SlideShare une entreprise Scribd logo
1  sur  6
Télécharger pour lire hors ligne
Approval Standard

                        for




                                                         om
Water Motor Gong

                                             .c
       Class Number 1055         a         se
                              gb
                       in
           in
        tra




                        July 1970
    re
    .fi
 w
w
w




     ©2002 FM Global Technologies LLC. All rights reserved.
Foreword


FM Approvals are intended to verify that the products and services described will meet stated conditions of
performance, safety and quality useful to the ends of property conservation. The purpose of FM Approval
Standards is to present the criteria for FM Approval of various types of products and services, as guidance for
FM Approvals personnel, manufacturers, users and authorities having jurisdiction.

Products submitted for Approval shall demonstrate that they meet the intent of the Approval Standard, and that
quality control in manufacturing and/or applications shall ensure a consistently uniform and reliable product or
service. FM Approval Standards strive to be performance-oriented and to facilitate technological development.




                                                                     om
For examining equipment, materials and services, FM Approval Standards:




                                                            .c
      a) must be useful to the ends of property conservation by preventing, limiting or not causing damage
         under the conditions stated by the Approval listing; and




                                                          se
      b) must be readily identifiable.

                                                   a
Continuance of Approval and Listing depends on compliance with the Approval agreement, satisfactory
                                                gb
performance in the field, on successful re-examinations of equipment, materials, and services as appropriate, and
on periodic follow-up audits of the manufacturing facility or service/application.
                                           in

FM Global Technologies LLC reserves the right in its sole judgement to change or revise its standards, criteria,
                                  in


methods, or procedures.
                               tra
                          re
                     .fi
             w
            w
        w
TABLE OF CONTENTS

INTRODUCTION .......................................................................................................................................................................... 1
REQUIREMENTS ........................................................................................................................................................................... 1
   Durability ................................................................................................................................................................................... 1
   Audibility ................................................................................................................................................................................... 1
   Sensitivity .................................................................................................................................................................................. 1
   Port Sizes ................................................................................................................................................................................... 2
   Inlet and Outlet .......................................................................................................................................................................... 2
   Moving Parts .............................................................................................................................................................................. 2
   Water Motor Housing ................................................................................................................................................................ 2
   Accessibility for Service ........................................................................................................................................................... 2
   Protective Cover ........................................................................................................................................................................ 2




                                                                                                                           om
   Materials .................................................................................................................................................................................... 3
   Markings .................................................................................................................................................................................... 3




                                                                                                          .c
                                                                                          a             se
                                                                                       gb
                                                                               in
                                                              in
                                                           tra
                                                  re
                                          .fi
                             w
                            w
                    w
July 1970                                                                                                    1055


INTRODUCTION
    A water motor gong is used to give a locally audible alarm signal when a fire protection sprinkler system
    operates. Such a device should be highly reliable and durable.

    FM Approval is based on examination and test of production samples, inspection of the manufacturing and/or
    quality control facilities, and use experience. Particularly considered are functional suitability, adequacy of
    design and workmanship, uniformity and dependability of production, effectiveness of quality control, and
    assurance of service and of replacement parts.

    Minimum physical requirements given below are guides. Mere conformity does not assure Approval since other
    considerations may control. Nor is strict conformity necessary; devices having different characteristics may be
    considered and Approved, if shown to be essentially equivalent or superior in performance.




                                                                          om
                                                                 .c
REQUIREMENTS

Durability                                             a       se
                                                    gb
    The water motor gong shall be designed to operate reliably without excessive maintenance. It will be subjected
                                               in

    to a 60-hour continuous endurance run with an average operating pressure of 50 psi at the inlet to the device.
    No lubrication or adjustment will be made during this test. There shall be no evidence of any excessive wear at
                                      in


    the completion of the test.
                                   tra




Audibility
                              re




    The water motor gong shall produce an audible signal sufficient to alert a nearby plant employee during working
                         .fi




    hours or a guard or other person during idle hours. The sound should be loud enough and of such a pitch as to
                 w




    be clearly heard, above the average factory noise levels, at a distance of several hundred feet.
                w




    It shall generate sound waves having a minimum sound-pressure level of 90 decibels (referred to a 0.0002
              w




    microbar base) using the ‘‘C’’ weighting, when tested in a room having a background noise level within the
    approximate range of 50 to 55 decibels and using 30 lb operating pressure at the inlet to the gong. Sound pressure
    level measurements will be made at a point 10 ft in front of the gong with the protective cover in place.


Sensitivity

    Operation shall commence at a maximum pressure of 5.0 psig measured at the inlet to the device, upstream of
    the strainer, when the pressure is increased from zero.




