Contenu connexe Similaire à Willbros - Summary: Advanced Notice of Proposed Rulemaking (20) Plus de Willbros Group, Inc. (13) Willbros - Summary: Advanced Notice of Proposed Rulemaking1. Summary:
Advanced Notice of Proposed Rulemaking
Released August 2011
By John Beets
Principal GIS Technologist, Willbros Engineering
An Advanced Notice of Proposed Rulemaking (ANPRM) was released by the Pipeline and Hazardous Materials Safety
Administration (PHMSA) in August 2011. High profile incidents, such as the PG&E failure in San Bruno, CA, have
instigated a push by Federal regulatory agencies for additional safety measures for gas transmission pipelines. This
ANPRM is requesting public comment on 14 specific topics in two broad categories. At some point following the review
period, PHMSA will release a Notice of Proposed Rulemaking (NPRM) that will incorporate comments/questions they
receive as a result of this ANPRM. This will allow another round of public comment/questions before a final rule is
released. It is difficult to predict the time frame for release of a final rule – past experience might indicate this could
occur very late in 2012, but more likely sometime in 2013.
The purpose of this document is to provide a brief summary of the content of the ANPRM in order to present a snapshot
of issues that may be under consideration for a revised final rule. An analysis of the information contained in the
ANPRM is not included.
Category 1: Should integrity management requirements be revised and strengthened to bring more pipeline mileage
under integrity management requirements and to better assure safety of pipeline segments in high-consequence
areas (HCAs)?
Topics:
1. Modify HCA definition to expand pipeline mileage in HCAs? This could be done by:
a. Revising (decreasing) the count for buildings intended for human occupancy
b. Expanding the definition of identified sites
c. Making all Class 3 and 4 locations HCA – also increase the width for determining class location on pipelines
over 24” outside diameter (OD) operating above 1,000 pounds per square inch gauge (psig)
d. Increasing the HCA buffer beyond that determined by the potential impact radius (PIR)
e. Considering presence of electric transmission lines or other critical infrastructure within the pipeline
right-of-way (ROW)
f. Allowing general public/local communities to provide input into identification of HCAs
2. Strengthen requirements to implement preventative and mitigative measures for pipeline segments in HCAs:
The current rule requires operators to take additional preventative and mitigative measures in HCAs, but these
measures are not specified. Risk analysis is to be used to identify additional measures appropriate to the HCA,
but the current rule does not establish objective criteria or standards on how to determine what measures should
be taken. PHMSA is considering additional prescriptive requirements to improve selection and implementation
decisions for preventative and mitigative measures within and, potentially, outside of HCAs.
3. Modification of repair criteria: Changes to repair criteria to provide greater assurance of anomalies/defects being
repaired before leading to a leak or rupture and whether these criteria need to be expanded to segments outside
Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 1
© 2011 Willbros • All Rights Reserved.
