2. Introduction
Professional Work is a document that exhibits a compilation of proj-
ects worked on by William Schmeling while employed by both archi-
tects and contractors. In the Table of Contents five projects are listed
chronologically. They begin at the start of William’s architectural ca-
reer and end with a project worked on for Joshua Schmeling Con-
struction in the Summer of 2010. These projects occur at many differ-
ent scales, the largest being producing a set of as-built drawings for
a large educational facility and smallest is designing and building a
small childrens playhouse. Through close investigation, actual hands
on experience, and site analysis, these projects were visualized and
then completed as a result of team efforts.
3. Table of Contents
5 Moraine Hall
Boer Architects: Summer 2006
Project Team: William Schmeling, Robert Powers
9 MATC T-Building
Boer Architects: Summer 2006
Project Team: William Schmeling, Alex Getson
13 Schmeling Residence
Joshua Schmeling Construction: Fall 2008
Project Team: William Schmeling, Joshua Schmeling
17 Faulk Residence
Joshua Schmeling Construction: Summer 2010
Project Team: William Schmeling, Joshua Schmeling, Jason Kuehn
21 The Green Team Facility
Joshua Schmeling Construction: Summer 2010
Project Team: William Schmeling, Joshua Schmeling
As-Built Drawing | Boer Architects
4. Moraine Hall
Whitewater, Wisconsin
Moraine Hall is located at the of all the university textbooks. reflected ceiling plans, interior el-
heart of the Whitewater Campus The objective of this project was evations, exterior elevations, and
and is primarily used as the Uni- to compile a set of as-built draw- building sections.
versity Bookstore. In its central- ings for future renovations to the The most challenging part of this
ized location it is surrounded both building including: miscellaneous project was to accurately measure
new and old buildings, pedestrian remodeling of the main floor and and document the entire building.
thoroughfares, and is adjacent to select basement areas, the instal- The building was very large and
Starin Road. The building is a one lation of a new hydraulic elevator, complicated. Almost every other
story structure that is clad with renovations to the basement toi- room contained different wall or
red brick and white stucco pan- lets, and a new loading dock. floor surfaces and the open floor
els. The majority of the main floor My involvement with the proj- plans on both levels were clut-
consists of retail space, but also ect was to assist a team in field tered with store merchandise and
contains offices and a loading measuring the entire facility and permanent shelving units for the
dock at the back end of the build- compiling a set of computer aided books. The project took roughly 4
ing. The lower level of the building drawings for our office. Drawings weeks for our team to document
also contains offices but is primar- included: site plan, level one and and compile a complete set of
ily used as the storage and sales lower level floor plans, multiple working drawings.
Moraine Hall
Level One Floor Plan - As-Built
South Building Elevation - As-Built
5 Boer Architects, Inc. | Summer 2006 Boer Architects, Inc. | Summer 2006 6
5. West Building Elevation - As-Built
This sketch was drawn while documenting the
West Exterior Building Elevation. It depicts field
measurements taken and calls out any changes
of exterior surface materials. Many photographs
were also taken as a record and to assist our
team with questionable field notes.
Level One Reflected Ceiling Plan - As-Built
West Building Elevation
Building Section Looking North - As-Built
7 Boer Architects, Inc. | Summer 2006 Boer Architects, Inc. | Summer 2006 8
6. MATC T-Building
Milwaukee, Wisconsin
The Technical Building located measuring the entire first floor ing baffles located in each class-
on the corner of North 6th Street of facility and compiling a set of room and office spaces.
and West Highland Avenue is part computer aided drawings for our The biggest difficulty of this
of Milwaukee’s downtown MATC office. Drawings included: site project was to field measure the
campus. This building contains plan, level one floor plan, multiple building while school was in ses-
mostly classrooms and labs for reflected ceiling plans, interior sion. Our team had to coordinate
the Technical and Applied Sci- elevations, exterior elevations, with the teachers and staff and
ences Division of the school. The and wall sections. As a building work efficiently around an existing
objective of this project was to put of mostly classrooms and labs for class schedule. We also removed
together a set of As-Built Draw- Technical and Applied Sciences, acoustic ceiling tiles to measure
West Highland Avenue
ings for future renovations to the our team spent a great deal of everything above them using a
existing building including: abate- time locating all of the objects at- flashlight. Through accurate field
ment work, window installation tached to the interior and exterior notes and the construction of a
work, restoration work, new con- walls, floors, and ceilings into our detailed set of drawings, our proj-
struction work, and HVAC work. field notes. We also documented ect team successfully completed
My involvement with the proj- a detailed list of all the HVAC, our assigned task effectively and
ect was to assist a team in field machinery, components, and ceil- in a timely and manner.