                                                                                           FM APPROVALS             1
1055                                                                                                        July 1970



Port Sizes

    Operating ports such as nozzles shall have a diameter of not less than 1⁄8 in. and be protected by a suitable strainer
    of corrosion-resistant material. The total area of all openings in the strainer screen shall be at least ten times the
    port area.

    The strainer, which shall be furnished by the gong manufacturer, may be located at the waterflow detecting
    device.


Inlet and Outlet

    The inlet opening shall be suitable for connection to 3⁄4 in. IPS supply piping.

    The outlet opening shall be of ample size to facilitate the removal of waste water. A connecting pipe in the order




                                                                                         om
    of 1 to 11⁄2 in. IPS will be acceptable.




                                                                               .c
Moving Parts




                                                                             se
    Shafts and other moving parts shall be designed to prevent binding and protected against mechanical injury.

                                                                      a
    Bearings shall be self lubricating or have means for lubrication. The lubricant must be suitable for use over the
                                                                   gb
    range of temperatures between -60°F and 110°F.
                                                              in

Water Motor Housing
                                                    in


    The water motor housing shall be able to withstand a hydrostatic pressure of 200 psig for 5 minutes.
                                                 tra
                                           re




Accessibility for Service
                                      .fi




    Design must permit disassembly for inspection, lubrication, adjustment or repair without removal from the
    supporting wall or structure.
                              w
                             w




    Suitable means shall be provided so that nozzle and strainer can be readily cleaned.
                         w




Protective Cover

    An outer shield or protective cover shall be provided to protect the gong from deteriorating effects of rain and
    snow and to prevent nesting of birds, vermin, etc.

    A combination gong-cover shall be able to withstand six (6) blows from a 101⁄2 lb. steel ball, swinging as a 101⁄2
    ft. long pendulum, hung directly over the gong from a height of five (5) feet. Point of contact between ball and
    gong-cover will be halfway between center of gong-cover and its periphery on a horizontal plane.

    Following this test, the operating water motor gong shall still sound an audible alarm.




2     FM APPROVALS
July 1970                                                                                                  1055


Materials

   All materials used shall be suitable for the intended application.


Markings

   The shield shall carry the words ‘‘SPRINKLER ALARM’’ having a minimum letter height of 1 in. The lettering
   may be cast on the shield or may be on a separate plate which shall be substantially fastened to the shield. Cast
   letters shall be raised approximately 3⁄32 in.

   The body of the device (motor housing) shall be marked with the manufacturer’s name or trade mark, and a
   distinctive model or figure number.




                                                                        om
                                                               .c
                                                      a      se
                                                   gb
                                              in
                                     in
                                  tra
                             re
                        .fi
                w
               w
            w




                                                                                          FM APPROVALS            3

Contenu connexe

Similaire à Nfpa 1055

3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)Home
 
6 cu-ft-contractor
6 cu-ft-contractor6 cu-ft-contractor
6 cu-ft-contractorJane Smith
 
Yamaha outboard l250 beto, l250tr service repair manual x 101047
Yamaha outboard l250 beto, l250tr service repair manual x 101047  Yamaha outboard l250 beto, l250tr service repair manual x 101047
Yamaha outboard l250 beto, l250tr service repair manual x 101047 fjskefksemer
 
Yamaha outboard l225 feto, l225tr service repair manual u 200132
Yamaha outboard l225 feto, l225tr service repair manual u 200132  Yamaha outboard l225 feto, l225tr service repair manual u 200132
Yamaha outboard l225 feto, l225tr service repair manual u 200132 fujsefkskemm
 
Galvanizing Inspection of Structure
Galvanizing Inspection of StructureGalvanizing Inspection of Structure
Galvanizing Inspection of StructureNarendra Chhaba
 
Inspection and assembly of Open web Girder
Inspection and assembly of Open web GirderInspection and assembly of Open web Girder
Inspection and assembly of Open web GirderAshish Kumar Yadav
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping designMusa Sabri
 
Daewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualDaewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualudfjjsjekkeme
 
Daewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualDaewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualhfhjskedme
 

Similaire à Nfpa 1055 (20)

Nfpa 1032
Nfpa 1032Nfpa 1032
Nfpa 1032
 
Nfpa 1045
Nfpa 1045Nfpa 1045
Nfpa 1045
 
Nfpa 1021
Nfpa 1021Nfpa 1021
Nfpa 1021
 
Nfpa 1041
Nfpa 1041Nfpa 1041
Nfpa 1041
 
Nfpa 1110
Nfpa 1110Nfpa 1110
Nfpa 1110
 
Nfpa 1111
Nfpa 1111Nfpa 1111
Nfpa 1111
 
Nfpa 1210
Nfpa 1210Nfpa 1210
Nfpa 1210
 
Nfpa 1046
Nfpa 1046Nfpa 1046
Nfpa 1046
 
Zone techbook en
Zone techbook enZone techbook en
Zone techbook en
 
Nfpa 1051
Nfpa 1051Nfpa 1051
Nfpa 1051
 
3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)
 
