June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 1
Foundation In Natural & Built Environment
January Intake 2012
Semester 1
Introduction To Construction Industry (FNBE0125)
Lecturer : Pn. Hasmanira
Final Project – Focus on Architect/Quantity Surveyor roles, process
and procedures in completing a construction project.
GROUP 6
Name Student ID no.
Yam Yih Hwan 0305861
Chew Wen Lin 1007C10646
Janice Kong Yin Ying 0308798
Cromwell Augustine Jubili 0306595
Adrian HongSheng Jie 0308512
Alex Wong Kai Tze 0303228
Low RongTzuoo 0308336
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 2
CONTENT Page no.
1) Cover Page 1
2) Table Content 2
3) Introduction 3
4) Information on Quantity Surveyor Firm 4
5) Flow Chart of the Interview 5
6) Progress 6-9
7) Interview Questions 10
8) Brief Answers 11-14
9) Responsibilities 15
10) Conclusion 16
Table Content
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 3
Aim
The purposes of this interview areto know the role ofa Quantity
Surveyorin a construction site. It introduces the scope of work handled
by Quantity Surveyor in construction with regards to their responsibility
and duties in completing a construction project. During the interview, I
learnt the need of compliance to particular requirements in obtaining
authority approval. Besides that, I asked about the advantages of
having a Quantity Surveyor on site and the disadvantages of not having
a Quantity Surveyor on site. By the answers given by the Quantity
Surveyor Firm, I get to conclude myself that Quantity Surveyor is an
important role in a construction project. At the end of the interview, we
gain the ability to document their observations and research as well as
to communicate their findings.
Introduction
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 4
Personal Details
Company Name JurukurBahanAnnor
Department Quantity Surveying Firm
Tel. No. (Office) 03-56310464
Fax No. 03-56348254
E-mail Address jubannor@streamyx.com
Address 29B, Jalan SS15/4, Subang Jaya,47300, Petaling Jaya.
PROFESSIONAL AFFILIATION/MEMBERSHIP
Board of Quantity Surveyors Malaysia, Graduate Member, 2008,
(National)
Institute of Surveyor Malaysia, Graduate Member, 2007,
(National)
Institute of Value Management Malaysia (IVMM), Member,
2005, (National)
Information on Quantity
Surveyor Firm
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 5
We called up the Quantity Surveyor Firm to make an
appointment regarding on our assisgnment.
Group Leader had divided every members works and
must be completed before the interview date.
On 1st June 2012, members in my group are required to
be in campus by 12pm. We took Taylor's bus since the
place is close by, around ss15.
We had arrived and met the Quantity Surveyor. He
brings us to look around.
We started our interview with the Quantity Surveyor
and completed our task at 4pm.
Flow Chart of the Interview
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 6
My group is Group 6; we have total number of 7 members. Each of us
isdivided into different scale of works in order to smoothen our project
without delay.
Yam YihHwan:
Prepared Interview Questions and the Final Report
Chew Wen Lin:
Made appointment with Quantity Surveyor Firm
Cromwell Augustine Jubili:
Interview the Quantity Surveyor
Adrian Hong Sheng Jie:
Research on the Quantity Surveyor Firm we are visiting
Alex Wong Kai Tze:
Provide paperwork and Interview the Quantity Surveyor
Low RongTzuoo :
Wrote down the answers given by Quantity Surveyor
Janice Kong Yin Ying :
Made our schedule to prevent it collide with other subjects
Progress
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 7
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 8
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 9
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 10
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 11
1. What is the work involved? It is about the 5 distinct stages as
you mentioned, Preliminary Stage, Detailed Design Stage,
Tender Stage, Construction Stage, Post- Construction Stage,
can you briefly explain all the stages?
2. Can you tell us the process of getting plan approval, is there
any problems encountered? Any amendments to the original
submission as per request by authority?
3. We know that you are required to send in a proposal about
the constructions costs, constructions materials and labour
activities on particular project in order to get a contract
approval from the authority, can you elaborate in details of
this proposal?
4. As a quantity surveyor, how frequent does you carry out site
inspection to check the work process?
5. After site inspection, do you report the work process to
Project Manager or Project Director? What does the report is
all about, can you specify it?
6. Does a quantity surveyor important in a construction? What
are the advantages for having a quantity surveyor and the
disadvantages for not having a quantity surveyor?
Interview Questions
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 12
What is the work involved? It is about the 5 distinct
stages as you mentioned, Preliminary Stage, Detailed
Design Stage, Tender Stage, Construction Stage, Post-
Construction Stage, can you briefly explain all the
stages?
A Quantity Surveyormanages all costs relating to building and civil engineering
projects, from the initial calculations to the final figures. Surveyors seek to
minimize the costs of a project and enhance value for money, while still achieving
the required standards and quality. Many of these are specified by statutory
building regulations, which the surveyor needs to understand and adhere.
A Quantity Surveyormay work for either the client or the contractor, working in
an office or on-site. They are involved in a project from the start, preparing
estimates and costs of the work. When the projectis in progress, quantity
surveyors help other parties in the construction site.The title of the job may also
be referred to as a construction cost consultant or commercial manager.
Preliminary Stage or Early Stage is a phase of the starting of all construction. An
example would be planning. What to do? How to do? When to do? The whole
team of construction will come. Architect, Consultant Manager, Quantity
Surveyor, and many more will have a brainstorming session.
Tender Stage is a phase of tendering which involves firstly through a competitive
exercise based on outline pricing and quality the identification of a preferred
contracting organization; the second stage includes negotiation and working with
