SlideShare une entreprise Scribd logo
1  sur  10
TIPS IN DEVELOPING SPM
      Surabaya, 24 September 2011
TIP S
TIP 1: TAKE TIME TO STUDY THE STANDARD AND REVIEW AVAILABLE
SUPPORTING IMPLEMENTATION GUIDANCE

TIP 2: COMPARE CURRENT QC SYSTEM WITH ISQC 1

TIP 3: TAILOR THE QC POLICIES AND PROCEDURES

TIP 4: ASSESS THE NEED FOR OUTSIDE HELP

TIP 5: EDUCATION AND TRAINING
TIP 1 :
    TAKE TIM E TO S TU D Y TH E S TAN D AR D AN D R E VIE W AVAILABLE
             S U P P O R TIN G IM P LE M E N TATIO N G U ID AN C E
ISQC 1 requires those personnel within the firm who are
responsible for establishing and maintaining the firm’s
system of quality control to have an understanding of the
entire text of the standard, including its application and
other explanatory material, in order to apply the
requirements properly.

Without reading the full standard, there is a risk that
some requirements will get missed, that the aim and
scope of some of the requirements will not be fully
understood, or that helpful application guidance will be
overlooked.
TIP 2:
           C O M PAR E C U R R E N T Q C S YS TE M WITH
                              IS Q C 1
Does your firm’s current QC system meet all the requirements of ISQC 1?

ISQC 1 requires firms to document their QC policies and procedures. These
documented policies and procedures may help facilitate a gap analysis against
the requirements of the standard by:
a) comparing each requirement within the standard to the existing policies and
procedures;
b) highlighting those requirements not currently met; and
c) determining what changes need to be made.
Consider also if your firm has had any significant changes in its operations in
recent years—for example, it may have started providing a new service or
accepting new types of clients—as this too may indicate that the current QC
system is in need of updating.
TIP 2:
       C O M PAR E C U R R E N T Q C S YS TE M WITH
                          IS Q C 1
Such a manual could usefully act as a key communication tool between all
partners and staff to set expectations and may, therefore, also serve as a
framework within which to develop performance evaluation criteria.
Revisions or additions of new policies or procedures that are necessary to
close any gaps between the current QC system and the requirements of ISQC
1 can then simply be edited or inserted into the manual.
In order to be able to demonstrate how the QC policies and procedures meet
the requirements of ISQC 1—whether for internal purposes or external
inspection purposes—it may be useful to consider cross- referencing directly
between the quality control manual and ISQC 1 or preparing a mapping
document that compares the two.
TIP 3:
                     TAILO R TH E Q C P O LIC IE S AN D
                             PRO C E D U R E S
While the elements of a QC system are common to all firms no matter their size,
smaller and simpler practices will often have smaller and simpler QC systems.
ISQC 1 includes considerations specific to smaller practices in the application
and other explanatory material section. For example, smaller firms may employ
less formal methods of evaluating the performance of their personnel (see ISQC 1,
paragraph A29).
ISQC 1 also recognizes that some requirements are not always relevant. For
example, sole practitioners with no staff would not require policies and procedures
for the assignment of appropriate personnel to the engagement team, for certain
review responsibilities, and for the annual communication of the results of
monitoring to engagement partners within the firm (see ISQC 1, paragraph A1).
ISQC 1 requires firms to document their QC policies and procedures. The standard
also acknowledges that, for smaller firms, such documentation may be less formal
and less extensive than for larger firms (see ISQC 1, paragraph A3).
Firms may also consider adding to their QC policies and procedures through
maintaining a wider awareness of good practices, thereby further helping them
achieve the overall goal of lasting quality.
TIP 4:
            AS S E S S TH E N E E D F O R O U TS ID E H E LP

ISQC 1 acknowledges that smaller firms may have more limited internal
resources and, therefore, may need outside help in order to meet the
requirements of the standard. The standard identifies four areas where this
may be the case—consultation, engagement quality control reviews,
monitoring, and dealing with complaints and allegations—and provides
guidance for identifying and deploying a suitable external party (see ISQC 1,
paragraphs A40, A50, A68, and A72 respectively).
The independent monitoring requirement poses a unique challenge to smaller
firms and sole practitioners.
ISQC 1 requires the inspection of at least one completed engagement for each
engagement partner on a cyclical (not necessarily annual) basis and
specifically prohibits the use of personnel involved         in performing an
engagement from also performing an inspection of files for that engagement.
TIP 4:
            AS S E S S TH E N E E D F O R O U TS ID E H E LP

