East Delta WTP

            WTP Water Hammer - Damage Sphere




   Checking the water hammer vessel water rise andnot go down so that
                 mean sphere damaged and to Checked




                                    page 1/12
East Delta WTP

            WTP Water Hammer - Damage Sphere




                 Sphere Welding Carck and fll with water




                                    page 2/12
East Delta WTP

            WTP Water Hammer - Damage Sphere




                 Sphere Welding Carck and fll with water




                                    page 3/12
East Delta WTP

                    Spare Parts




                 No new for Spare parts




                            page 4/12
East Delta WTP

                 Flash Mixer Dry Run damage




          Dry Run damage because of twisted a round the mixer




                                   page 5/12
East Delta WTP

                 Flash Mixer Dry Run damage




             They assembly the switch but not connected yet




                                    page 6/12
East Delta WTP

            Filter 03,04 Refill with New Filter Media




                      The empty 03 and refill 04




                                   page 7/12
East Delta WTP

            Filter 03,04 Refill with New Filter Media




                      The empty 03 and refill 04




                                   page 8/12
East Delta WTP

                                Chlorine




       Sherkia CO take Drum valve to mainten , till now not installed




                                      page 9/12
East Delta WTP

                             Thickener




       Thickener empty or full and pipe blocked and pumps stopped




                                   page 10/12
Regular Check
 No               Unit                                                   Activates
      Intake                   1- Checking Raw Water Pump pressure,temprature,power and gland packing leakage.
  1
                               2- Checking water hammer system working or not.
  2   Distribution Shift       Checking flow, pressure, chlorine dosing and float fix or not.
      Chlarifier               Checking sludge pumping units, cleaning and greasing of knife,air pressure, bridge and mixers.
  3
  4   Thickener                Checking pump pressure, pipeline blocking and thickener level.
      Filters                  1- Checking backwash , backwash waste ,boosters and dewatering.
  5                            2- Air system ,compressors,dryer,pressure,…,etc.
                               3- Checking filters flow , levels , backwash tank level.
  6   Under Ground Reservoir   Checking rediusal chlorine smaple plan and tanks levels
      Treated Water Pump       1- Checking pump priming system.
      Station                  2- Checking Treated Water Pump pressure,temprature,power and mechanical seal leakage.
  7
                               3- Checking water hammer system working or not.
                               4- Checking measurement devices.
      Chlorine                 1- Checking drums, vacuum units , changeover unit and piping.
  8                            2- Checking dosing cabient, dosing , feeding pressure.
                               3- checking Caustic Soda Pump.
      Chemical                 1- Checking dosing pumps, strianers, pressure , flow and piping.
  9
                               2- Checking Tanks levels and cleaning.
 10   Evaporation ponds        1- Checking air pressure , cleaning and greasing of knife.



Activites and Remarks for week

 No               Unit                                                     Remaks
  1   Intake




  2   Distribution Shaft



  3   Clarifier
                               1- Fixing of the flash mixer dry run was bad and cause damage to it.



  3   Thickener                1- Thickener empty or full and piping blocked and pumps stopped




  4   Filters                  1- Filter 03,04 Refill with New Filter Media
                               2- Backwash pumps was stopped because someone played by button.
                               3- Backwash pump 42 coupling extension handed over to AC till install new H-Shape rubber



  5   Chlorine
                               1- Sherkia CO take Drum valve to mainten , till now not installed
                               2- General cleaning of drum store

  7   Chemical                 1- Plastic fall in tanks during filling.


      Central dewatering
  8
      Station

  9   Evaporation ponds        1-opened valve closed and operation shloud from panel.

 10   Under Ground Reservoir   Rediusal Chlorine sample pump not working.


      Treated Water Pump       Water hammer maintenance
 11
      Station
12   Insturctions   .lenieregyp

Contenu connexe

Tendances

Hydraulic Maintenance and Troubleshooting
Hydraulic Maintenance and TroubleshootingHydraulic Maintenance and Troubleshooting
Hydraulic Maintenance and TroubleshootingCMA/Flodyne/Hydradyne
 
Internship Report
Internship ReportInternship Report
Internship ReportMalik Ehsan
 
Valve sizing reference
Valve sizing referenceValve sizing reference
Valve sizing referencemanjunath8685
 
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007yudi05
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelinesVladimir Popovic
 
Sampling Rev 1 Presentation
Sampling  Rev 1 PresentationSampling  Rev 1 Presentation
Sampling Rev 1 PresentationPaulBagnall
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)Mubarik Rao
 