Nfpa 1221
Nfpa 1221Nfpa 1221
Nfpa 1221
 
6 cu-ft-contractor
6 cu-ft-contractor6 cu-ft-contractor
6 cu-ft-contractor
 
Yamaha outboard l250 beto, l250tr service repair manual x 101047
Yamaha outboard l250 beto, l250tr service repair manual x 101047  Yamaha outboard l250 beto, l250tr service repair manual x 101047
Yamaha outboard l250 beto, l250tr service repair manual x 101047
 
Yamaha outboard l225 feto, l225tr service repair manual u 200132
Yamaha outboard l225 feto, l225tr service repair manual u 200132  Yamaha outboard l225 feto, l225tr service repair manual u 200132
Yamaha outboard l225 feto, l225tr service repair manual u 200132
 
Galvanizing Inspection of Structure
Galvanizing Inspection of StructureGalvanizing Inspection of Structure
Galvanizing Inspection of Structure
 
Inspection and assembly of Open web Girder
Inspection and assembly of Open web GirderInspection and assembly of Open web Girder
Inspection and assembly of Open web Girder
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping design
 
Daewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualDaewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manual
 
Daewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualDaewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manual
 

Plus de Jianping Wong

Nyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformNyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformJianping Wong
 
Seamless transitions are_they_possible
Seamless transitions are_they_possibleSeamless transitions are_they_possible
Seamless transitions are_they_possibleJianping Wong
 
521 announcement 29102013 interim financial report q3 2013
521  announcement 29102013  interim financial report q3 2013521  announcement 29102013  interim financial report q3 2013
521 announcement 29102013 interim financial report q3 2013Jianping Wong
 
Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Jianping Wong
 
Estes express lines announces general rate increase
Estes express lines announces general rate increaseEstes express lines announces general rate increase
Estes express lines announces general rate increaseJianping Wong
 
Top 10 popular express companies in us
Top 10 popular express companies in usTop 10 popular express companies in us
Top 10 popular express companies in usJianping Wong
 

Plus de Jianping Wong (10)

Nyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformNyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platform
 
Seamless transitions are_they_possible
Seamless transitions are_they_possibleSeamless transitions are_they_possible
Seamless transitions are_they_possible
 
521 announcement 29102013 interim financial report q3 2013
521  announcement 29102013  interim financial report q3 2013521  announcement 29102013  interim financial report q3 2013
521 announcement 29102013 interim financial report q3 2013
 
Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72
 
Estes express lines announces general rate increase
Estes express lines announces general rate increaseEstes express lines announces general rate increase
Estes express lines announces general rate increase
 
Top 10 popular express companies in us
Top 10 popular express companies in usTop 10 popular express companies in us
Top 10 popular express companies in us
 
Nfpa 1031
Nfpa 1031Nfpa 1031
Nfpa 1031
 
Nfpa 1020
Nfpa 1020Nfpa 1020
Nfpa 1020
 
Nfpa 557
Nfpa 557Nfpa 557
Nfpa 557
 
Nfpa 1140
Nfpa 1140Nfpa 1140
Nfpa 1140
 

Dernier

2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 

Dernier (20)

