Soumettre la recherche
Mettre en ligne
Resource Levelling - PMBOK - Example
•
11 j'aime
•
5,177 vues
Waleed Liaqat
Suivre
An example describing resource levelling according to PMBOK
Lire moins
Lire la suite
Formation
Technologie
Business
Signaler
Partager
Signaler
Partager
1 sur 6
Télécharger maintenant
Télécharger pour lire hors ligne
Recommandé
5year lahore board xi
5year lahore board xi
Asad Shafat
UBC_Transcript
UBC_Transcript
Ziyang Jin
Back to basics scheduling Webinar
Back to basics scheduling Webinar
Association for Project Management
Transcript
Transcript
Raymond Russell
Practice pert gantt
Practice pert gantt
Hira Farooq
EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011
abughaws
arm
arm
Kevin scott
The 5 Pillars of Cloudiness
The 5 Pillars of Cloudiness
Wayne Walls
Recommandé
5year lahore board xi
5year lahore board xi
Asad Shafat
UBC_Transcript
UBC_Transcript
Ziyang Jin
Back to basics scheduling Webinar
Back to basics scheduling Webinar
Association for Project Management
Transcript
Transcript
Raymond Russell
Practice pert gantt
Practice pert gantt
Hira Farooq
EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011
abughaws
arm
arm
Kevin scott
The 5 Pillars of Cloudiness
The 5 Pillars of Cloudiness
Wayne Walls
Bas Vodde - The story of LEsS
Bas Vodde - The story of LEsS
Scrum Australia Pty Ltd
PH Test.pdf
PH Test.pdf
ssusercc4520
The circle
The circle
sjamaths
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Florian Reifschneider
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John Mueller
John Mueller
GC minyak jelantah
GC minyak jelantah
shintia putri
Logs & exponential
Logs & exponential
sjamaths
prongshollow
prongshollow
Kevin scott
armfor3dprinter
armfor3dprinter
Kevin scott
Assembly2
Assembly2
Kevin scott
Applied computer and business skills pacing chart sem 1 15 16
Applied computer and business skills pacing chart sem 1 15 16
Kathy Sheridan
Root cause analysis procedure
Root cause analysis procedure
Sambeet Panda
Consider the following resource loading table. Assume that we canno.docx
Consider the following resource loading table. Assume that we canno.docx
donnajames55
Fast and accurate metrics. Is it actually possible?
Fast and accurate metrics. Is it actually possible?
Bogdan Storozhuk
Lecture 5.pdf
Lecture 5.pdf
JamalKhan696508
EM Assignment 3.docx
EM Assignment 3.docx
HadiKhan958765
Asset final
Asset final
Rahul Singh Dhanik
Mech 202 Project 2 Report
Mech 202 Project 2 Report
Justin Weinmeister
Project management
Project management
Anurag Srivastava
A Short Study of Galois Field
A Short Study of Galois Field
Hazratali Naim
Critical path method (cpm)
Critical path method (cpm)
Nikka Lopez
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
BiswajitPalei2
Contenu connexe
Tendances
Bas Vodde - The story of LEsS
Bas Vodde - The story of LEsS
Scrum Australia Pty Ltd
PH Test.pdf
PH Test.pdf
ssusercc4520
The circle
The circle
sjamaths
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Florian Reifschneider
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John Mueller
John Mueller
GC minyak jelantah
GC minyak jelantah
shintia putri
Logs & exponential
Logs & exponential
sjamaths
prongshollow
prongshollow
Kevin scott
armfor3dprinter
armfor3dprinter
Kevin scott
Assembly2
Assembly2
Kevin scott
Applied computer and business skills pacing chart sem 1 15 16
Applied computer and business skills pacing chart sem 1 15 16
Kathy Sheridan
Root cause analysis procedure
Root cause analysis procedure
Sambeet Panda
Tendances
(12)
Bas Vodde - The story of LEsS
Bas Vodde - The story of LEsS
PH Test.pdf
PH Test.pdf
The circle
The circle
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Angular Frankfurt #1 - Managing Application State in Reactive Angular Applica...