North 6th Street
MATC T-Building Site Plan - As-Built
Level One Floor Plan - As-Built
9 Boer Architects, Inc. | Summer 2006 Boer Architects, Inc. | Summer 2006 10
7. West Elevation - As-Built
East Elevation - As-Built
West Building Perspective
South Elevation - As-Built
North Elevation - As-Built West Buidling Elevation - As-Built
11 Boer Architects, Inc. | Summer 2006 Boer Architects, Inc. | Summer 2006 12
8. Schmeling Residence
Sheboygan, Wisconsin
The Schmeling Residence is a from inside the home, painting all The objective of this project was
small cottage-like home located of the interior walls and ceilings, to accentuate the exterior of the
near the shores of Lake Michigan installing ceramic tile in the front home by creating a color scheme
in Sheboygan, Wisconsin. It is entryway, painting the exterior that would complement the sur-
nestled between two other homes of the home and garage, adding rounding context and create an
similar in style and set back a shutters to either side of the front attractive appearance on a mini-
distance from the front sidewalk windows, replacing the front door, mal budget. To accomplish this,
while the back of the home abuts replacing the light fixture next to we established a color guideline
the alley. The home was bought the front door, re-roofing an archi- from a swatch of brown and tan
in 2003 and was in need of many tectural shingle over the existing hues acquired from The Home
updates both inside and out. shingles, building a cedar fence Depot and matched our shingles,
Joshua Schmeling Construction along the north side of the home, shutters, and paint colors to it. To
was responsible for updating the removing the existing antennae cut costs, we were also able to re-
exterior of the home and some of from the roof, removing a copper use dogwood bushes taken from
the interior renovations. pipe from the front of house, and an existing home in the neighbor- Hybrid Drawing - Field Notes and Exterior Rendering
Work that was done included: planting native bushes and flow- hood and replanted them along
removing all of the old carpet ers along the front of the home. the front of the home.
Lake Michiga
igan
2311 North 4th Street
Existing Exterior Elevation 2003
13 Schmeling Construction, LLC | Fall 2008 Schmeling Construction, LLC | Fall 2008 14
9. Exterior Light Fixture
Cedar Board Shutters
Architectural Shingle
Exterior Glass Door
Dogwood Bushes
In 2010 a small children’s playhouse was designed and built to
replace an old play set in the yard of the Schmeling Residence.
It was commissioned by the owner for her grandchildren and de-
signed to resemble the architectural style the existing home. Ele-
ments such as the roofing materials, color swatches, and even
miniature shutters were built to match the home.
The playhouse was built at a minimal cost as a result of using
left over materials from previous jobsites. We were even able to
salvage pieces from the old play set that was taken down. Inside,
bunk beds are stacked along the back wall and face a flat screen
TV is located above the front door. There are also two small chil-
dren’s desks across from the beds with chairs next to them.
Childrens Playhouse - Summer 2010
Proposed East Elevation
15 Schmeling Construction, LLC | Fall 2008 Schmeling Construction, LLC | Fall 2008 16
10. Faulk Residence
Menomonee Falls, Wisconsin
The Faulk Residence is located gable roof to be torn off and re- its warm, aesthetic appearance,
in a secluded subdivision tucked placed because the old cedar Western Red Cedar has long
along the North Hills Country Club shakes were heavily worn and been used for roofing and side-
in Menomonee Falls, Wisconsin. decomposing. The roof also con- walls, because of its durability and
Joshua Schmeling Construction tains 5 skylights on the either side weather-resistance, and good
was responsible for tearing off a of the gable allowing an abun- thermal insulating properties.