2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 

Nfpa 1055

  • 1. Approval Standard for om Water Motor Gong .c Class Number 1055 a se gb in in tra July 1970 re .fi w w w ©2002 FM Global Technologies LLC. All rights reserved.
  • 2. Foreword FM Approvals are intended to verify that the products and services described will meet stated conditions of performance, safety and quality useful to the ends of property conservation. The purpose of FM Approval Standards is to present the criteria for FM Approval of various types of products and services, as guidance for FM Approvals personnel, manufacturers, users and authorities having jurisdiction. Products submitted for Approval shall demonstrate that they meet the intent of the Approval Standard, and that quality control in manufacturing and/or applications shall ensure a consistently uniform and reliable product or service. FM Approval Standards strive to be performance-oriented and to facilitate technological development. om For examining equipment, materials and services, FM Approval Standards: .c a) must be useful to the ends of property conservation by preventing, limiting or not causing damage under the conditions stated by the Approval listing; and se b) must be readily identifiable. a Continuance of Approval and Listing depends on compliance with the Approval agreement, satisfactory gb performance in the field, on successful re-examinations of equipment, materials, and services as appropriate, and on periodic follow-up audits of the manufacturing facility or service/application. in FM Global Technologies LLC reserves the right in its sole judgement to change or revise its standards, criteria, in methods, or procedures. tra re .fi w w w
  • 3. TABLE OF CONTENTS INTRODUCTION .......................................................................................................................................................................... 1 REQUIREMENTS ........................................................................................................................................................................... 1 Durability ................................................................................................................................................................................... 1 Audibility ................................................................................................................................................................................... 1 Sensitivity .................................................................................................................................................................................. 1 Port Sizes ................................................................................................................................................................................... 2 Inlet and Outlet .......................................................................................................................................................................... 2 Moving Parts .............................................................................................................................................................................. 2 Water Motor Housing ................................................................................................................................................................ 2 Accessibility for Service ........................................................................................................................................................... 2 Protective Cover ........................................................................................................................................................................ 2 om Materials .................................................................................................................................................................................... 3 Markings .................................................................................................................................................................................... 3 .c a se gb in in tra re .fi w w w
  • 4. July 1970 1055 INTRODUCTION A water motor gong is used to give a locally audible alarm signal when a fire protection sprinkler system operates. Such a device should be highly reliable and durable. FM Approval is based on examination and test of production samples, inspection of the manufacturing and/or quality control facilities, and use experience. Particularly considered are functional suitability, adequacy of design and workmanship, uniformity and dependability of production, effectiveness of quality control, and assurance of service and of replacement parts. Minimum physical requirements given below are guides. Mere conformity does not assure Approval since other considerations may control. Nor is strict conformity necessary; devices having different characteristics may be considered and Approved, if shown to be essentially equivalent or superior in performance. om .c REQUIREMENTS Durability a se gb The water motor gong shall be designed to operate reliably without excessive maintenance. It will be subjected in to a 60-hour continuous endurance run with an average operating pressure of 50 psi at the inlet to the device. No lubrication or adjustment will be made during this test. There shall be no evidence of any excessive wear at in the completion of the test. tra Audibility re The water motor gong shall produce an audible signal sufficient to alert a nearby plant employee during working .fi hours or a guard or other person during idle hours. The sound should be loud enough and of such a pitch as to w be clearly heard, above the average factory noise levels, at a distance of several hundred feet. w It shall generate sound waves having a minimum sound-pressure level of 90 decibels (referred to a 0.0002 w microbar base) using the ‘‘C’’ weighting, when tested in a room having a background noise level within the approximate range of 50 to 55 decibels and using 30 lb operating pressure at the inlet to the gong. Sound pressure level measurements will be made at a point 10 ft in front of the gong with the protective cover in place. Sensitivity Operation shall commence at a maximum pressure of 5.0 psig measured at the inlet to the device, upstream of the strainer, when the pressure is increased from zero. FM APPROVALS 1
  • 5. 1055 July 1970 Port Sizes Operating ports such as nozzles shall have a diameter of not less than 1⁄8 in. and be protected by a suitable strainer of corrosion-resistant material. The total area of all openings in the strainer screen shall be at least ten times the port area. The strainer, which shall be furnished by the gong manufacturer, may be located at the waterflow detecting device. Inlet and Outlet The inlet opening shall be suitable for connection to 3⁄4 in. IPS supply piping. The outlet opening shall be of ample size to facilitate the removal of waste water. A connecting pipe in the order om of 1 to 11⁄2 in. IPS will be acceptable. .c Moving Parts se Shafts and other moving parts shall be designed to prevent binding and protected against mechanical injury. a Bearings shall be self lubricating or have means for lubrication. The lubricant must be suitable for use over the gb range of temperatures between -60°F and 110°F. in Water Motor Housing in The water motor housing shall be able to withstand a hydrostatic pressure of 200 psig for 5 minutes. tra re Accessibility for Service .fi Design must permit disassembly for inspection, lubrication, adjustment or repair without removal from the supporting wall or structure. w w Suitable means shall be provided so that nozzle and strainer can be readily cleaned. w Protective Cover An outer shield or protective cover shall be provided to protect the gong from deteriorating effects of rain and snow and to prevent nesting of birds, vermin, etc. A combination gong-cover shall be able to withstand six (6) blows from a 101⁄2 lb. steel ball, swinging as a 101⁄2 ft. long pendulum, hung directly over the gong from a height of five (5) feet. Point of contact between ball and gong-cover will be halfway between center of gong-cover and its periphery on a horizontal plane. Following this test, the operating water motor gong shall still sound an audible alarm. 2 FM APPROVALS
  • 6. July 1970 1055 Materials All materials used shall be suitable for the intended application. Markings The shield shall carry the words ‘‘SPRINKLER ALARM’’ having a minimum letter height of 1 in. The lettering may be cast on the shield or may be on a separate plate which shall be substantially fastened to the shield. Cast letters shall be raised approximately 3⁄32 in. The body of the device (motor housing) shall be marked with the manufacturer’s name or trade mark, and a distinctive model or figure number. om .c a se gb in in tra re .fi w w w FM APPROVALS 3