Pre-Bid Conference ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Pre-Bid Conference ,[object Object],[object Object],[object Object],[object Object],[object Object]
Painting  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Roof  ,[object Object],[object Object],[object Object],[object Object],[object Object]
General  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object]
PEB Design
Pre Engineered Metal Building ( Major Components) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MAIN FRAMING ,[object Object]
PURLINS, GIRTS AND EAVE STRUTS ,[object Object],[object Object],[object Object]
PANELS AND INSULATION  ,[object Object],[object Object],[object Object]
PANELS AND INSULATION ,[object Object],[object Object],[object Object],[object Object]
PANELS AND INSULATION 2  ,[object Object],[object Object],[object Object],[object Object]
PAINTS AND FINISHES ,[object Object]
DOORS AND WINDOWS ,[object Object]
Design Codes ,[object Object],[object Object],[object Object]
Design Codes 2 ,[object Object],[object Object],[object Object]
Guidelines for PEB design  1 ,[object Object],[object Object],[object Object],[object Object]
Guidelines for PEB design 2 ,[object Object],[object Object],[object Object],[object Object]
PEB ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PEB TCCS = TAPERED COLUMN CLEAR SPAN
Steps in design of PEB ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Erection System 1 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Erection System 2 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Erection System 3 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PROCESSES PEB BUILT UP LINE COLD FORM LINE SHEETING PRIMARY MEMBERS CKD C & Z PURLINS LINE HR SECTIONS  & MISCELLANEOUS PARTS ROOF & WALL SHEETING GUTTER, FLASHINGS, TRIMS, ETC CKD CKD CKD ACCESSORIES SHIPMENT
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Electrical Issues ,[object Object],[object Object],[object Object],[object Object]
Fire Fighting-1 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Fire Fighting-2 ,[object Object],[object Object],[object Object],[object Object],[object Object]
Bar-coding and RFID 1 ,[object Object],[object Object]
Bar-coding and RFID- 2 ,[object Object],[object Object]
Interfacing of WMS, LMS, ICMS & MMIS ,[object Object]
Office area , Wash Rooms ,Change Rooms ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Location of Offices in the new setup ,[object Object],[object Object],[object Object]
Layout of New Office Complex. Dy. CMM DMS CDMS Computer Center AMM Office Complex DMS DMS CA  Visitors Area ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Soil test report
Modernization of Carriage Repairs Depot at Carriage Repair Workshop ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Plan of Parel Workshop CENTRAL WARD MAIN GATE
PAREL WORKSHOP LAYOUT
PROPOSED SITE FOR ASRS
 