small portion of the roof and re- dant abundant amount of natural This even-grained wood ranges
placing it with new cedar shake daylight into the home. The roof in color from light blond to deep
shingles. Work that was done replaced is part of a larger roof chocolate brown, and weathers
included: removing the existing system that was still in good con- gracefully to shades of gray.
cedar shake shingles down to the dition and capable of keeping the Cedar offers a full range of prod-
plywood sheathing, waterproofing water out. uct benefits. It has high insula-
the roof with ice and water shield Western Red Cedar, a wood tion value, which reduces energy
and tar paper, installing new vents commonly found on the North consumption throughout the year.
onto the roof, and applying new American West Coast, is a popu- Many types of cedar shakes have
cedar shake shingles to the roof. lar source of manufactured ce- been tested and proved to be re-
This project consisted of a small dar shakes and shingles. With sistant to wind, impact and fire.
Wood is biodegradable, recyclable, renew- Using skylights to provide daylight re-
able, and an environmentally sound building duces energy costs, energy consumption
material. Among all the building products avail- and the demand for unsustainable power
able, wood is one of the few building products that is currently challenging the health of
that is derived from a renewable resource. the world’s environment.
1. Cedar Shake Tear-Off 2. Cedar Shake Tear-Off
N80 W13320 River Park Drive
17 Schmeling Construction, LLC | Summer 2010 Schmeling Construction, LLC | Summer 2010 18
11. Construction Process Construction Completion
Cedar Shake Application Diagram
19 Schmeling Construction, LLC | Summer 2010 Schmeling Construction, LLC | Summer 2010 20
12. The Green Team Facility
Milwaukee, Wisconsin
The Green Team Facility is small rainwater from the roof by stra- Rain barrels help slow down rain
warehouse building located at tegically adding and rerouting an runoff so it can drain naturally into
the intersection of 54th and State existing downspout to a key loca- the ground.
Street. They provide services of tion. By analyzing the pitch of the Our final task was to reroute an
sustainable landscape manage- gutter along the East Elevation we existing downspout located near
ment for properties that range in were able to determine the most the center of the building to front.
size from small residential homes logical place to insert a diverter in Spanning over 40’ the newly
to large commercial and munici- order to supply both downspouts pitched downspout directs water
pal landscapes. The Green Team with reasonable amounts of wa- to the base of the building where
is also committed to reducing its ter. The downspout added to the plastic tubing buried under the
footprint by providing services southwest corner of the building driveway carries it into the newly
that reduce your footprint, like was installed so it could hook built rain garden. A rain garden is
installation and management of directly into a rain barrel. A rain a planted depression that allows
rain barrels, compost, and native barrel collects and stores rainwa- rainwater runoff from impervious
gardens. ter from your rooftop, which you urban areas like roofs, driveways,
This project consisted of develop- later can use to water your lawn walkways, and parking lots the
ing a strategy to collect and store or garden, or to wash your car. opportunity to be absorbed.
Existing East Elevation
5402 West State Street
Rain Water Collection Proposal
21 Schmeling Construction, LLC | Summer 2010 Schmeling Construction, LLC | Summer 2010 22
13. The average yearly rainfall in Milwaukee is 29.1 inches
Water Diverter
Rain Garden Collection Area Rain Barrel Collection Area
Rainwater Collection Rain Garden Rainwater Collection Rain Barrel
Surface Width: 45’ - 0” Surface Width: 45’ - 0”
Surface Length 38’ - 0” Surface Length 20’ - 0”
Rain Depth: 1” Rain Depth: 1”
Estimated Water Recovery: 75% Estimated Water Recovery: 75%
Total Square Feet: 1710 sq. ft. Total Square Feet: 788 sq. ft.
Total Volume Gallons Potential: 1166 Total Volume Gallons Potential: 491
Total Volume Gallons Factored: 799 Gallons of Water Total Volume Gallons Factored: 368
Rain Garden Perspective
23 Schmeling Construction, LLC | Summer 2010 Schmeling Construction, LLC | Summer 2010 24