest ratio of benefits to costs are usually thought to be most desirable. Cost-benefits analysis is seen as the basic tool of project analysis. If the total benefits (which includes social benefits) of any activity exceeds total cost (including social cost) then the projects involved are profitable. On the other hand, if total cost exceeds total benefits, these would prevent project from springing up or discourage investors from investing in such projects. Because non- marketed costs and benefits are difficult to measure and evaluate, the results of cost-benefit analysis can be highly controversial. In other words, cost-benefit analysis in agriculture means value of inputs needed to produce agricultural products and the gains to be expected from the sales of such goods. Costs incurred include expenditure on the initial processing, handling, reduction in wastage, grading , quality control, sales transactions and holding inventory to match concentrated harvest seasons which the continuing demands of consumers (Ezenwa, 1987). Cost-benefit analysis is a highly dynamic subject in the appraisal of a project. There are several criteria to analyzing cost- benefit, which is given by Jinghan (2002). They include; 1) B - C Benefit- cost; 2) B – C/I Benefit – cost/ investment
  • 4. 3) ΔB/ΔC ΔBenefit/Δcost 4) B/C Benefit/ Cost Where: B: Benefit C: Cost I: Investment Δ: Incremental or Marginal 1. B–C/I is for determining the total annual returns on a particular investment in the economy as a whole irrespective of whom these accrue. The investment (I) here does not include the private investment that may be incurred by the beneficiaries of the project such as the cultivators from an irrigation project. A high value of B–C/I may be less beneficial to the economy even if the private investment happens to be very large. The problem with this criterion is that it does not put into consideration the private investment. 2. ΔB/ΔC. The second criterion of ΔB/ΔC is aimed at determining the size of a project but can only determine a selected project. 3. B – C: the B – C criterion would favour large projects and make small and medium size projects less beneficial. This criterion can only help in determining the scale of the project on the basis of the maximization of the difference between benefit and cost. 4. B/C: This is the best and most reliable criterion for project evaluation is. This criterion (benefit to cost ratio) is the measure for the evaluation of a project. If B/C =1, then the project is marginal, it is just covering its cost. If B/C>1, then benefits are more than cost and it is beneficial to undertake the project.
  • 5. If B/C<1, then the benefits are less than cost and the project cannot be undertaken, The higher the benefit- cost ratio, the higher will be the profit attached to a project. This criterion does not take into account the time horizon of the project. The fact is that future benefits and costs cannot be treated at par with present benefits and cost. Therefore, the appraisal rule for project evaluation requires discounting of future benefits and costs because the society prefers the present to the future. Due to the flaws above, new criteria were developed, they include; a. Net present value (NPV) b. Internal rate of return criterion (IRR) 3.1.1 Net Present Value (NPV) The net present value criterion is vital in project evaluation. It is equal to the present value of benefits minus the present value of operating and maintenance cost minus initial outlay. The NPV is also expressed as Net Present Value of benefits (NPVB) criterion, which equals: Gross Present Value of Benefits – Gross Present value of costs. A project is socially profitable if the NPVB> 0. In a case where there are a number of mutually exclusive projects and the project with the highest net present value of benefits will be chosen. This criterion in terms of benefits and costs is not a correct method for project evaluation as it neglected also the time horizon. Capital investments give benefits over a period of time. Hence, future benefits and cost cannot be equated with present benefits and costs. Since preference is given to the present over the future, then future benefits and costs of projects are to be discounted.
  • 6. The discounted factor is expressed as D= 1/ (1+i) t Where i is the social discount rate t is the time period The NPV will therefore be NPV= B1 ….. Bn B2 + + (1+i)2 (1+i) (1+i)n C1 - C2 + + (1+i)2 (1+i) ….Cn (1+i)n B1, B2…Bn- series of gross present benefit in years 1 ton C1, C2…Cn- series of gross present cost in years 1 to n i- Social rate of discount for annual compounding. When choice is to be made on project, one of these two rules can be followed. 1. B1 + B2 + ... Bn (1+i) 2 (1+i) C1 > (1+i) n (1+i) + C2 + (1+i)2 2 ….Cn (1+i)n Only the projects, which the present value benefits exceeds the present value of cost should be selected. 2. B1 (1+i) B2 + + (1+i) 2 ... Bn (1+i) n >1 C1 C2 + (1+i) (1+i) 2 ...Cn + (1+i) n All projects where the ratio of the present value of benefits divided by the ratio of the present value of cost is greater than one. The NPV criterion is considered as the most appropriate rule for perfect evaluation.
