Writing Evaluation Report of a Project
Mid and Final Term Evaluation Report Templet
Content
1. Executive Summery
2. Introductiontothe Project
3. Purpose of the Evaluation
4. Objective of the Evaluation
5. Methodology
6. EvaluationFindings
7. Strengthof the projectorganization
8. Areaof Improvement
9. Conclusion
10. Recommendation
11. Annexes
1. Executive Summery
The executive summary of an evaluation report is a shortened version of the full report. It highlights
the purpose of the evaluation, key questions, research methodology, evaluation findings,
conclusions and recommendations.
This summary provides a condensed version of the different sections – usually one to four pages –
and is placed at the start of the report. To write an effective summary, the original document must
be fully read with key ideas and important points highlighted. Re-write the highlighted sentences
briefly, skipping the unimportant details. The executive summary should contain the following details
in brief form:
 Background
 Purpose/Objective
 Methodology
 Key Findings and Conclusions
 Lessons Learned: Recommendations that can be generalized beyond the specific case to apply
to programs globally
 Recommendations: Overall suggestions of how the project/program can be improved based on
the findings
2. Introduction to the project
It is a brief summary of the background of the project, its objectives, planned outputs, outcomes,
impacts and stakeholders of the project. Introduction to the project states what the project aims to
achieve and what measures are to be taken for this purpose. Here information about the project team,
target area and donors can also be provided briefly.
3. Purpose of the Evaluation
It is a statement of why the assessment is needed, how it will benefit the program/project. In this
section the evaluator should state the purpose of this practice that may be to assess the degree of
achievements of the objectives and results of the project, as outlined in the proposal. The purpose of
the evaluation is usually mentioned in the Request for Proposal (RFP) too, so that document can also
be used as reference here.
4. Objective of the Evaluation
Objectives of the evaluation include assessing the relevance, effectiveness, efficiency, impacts and
sustainability of the project and its activities. These should be realistic, in line with the RFP and the
given resources (time and money). Objectives of the evaluation can also include what challenges were
faced during implementation of the project, important lessons learned and recommendations for the
future project implementation.
Sometimes the main purpose of the evaluation can be to focus on the process of implementation
rather than on its impact, since this would be minimal if the project has started short time ago or was
a short duration project. In this case it would also be important to access the participatory approaches
used to identify project beneficiaries and the communities’ role in implementing and monitoring the
project.
a. Problems and Needs (Relevance)
 Is the overall project design relevant to the specific problem and needs of the target
population?
b. Achievements of Purpose (Effectiveness)
 To what extent does the intended outputs and outcomes level indicators achieved in relation to
targets set up in the project document;
 How effective and appropriate is the project approach?
 How well was beneficiaries’ and stakeholders’ (including government) participation incorporated
in the project cycle?
 What was the quality of the M&E system?
c. Sound management andvalue for money(Efficiency)
 How far funding, staff, time and other resources contributing to or hindering the achievement
of the results. Is ‘Value for money’ achieving?
d. Achievement of wider effects (Impact)
 Who were the direct and indirect/wider beneficiaries of the project?
 Will the project activities be helpful in impacting the lives of the people? If the project is a
short-term, care should be taken about committing for long term impacts. What difference is
expected in the lives of those targeted in the project as compare the project baseline initial
bench marks?
e. Likelycontinuation of achieved results(Sustainability)
 What were the prospects for the benefits of the project being sustained after the funding will
be over?
 How was the exit strategy defined, and how this will be managed at the end of the funding
period?
5. Methodology
The evaluator should make use of this section to define what methods of research (Quantitative /
qualitative) did he/she used, what documents/reports did he/she study, how was the sampling done
and how did he/she arranged for knowing about the community’s feedback on the project. In short,
the evaluator should mention all of the sources of data collection, sampling techniques used,
methods of data collection (e.g. surveys, FGDs, key informant interviews, staff debriefing), data
analysis and documentation. Here he/she can also select or finalize the key areas of investigation