the preferred contractor in order to arrive at a final price for the scheme.
Brief answers
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 13
Detailed Design Stage is a phase when all building construction projects include
some elements in common – design, financial, estimating and legal
considerations. Many projects of varying sizes reach undesirable end results, such
as structural collapse, cost overruns, or litigation reason; those with experience in
the field make detailed plans and maintain careful oversight during the project to
ensure a positive outcome.
Construction stage is a phase is a specific period, stipulated in a contract is the
beginning from the date stated in the notice to proceed during which the
contractor must complete construction, subject to the conditions of the contract.
Post-construction stage is a phase of the construction; analyses arecarried out for
the construction stage loads as well as other general loads,response spectrum,
etc.
Can you tell us the process of getting plan approval, is
there any problems encountered? Any amendments to
the original submission as per request by authority?
A contractor's Quantity Surveyor is responsible for the performance of operations
that mirror those of the owner's Quantity Surveyor; for example, the
measurement and pricing of construction work, but specifically that actually
performed by the contractor and the contractor's subcontractors, as opposed to
the construction work described and measured in the construction contract
between the owner and the contractor. Such a difference in quantity of work may
arise from changes required by an owner, or by an architect or engineer on an
owner's behalf.
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 14
We know that you are required to send in a proposal
about the constructions costs, constructions materials
and labour activities on particular project in order to
get a contract approval from the authority, can you
elaborate in details of this proposal?
Planning and monitoring of each activity, Preparation of Cash Flow for every
month Billing, Co-coordinating with the site engineers to achieve the planned
cash flow for inter payment certificate, Estimation of all the Bill of Quantities with
the GFC drawings, preparation of Variation, Monthly Billing, Preparation of
Monthly Progress Report, Updating Drawing schedule, Material approval list,
material stock details, follow up with the client towards Billing etc.Supervision
and quantity finalization of subcontractor’s bills.As per contract – preparation of
claims, price variation and extra items.Project planning, scheduling, cost
estimation, cost control & day today monitoring.Quantity Surveyor with monthly
billing and preparation of Progress Report.
As a quantity surveyor, how frequent does you carry
out site inspection to check the work process?
It's all depends on the construction and the schedule for one contract. As long as
we ensure that the project adheres to local and national regulations. During the
pre-construction, the responsibilities are to make sure the project adheres to
local and national tax laws. Insurance is another aspect of the project. Insurance
claims and cost of replacement are dealt with by the Quantity Surveyor. Valuable
and accurate estimates of damages and costs of destroyed or damaged goods are
also provided.
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 15
After site inspection, do you report the work process
to Project Manager or Project Director? What does the
report is all about, can you specify it?
We usually provide advice in decision making processes throughout the project
management from start to finish. So, we usually have to report about price
analysis, work items and quantity from up to date.
Does a quantity surveyor important in a construction?
What are the advantages for having a quantity
surveyor and the disadvantages for not having a
quantity surveyor?
Of cause they do. Without us, the team is not complete. Without us, there isn't
anybody doing the calculation and the precaution for the construction.
The advantages would be we can keep our financial keep in check and to prevent
financial crisis occurs. We also ensure that the resources of the construction
industry are utilized to the best advantage of society by providing,inter alia,the
financial management for projects and a cost consultancy service to theclient and
designer during the whole construction process.
The disadvantages would be the calculation is in our hands. If we calculate wrong,
it might take money and time or even lives. That's why if you are not good in
math or not confident in your calculation, don't do this firm.
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 16
The responsibilities of a Quantity Surveyor:
 carrying out initial feasibility studies, to assess costs and materials and
estimate the amount of time needed for a project to be complete
 ensuring that materials to be used during construction match up to
environmental guidelines
 negotiating costs and working with vendors to draw up bids for contracts
 monitoring the construction of a building project to ensure costs and
materials are in line with the initial assessment
 updating the client on the progress of the project, with particular reference
to financial matters
 staying up-to-date on new standards in construction, property and
surveying
 preparing and maintaining financial records
Responsibilities
June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY]
Group 6 | Final Interview Report 17
Quantity Surveyors estimate and manage the cost of construction
projects. Their responsibilities begin at the planning stage and continue
through the construction period. First, they interpret architectural or
engineering drawings and specifications to calculate project costs.
During the building stage, they monitor expenses and check on any
changes in design to see whether the cost will be affected. They also
provide monthly cash-flow forecasts to their client and may organize
the amount and timing of payments to contractors. Quantity Surveyors
work in partnership with architects, engineers, builders, contractors,
suppliers and project owners.
Students who are going to advance into Quantity Surveyor, it helps
students to work as a team to finish up a given project. Besides that, it
brings understanding of a construction process, on the way we
interview a profession and documentation of proposal.
Conclusion

