SlideShare une entreprise Scribd logo
1  sur  9
Télécharger pour lire hors ligne
Service Parts
Chain of Quality
Operations Department
Re-Manufacturing
Evolution


At Metrofuser each repair generation is an
evolution to greater quality - a continuous
improvement from the original factory model.
From implementing engineering upgrades and
component-level redesigns all the way through to
process engineering efficiencies, the evolution
and innovation never stops at Metrofuser.

                                       www.metrofuser.com
Pre Production

Direct Relationship With
Suppliers
   Co Develop Proprietary Components
   Pre-Qualification of Materials and
   Suppliers
(IMI) Incoming Material
Inspection Program- Materials
Analysis and Testing.
   Part Validation OEM vs Aftermarket
   Identify/Isolate Quality Fade
   Damage in Transit
   Vendor Validating- 3 Approved
Post Inspection
   TRUE Frame alignment
   Welds and Gear Post Inspection
   Tested in Printer Prior to Rebuild



                                        www.metrofuser.com
Production
Documented Repair Processes
Command Center Technology
   Increases Process Engineering Efficiency
Engineering Upgrades and
Proprietary Technology
   AntiTear Technology-Sleeved Fusers
   Firmware Upgrades-Boards Network
   Cards
   ZeroSet Technology-4700/4005 Fuser
   Reinforced Lock levers- 100%
   Replacement
   4200/4250/4300/4350/4345/4014/4015
Routine Production/Process
Audits




                                              www.metrofuser.com
Production
BioMetric Label on All Parts
   Tracks part, components, part date and process performance
   Tracks Production Technician and Final QA technician
Multiple in-process QA check point
Premium Materials
   4+/4/8000/8100/9000/8500 Premium coated upper rollers
   prevents toner build up and ghosting.
   Teflon Impregnated Gears
   High Degree Temperature Bearings
   Advanced Thermobaric Coatings used in Film Sleeves
   Teflon Jacketed Bushings
OEM Fasteners in Original Locations
   Fastener and Fixture Married
Final Pre-Testing QA
   24 Point Inspection Points




                                                                www.metrofuser.com
Post Production
Advanced Testing
   Testing The Tester Program
         Faults Inserted into Models to Test QC
   100% Outbound Print Testing and
   Verification
         More than 400,000 test pages per
         month
   Variable Test Prints
   Duplexer and Multiple Media Testing
   Variable/Intermittent Power Tests
   Acoustics

Sustainable Packaging
   Superior End-cap Design
   CNC Engineered Molds
        Drop Tested in an ISTA-Certified lab, in   Order Fulfillment
        accordance with a valid ISTA                  Order Aggregation
        Procedures.                                   All orders QC by 2 shippers
   Document Packaging Standards                       Dim Optimization-Less then 5% void
   100% Pre-Pack                                      First In First Out Stock Rotation FIFO
   Packaging Audits
   Final QC Inspection
   Packaging BioMetric Label
                                                                          www.metrofuser.com
Pre/Post Sale
Extended Warranty
   OEM 30-60-90 Days
   Metrofuser 30-90-180 Days
       Help you identify poor OEM engineering to
       make sure HP’s Problems don’t become
       your problems.
   Page Count Warranties Option Available
Level III Tech Support
   Dependable Help and Reliable advice is always
   just a call away. So you can do more with less
                                                           ProNotes
                                                             Technical bulletins and
   worry.
                                                             procedures designed to
Vendor Backed Quality Guarantees                             aid/inform technicians in
   We require all of our suppliers to participate in         installation/troubleshooting
   our labor reimbursement program. The program              process.
   outlines that if our part fails our customers in the
   field due to the result of their part failure that we
   will jointly reimburse customers for the
   wholesale labor rate.
         Supplier Financial Commitment Reduces
         Quality Fade


                                                                       www.metrofuser.com
Forensics
Forensics Return Analysis
   RMA Status and Results Analysis
   Accountability across the service parts universe.
   From our factory thru the shipping carriers to the
   field technician and finally the customer we can
   provide answers. We will help you spot problems
   and solve repeat calls and missed opportunities.