Shail Soni- Internship Presentation
Shail Soni- Internship PresentationShail Soni- Internship Presentation
Shail Soni- Internship PresentationShail Soni
 
شیرهای کنترلی دوستارگان
شیرهای کنترلی دوستارگانشیرهای کنترلی دوستارگان
شیرهای کنترلی دوستارگانAkbar Doustaregan
 
Formation Evaluation project (drill stem test DST)
Formation Evaluation project (drill stem test DST)Formation Evaluation project (drill stem test DST)
Formation Evaluation project (drill stem test DST)Gehad Alyazidy
 
Control valve selection article
Control valve selection articleControl valve selection article
Control valve selection articleLyn Thomas
 
Ease Control Valve Selection
Ease Control Valve SelectionEase Control Valve Selection
Ease Control Valve SelectionJozsef Magyari
 
Control Valve Actuators: Their Impact on Control and Variability
Control Valve Actuators: Their Impact on Control and VariabilityControl Valve Actuators: Their Impact on Control and Variability
Control Valve Actuators: Their Impact on Control and VariabilityCTi Controltech
 

Tendances (20)

780129
780129780129
780129
 
Hydraulic Maintenance and Troubleshooting
Hydraulic Maintenance and TroubleshootingHydraulic Maintenance and Troubleshooting
Hydraulic Maintenance and Troubleshooting
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Purifier and carifier
Purifier and carifierPurifier and carifier
Purifier and carifier
 
Control valve-sizing
Control valve-sizingControl valve-sizing
Control valve-sizing
 
Flow controll valve
Flow controll valveFlow controll valve
Flow controll valve
 
Valve sizing reference
Valve sizing referenceValve sizing reference
Valve sizing reference
 
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
 
Control valve
Control valveControl valve
Control valve
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelines
 
Dc valve
Dc  valve Dc  valve
Dc valve
 
Sampling Rev 1 Presentation
Sampling  Rev 1 PresentationSampling  Rev 1 Presentation
Sampling Rev 1 Presentation
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)
 
Shail Soni- Internship Presentation
Shail Soni- Internship PresentationShail Soni- Internship Presentation
Shail Soni- Internship Presentation
 
شیرهای کنترلی دوستارگان
شیرهای کنترلی دوستارگانشیرهای کنترلی دوستارگان
شیرهای کنترلی دوستارگان
 
General Control Valve Study
General Control Valve StudyGeneral Control Valve Study
General Control Valve Study
 
Formation Evaluation project (drill stem test DST)
Formation Evaluation project (drill stem test DST)Formation Evaluation project (drill stem test DST)
Formation Evaluation project (drill stem test DST)
 
Control valve selection article
Control valve selection articleControl valve selection article
Control valve selection article
 
Ease Control Valve Selection
Ease Control Valve SelectionEase Control Valve Selection
Ease Control Valve Selection
 
Control Valve Actuators: Their Impact on Control and Variability
Control Valve Actuators: Their Impact on Control and VariabilityControl Valve Actuators: Their Impact on Control and Variability
Control Valve Actuators: Their Impact on Control and Variability
 

En vedette

Vacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakersVacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakersshubham_bharadia
 
Dg synchronisation process
Dg synchronisation processDg synchronisation process
Dg synchronisation processVNIT Nagpur
 
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Hazem El-Henawy
 
Dol starter by kantiakapil
Dol  starter by kantiakapilDol  starter by kantiakapil
Dol starter by kantiakapilKapil Kantia
 
Auto synch considerations methods
Auto synch considerations methodsAuto synch considerations methods
Auto synch considerations methodsmichaeljmack
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNageswar Rao
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamleshKamlesh Vala
 
Building Services :Drainage, Rain Water Disposal and Harvesting
Building Services :Drainage,  Rain Water Disposal and  HarvestingBuilding Services :Drainage,  Rain Water Disposal and  Harvesting
Building Services :Drainage, Rain Water Disposal and HarvestingSumit Ranjan
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformervikasgupta1965
 
Basics of ups seminar presentation
Basics of ups   seminar presentationBasics of ups   seminar presentation
Basics of ups seminar presentationMurali Krishnan
 
Rainwater harvesting and watershed management
Rainwater harvesting and watershed managementRainwater harvesting and watershed management
Rainwater harvesting and watershed managementPranay Krishnan
 

En vedette (20)

Vacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakersVacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakers
 