2. Summary: Advanced Notice of Proposed Rulemaking
of HCAs. This could involve the following:
a. Revision of the repair criterion to add an additional safety margin
b. Risk ranking – conditions in HCAs addressed first, followed by non-HCA areas
c. Adjustment of repair schedules in both HCA and non-HCA areas
d. Potential standards to account for known accuracy of inline inspection (ILI) tools that are consistent across
all ILI vendors and operator
e. Potential methods for validation of tool performance such as validation digs or analysis of as-found versus
as-predicted defect dimensions
f. Standards for conducting inline inspections, specific interpretation of personnel qualifications, integration
of other data sources with ILI
4. Improving requirements for collecting, validating and integrating pipeline data:
a. Require validation methods be in place, such as pipeline excavations
b. Require collection of data during pipeline exposure to validate information in the operator’s records
c. Verify critical pipe data, coating, testing, and operations and maintenance (O&M) records on a periodic basis
(requirements become more prescriptive)
5. Making requirements related to the nature and application of risk models more prescriptive: PHMSA’s experience
indicates that majority of operators use relative index-model approaches to risk assessment. PHMSA is not convinced
as to the robustness of this method. Possible changes discussed:
a. Strengthen requirements on functions risk models perform
b. Mandate usage of a specific risk model
c. Improve existing models to assure usefulness
d. Push to use more quantitative models is contemplated
6. Strengthening requirements for applying knowledge gained through the integrity management (IM) program: This
is related to the current regulation requiring operators to consider other portions of their systems if an assessment
identifies corrosion requiring repair. Intention is to strengthen requirements related to operator’s use of insights
gained from implementation of their IM program:
a. Potential requirements for updating risk models as additional knowledge is gained
b. Guidelines or requirements related to data integration and/or updating of aerial imagery or patrolling
c. Specification of a maximum time period for review and validation of risk assessments
d. Potential data requirements for data integration
7. Strengthening requirements on the selection and use of assessment methods: Currently four methods –
ILI, pressure test, direct assessment and other technology demonstrated to provide an equivalent understanding
of pipe condition. Possible changes discussed:
a. Require ILI wherever possible – include requirements to expand line modifications to accommodate ILI
b. Restrictions on use of other assessment technologies
c. Establish standards for conducting ILI assessments – incorporate by reference into regulations
Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 2
© 2011 Willbros • All Rights Reserved.
3. Summary: Advanced Notice of Proposed Rulemaking
d. Establish standards for conducting Internal Corrosion Direct Assessment (ICDA) and Stress Corrosion Cracking
Direct Assessment (SCCDA) – incorporate by reference into regulations
e. Require a onetime pressure test to address manufacturing and construction defects
Category 2: Should non-IM requirements be strengthened or expanded to address other issues associated with
pipeline system integrity?
Topics:
1. Valve spacing and the need for remotely or automatically controlled valves: Current regulation specifies block
valve spacing by class location on newly built lines. Remotely operating and/or automatic valves are not currently
required. Potential changes:
a. Change spacing requirements for new lines
b. Explicitly require new valves in the event of class change to meet spacing requirements
c. Explicitly require new valves under other (non-class change) conditions
d. Require remotely controlled sectionalizing block valves
e. Require prescriptive design criteria for operator evaluation of additional valves, remote closure and/or
valve automation
2. Corrosion control: Requirements related to external, internal and atmospheric corrosion:
a. Require post-construction surveys for coating damage or to determine Cathodic Protection (CP) adequacy
b. Require periodic interference current surveys (such as Close Interval Survey – CIS)
c. Add additional measures to prevent internal corrosion (such as ILI runs or accumulated liquids sampling)
d. Include practices or standards addressing prevention, detection, assessment and remediation of SCC – requiring
additional surveys or shorter internal surveys based on pipeline operating temperatures and coating types
e. Prescribe CIS external corrosion control survey timing intervals for both HCAs and non-HCAs that are used
to determine CP effectiveness
f. Provide specific HCA and non-HCA corrosion control measures with clearly defined conditions and appropriate
mitigation efforts
g. Perform a critical analysis of all factors influencing SCC to determine if a credible threat exists for each
pipeline segment
h. Require SCC integrity assessment in segments where a credible threat has been identified
i. Require a periodic analysis of operator corrosion management programs, integrating all relevant data
j. Require operators to periodically submit corrosion management performance metric data
3. Pipe manufactured using longitudinal weld seams: This is meant to address longitudinal seam weld issues with
pipe manufactured primarily before 1970 and pressure test grandfathering for lines built prior to 1971 (allowing
operations at a maximum allowable operating pressure (MAOP) based on the highest 5-year operating pressure
prior to July 1, 1970 in lieu of a pressure test):
a. Require all pipelines that have not been pressure tested at or above 1.1 times MAOP or class location test criteria
to be pressure tested in accordance with present regulation
Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 3
© 2011 Willbros • All Rights Reserved.