Present Status
 
 
What and where is the central ward ? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Layout of C ward Dy.CMM-PL  Chamber CA/TA to  Dy.CMM lift AMM, Ledger Section & computer cell NF Ward DMS Returned stores  & platform Survey Plot &  Loading platform
LAYOUT  FOR THE PROPOSED ASRS AT THE CENTRAL WARD
Installation of IW-ASRS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Existing Plan of Roof for  Central Ward Existing Elevation of Roof for  Central Ward Dy.CMM-PL  Chamber CA/TA to  Dy.CMM lift AMM, Ledger Section & computer cell NF Ward DMS Returned stores  & platform Survey Plot &  Loading platform
Future elevation of Roof for  Central Ward Dy.CMM-PL  Chamber CA/TA to  Dy.CMM lift AMM, Ledger Section & computer cell NF Ward DMS Returned stores  & platform Survey Plot &  Loading platform
Layout of C ward Dy.CMM-PL  Chamber CA/TA to  Dy.CMM lift AMM, Ledger Section & computer cell NF Ward DMS Returned stores  & platform Survey Plot &  Loading platform
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Broad Design Parameter
General Specifications of IW-ASRS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Crane Rail with V-H Drives ,[object Object],[object Object],[object Object],[object Object]
Communication & Controls ,[object Object],[object Object],[object Object],[object Object],[object Object]
Rack & Pallets ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
. Automated Control: The Stacker Cranes should be linked to central computer control through WMS ( Warehouse Management System) within the warehouse & should include the  following operations  Inventory Control Software (ICS):  This module shall manage the inventory of the entire material stored in AS/RS and has the database of all transactions. Location Management Software Module (LMS): The Location of each pallet and its status shall be continuously monitored and controlled by the location Management software module. Handling Control Software Module (HCS): Handling Control software shall monitors the movement of the equipment and controls the functions of actual process of traveling, hoisting, forking etc Automated Controls
CIVIL CONSTRUCTION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Civil Work (Cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Civil Work (Cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object]
S/ASRS/LPL/2008/01  DATED 07.07.2008  opening  ON 07.10.2008 AT 11.00 HRS  SCOPE: Design , fabrication, supply, commissioning and testing of automated storage and retrieval system at carriage repair stores depot, lower Parel, Mumbai  EMD:  7.70 Lakhs. Expected time of completion:  12 TO 15 Months from the date of issue of  signing of contract Tender Details
Major work involved ,[object Object],[object Object]
CIVIL WORK INVOLVES Demolishing /dismantling of existing structure/building and segregation of dismantled debris along with their transportation to nominated Scrap Yards .  Construction of concrete platform of approximate height 1 Mtr For supporting entire ASRS structure.  Erection of pre-engineered modular steel  structure/building for housing the ASRS .  Provision of High Rise Racking System with minimum 3840 racking Locations  
Provision of cage and plain pallets for keeping material. Provision of High rise Fully Automated, Computer Controlled, Stacker Crane and Transfer Car system along with necessary Aisle Equipment0.  Provision of comprehensive Warehouse Management System.  Provision of Electricals, screened partition and fire protection system for complete ASRS system. CIVIL WORK . CONT.
Two bid system ,[object Object],[object Object],[object Object],[object Object],[object Object]
PAYMENT   TERMS ,[object Object],[object Object],[object Object],[object Object],[object Object]
PAYMENT   TERMS Payment will be made for the actual work done at site on pro-rata basis. The tendered is free to submit its stage payment schedule based on the activities involved such as dismantling of building, removal of debris, construction of ASRS platform, erection of columns, construction of roof etc.  Advance payment of  accepted rate/structural steel of bars, HTS wires, neoprene bearings, anchorages, sheathing etc. shall be made after bringing to the site of  work and on production of necessary purchase voucher/Test certificates, an insurance policy covering losses due to thefts & floods and against indemnity bond submitted by the contractors and accepted by competent authority. This advance is recoverable from running bills to the extant quantity of above material are consumed up to the running bills stage.   Sr.No Work Payment to be made Remarks. (a) Supply of reinforced steel 70% (b) Supply of material other than reinforced steel 60% (c) Fabrication & Erection 90% (d) On commissioning 100%
EMD & SD EMD. Deposit Receipt, Pay order,  Demand Draft, Guarantee Bonds. Performance Guarantee/Security Deposit To. Be deposited  Excise Duty & Modvat
Technical Specification 1 One Single Mast Stacker Crane for 1000 mm (W) X 1200 mm (D) X 1200 mm (H) Pallets of one ton capacity and capable of serving a height of 18 meters or more  Transfer Car – Racking System  Plain Steel Pallets -:  Qty 1920 Numbers of Four way entry Plain Steel pallets of  size – 1000 mm (W) X 1200 mm(D) X 1200 mm (H) Cage Steel Pallets :  Qty. 1920 Numbers of Four way entry four side wire mesh cage steel pallets of size – 1000 mm (W) X 1200 mm(D) X 1200 mm Mechanical Aisle Equipments:  Railway railwith adjustable clamps for holding the rails inposition & to ensure alignment. Top rail shall be mounted on the racking system through clamps
Electrical Aisle Equipments:  The Electrical aisle equipment shall consist of Power rail (fully enclosed Bus Bar), which is mounted on the racking system below the first loading level with necessary protection as feature as per Indian Electricity Act. Controls & Hardware  – All necessary controls, PLC, Hardware etc. Software  – Warehouse Management System and inverter control system OPERATION CYCLE Technical Specification 2
[object Object],[object Object],[object Object],[object Object],[object Object],Automated Controls and Software
DESIGN STANDARDS 1 The design of the AS/RS should conform to Indian and International standards, ensuring that best of the System is supplied. Following Indian and International Standards should be followed. IS 800 – 1984 General Construction on steel IS 801 – 1975 Code of practice for use of cold formed light gauge steel structural members in general building construction IS 10748 – 1984 Hot-rolled Steel Strip for Welded Tubes and Pipes – Specification IS 3655 – 1966 Recommended practice for electroplating IS 101 – 1964 Methods of Sampling and test for paints, varnishes and related Products
DESIGN STANDARDS 2 IS 2074 – 1992 Ready Mixed Paint, Air Drying, Red Oxide Zinc Chrome, Priming –  Specification IS 513 : Cold Rolled Low Carbon Steel Sheets & Strips IS 325 : 3-Phase induction motor – specifications. IS 1363 : Hexagon Head Bolts, Screws and Nuts IS 2062 : 1999 Steel for General Structural Purposes – Specification IS 4923 : 1997 Hollow Steel Sections for structural use IS 2266 : Steel Wire Rope for engineering purpose. IS 4923 : Hollow steel section for structural use. FEM 9.311 – 1978: Rules for Design of Storage & retrieval Machines – Structures. 5.1.15 FEM 9.831 – 1995 : Basis of calculation for Storage & retrieval Machines – Tolerances & Clearances within warehouse. 5.1.16 FEM 9.851 – 2003 : Performance Data of S/R Machines – Cycle Time.