Nationwide Field Visits
   Customer and End-user Site Visits




                                                        www.metrofuser.com
Across Chain
Of Quality
Quality Meetings every 15 days
   Rigorous Self Analysis and Improvement
Event Horizon Program
   Every change is documented, time stamped and
   tracked
QC Hold QC Pass-
   Isolate/Recall/Rework- Our problems don’t
   become your problems




                                                  www.metrofuser.com

Contenu connexe

Tendances

Tiera Lopez-professionals
Tiera Lopez-professionalsTiera Lopez-professionals
Tiera Lopez-professionalstiera lopez
 
Amy Walton's resume 2016
Amy Walton's resume 2016Amy Walton's resume 2016
Amy Walton's resume 2016Amy Walton
 
090701 Link Acseu Ppp
090701 Link Acseu Ppp090701 Link Acseu Ppp
090701 Link Acseu PppACSEU
 
Institutionalizing a Sustainable Continuous Improvement Culture
Institutionalizing a Sustainable Continuous Improvement CultureInstitutionalizing a Sustainable Continuous Improvement Culture
Institutionalizing a Sustainable Continuous Improvement CultureTony Lopez
 
Cimlogic Customer Case study - Denso Marston
Cimlogic Customer Case study - Denso MarstonCimlogic Customer Case study - Denso Marston
Cimlogic Customer Case study - Denso MarstonClaire Healey
 
Production optimization with process fmea
Production optimization with process fmeaProduction optimization with process fmea
Production optimization with process fmeaNgoc Dep
 
Industrialization Of Testing Softec2012 Ramesh
Industrialization Of Testing   Softec2012   RameshIndustrialization Of Testing   Softec2012   Ramesh
Industrialization Of Testing Softec2012 Ramesharalikatte
 
Acquirer Systems Company Introduction
Acquirer Systems Company IntroductionAcquirer Systems Company Introduction
Acquirer Systems Company IntroductionBayberry
 
Walid Saliba resume 2015
Walid Saliba resume 2015Walid Saliba resume 2015
Walid Saliba resume 2015walid Saliba
 
JYanez Resume 2015
JYanez Resume 2015JYanez Resume 2015
JYanez Resume 2015Jaime Yanez
 

Tendances (19)

Tiera Lopez-professionals
Tiera Lopez-professionalsTiera Lopez-professionals
Tiera Lopez-professionals
 
Amy Walton's resume 2016
Amy Walton's resume 2016Amy Walton's resume 2016
Amy Walton's resume 2016
 
090701 Link Acseu Ppp
090701 Link Acseu Ppp090701 Link Acseu Ppp
090701 Link Acseu Ppp
 
Institutionalizing a Sustainable Continuous Improvement Culture
Institutionalizing a Sustainable Continuous Improvement CultureInstitutionalizing a Sustainable Continuous Improvement Culture
Institutionalizing a Sustainable Continuous Improvement Culture
 
Cimlogic Customer Case study - Denso Marston
Cimlogic Customer Case study - Denso MarstonCimlogic Customer Case study - Denso Marston
Cimlogic Customer Case study - Denso Marston
 
resume
resumeresume
resume
 
Factory overhaul ny
Factory overhaul nyFactory overhaul ny
Factory overhaul ny
 
Qip
QipQip
Qip
 
Production optimization with process fmea
Production optimization with process fmeaProduction optimization with process fmea
Production optimization with process fmea
 
Eduardo C. Silva
Eduardo C. SilvaEduardo C. Silva
Eduardo C. Silva
 
Thiruchelvan K
Thiruchelvan KThiruchelvan K
Thiruchelvan K
 
Fmea
FmeaFmea
Fmea
 
Industrialization Of Testing Softec2012 Ramesh
Industrialization Of Testing   Softec2012   RameshIndustrialization Of Testing   Softec2012   Ramesh
Industrialization Of Testing Softec2012 Ramesh
 
Acquirer Systems Company Introduction
Acquirer Systems Company IntroductionAcquirer Systems Company Introduction
Acquirer Systems Company Introduction
 
Walid Saliba resume 2015
Walid Saliba resume 2015Walid Saliba resume 2015
Walid Saliba resume 2015
 
CV_piroon3
CV_piroon3CV_piroon3
CV_piroon3
 
Asian creation introduction
Asian creation introductionAsian creation introduction
Asian creation introduction
 