Dg synchronisation process
Dg synchronisation processDg synchronisation process
Dg synchronisation process
 
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
 
Dol starter by kantiakapil
Dol  starter by kantiakapilDol  starter by kantiakapil
Dol starter by kantiakapil
 
Auto synch considerations methods
Auto synch considerations methodsAuto synch considerations methods
Auto synch considerations methods
 
Mcb, rccb, elcb
Mcb, rccb, elcbMcb, rccb, elcb
Mcb, rccb, elcb
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
plumbing
plumbingplumbing
plumbing
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamlesh
 
Building Services :Drainage, Rain Water Disposal and Harvesting
Building Services :Drainage,  Rain Water Disposal and  HarvestingBuilding Services :Drainage,  Rain Water Disposal and  Harvesting
Building Services :Drainage, Rain Water Disposal and Harvesting
 
Fuses and mcb
Fuses and mcbFuses and mcb
Fuses and mcb
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Sprinkler
SprinklerSprinkler
Sprinkler
 
rainwater harvesting
rainwater harvestingrainwater harvesting
rainwater harvesting
 
Circuit breakers
Circuit breakersCircuit breakers
Circuit breakers
 
Sprinkler system.
Sprinkler system.Sprinkler system.
Sprinkler system.
 
Sprinkler system
Sprinkler systemSprinkler system
Sprinkler system
 
Basics of ups seminar presentation
Basics of ups   seminar presentationBasics of ups   seminar presentation
Basics of ups seminar presentation
 
Rainwater harvesting and watershed management
Rainwater harvesting and watershed managementRainwater harvesting and watershed management
Rainwater harvesting and watershed management
 
Basics of Fire fighting
Basics of Fire fightingBasics of Fire fighting
Basics of Fire fighting
 

Similaire à Week report

Compendium In Hydraulic Ram-Pumps
Compendium In Hydraulic Ram-PumpsCompendium In Hydraulic Ram-Pumps
Compendium In Hydraulic Ram-PumpsFatin62c
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...hydrologyproject001
 
New item 103_statusofwaterqualitypackage
New item 103_statusofwaterqualitypackageNew item 103_statusofwaterqualitypackage
New item 103_statusofwaterqualitypackagebanti12
 
Status of water_ treatment_ plants_ in_ india_central_ pollution_ and_ cont...
Status  of  water_ treatment_ plants_ in_ india_central_ pollution_ and_ cont...Status  of  water_ treatment_ plants_ in_ india_central_ pollution_ and_ cont...
Status of water_ treatment_ plants_ in_ india_central_ pollution_ and_ cont...Sanjeev Sharma
 
Well Protector Dry Pellet Chlorinator Installation, Operation, and Maintenanc...
Well Protector Dry Pellet Chlorinator Installation, Operation, and Maintenanc...Well Protector Dry Pellet Chlorinator Installation, Operation, and Maintenanc...
Well Protector Dry Pellet Chlorinator Installation, Operation, and Maintenanc...Clean Water Systems
 
Drip Irrigation System 04
Drip Irrigation System 04Drip Irrigation System 04
Drip Irrigation System 04Suyog Khose
 
NCIT civil (NVQ 5, Sri Lanka) field reports
NCIT civil (NVQ 5, Sri Lanka) field reportsNCIT civil (NVQ 5, Sri Lanka) field reports
NCIT civil (NVQ 5, Sri Lanka) field reportsLAKSHITHA RAJAPAKSHA
 

Similaire à Week report (10)

Compendium In Hydraulic Ram-Pumps
Compendium In Hydraulic Ram-PumpsCompendium In Hydraulic Ram-Pumps
Compendium In Hydraulic Ram-Pumps
 
Vales
Vales Vales
Vales
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 
New item 103_statusofwaterqualitypackage
New item 103_statusofwaterqualitypackageNew item 103_statusofwaterqualitypackage
New item 103_statusofwaterqualitypackage
 
Status of water_ treatment_ plants_ in_ india_central_ pollution_ and_ cont...
Status  of  water_ treatment_ plants_ in_ india_central_ pollution_ and_ cont...Status  of  water_ treatment_ plants_ in_ india_central_ pollution_ and_ cont...
Status of water_ treatment_ plants_ in_ india_central_ pollution_ and_ cont...
 
Well Protector Dry Pellet Chlorinator Installation, Operation, and Maintenanc...
Well Protector Dry Pellet Chlorinator Installation, Operation, and Maintenanc...Well Protector Dry Pellet Chlorinator Installation, Operation, and Maintenanc...
Well Protector Dry Pellet Chlorinator Installation, Operation, and Maintenanc...
 