like:
1. Impact on beneficiaries and the community
2. Community participation
3. Selection and processing of beneficiaries
4. Project management and overall implementation process
It would also be necessary to include the limitations of the methodology, if any.
6. EvaluationFindings
Here the evaluator can discuss whether the project has adequate number of qualified and
experienced staff and whether they are performing their duties to the required performance level or
not. Details about individual staff members involved in the project can be included either as part of
this section or in the appendix, depending on the length and importance of this information.
a. Relevance
The evaluator should answer at least the following questions with regards to the project being
evaluated:
 What activities were planned/implemented and how relevant the activities are in the context of
what is to be achieved in the outcomes/impact
 Can it really bring lasting changes in the community?
 Are the activities culturally relevant?
 What are the shortcomings in the relevance of the planned activities in the proposal?
 To what extent the objectives of the project are still valid etc.
b. Effectiveness
 What is the degree of effectiveness of the activities on the lives of the people?
 To what extent were the objectives achieved
 Are people engaging and taking ownership of the project?
 What were the challenging factors?
c. Efficiency
Efficiency of the project should be assessed against its costs, human resources and time. Answers to
following questions should be found out:
 Are the outputs completed in specified time and allocated budget?
 Is the Burn rate of the project OK?
 Were activities cost efficient?
 Were objectives achieved on time?
 What alternatives were available and Was the best of the alternatives was chosen in
implementing activities?
d. Impact
This involves evaluation of all the social, economic and environmental changes, direct or indirect,
intended or unintended, produced by the project. An impact evaluation assesses changes in the well-
being of individuals, households, communities or firms that can be attributed to a particular project,
program or policy. The main impact evaluation question is what would have happened to the
beneficiaries if they had not received the program. The evaluator can gauge the number of
beneficiaries and see what real difference has the project or its activities made in the lives of the
people?
Impact evaluation provides feedback to help improve the design of programs and policies. In addition
to providing for improved accountability, impact evaluations are a tool for dynamic learning, allowing
policymakers to improve ongoing programs and ultimately better allocate funds across programs.
Information generated by impact evaluations informs decisions on whether to expand, modify, or
eliminate a particular policy or program and can be used in prioritizing public actions.
e. Sustainability
Sustainability or exit strategy of a project is a plan describing how the program will continue to achieve
its goal after the project funding has exhausted. The community should be the main stakeholder in
planning an exit strategy, as they are the most expert on their communities. Exit Strategies, when
planned and implemented correctly, can be a springboard for sustainable development.
The evaluator should answer the following questions:
 Will the project benefits continue after completion of the project?
 Is there an exit strategy? Is it being implemented?
 How effective is the exit strategy?
 Will the project be sustainable through this strategy? What are the challenges in carrying out
the exit strategy?
7. Strengthsof the Project/Organization
The evaluator should use this section to portray the strengths of the organization like staff
commitment, staff efficiency, organizational links and strong local presence, level of government
support, availability of resources (field office, equipment etc.), successful activities of project
implementation etc.
8. Areasof Improvement
Equipping field office, staff capacity building, staff turnover, increasing community involvement,
improvement in checks and balances system (M&E), planning and implementation, sustainability
strategy (exit strategy), security issues, linkages between outputs, outcomes and impact.
9. Conclusions
10.Recommendations
Recommendations/solutions. Evaluations often make recommendations about how a program can be
improved, how the risk of program failure can be reduced or whether a program should continue.
However, the inclusion of recommendations is based upon the provided terms of reference for the
evaluation. These should be formed on the basis of the evaluation findings and processes which
involve all the stakeholders.
11.Annexes
Reference
MonitoringandEvaluationStudies
http://www.mnestudies.com/evaluation/writing-evaluation-report-project?destination=node/181