JYanez Resume 2015
JYanez Resume 2015JYanez Resume 2015
JYanez Resume 2015
 
TTP
TTPTTP
TTP
 

En vedette

Giuramento medico neolaureati in Medina 2014
Giuramento medico neolaureati in Medina 2014Giuramento medico neolaureati in Medina 2014
Giuramento medico neolaureati in Medina 2014Alberto Ferrando
 
Grapes tradition
Grapes traditionGrapes tradition
Grapes traditionisamadero79
 
Ambition sermon
Ambition sermonAmbition sermon
Ambition sermonU2CAN
 
Philosophical considerations aside
Philosophical considerations asidePhilosophical considerations aside
Philosophical considerations asideMuhammad Fahad Saleh
 
Lily Allen
Lily AllenLily Allen
Lily AllenLauz_xOx
 
Revue de presse kylia semaine du 14 au 19 avril 2014
Revue de presse kylia   semaine  du 14 au 19 avril 2014Revue de presse kylia   semaine  du 14 au 19 avril 2014
Revue de presse kylia semaine du 14 au 19 avril 2014KYLIA France
 
Lauren.Sea Mammals
Lauren.Sea MammalsLauren.Sea Mammals
Lauren.Sea MammalsMinnie4
 

En vedette (8)

Giuramento medico neolaureati in Medina 2014
Giuramento medico neolaureati in Medina 2014Giuramento medico neolaureati in Medina 2014
Giuramento medico neolaureati in Medina 2014
 
Grapes tradition
Grapes traditionGrapes tradition
Grapes tradition
 
Ambition sermon
Ambition sermonAmbition sermon
Ambition sermon
 
Présentation jto-v3
Présentation jto-v3Présentation jto-v3
Présentation jto-v3
 
Philosophical considerations aside
Philosophical considerations asidePhilosophical considerations aside
Philosophical considerations aside
 
Lily Allen
Lily AllenLily Allen
Lily Allen
 
Revue de presse kylia semaine du 14 au 19 avril 2014
Revue de presse kylia   semaine  du 14 au 19 avril 2014Revue de presse kylia   semaine  du 14 au 19 avril 2014
Revue de presse kylia semaine du 14 au 19 avril 2014
 
Lauren.Sea Mammals
Lauren.Sea MammalsLauren.Sea Mammals
Lauren.Sea Mammals
 

Similaire à Chain Of Quality (20)

Zero defect zero excursions
Zero defect zero excursionsZero defect zero excursions
Zero defect zero excursions
 
updated CV (2)
updated CV (2)updated CV (2)
updated CV (2)
 
Finpower Aircon LLC
Finpower  Aircon LLCFinpower  Aircon LLC
Finpower Aircon LLC
 
QA metrics in Agile (GUIDE)
QA metrics in Agile (GUIDE)QA metrics in Agile (GUIDE)
QA metrics in Agile (GUIDE)
 
Metrofuser Printer Parts Dealer Catalog
Metrofuser Printer Parts Dealer CatalogMetrofuser Printer Parts Dealer Catalog
Metrofuser Printer Parts Dealer Catalog
 
Risk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmeaRisk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmea
 
CV KDueñas Oct 2015_2
CV KDueñas Oct 2015_2CV KDueñas Oct 2015_2
CV KDueñas Oct 2015_2
 
Metrofuser Printer Parts Wholesale
Metrofuser Printer Parts WholesaleMetrofuser Printer Parts Wholesale
Metrofuser Printer Parts Wholesale
 
0 2008 Ct Capabilities
0 2008 Ct Capabilities0 2008 Ct Capabilities
0 2008 Ct Capabilities
 
Cv 30032015 3
Cv 30032015 3Cv 30032015 3
Cv 30032015 3
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 
Thanigaivel P G Exp 15years
Thanigaivel P G Exp 15years Thanigaivel P G Exp 15years
Thanigaivel P G Exp 15years
 
cv- L
cv- Lcv- L
cv- L
 
Doc. RMD
Doc. RMDDoc. RMD
Doc. RMD
 
Why Choose Icon Presentation
Why Choose Icon PresentationWhy Choose Icon Presentation
Why Choose Icon Presentation
 
Qa brochure
Qa brochureQa brochure
Qa brochure
 
Jerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3aJerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3a
 