Contenu connexe

Tendances

115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
hlksd
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
ong93
 
mild steel
 mild steel mild steel
mild steel
Anu Dang
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
neerajtri
 

Tendances (19)

Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildings
 
Steel
Steel Steel
Steel
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
 
Brochure eb 2017
Brochure eb 2017Brochure eb 2017
Brochure eb 2017
 
ct3 presentation slides
ct3 presentation slides ct3 presentation slides
ct3 presentation slides
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment
 
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
 
Metal roofing (mmbc 2 seminar 2020) 1
Metal roofing (mmbc 2 seminar 2020) 1Metal roofing (mmbc 2 seminar 2020) 1
Metal roofing (mmbc 2 seminar 2020) 1
 
STEEL CONSTRUCTION
STEEL CONSTRUCTIONSTEEL CONSTRUCTION
STEEL CONSTRUCTION
 
Ct 2-Theory Presentation
Ct 2-Theory PresentationCt 2-Theory Presentation
Ct 2-Theory Presentation
 
Floor and slab system design and construction
Floor and slab system design and constructionFloor and slab system design and construction
Floor and slab system design and construction
 
Roof system and roof construction
Roof system and roof constructionRoof system and roof construction
Roof system and roof construction
 
Steel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_edSteel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_ed
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
 
mild steel
 mild steel mild steel
mild steel
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
 
Steel Beams
Steel BeamsSteel Beams
Steel Beams
 
Steel
SteelSteel
Steel
 
STEEL CONSTRUCTION.pptx
STEEL CONSTRUCTION.pptxSTEEL CONSTRUCTION.pptx
STEEL CONSTRUCTION.pptx
 

En vedette

Presentacion pl
Presentacion plPresentacion pl
Presentacion pl
lineal
 
Por qué son importantes los software de
Por qué son importantes los software dePor qué son importantes los software de
Por qué son importantes los software de
lineal
 
Tecnologías de la Informacion
Tecnologías de la InformacionTecnologías de la Informacion
Tecnologías de la Informacion
Hero Valrey
 
Sistemas Logísticos
Sistemas LogísticosSistemas Logísticos
Sistemas Logísticos
tareasuvaq
 

En vedette (15)

Pre-Engineering Building (PEB Work) by Sai Corporation Vadodara
Pre-Engineering Building (PEB Work) by Sai Corporation VadodaraPre-Engineering Building (PEB Work) by Sai Corporation Vadodara
Pre-Engineering Building (PEB Work) by Sai Corporation Vadodara
 
Los Software Educativos
Los Software Educativos Los Software Educativos
Los Software Educativos
 
Presentacion pl
Presentacion plPresentacion pl
Presentacion pl
 
Por qué son importantes los software de
Por qué son importantes los software dePor qué son importantes los software de
Por qué son importantes los software de
 
Steel Construction: Manual Design-examples
Steel Construction: Manual Design-examplesSteel Construction: Manual Design-examples
Steel Construction: Manual Design-examples
 
Tecnologías de la Informacion
Tecnologías de la InformacionTecnologías de la Informacion
Tecnologías de la Informacion
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh Bhavsar
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt rit
 