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John Mueller
GC minyak jelantah
GC minyak jelantah
Logs & exponential
Logs & exponential
prongshollow
prongshollow
armfor3dprinter
armfor3dprinter
Assembly2
Assembly2
Applied computer and business skills pacing chart sem 1 15 16
Applied computer and business skills pacing chart sem 1 15 16
Root cause analysis procedure
Root cause analysis procedure
Similaire à Resource Levelling - PMBOK - Example
Consider the following resource loading table. Assume that we canno.docx
Consider the following resource loading table. Assume that we canno.docx
donnajames55
Fast and accurate metrics. Is it actually possible?
Fast and accurate metrics. Is it actually possible?
Bogdan Storozhuk
Lecture 5.pdf
Lecture 5.pdf
JamalKhan696508
EM Assignment 3.docx
EM Assignment 3.docx
HadiKhan958765
Asset final
Asset final
Rahul Singh Dhanik
Mech 202 Project 2 Report
Mech 202 Project 2 Report
Justin Weinmeister
Project management
Project management
Anurag Srivastava
A Short Study of Galois Field
A Short Study of Galois Field
Hazratali Naim
Critical path method (cpm)
Critical path method (cpm)
Nikka Lopez
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
BiswajitPalei2
CPM practicals (2) with answers.pptx
CPM practicals (2) with answers.pptx
zxcvbnm43
Week 10 part 1 pe 6282 Block Diagrams
Week 10 part 1 pe 6282 Block Diagrams
Charlton Inao
Similaire à Resource Levelling - PMBOK - Example
(12)
Consider the following resource loading table. Assume that we canno.docx
Consider the following resource loading table. Assume that we canno.docx
Fast and accurate metrics. Is it actually possible?
Fast and accurate metrics. Is it actually possible?
Lecture 5.pdf
Lecture 5.pdf
EM Assignment 3.docx
EM Assignment 3.docx
Asset final
Asset final
Mech 202 Project 2 Report
Mech 202 Project 2 Report
Project management
Project management
A Short Study of Galois Field
A Short Study of Galois Field
Critical path method (cpm)
Critical path method (cpm)
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
newmicrosoftofficepowerpointpresentation-150826055944-lva1-app6891.pdf
CPM practicals (2) with answers.pptx
CPM practicals (2) with answers.pptx
Week 10 part 1 pe 6282 Block Diagrams
Week 10 part 1 pe 6282 Block Diagrams
Plus de Waleed Liaqat
The Three Step Writing Process (Technical & Business Writing)
The Three Step Writing Process (Technical & Business Writing)
Waleed Liaqat
Nietzsche's Philosophies
Nietzsche's Philosophies
Waleed Liaqat
Selected verses from the quran
Selected verses from the quran
Waleed Liaqat
Brief Introduction to Architecture
Brief Introduction to Architecture
Waleed Liaqat
Urban Planning Types, Processes and History
Urban Planning Types, Processes and History
Waleed Liaqat
Construction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic concepts
Waleed Liaqat
Fundamentals of Effective Business Communication
Fundamentals of Effective Business Communication
Waleed Liaqat
Introduction to town and Urban planning
Introduction to town and Urban planning
Waleed Liaqat
Brief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational Structures
Waleed Liaqat
Brief Introduction to Project Management
Brief Introduction to Project Management
Waleed Liaqat
Public Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding Water
Waleed Liaqat
Youth and Education in Pakistan
Youth and Education in Pakistan
Waleed Liaqat
LEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use building
Waleed Liaqat
An Overview of the History of Pakistan: 1947 - 1973
An Overview of the History of Pakistan: 1947 - 1973
Waleed Liaqat
Richter scale and mercalli scale
Richter scale and mercalli scale
Waleed Liaqat
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
Waleed Liaqat
Plain Concrete - General concepts
Plain Concrete - General concepts
Waleed Liaqat
S-curve analysis for development of hydrographs
S-curve analysis for development of hydrographs
Waleed Liaqat
Activity on Arrow Diagram
Activity on Arrow Diagram
Waleed Liaqat
Remote sensing and it's applications
Remote sensing and it's applications
Waleed Liaqat
Plus de Waleed Liaqat
(20)
The Three Step Writing Process (Technical & Business Writing)
The Three Step Writing Process (Technical & Business Writing)
Nietzsche's Philosophies