  • 7. 3.1.2 The Internal Rate of Return criterion The criterion refers to the percentage rate of return of implicit in the flows of benefit and cost of projects The internal rate of returns (IRR) is the discount rate at which the present value of returns minus cost is zero. The formula for the calculation of IRR is B1-C1 (1+i) B2-C2 + (( …Bn-…..Cn + (1+i) 2 =0 n (1+i) ` ` Where ‘r’ is the internal rate of returns 3.2. Study area This research would be carried out in Akure metropolis, Ondo state Nigeria so as to make the results useful for farmers and intending fish farmers in the state. The farms to be studied include: 3.3 Sampling Procedure. The sampling procedure used in this study is called the purposive sampling where the study was aimed at gathering information from particular farms as a representative of similar sized farms. The reason for this is due to little or no record keeping by other fish farmers. Hence, a farm with considerable record of expenditure and income within the year was chosen. 3.4 Data collection As a result of the kind of study that was researched, the data collection instrument that was used to gather information was the primary source, this was done by the use of personal interview.
  • 8. The interview was designed to reflect the general information, construction information, and production information. The fish farmer was able to relate directly with the researcher and gave some vital information that were not even in the records in the farm. The researcher was able to get direct answers from the farm owner as questions were flexible enough and were poised to elicit direct answers. 3.5 Method of data analysis In order to achieve our stated objectives of the study, the following tools for analyzing the data collected were employed: 3.5.1 Benefit-cost ratio (b-c ratio): This is the ratio obtained when the present worth of the benefit stream is divided by the present worth of the cost stream. It is used to directly note how much cost could rise without making the project economically unattractive. Cost- benefit ratio is usually computed by using gross cost and gross benefit. More specifically, using the present worth of the gross benefit less the associated cost and then comparing it with the present worth of the project is mathematically computed as: B-C RATIO = Benefit Cost If B/C =1, then the project is marginal, it is just covering its cost. If B/C>1, then benefits are more than cost and it is beneficial to undertake the project. If B/C<1, then the benefits are less than cost and the project cannot be undertaken,
  • 9. 3.5.2 Net benefit-investment ratio (NBI ratio): This is the present worth of the net benefit divided by the present worth of the investment. It is a form of the benefit-cost ratio and has been infrequently used in project analysis. Net benefitinvestment ratio is used to determine an incremental net benefit or cash flow calculation for a project. The net benefit-investment ratio is calculated by: NBI RATIO = Present worth of net benefit Present worth of investment 3.5.3 Net Present Worth (NPW): It is the most straightforward discounted cash flow measure of project worth. It is the present worth of incremental cash flow stream. Calculation of the NPW requires the determination of the appropriate discount rate, which is also used in the calculation of B-C ratio and the NBI. : NPW = Discounted Benefit –Discounted Cost. 3.5.4 Internal Rate of Returns (IRR) In computing the internal rate of returns, the following rules are needed 1. Two discount rates are involved in the calculation 2. The net present value of the higher discount rate must give a negative figure The calculation of the IRR is given as LDR + DIFFERENCE IN 2DR (NPV AT LDR/ SUM OF NPV OF THE 2DR)
  • 10. Where NPV: NET PRESENT VALUE LDR: LOWER DISCOUNT RATE 2DR: TWO DISCOUNT RATES 3.5.5 The Decision Rule: If the project has an IRR that is equal to or greater than the lending rate, then the project should be accepted. Hence accept the project if it is greater than the cut off rate or that is higher than the cost of borrowing 3.5.6 Sensitivity analysis Sensitivity analysis is a measure used to determine the how viable a project can be when some variables are changed. This means that it is a method that is used to know how profitable it is to embark on a project when there are changes in some factors that enhances the viability of the project. In most cases, these factors could either be change in cost of production, revenue or both. This is usually calculated using percentage. In this study, a 20percent provision was made with respect to cost over-run or fall in revenue.