Contenu connexe

Tendances

Latihan Industri Politeknik
Latihan Industri Politeknik Latihan Industri Politeknik
Latihan Industri Politeknik
Hajar Hafizah
 
Sejarah presentation(adleena)
Sejarah presentation(adleena)Sejarah presentation(adleena)
Sejarah presentation(adleena)
Nisha Vijakumaran
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 
PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment Report
Melvin Lim
 

Tendances (20)

Project management (1)
Project management (1)Project management (1)
Project management (1)
 
Am 2 23042018
Am 2 23042018Am 2 23042018
Am 2 23042018
 
Building Construction Proposal PowerPoint Presentation Slides
Building Construction Proposal PowerPoint Presentation SlidesBuilding Construction Proposal PowerPoint Presentation Slides
Building Construction Proposal PowerPoint Presentation Slides
 
Penyata pendapatan
Penyata pendapatanPenyata pendapatan
Penyata pendapatan
 
Latihan Industri Politeknik
Latihan Industri Politeknik Latihan Industri Politeknik
Latihan Industri Politeknik
 
Able construction pte ltd company profile
Able construction pte ltd   company profileAble construction pte ltd   company profile
Able construction pte ltd company profile
 
Sejarah presentation(adleena)
Sejarah presentation(adleena)Sejarah presentation(adleena)
Sejarah presentation(adleena)
 
Perniagaan antarabangsa
Perniagaan antarabangsaPerniagaan antarabangsa
Perniagaan antarabangsa
 
PROTON HOLDINGS CASE STUDY
PROTON HOLDINGS CASE STUDYPROTON HOLDINGS CASE STUDY
PROTON HOLDINGS CASE STUDY
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
SME Corp.Malaysia
SME Corp.Malaysia  SME Corp.Malaysia
SME Corp.Malaysia
 
PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment Report
 
Petikan surat rasmi
Petikan surat rasmiPetikan surat rasmi
Petikan surat rasmi
 
Apa beza baru dan baharu
Apa beza baru dan baharuApa beza baru dan baharu
Apa beza baru dan baharu
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
 
Osha stdy case
Osha stdy caseOsha stdy case
Osha stdy case
 
Pengurusan stor
Pengurusan storPengurusan stor
Pengurusan stor
 
Project management chapter 1 notes
Project management chapter 1 notesProject management chapter 1 notes
Project management chapter 1 notes
 
Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3
 
ACC116 MATERIAL
ACC116 MATERIALACC116 MATERIAL
ACC116 MATERIAL
 

En vedette (13)

Assignment 1: individual essay
Assignment 1: individual essayAssignment 1: individual essay
Assignment 1: individual essay
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
 
Measurement V
Measurement VMeasurement V
Measurement V
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)
 
Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Certificates and payments
Certificates and paymentsCertificates and payments
Certificates and payments
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
 

Similaire à Final interview report

Final projectcomplete
Final projectcompleteFinal projectcomplete
Final projectcomplete
Anthony Chew
 
Post mortem report
Post mortem reportPost mortem report
Post mortem report
Kuaci Pedas
 