Point of sale_framework
Point of sale_frameworkPoint of sale_framework
Point of sale_framework
 
Khushmeet Khushi
Khushmeet KhushiKhushmeet Khushi
Khushmeet Khushi
 
RSL new project
RSL new projectRSL new project
RSL new project
 

Chain Of Quality

  • 1. Service Parts Chain of Quality Operations Department
  • 2. Re-Manufacturing Evolution At Metrofuser each repair generation is an evolution to greater quality - a continuous improvement from the original factory model. From implementing engineering upgrades and component-level redesigns all the way through to process engineering efficiencies, the evolution and innovation never stops at Metrofuser. www.metrofuser.com
  • 3. Pre Production Direct Relationship With Suppliers Co Develop Proprietary Components Pre-Qualification of Materials and Suppliers (IMI) Incoming Material Inspection Program- Materials Analysis and Testing. Part Validation OEM vs Aftermarket Identify/Isolate Quality Fade Damage in Transit Vendor Validating- 3 Approved Post Inspection TRUE Frame alignment Welds and Gear Post Inspection Tested in Printer Prior to Rebuild www.metrofuser.com
  • 4. Production Documented Repair Processes Command Center Technology Increases Process Engineering Efficiency Engineering Upgrades and Proprietary Technology AntiTear Technology-Sleeved Fusers Firmware Upgrades-Boards Network Cards ZeroSet Technology-4700/4005 Fuser Reinforced Lock levers- 100% Replacement 4200/4250/4300/4350/4345/4014/4015 Routine Production/Process Audits www.metrofuser.com
  • 5. Production BioMetric Label on All Parts Tracks part, components, part date and process performance Tracks Production Technician and Final QA technician Multiple in-process QA check point Premium Materials 4+/4/8000/8100/9000/8500 Premium coated upper rollers prevents toner build up and ghosting. Teflon Impregnated Gears High Degree Temperature Bearings Advanced Thermobaric Coatings used in Film Sleeves Teflon Jacketed Bushings OEM Fasteners in Original Locations Fastener and Fixture Married Final Pre-Testing QA 24 Point Inspection Points www.metrofuser.com
  • 6. Post Production Advanced Testing Testing The Tester Program Faults Inserted into Models to Test QC 100% Outbound Print Testing and Verification More than 400,000 test pages per month Variable Test Prints Duplexer and Multiple Media Testing Variable/Intermittent Power Tests Acoustics Sustainable Packaging Superior End-cap Design CNC Engineered Molds Drop Tested in an ISTA-Certified lab, in Order Fulfillment accordance with a valid ISTA Order Aggregation Procedures. All orders QC by 2 shippers Document Packaging Standards Dim Optimization-Less then 5% void 100% Pre-Pack First In First Out Stock Rotation FIFO Packaging Audits Final QC Inspection Packaging BioMetric Label www.metrofuser.com
  • 7. Pre/Post Sale Extended Warranty OEM 30-60-90 Days Metrofuser 30-90-180 Days Help you identify poor OEM engineering to make sure HP’s Problems don’t become your problems. Page Count Warranties Option Available Level III Tech Support Dependable Help and Reliable advice is always just a call away. So you can do more with less ProNotes Technical bulletins and worry. procedures designed to Vendor Backed Quality Guarantees aid/inform technicians in We require all of our suppliers to participate in installation/troubleshooting our labor reimbursement program. The program process. outlines that if our part fails our customers in the field due to the result of their part failure that we will jointly reimburse customers for the wholesale labor rate. Supplier Financial Commitment Reduces Quality Fade www.metrofuser.com
  • 8. Forensics Forensics Return Analysis RMA Status and Results Analysis Accountability across the service parts universe. From our factory thru the shipping carriers to the field technician and finally the customer we can provide answers. We will help you spot problems and solve repeat calls and missed opportunities. Nationwide Field Visits Customer and End-user Site Visits www.metrofuser.com
  • 9. Across Chain Of Quality Quality Meetings every 15 days Rigorous Self Analysis and Improvement Event Horizon Program Every change is documented, time stamped and tracked QC Hold QC Pass- Isolate/Recall/Rework- Our problems don’t become your problems www.metrofuser.com