Nietzsche's Philosophies
Selected verses from the quran
Selected verses from the quran
Brief Introduction to Architecture
Brief Introduction to Architecture
Urban Planning Types, Processes and History
Urban Planning Types, Processes and History
Construction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic concepts
Fundamentals of Effective Business Communication
Fundamentals of Effective Business Communication
Introduction to town and Urban planning
Introduction to town and Urban planning
Brief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Management
Brief Introduction to Project Management
Public Health Engineering - Concepts Regarding Water
Public Health Engineering - Concepts Regarding Water
Youth and Education in Pakistan
Youth and Education in Pakistan
LEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use building
An Overview of the History of Pakistan: 1947 - 1973
An Overview of the History of Pakistan: 1947 - 1973
Richter scale and mercalli scale
Richter scale and mercalli scale
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
Plain Concrete - General concepts
Plain Concrete - General concepts
S-curve analysis for development of hydrographs
S-curve analysis for development of hydrographs
Activity on Arrow Diagram
Activity on Arrow Diagram
Remote sensing and it's applications
Remote sensing and it's applications
Dernier
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
RKavithamani
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
GeoBlogs
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
TechSoup
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
Thiyagu K
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
SafetyChain Software
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
Sarwono Sutikno, Dr.Eng.,CISA,CISSP,CISM,CSX-F
mini mental status format.docx
mini mental status format.docx
PoojaSen20
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Sapana Sha
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
RKavithamani
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
Celine George
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
dawncurless
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
misteraugie
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Krashi Coaching
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
Chameera Dedduwage
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
NirmalaLoungPoorunde1
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
RAM LAL ANAND COLLEGE, DELHI UNIVERSITY.
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
pboyjonauth
Dernier
(20)
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
mini mental status format.docx
mini mental status format.docx
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
Resource Levelling - PMBOK - Example
1.
Waleed Liaqat 122 SEC A Construction
Project Management Assignment # 3 Submitted to: Lec. Bilal Zafar From:
2.
3.
Activity Duration ES
EF LS LF TF FF A 2 0 2 0 2 0 0 B 4 2 6 4 8 2 0 C 6 2 8 2 8 0 0 D 9 2 11 6 15 4 4 E 5 6 11 10 15 4 4 F 7 8 15 8 15 0 0 G 3 15 18 15 18 0 nil 18 Total Duration of project (Days) B 4 D 9 C 6 F 7 E 5 G 3 A 2 PS Critical
4.
Activity A 3 3 B
2 2 2 2 C 4 4 4 4 4 4 D 3 3 3 3 3 3 3 3 3 E 4 4 4 4 4 F 2 2 2 2 2 2 G 4 4 4 Day 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 Total Laborers 3 3 9 9 9 9 11 11 9 9 9 2 2 2 4 4 4 KEY OveruseFloat Non critical Activity Critical Activity 0 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 1 3 1 4 15 1 6 1 7 18 LABORERS DAYS BEFORE LEVELLING
5.
Activity A 3 3 B
X X 2 2 2 2 C 4 4 4 4 4 4 D 3 3 3 3 3 3 3 3 3 E X X 4 4 4 4 F 2 2 2 2 2 2 G 4 4 4 Day 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 Total Laborers 3 3 7 7 9 9 9 9 9 9 9 6 2 2 4 4 4 0 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 LABORERS DAYS INTERMEDIATE LEVELLING
6.
Activity A 3 3 B
X X 2 2 2 2 C 4 4 4 4 4 4 D D D D D 3 3 3 3 3 3 3 3 E X X 4 4 4 4 F 2 2 2 2 2 2 G 4 4 4 Day 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 Total Laborers 3 3 4 4 6 6 9 9 9 9 9 9 5 5 4 4 4 Float X ASSIGNMENT FIX D DISTRIBUTIO N FIX KEY Critical Activity Non critical Activity 0 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 LABORERS DAYS AFTER COMPLETE LEVELLING
Télécharger maintenant