Construction process
Construction processConstruction process
Construction process
Mazen Al-Qadi
 
Project PlanProject ManagementSher.docx
Project PlanProject ManagementSher.docxProject PlanProject ManagementSher.docx
Project PlanProject ManagementSher.docx
LynellBull52
 

Similaire à Final interview report (20)

Publishable article
Publishable articlePublishable article
Publishable article
 
Final projectcomplete
Final projectcompleteFinal projectcomplete
Final projectcomplete
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
Delay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodDelay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index Method
 
Post mortem report
Post mortem reportPost mortem report
Post mortem report
 
SEM 3 PM SUMMER 2014 ASSIGNMENTS
SEM 3 PM SUMMER 2014 ASSIGNMENTSSEM 3 PM SUMMER 2014 ASSIGNMENTS
SEM 3 PM SUMMER 2014 ASSIGNMENTS
 
Management For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of DelayManagement For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of Delay
 
Construction process
Construction processConstruction process
Construction process
 
Management Science Assignment
Management Science AssignmentManagement Science Assignment
Management Science Assignment
 
Project PlanProject ManagementSher.docx
Project PlanProject ManagementSher.docxProject PlanProject ManagementSher.docx
Project PlanProject ManagementSher.docx
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
Part (1 1)
Part (1 1)Part (1 1)
Part (1 1)
 
Project Delivery Lifecycle
Project Delivery LifecycleProject Delivery Lifecycle
Project Delivery Lifecycle
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
 
Project Management Demo
Project Management DemoProject Management Demo
Project Management Demo
 
Pm chapter 7
Pm chapter 7Pm chapter 7
Pm chapter 7
 
Pm chapter 7...
Pm chapter 7...Pm chapter 7...
Pm chapter 7...
 

Plus de 마 이환

Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
마 이환
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
마 이환
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
마 이환
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
마 이환
 
Organization Chart
Organization ChartOrganization Chart
Organization Chart
마 이환
 
Bank guarantee
Bank guaranteeBank guarantee
Bank guarantee
마 이환
 
Letter of invitation
Letter of invitationLetter of invitation
Letter of invitation
마 이환
 
Virtigo holding berhad
Virtigo holding berhadVirtigo holding berhad
Virtigo holding berhad
마 이환
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows
마 이환
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
마 이환
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides
마 이환
 
Case Study Report: The Summit
Case Study Report: The SummitCase Study Report: The Summit
Case Study Report: The Summit
마 이환
 
Assignment:Time Management
Assignment:Time ManagementAssignment:Time Management
Assignment:Time Management
마 이환
 

Plus de 마 이환 (19)

Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Internal memo
Internal memoInternal memo
Internal memo
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 
Organization Chart
Organization ChartOrganization Chart
Organization Chart
 
Bank guarantee
Bank guaranteeBank guarantee
Bank guarantee
 
Letter of invitation
Letter of invitationLetter of invitation
Letter of invitation
 
Virtigo holding berhad
Virtigo holding berhadVirtigo holding berhad
Virtigo holding berhad
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides
 
Case Study Report: The Summit
Case Study Report: The SummitCase Study Report: The Summit
Case Study Report: The Summit
 
Assignment:Time Management
Assignment:Time ManagementAssignment:Time Management
Assignment:Time Management
 

Dernier

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Dernier (20)

QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 

Final interview report

  • 1. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 1 Foundation In Natural & Built Environment January Intake 2012 Semester 1 Introduction To Construction Industry (FNBE0125) Lecturer : Pn. Hasmanira Final Project – Focus on Architect/Quantity Surveyor roles, process and procedures in completing a construction project. GROUP 6 Name Student ID no. Yam Yih Hwan 0305861 Chew Wen Lin 1007C10646 Janice Kong Yin Ying 0308798 Cromwell Augustine Jubili 0306595 Adrian HongSheng Jie 0308512 Alex Wong Kai Tze 0303228 Low RongTzuoo 0308336
  • 2. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 2 CONTENT Page no. 1) Cover Page 1 2) Table Content 2 3) Introduction 3 4) Information on Quantity Surveyor Firm 4 5) Flow Chart of the Interview 5 6) Progress 6-9 7) Interview Questions 10 8) Brief Answers 11-14 9) Responsibilities 15 10) Conclusion 16 Table Content
  • 3. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 3 Aim The purposes of this interview areto know the role ofa Quantity Surveyorin a construction site. It introduces the scope of work handled by Quantity Surveyor in construction with regards to their responsibility and duties in completing a construction project. During the interview, I learnt the need of compliance to particular requirements in obtaining authority approval. Besides that, I asked about the advantages of having a Quantity Surveyor on site and the disadvantages of not having a Quantity Surveyor on site. By the answers given by the Quantity Surveyor Firm, I get to conclude myself that Quantity Surveyor is an important role in a construction project. At the end of the interview, we gain the ability to document their observations and research as well as to communicate their findings. Introduction
  • 4. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 4 Personal Details Company Name JurukurBahanAnnor Department Quantity Surveying Firm Tel. No. (Office) 03-56310464 Fax No. 03-56348254 E-mail Address jubannor@streamyx.com Address 29B, Jalan SS15/4, Subang Jaya,47300, Petaling Jaya. PROFESSIONAL AFFILIATION/MEMBERSHIP Board of Quantity Surveyors Malaysia, Graduate Member, 2008, (National) Institute of Surveyor Malaysia, Graduate Member, 2007, (National) Institute of Value Management Malaysia (IVMM), Member, 2005, (National) Information on Quantity Surveyor Firm
  • 5. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 5 We called up the Quantity Surveyor Firm to make an appointment regarding on our assisgnment. Group Leader had divided every members works and must be completed before the interview date. On 1st June 2012, members in my group are required to be in campus by 12pm. We took Taylor's bus since the place is close by, around ss15. We had arrived and met the Quantity Surveyor. He brings us to look around. We started our interview with the Quantity Surveyor and completed our task at 4pm. Flow Chart of the Interview
  • 6. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 6 My group is Group 6; we have total number of 7 members. Each of us isdivided into different scale of works in order to smoothen our project without delay. Yam YihHwan: Prepared Interview Questions and the Final Report Chew Wen Lin: Made appointment with Quantity Surveyor Firm Cromwell Augustine Jubili: Interview the Quantity Surveyor Adrian Hong Sheng Jie: Research on the Quantity Surveyor Firm we are visiting Alex Wong Kai Tze: Provide paperwork and Interview the Quantity Surveyor Low RongTzuoo : Wrote down the answers given by Quantity Surveyor Janice Kong Yin Ying : Made our schedule to prevent it collide with other subjects Progress
  • 7. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 7
  • 8. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 8
  • 9. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 9
  • 10. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 10
  • 11. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 11 1. What is the work involved? It is about the 5 distinct stages as you mentioned, Preliminary Stage, Detailed Design Stage, Tender Stage, Construction Stage, Post- Construction Stage, can you briefly explain all the stages? 2. Can you tell us the process of getting plan approval, is there any problems encountered? Any amendments to the original submission as per request by authority? 3. We know that you are required to send in a proposal about the constructions costs, constructions materials and labour activities on particular project in order to get a contract approval from the authority, can you elaborate in details of this proposal? 4. As a quantity surveyor, how frequent does you carry out site inspection to check the work process? 5. After site inspection, do you report the work process to Project Manager or Project Director? What does the report is all about, can you specify it? 6. Does a quantity surveyor important in a construction? What are the advantages for having a quantity surveyor and the disadvantages for not having a quantity surveyor? Interview Questions
  • 12. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 12 What is the work involved? It is about the 5 distinct stages as you mentioned, Preliminary Stage, Detailed Design Stage, Tender Stage, Construction Stage, Post- Construction Stage, can you briefly explain all the stages? A Quantity Surveyormanages all costs relating to building and civil engineering projects, from the initial calculations to the final figures. Surveyors seek to minimize the costs of a project and enhance value for money, while still achieving the required standards and quality. Many of these are specified by statutory building regulations, which the surveyor needs to understand and adhere. A Quantity Surveyormay work for either the client or the contractor, working in an office or on-site. They are involved in a project from the start, preparing estimates and costs of the work. When the projectis in progress, quantity surveyors help other parties in the construction site.The title of the job may also be referred to as a construction cost consultant or commercial manager. Preliminary Stage or Early Stage is a phase of the starting of all construction. An example would be planning. What to do? How to do? When to do? The whole team of construction will come. Architect, Consultant Manager, Quantity Surveyor, and many more will have a brainstorming session. Tender Stage is a phase of tendering which involves firstly through a competitive exercise based on outline pricing and quality the identification of a preferred contracting organization; the second stage includes negotiation and working with the preferred contractor in order to arrive at a final price for the scheme. Brief answers