More Related Content

What's hot

Project communication management
Project communication  managementProject communication  management
Project communication managementyouness jabbar
 
Sample of a Community Development project proposal writing
Sample of a Community Development project proposal writingSample of a Community Development project proposal writing
Sample of a Community Development project proposal writingMariki Belingtone
 
326918375-Barangay-Development-Planning.ppt
326918375-Barangay-Development-Planning.ppt326918375-Barangay-Development-Planning.ppt
326918375-Barangay-Development-Planning.pptbenito procia
 
Philippine Government Budgetary Processes
 Philippine Government Budgetary Processes Philippine Government Budgetary Processes
Philippine Government Budgetary ProcessesChristine Liz Jimenea
 
Problem & Objective Tree.pptx
Problem & Objective Tree.pptxProblem & Objective Tree.pptx
Problem & Objective Tree.pptxNimra zaman
 
Current Issues in Public Personnel Administration
Current Issues in Public Personnel AdministrationCurrent Issues in Public Personnel Administration
Current Issues in Public Personnel AdministrationJaypeeRojas
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: IndicatorsTony
 
Monitoring evaluation
Monitoring evaluationMonitoring evaluation
Monitoring evaluationCarlo Magno
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMichelle Joja
 
Project proposal
Project proposalProject proposal
Project proposalHuba Akhtar
 

What's hot (20)

Project communication management
Project communication  managementProject communication  management
Project communication management
 
Comprehensive Land Use Planning
Comprehensive Land Use Planning Comprehensive Land Use Planning
Comprehensive Land Use Planning
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
ISO for Local Government Units
ISO for Local Government UnitsISO for Local Government Units
ISO for Local Government Units
 
Project planning and project work plan
Project planning and project work planProject planning and project work plan
Project planning and project work plan
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
Regional Development Plan 2017-2022
Regional Development Plan 2017-2022Regional Development Plan 2017-2022
Regional Development Plan 2017-2022
 
Project Planning and Development
Project Planning and DevelopmentProject Planning and Development
Project Planning and Development
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Sample of a Community Development project proposal writing
Sample of a Community Development project proposal writingSample of a Community Development project proposal writing
Sample of a Community Development project proposal writing
 
326918375-Barangay-Development-Planning.ppt
326918375-Barangay-Development-Planning.ppt326918375-Barangay-Development-Planning.ppt
326918375-Barangay-Development-Planning.ppt
 
Philippines - climate change act 2009 - ccc
Philippines - climate change act 2009 - cccPhilippines - climate change act 2009 - ccc
Philippines - climate change act 2009 - ccc
 
Philippine Government Budgetary Processes
 Philippine Government Budgetary Processes Philippine Government Budgetary Processes
Philippine Government Budgetary Processes
 
Problem & Objective Tree.pptx
Problem & Objective Tree.pptxProblem & Objective Tree.pptx
Problem & Objective Tree.pptx
 
Current Issues in Public Personnel Administration
Current Issues in Public Personnel AdministrationCurrent Issues in Public Personnel Administration
Current Issues in Public Personnel Administration
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: Indicators
 
Monitoring evaluation
Monitoring evaluationMonitoring evaluation
Monitoring evaluation
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation Framework
 
Project proposal
Project proposalProject proposal
Project proposal
 

Similar to Writing evaluation report of a project

PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
Monitoring and Evaluation Unit 1.pptx
Monitoring and Evaluation Unit 1.pptxMonitoring and Evaluation Unit 1.pptx
Monitoring and Evaluation Unit 1.pptxVallentine Okumu
 
Program Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringProgram Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringThabang Nare
 
Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Harinder Goel
 
COMMUNITY EVALUATION 2023.pptx
COMMUNITY  EVALUATION 2023.pptxCOMMUNITY  EVALUATION 2023.pptx
COMMUNITY EVALUATION 2023.pptxgggadiel
 
Masterclass on project building
Masterclass on project buildingMasterclass on project building
Masterclass on project buildingtamsin.rose
 
Evaluating a Development Project.pptx
Evaluating a Development Project.pptxEvaluating a Development Project.pptx
Evaluating a Development Project.pptxMangasini Katundu
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)Regmi Milan
 
Monotoring and evaluation principles and theories
Monotoring and evaluation  principles and theoriesMonotoring and evaluation  principles and theories
Monotoring and evaluation principles and theoriescommochally
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraSandra Guevara
 