SISTEMAS DE INFORMACIÓN LOGISTICA
SISTEMAS DE INFORMACIÓN LOGISTICASISTEMAS DE INFORMACIÓN LOGISTICA
SISTEMAS DE INFORMACIÓN LOGISTICA
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Sistemas Logísticos
Sistemas LogísticosSistemas Logísticos
Sistemas Logísticos
 
Tender
TenderTender
Tender
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011
 

Similaire à Pre Bid Conference

Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
mustafa hussain
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
hlksd
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
mustafa hussain
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
hlksd
 
Standard specifications
Standard specificationsStandard specifications
Standard specifications
hlksd
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
w ss
 
Catlogue
CatlogueCatlogue
Catlogue
Maxpromotion
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
w ss
 
Primasteel Roofs - Everest Industries Limited
Primasteel Roofs - Everest Industries LimitedPrimasteel Roofs - Everest Industries Limited
Primasteel Roofs - Everest Industries Limited
Vyas Jayesh K
 

Similaire à Pre Bid Conference (20)

New Life Steel Structures, Mumbai, Sheds and Steel Structures
 New Life Steel Structures, Mumbai, Sheds and Steel Structures New Life Steel Structures, Mumbai, Sheds and Steel Structures
New Life Steel Structures, Mumbai, Sheds and Steel Structures
 
Cl newlifesteel
Cl newlifesteelCl newlifesteel
Cl newlifesteel
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Steel shed manufacturer noida
Steel shed manufacturer noidaSteel shed manufacturer noida
Steel shed manufacturer noida
 
Assignment 2 (techniqes construction of mass building)
Assignment  2 (techniqes construction of mass building)Assignment  2 (techniqes construction of mass building)
Assignment 2 (techniqes construction of mass building)
 
Steel Roof Truss
Steel Roof TrussSteel Roof Truss
Steel Roof Truss
 
Roof truss
Roof trussRoof truss
Roof truss
 
Standard specifications
Standard specificationsStandard specifications
Standard specifications
 
Indiawarehousing pre engineered-buildings-peb
Indiawarehousing  pre engineered-buildings-pebIndiawarehousing  pre engineered-buildings-peb
Indiawarehousing pre engineered-buildings-peb
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
 
Catlogue
CatlogueCatlogue
Catlogue
 
Atrium Details
Atrium DetailsAtrium Details
Atrium Details
 
Pole type structures
Pole type structuresPole type structures
Pole type structures
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system report
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
 
Primasteel Roofs - Everest Industries Limited
Primasteel Roofs - Everest Industries LimitedPrimasteel Roofs - Everest Industries Limited
Primasteel Roofs - Everest Industries Limited
 

Plus de Jogendra Yadvendu

Old & new office yadvendu lower parel yadvendu
Old & new office yadvendu lower parel yadvenduOld & new office yadvendu lower parel yadvendu
Old & new office yadvendu lower parel yadvendu
Jogendra Yadvendu
 
Changes at Carriage Workshop, Lower Parel, Mumbai, India
Changes at Carriage Workshop, Lower Parel, Mumbai, IndiaChanges at Carriage Workshop, Lower Parel, Mumbai, India
Changes at Carriage Workshop, Lower Parel, Mumbai, India
Jogendra Yadvendu
 
Depot Modernisation Parel Wr
Depot Modernisation   Parel   WrDepot Modernisation   Parel   Wr
Depot Modernisation Parel Wr
Jogendra Yadvendu
 

Plus de Jogendra Yadvendu (16)

Wheel Slide Protection System in LHB FIAT Railway Coaches
Wheel Slide Protection System in LHB FIAT Railway  CoachesWheel Slide Protection System in LHB FIAT Railway  Coaches
Wheel Slide Protection System in LHB FIAT Railway Coaches
 
Brake binding in Rolling Stock
Brake binding in Rolling StockBrake binding in Rolling Stock
Brake binding in Rolling Stock
 
Electric locomotives of Indian Railways
Electric locomotives of Indian RailwaysElectric locomotives of Indian Railways
Electric locomotives of Indian Railways
 
Just do it.: A unflinching saga of change in a typical government setup
Just do it.: A unflinching saga of change in a typical government setupJust do it.: A unflinching saga of change in a typical government setup
Just do it.: A unflinching saga of change in a typical government setup
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
Dignity of labour by yadvendu
Dignity of labour by yadvenduDignity of labour by yadvendu
Dignity of labour by yadvendu
 