RO DRINKING WATER FILTRATION SYSTEM IN UAE ( www.aquaprouae.com )
RO DRINKING WATER FILTRATION SYSTEM IN UAE ( www.aquaprouae.com )RO DRINKING WATER FILTRATION SYSTEM IN UAE ( www.aquaprouae.com )
RO DRINKING WATER FILTRATION SYSTEM IN UAE ( www.aquaprouae.com )
 
Drip Irrigation System 04
Drip Irrigation System 04Drip Irrigation System 04
Drip Irrigation System 04
 
NCIT civil (NVQ 5, Sri Lanka) field reports
NCIT civil (NVQ 5, Sri Lanka) field reportsNCIT civil (NVQ 5, Sri Lanka) field reports
NCIT civil (NVQ 5, Sri Lanka) field reports
 

Week report

  • 1. East Delta WTP WTP Water Hammer - Damage Sphere Checking the water hammer vessel water rise andnot go down so that mean sphere damaged and to Checked page 1/12
  • 2. East Delta WTP WTP Water Hammer - Damage Sphere Sphere Welding Carck and fll with water page 2/12
  • 3. East Delta WTP WTP Water Hammer - Damage Sphere Sphere Welding Carck and fll with water page 3/12
  • 4. East Delta WTP Spare Parts No new for Spare parts page 4/12
  • 5. East Delta WTP Flash Mixer Dry Run damage Dry Run damage because of twisted a round the mixer page 5/12
  • 6. East Delta WTP Flash Mixer Dry Run damage They assembly the switch but not connected yet page 6/12
  • 7. East Delta WTP Filter 03,04 Refill with New Filter Media The empty 03 and refill 04 page 7/12
  • 8. East Delta WTP Filter 03,04 Refill with New Filter Media The empty 03 and refill 04 page 8/12
  • 9. East Delta WTP Chlorine Sherkia CO take Drum valve to mainten , till now not installed page 9/12
  • 10. East Delta WTP Thickener Thickener empty or full and pipe blocked and pumps stopped page 10/12
  • 11. Regular Check No Unit Activates Intake 1- Checking Raw Water Pump pressure,temprature,power and gland packing leakage. 1 2- Checking water hammer system working or not. 2 Distribution Shift Checking flow, pressure, chlorine dosing and float fix or not. Chlarifier Checking sludge pumping units, cleaning and greasing of knife,air pressure, bridge and mixers. 3 4 Thickener Checking pump pressure, pipeline blocking and thickener level. Filters 1- Checking backwash , backwash waste ,boosters and dewatering. 5 2- Air system ,compressors,dryer,pressure,…,etc. 3- Checking filters flow , levels , backwash tank level. 6 Under Ground Reservoir Checking rediusal chlorine smaple plan and tanks levels Treated Water Pump 1- Checking pump priming system. Station 2- Checking Treated Water Pump pressure,temprature,power and mechanical seal leakage. 7 3- Checking water hammer system working or not. 4- Checking measurement devices. Chlorine 1- Checking drums, vacuum units , changeover unit and piping. 8 2- Checking dosing cabient, dosing , feeding pressure. 3- checking Caustic Soda Pump. Chemical 1- Checking dosing pumps, strianers, pressure , flow and piping. 9 2- Checking Tanks levels and cleaning. 10 Evaporation ponds 1- Checking air pressure , cleaning and greasing of knife. Activites and Remarks for week No Unit Remaks 1 Intake 2 Distribution Shaft 3 Clarifier 1- Fixing of the flash mixer dry run was bad and cause damage to it. 3 Thickener 1- Thickener empty or full and piping blocked and pumps stopped 4 Filters 1- Filter 03,04 Refill with New Filter Media 2- Backwash pumps was stopped because someone played by button. 3- Backwash pump 42 coupling extension handed over to AC till install new H-Shape rubber 5 Chlorine 1- Sherkia CO take Drum valve to mainten , till now not installed 2- General cleaning of drum store 7 Chemical 1- Plastic fall in tanks during filling. Central dewatering 8 Station 9 Evaporation ponds 1-opened valve closed and operation shloud from panel. 10 Under Ground Reservoir Rediusal Chlorine sample pump not working. Treated Water Pump Water hammer maintenance 11 Station
  • 12. 12 Insturctions .lenieregyp