Similar to Writing evaluation report of a project (20)

PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Monitoring and Evaluation Unit 1.pptx
Monitoring and Evaluation Unit 1.pptxMonitoring and Evaluation Unit 1.pptx
Monitoring and Evaluation Unit 1.pptx
 
unit-3.pptx
unit-3.pptxunit-3.pptx
unit-3.pptx
 
Program Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringProgram Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post Monitoring
 
Ngo’s project management
Ngo’s project managementNgo’s project management
Ngo’s project management
 
Project Monitoring & Evaluation
Project Monitoring & EvaluationProject Monitoring & Evaluation
Project Monitoring & Evaluation
 
Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
 
COMMUNITY EVALUATION 2023.pptx
COMMUNITY  EVALUATION 2023.pptxCOMMUNITY  EVALUATION 2023.pptx
COMMUNITY EVALUATION 2023.pptx
 
Masterclass on project building
Masterclass on project buildingMasterclass on project building
Masterclass on project building
 
Project management
Project managementProject management
Project management
 
Evaluating a Development Project.pptx
Evaluating a Development Project.pptxEvaluating a Development Project.pptx
Evaluating a Development Project.pptx
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)
 
Assignment
Assignment Assignment
Assignment
 
Model of Programs.pptx
Model of Programs.pptxModel of Programs.pptx
Model of Programs.pptx
 
A2011214171642 1
A2011214171642 1A2011214171642 1
A2011214171642 1
 
Monotoring and evaluation principles and theories
Monotoring and evaluation  principles and theoriesMonotoring and evaluation  principles and theories
Monotoring and evaluation principles and theories
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandra
 
CIB8942.pdf
CIB8942.pdfCIB8942.pdf
CIB8942.pdf
 

More from 03363635718

Village Jaffar Khan Jalbani Pdf
Village Jaffar Khan Jalbani PdfVillage Jaffar Khan Jalbani Pdf
Village Jaffar Khan Jalbani Pdf03363635718
 
Article Issues of labor in bangle manufacturing factories
Article Issues of labor in bangle manufacturing factoriesArticle Issues of labor in bangle manufacturing factories
Article Issues of labor in bangle manufacturing factories03363635718
 
Socio-economic effect and consequences of flood 2015 Pdf
Socio-economic effect and consequences of flood 2015 PdfSocio-economic effect and consequences of flood 2015 Pdf
Socio-economic effect and consequences of flood 2015 Pdf03363635718
 
Summer Internship Report TRDP PDF
Summer Internship Report TRDP PDFSummer Internship Report TRDP PDF
Summer Internship Report TRDP PDF03363635718
 
POST PROJECT EVALUATION REPORT
POST PROJECT EVALUATION REPORTPOST PROJECT EVALUATION REPORT
POST PROJECT EVALUATION REPORT03363635718
 
ACTION RESEARCH PROJECT PHASE 111 - POST-RESEARCH
ACTION RESEARCH PROJECT PHASE 111 - POST-RESEARCHACTION RESEARCH PROJECT PHASE 111 - POST-RESEARCH
ACTION RESEARCH PROJECT PHASE 111 - POST-RESEARCH03363635718
 

More from 03363635718 (6)

Village Jaffar Khan Jalbani Pdf
Village Jaffar Khan Jalbani PdfVillage Jaffar Khan Jalbani Pdf
Village Jaffar Khan Jalbani Pdf
 
Article Issues of labor in bangle manufacturing factories
Article Issues of labor in bangle manufacturing factoriesArticle Issues of labor in bangle manufacturing factories
Article Issues of labor in bangle manufacturing factories
 
Socio-economic effect and consequences of flood 2015 Pdf
Socio-economic effect and consequences of flood 2015 PdfSocio-economic effect and consequences of flood 2015 Pdf
Socio-economic effect and consequences of flood 2015 Pdf
 
Summer Internship Report TRDP PDF
Summer Internship Report TRDP PDFSummer Internship Report TRDP PDF
Summer Internship Report TRDP PDF
 