You get what you want: The saga of Matunga Workshop
You get what you want: The saga of Matunga WorkshopYou get what you want: The saga of Matunga Workshop
You get what you want: The saga of Matunga Workshop
 
Old & new office yadvendu lower parel yadvendu
Old & new office yadvendu lower parel yadvenduOld & new office yadvendu lower parel yadvendu
Old & new office yadvendu lower parel yadvendu
 
Changes at Carriage Workshop, Lower Parel, Mumbai, India
Changes at Carriage Workshop, Lower Parel, Mumbai, IndiaChanges at Carriage Workshop, Lower Parel, Mumbai, India
Changes at Carriage Workshop, Lower Parel, Mumbai, India
 
Presentation
PresentationPresentation
Presentation
 
Rfid Basics Qed
Rfid Basics QedRfid Basics Qed
Rfid Basics Qed
 
Amrs
AmrsAmrs
Amrs
 
Presentation
PresentationPresentation
Presentation
 
Peb
PebPeb
Peb
 
Amrs
AmrsAmrs
Amrs
 
Depot Modernisation Parel Wr
Depot Modernisation   Parel   WrDepot Modernisation   Parel   Wr
Depot Modernisation Parel Wr
 

Pre Bid Conference

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. PEB TCCS = TAPERED COLUMN CLEAR SPAN
  • 24.
  • 25.
  • 26.
  • 27.
  • 28. PROCESSES PEB BUILT UP LINE COLD FORM LINE SHEETING PRIMARY MEMBERS CKD C & Z PURLINS LINE HR SECTIONS & MISCELLANEOUS PARTS ROOF & WALL SHEETING GUTTER, FLASHINGS, TRIMS, ETC CKD CKD CKD ACCESSORIES SHIPMENT
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 40.
  • 41. Plan of Parel Workshop CENTRAL WARD MAIN GATE
  • 44.  
  • 46.  
  • 47.  
  • 48.
  • 49. Layout of C ward Dy.CMM-PL Chamber CA/TA to Dy.CMM lift AMM, Ledger Section & computer cell NF Ward DMS Returned stores & platform Survey Plot & Loading platform
  • 50. LAYOUT FOR THE PROPOSED ASRS AT THE CENTRAL WARD
  • 51.
  • 52. Existing Plan of Roof for Central Ward Existing Elevation of Roof for Central Ward Dy.CMM-PL Chamber CA/TA to Dy.CMM lift AMM, Ledger Section & computer cell NF Ward DMS Returned stores & platform Survey Plot & Loading platform
  • 53. Future elevation of Roof for Central Ward Dy.CMM-PL Chamber CA/TA to Dy.CMM lift AMM, Ledger Section & computer cell NF Ward DMS Returned stores & platform Survey Plot & Loading platform
  • 54. Layout of C ward Dy.CMM-PL Chamber CA/TA to Dy.CMM lift AMM, Ledger Section & computer cell NF Ward DMS Returned stores & platform Survey Plot & Loading platform
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60. . Automated Control: The Stacker Cranes should be linked to central computer control through WMS ( Warehouse Management System) within the warehouse & should include the following operations Inventory Control Software (ICS): This module shall manage the inventory of the entire material stored in AS/RS and has the database of all transactions. Location Management Software Module (LMS): The Location of each pallet and its status shall be continuously monitored and controlled by the location Management software module. Handling Control Software Module (HCS): Handling Control software shall monitors the movement of the equipment and controls the functions of actual process of traveling, hoisting, forking etc Automated Controls
  • 61.
  • 62.
  • 63.
  • 64. S/ASRS/LPL/2008/01 DATED 07.07.2008 opening ON 07.10.2008 AT 11.00 HRS SCOPE: Design , fabrication, supply, commissioning and testing of automated storage and retrieval system at carriage repair stores depot, lower Parel, Mumbai EMD: 7.70 Lakhs. Expected time of completion: 12 TO 15 Months from the date of issue of signing of contract Tender Details
  • 65.
  • 66. CIVIL WORK INVOLVES Demolishing /dismantling of existing structure/building and segregation of dismantled debris along with their transportation to nominated Scrap Yards . Construction of concrete platform of approximate height 1 Mtr For supporting entire ASRS structure. Erection of pre-engineered modular steel structure/building for housing the ASRS . Provision of High Rise Racking System with minimum 3840 racking Locations  