4. Summary: Advanced Notice of Proposed Rulemaking
b. Alternatively, require specific types of pipe with an operating history that demonstrates systemic integrity issues
to be pressure tested in accordance with present regulation, e.g., low-frequency electric resistance welded
(LF-ERW), direct current electric resistance welded (DC-ERW), lap-welded, electric flash welded (EFW), furnace
butt welded, submerged arc welded or other longitudinal seams
c. Define alternative minimum test pressures
d. Provide additional pressure test requirements to all pipelines, or only pipelines in HCAs, or only pipelines in
Class 2, 3, or 4 areas
e. Specify other technologies that may reliably find and remediate seam integrity issues
4. Establishing requirements applicable to underground gas storage: PHMSA may develop standards covering
underground gas storage facilities. This could include:
a. Safety standards for casing, tubing, isolation packer and wellbore communication and wellhead equipment
b. Standards for monitoring of external/internal corrosion
c. Standards for welding, pressure testing and design safety factors of casing and tubing
d. Emergency shutdowns for wellhead valves
e. Integrity and O&M intervals for key safety and CP systems
f. Standards for emergency shutdowns, emergency shutdown stations, gas monitors, local emergency response
communications, public communications and O&M procedures
5. Management of change: PHMSA pipeline safety regulations do not now address management process subjects
such as management of change. PHMSA is considering adding requirements in this area to provide a greater degree
of control over this element of pipeline risk:
a. Development of standards governing the management of change process including requirements for IM proce-
dures, O&M manuals, facility drawings, emergency response plans and procedures and documents required
to be maintained for the life of the pipeline
b. Consider incorporating like standards from other industries
6. Quality Management Systems (QMS): Quality management includes the activities and processes that an organization
uses to achieve quality. These include formulating policy, setting objectives, planning, quality control, quality
assurance, performance monitoring and quality improvement. PHMSA’s pipeline safety regulations do not now
address process management issues such as QMS. PHMSA may institute formal requirements for QMS into the
regulation. They are asking the industry for information on existing quality assurance standards and practices currently
in use that might be adopted. Should QMS be applied to all or some pipelines and does it apply to the complete
lifecycle? Do operators commonly require their contractors to maintain and use formal QMS?
7. Exemption of facilities installed prior to the regulations: This is to address the MAOP exemption for pre-1970 pipelines
that operate above 72% specified minimum yield strength (SMYS) and also includes use of materials manufactured
prior to 1970. The changes could include requirements for periodic pressure tests, in-line inspections, coating
examination, CP surveys and expanded requirements on interference currents and depth of cover maintenance for
these lines. This could be for all pipelines or targeted to those with a vintage history of systemic integrity issues
in areas such as longitudinal weld seams or steel quality.
Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 4
© 2011 Willbros • All Rights Reserved.
5. Summary: Advanced Notice of Proposed Rulemaking
8. Modifying the regulation of gas gathering lines: Recent developments in the field of gas exploration and production,
such as shale gas, indicate that the existing framework for regulating gas gathering lines may no longer be appropri-
ate. Gathering lines are being constructed to transport shale gas that range from 12 to 36 inches in diameter with
an MAOP of 1,480 psig, far exceeding the historical operating parameters of such lines. Moreover, enforcement of
the current requirements has been hampered by the conflicting and ambiguous language of American Petroleum
Institute Recommended Practice 80 (API RP 80), a complex standard that can produce multiple classifications for
the same pipeline system. Gathering regulation may be modified as follows:
a. Require submission of annual incident and safety-related conditions reports
b. Include a new definition for gathering in the regulation
c. Establish new, risk-based safety requirements for large diameter, high pressure gathering lines in rural locations
d. Consider short sections of pipeline downstream of processing, compression and similar equipment to be
a continuation of gathering
e. Adopt specific requirements for pipelines associated with landfill gas systems (due to increased concentrations
of hydrogen sulfide and/or carbon dioxide)
f. Enhance requirements for internal corrosion control
g. Apply gas integrity management requirements to all onshore gas gathering
Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 5
© 2011 Willbros • All Rights Reserved.