POST PROJECT EVALUATION REPORT
POST PROJECT EVALUATION REPORTPOST PROJECT EVALUATION REPORT
POST PROJECT EVALUATION REPORT
 
ACTION RESEARCH PROJECT PHASE 111 - POST-RESEARCH
ACTION RESEARCH PROJECT PHASE 111 - POST-RESEARCHACTION RESEARCH PROJECT PHASE 111 - POST-RESEARCH
ACTION RESEARCH PROJECT PHASE 111 - POST-RESEARCH
 

Recently uploaded

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 

Recently uploaded (20)

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 

Writing evaluation report of a project

  • 1. Writing Evaluation Report of a Project Mid and Final Term Evaluation Report Templet Content 1. Executive Summery 2. Introductiontothe Project 3. Purpose of the Evaluation 4. Objective of the Evaluation 5. Methodology 6. EvaluationFindings 7. Strengthof the projectorganization 8. Areaof Improvement 9. Conclusion 10. Recommendation 11. Annexes 1. Executive Summery The executive summary of an evaluation report is a shortened version of the full report. It highlights the purpose of the evaluation, key questions, research methodology, evaluation findings, conclusions and recommendations. This summary provides a condensed version of the different sections – usually one to four pages – and is placed at the start of the report. To write an effective summary, the original document must be fully read with key ideas and important points highlighted. Re-write the highlighted sentences briefly, skipping the unimportant details. The executive summary should contain the following details in brief form:  Background  Purpose/Objective  Methodology  Key Findings and Conclusions  Lessons Learned: Recommendations that can be generalized beyond the specific case to apply to programs globally  Recommendations: Overall suggestions of how the project/program can be improved based on the findings
  • 2. 2. Introduction to the project It is a brief summary of the background of the project, its objectives, planned outputs, outcomes, impacts and stakeholders of the project. Introduction to the project states what the project aims to achieve and what measures are to be taken for this purpose. Here information about the project team, target area and donors can also be provided briefly. 3. Purpose of the Evaluation It is a statement of why the assessment is needed, how it will benefit the program/project. In this section the evaluator should state the purpose of this practice that may be to assess the degree of achievements of the objectives and results of the project, as outlined in the proposal. The purpose of the evaluation is usually mentioned in the Request for Proposal (RFP) too, so that document can also be used as reference here. 4. Objective of the Evaluation Objectives of the evaluation include assessing the relevance, effectiveness, efficiency, impacts and sustainability of the project and its activities. These should be realistic, in line with the RFP and the given resources (time and money). Objectives of the evaluation can also include what challenges were faced during implementation of the project, important lessons learned and recommendations for the future project implementation. Sometimes the main purpose of the evaluation can be to focus on the process of implementation rather than on its impact, since this would be minimal if the project has started short time ago or was a short duration project. In this case it would also be important to access the participatory approaches used to identify project beneficiaries and the communities’ role in implementing and monitoring the project. a. Problems and Needs (Relevance)  Is the overall project design relevant to the specific problem and needs of the target population? b. Achievements of Purpose (Effectiveness)  To what extent does the intended outputs and outcomes level indicators achieved in relation to targets set up in the project document;  How effective and appropriate is the project approach?
  • 3.  How well was beneficiaries’ and stakeholders’ (including government) participation incorporated in the project cycle?  What was the quality of the M&E system? c. Sound management andvalue for money(Efficiency)  How far funding, staff, time and other resources contributing to or hindering the achievement of the results. Is ‘Value for money’ achieving? d. Achievement of wider effects (Impact)  Who were the direct and indirect/wider beneficiaries of the project?  Will the project activities be helpful in impacting the lives of the people? If the project is a short-term, care should be taken about committing for long term impacts. What difference is expected in the lives of those targeted in the project as compare the project baseline initial bench marks? e. Likelycontinuation of achieved results(Sustainability)  What were the prospects for the benefits of the project being sustained after the funding will be over?  How was the exit strategy defined, and how this will be managed at the end of the funding period? 5. Methodology The evaluator should make use of this section to define what methods of research (Quantitative / qualitative) did he/she used, what documents/reports did he/she study, how was the sampling done and how did he/she arranged for knowing about the community’s feedback on the project. In short, the evaluator should mention all of the sources of data collection, sampling techniques used, methods of data collection (e.g. surveys, FGDs, key informant interviews, staff debriefing), data analysis and documentation. Here he/she can also select or finalize the key areas of investigation like: 1. Impact on beneficiaries and the community 2. Community participation 3. Selection and processing of beneficiaries 4. Project management and overall implementation process It would also be necessary to include the limitations of the methodology, if any.