  • 13. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 13 Detailed Design Stage is a phase when all building construction projects include some elements in common – design, financial, estimating and legal considerations. Many projects of varying sizes reach undesirable end results, such as structural collapse, cost overruns, or litigation reason; those with experience in the field make detailed plans and maintain careful oversight during the project to ensure a positive outcome. Construction stage is a phase is a specific period, stipulated in a contract is the beginning from the date stated in the notice to proceed during which the contractor must complete construction, subject to the conditions of the contract. Post-construction stage is a phase of the construction; analyses arecarried out for the construction stage loads as well as other general loads,response spectrum, etc. Can you tell us the process of getting plan approval, is there any problems encountered? Any amendments to the original submission as per request by authority? A contractor's Quantity Surveyor is responsible for the performance of operations that mirror those of the owner's Quantity Surveyor; for example, the measurement and pricing of construction work, but specifically that actually performed by the contractor and the contractor's subcontractors, as opposed to the construction work described and measured in the construction contract between the owner and the contractor. Such a difference in quantity of work may arise from changes required by an owner, or by an architect or engineer on an owner's behalf.
  • 14. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 14 We know that you are required to send in a proposal about the constructions costs, constructions materials and labour activities on particular project in order to get a contract approval from the authority, can you elaborate in details of this proposal? Planning and monitoring of each activity, Preparation of Cash Flow for every month Billing, Co-coordinating with the site engineers to achieve the planned cash flow for inter payment certificate, Estimation of all the Bill of Quantities with the GFC drawings, preparation of Variation, Monthly Billing, Preparation of Monthly Progress Report, Updating Drawing schedule, Material approval list, material stock details, follow up with the client towards Billing etc.Supervision and quantity finalization of subcontractor’s bills.As per contract – preparation of claims, price variation and extra items.Project planning, scheduling, cost estimation, cost control & day today monitoring.Quantity Surveyor with monthly billing and preparation of Progress Report. As a quantity surveyor, how frequent does you carry out site inspection to check the work process? It's all depends on the construction and the schedule for one contract. As long as we ensure that the project adheres to local and national regulations. During the pre-construction, the responsibilities are to make sure the project adheres to local and national tax laws. Insurance is another aspect of the project. Insurance claims and cost of replacement are dealt with by the Quantity Surveyor. Valuable and accurate estimates of damages and costs of destroyed or damaged goods are also provided.
  • 15. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 15 After site inspection, do you report the work process to Project Manager or Project Director? What does the report is all about, can you specify it? We usually provide advice in decision making processes throughout the project management from start to finish. So, we usually have to report about price analysis, work items and quantity from up to date. Does a quantity surveyor important in a construction? What are the advantages for having a quantity surveyor and the disadvantages for not having a quantity surveyor? Of cause they do. Without us, the team is not complete. Without us, there isn't anybody doing the calculation and the precaution for the construction. The advantages would be we can keep our financial keep in check and to prevent financial crisis occurs. We also ensure that the resources of the construction industry are utilized to the best advantage of society by providing,inter alia,the financial management for projects and a cost consultancy service to theclient and designer during the whole construction process. The disadvantages would be the calculation is in our hands. If we calculate wrong, it might take money and time or even lives. That's why if you are not good in math or not confident in your calculation, don't do this firm.
  • 16. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 16 The responsibilities of a Quantity Surveyor:  carrying out initial feasibility studies, to assess costs and materials and estimate the amount of time needed for a project to be complete  ensuring that materials to be used during construction match up to environmental guidelines  negotiating costs and working with vendors to draw up bids for contracts  monitoring the construction of a building project to ensure costs and materials are in line with the initial assessment  updating the client on the progress of the project, with particular reference to financial matters  staying up-to-date on new standards in construction, property and surveying  preparing and maintaining financial records Responsibilities
  • 17. June 4, 2012 [INTRODUCTION TO CONSTRUCTION INDUSTRY] Group 6 | Final Interview Report 17 Quantity Surveyors estimate and manage the cost of construction projects. Their responsibilities begin at the planning stage and continue through the construction period. First, they interpret architectural or engineering drawings and specifications to calculate project costs. During the building stage, they monitor expenses and check on any changes in design to see whether the cost will be affected. They also provide monthly cash-flow forecasts to their client and may organize the amount and timing of payments to contractors. Quantity Surveyors work in partnership with architects, engineers, builders, contractors, suppliers and project owners. Students who are going to advance into Quantity Surveyor, it helps students to work as a team to finish up a given project. Besides that, it brings understanding of a construction process, on the way we interview a profession and documentation of proposal. Conclusion