  • 67. Provision of cage and plain pallets for keeping material. Provision of High rise Fully Automated, Computer Controlled, Stacker Crane and Transfer Car system along with necessary Aisle Equipment0. Provision of comprehensive Warehouse Management System. Provision of Electricals, screened partition and fire protection system for complete ASRS system. CIVIL WORK . CONT.
  • 68.
  • 69.
  • 70. PAYMENT TERMS Payment will be made for the actual work done at site on pro-rata basis. The tendered is free to submit its stage payment schedule based on the activities involved such as dismantling of building, removal of debris, construction of ASRS platform, erection of columns, construction of roof etc. Advance payment of accepted rate/structural steel of bars, HTS wires, neoprene bearings, anchorages, sheathing etc. shall be made after bringing to the site of work and on production of necessary purchase voucher/Test certificates, an insurance policy covering losses due to thefts & floods and against indemnity bond submitted by the contractors and accepted by competent authority. This advance is recoverable from running bills to the extant quantity of above material are consumed up to the running bills stage. Sr.No Work Payment to be made Remarks. (a) Supply of reinforced steel 70% (b) Supply of material other than reinforced steel 60% (c) Fabrication & Erection 90% (d) On commissioning 100%
  • 71. EMD & SD EMD. Deposit Receipt, Pay order, Demand Draft, Guarantee Bonds. Performance Guarantee/Security Deposit To. Be deposited Excise Duty & Modvat
  • 72. Technical Specification 1 One Single Mast Stacker Crane for 1000 mm (W) X 1200 mm (D) X 1200 mm (H) Pallets of one ton capacity and capable of serving a height of 18 meters or more Transfer Car – Racking System Plain Steel Pallets -: Qty 1920 Numbers of Four way entry Plain Steel pallets of size – 1000 mm (W) X 1200 mm(D) X 1200 mm (H) Cage Steel Pallets : Qty. 1920 Numbers of Four way entry four side wire mesh cage steel pallets of size – 1000 mm (W) X 1200 mm(D) X 1200 mm Mechanical Aisle Equipments: Railway railwith adjustable clamps for holding the rails inposition & to ensure alignment. Top rail shall be mounted on the racking system through clamps
  • 73. Electrical Aisle Equipments: The Electrical aisle equipment shall consist of Power rail (fully enclosed Bus Bar), which is mounted on the racking system below the first loading level with necessary protection as feature as per Indian Electricity Act. Controls & Hardware – All necessary controls, PLC, Hardware etc. Software – Warehouse Management System and inverter control system OPERATION CYCLE Technical Specification 2
  • 74.
  • 75. DESIGN STANDARDS 1 The design of the AS/RS should conform to Indian and International standards, ensuring that best of the System is supplied. Following Indian and International Standards should be followed. IS 800 – 1984 General Construction on steel IS 801 – 1975 Code of practice for use of cold formed light gauge steel structural members in general building construction IS 10748 – 1984 Hot-rolled Steel Strip for Welded Tubes and Pipes – Specification IS 3655 – 1966 Recommended practice for electroplating IS 101 – 1964 Methods of Sampling and test for paints, varnishes and related Products
  • 76. DESIGN STANDARDS 2 IS 2074 – 1992 Ready Mixed Paint, Air Drying, Red Oxide Zinc Chrome, Priming – Specification IS 513 : Cold Rolled Low Carbon Steel Sheets & Strips IS 325 : 3-Phase induction motor – specifications. IS 1363 : Hexagon Head Bolts, Screws and Nuts IS 2062 : 1999 Steel for General Structural Purposes – Specification IS 4923 : 1997 Hollow Steel Sections for structural use IS 2266 : Steel Wire Rope for engineering purpose. IS 4923 : Hollow steel section for structural use. FEM 9.311 – 1978: Rules for Design of Storage & retrieval Machines – Structures. 5.1.15 FEM 9.831 – 1995 : Basis of calculation for Storage & retrieval Machines – Tolerances & Clearances within warehouse. 5.1.16 FEM 9.851 – 2003 : Performance Data of S/R Machines – Cycle Time.