  • 4. 6. EvaluationFindings Here the evaluator can discuss whether the project has adequate number of qualified and experienced staff and whether they are performing their duties to the required performance level or not. Details about individual staff members involved in the project can be included either as part of this section or in the appendix, depending on the length and importance of this information. a. Relevance The evaluator should answer at least the following questions with regards to the project being evaluated:  What activities were planned/implemented and how relevant the activities are in the context of what is to be achieved in the outcomes/impact  Can it really bring lasting changes in the community?  Are the activities culturally relevant?  What are the shortcomings in the relevance of the planned activities in the proposal?  To what extent the objectives of the project are still valid etc. b. Effectiveness  What is the degree of effectiveness of the activities on the lives of the people?  To what extent were the objectives achieved  Are people engaging and taking ownership of the project?  What were the challenging factors? c. Efficiency Efficiency of the project should be assessed against its costs, human resources and time. Answers to following questions should be found out:  Are the outputs completed in specified time and allocated budget?  Is the Burn rate of the project OK?  Were activities cost efficient?  Were objectives achieved on time?  What alternatives were available and Was the best of the alternatives was chosen in implementing activities?
  • 5. d. Impact This involves evaluation of all the social, economic and environmental changes, direct or indirect, intended or unintended, produced by the project. An impact evaluation assesses changes in the well- being of individuals, households, communities or firms that can be attributed to a particular project, program or policy. The main impact evaluation question is what would have happened to the beneficiaries if they had not received the program. The evaluator can gauge the number of beneficiaries and see what real difference has the project or its activities made in the lives of the people? Impact evaluation provides feedback to help improve the design of programs and policies. In addition to providing for improved accountability, impact evaluations are a tool for dynamic learning, allowing policymakers to improve ongoing programs and ultimately better allocate funds across programs. Information generated by impact evaluations informs decisions on whether to expand, modify, or eliminate a particular policy or program and can be used in prioritizing public actions. e. Sustainability Sustainability or exit strategy of a project is a plan describing how the program will continue to achieve its goal after the project funding has exhausted. The community should be the main stakeholder in planning an exit strategy, as they are the most expert on their communities. Exit Strategies, when planned and implemented correctly, can be a springboard for sustainable development. The evaluator should answer the following questions:  Will the project benefits continue after completion of the project?  Is there an exit strategy? Is it being implemented?  How effective is the exit strategy?  Will the project be sustainable through this strategy? What are the challenges in carrying out the exit strategy? 7. Strengthsof the Project/Organization The evaluator should use this section to portray the strengths of the organization like staff commitment, staff efficiency, organizational links and strong local presence, level of government support, availability of resources (field office, equipment etc.), successful activities of project implementation etc.
  • 6. 8. Areasof Improvement Equipping field office, staff capacity building, staff turnover, increasing community involvement, improvement in checks and balances system (M&E), planning and implementation, sustainability strategy (exit strategy), security issues, linkages between outputs, outcomes and impact. 9. Conclusions 10.Recommendations Recommendations/solutions. Evaluations often make recommendations about how a program can be improved, how the risk of program failure can be reduced or whether a program should continue. However, the inclusion of recommendations is based upon the provided terms of reference for the evaluation. These should be formed on the basis of the evaluation findings and processes which involve all the stakeholders. 11.Annexes