1. Introduction
Definitions
Terminology is sometimes confusing between
American & European standards
American Standard European Standards
Conformity checks & static de-energized test.
•Mechanical Completion •Precommissioning
Dynamic verification, on-line test & pre start-up activities
•Precommissioning •Commissioning
Plant initial start-up introducing hydrocarbons
•Commissioning •Start-up
1
2. Typical Project Phases (European terminology)
PRE- BASIC DETAILED
Engineering PROJECT ENGINEERING ENGINEERING
Long
Lead PROCUREMENT
Procurement Items
CONSTRUCTION MECHANICAL
COMPLETION
Construction Precom Precom =
READY FOR
Prepa. Execution COMMISSIONING
Comm Comm READY FOR
START-UP
Commissioning Prepa. Execution
ROUTINE
START-UP
OPERATION
2
3. PT. TEKNIKA REGULINDO ASIA
One Wolter Place Building 4th Floor
Jl. Wolter Monginsidi 63B Kebayoran Baru
Jakarta. 12180, Indonesia.
Phone : +62(0)21 7280 1162
Fax : +62(0)21 7280 1163
www.tra-indonesia.com
Piping – Mechanical – Electrical – Instrument – Control System - Telecommunication
3