For some small firms, these requirements may automatically necessitate an
external review or reduce the number of engagements capable of being
reviewed internally. In the latter case, consider the application material in the
standard (see ISQC 1, paragraphs A64–A67) and focus, ultimately, on deciding
whether, as a result of the engagement selection, the monitoring process
provides the firm with reasonable assurance that its QC policies and
procedures are relevant, adequate, and operating effectively, as required by the
standard.
Firms may consider making arrangements with other smaller firms or sole
proprietors to perform a monitoring inspection of each others’ files. This process
need not be time consuming and will likely result in a beneficial sharing of ideas
relating to quality improvement and engagement efficiency.
Whenever using outside help, take appropriate steps to confirm the external
party’s competence, independence, and confidentiality with them, preferably in
writing and perhaps as part of a wider written communication setting out the full
terms of the arrangement.
TIP 5:
                  E D U C ATIO N AN D TR AIN IN G

Firm-wide training on ISQC 1 will contribute positively to effective
compliance. By providing firm-wide training, firms can deliver a
consistent message to all and may use ISQC 1 to help promote the
firm’s wider commitment to quality and the use of best practices.
Training programs also offer the opportunity to create awareness of
any changes that need to be made to firm policies and procedures,
along with guid-ance as to what the changes are, how the QC system
has been updated, and how to implement the changes.

After an initial training session on changes to the QC system,
consider follow-up and reinforcement through periodic reminders of
personnel’s responsibility to adhere to the firm’s policies and
procedures.
S U M M ARY

Compliance with      ISQC 1 provides firms with the
opportunity to promote a culture that places quality front
and center. In turn, embedding such a culture within the
firm will not only help fulfill the objective set out in the
standard, but may also contribute to firms’ ability to
consistently meet stakeholder expectations.

Contenu connexe

Tendances

Iso Process Audit Training
Iso Process Audit TrainingIso Process Audit Training
Iso Process Audit Trainingsrmortensen
 
standard operating procedure pharmacy
standard operating procedure pharmacystandard operating procedure pharmacy
standard operating procedure pharmacysagar858
 
Iso Internal Auditor
Iso Internal AuditorIso Internal Auditor
Iso Internal AuditorDanyah Hejaij
 
Elements Of An Effective Quality Management System
Elements Of An Effective Quality Management SystemElements Of An Effective Quality Management System
Elements Of An Effective Quality Management Systemgauravdhupar
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management SystemSyed Muhammad Danish
 
Iso 9001 2015 checklist
Iso 9001 2015 checklistIso 9001 2015 checklist
Iso 9001 2015 checklistAtul Sharma
 
Internal auditchecklistiso9001 2015
Internal auditchecklistiso9001 2015Internal auditchecklistiso9001 2015
Internal auditchecklistiso9001 2015Dinesh Kumar
 
Presentasi Danang W
Presentasi Danang WPresentasi Danang W
Presentasi Danang WDANANG WID
 
Developing Effective Standard Operating Procedures
Developing Effective Standard Operating Procedures Developing Effective Standard Operating Procedures
Developing Effective Standard Operating Procedures CTSI at UCSF
 
QMS importance in Pharma companies
QMS importance in Pharma companiesQMS importance in Pharma companies
QMS importance in Pharma companiesVijay Banwala
 
QUALITY AUDITS
QUALITY AUDITSQUALITY AUDITS
QUALITY AUDITSMcpl Moshi
 
Standard operating procedure
Standard operating procedure  Standard operating procedure
Standard operating procedure PRANJAY PATIL
 
Audit and regulatory compliance
Audit  and  regulatory complianceAudit  and  regulatory compliance
Audit and regulatory complianceArchana Chavhan
 
7 Questions to Ask When Auditing Your Customer Success Processes
7 Questions to Ask When Auditing Your Customer Success Processes 7 Questions to Ask When Auditing Your Customer Success Processes
7 Questions to Ask When Auditing Your Customer Success Processes LizzyManz
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management SystemAsamHussain3
 
Quality Management System Qmspowerpoint
Quality Management System QmspowerpointQuality Management System Qmspowerpoint
Quality Management System QmspowerpointMojgan Talebian
 
QMS in Manufacturing Industries
QMS in Manufacturing IndustriesQMS in Manufacturing Industries
QMS in Manufacturing IndustriesMD. SELIM REZA
 

Tendances (20)

Iso Process Audit Training
Iso Process Audit TrainingIso Process Audit Training
Iso Process Audit Training
 
standard operating procedure pharmacy
standard operating procedure pharmacystandard operating procedure pharmacy
standard operating procedure pharmacy
 
Iso Internal Auditor
Iso Internal AuditorIso Internal Auditor
Iso Internal Auditor
 
Elements Of An Effective Quality Management System
Elements Of An Effective Quality Management SystemElements Of An Effective Quality Management System
Elements Of An Effective Quality Management System
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management System
 
Iso 9001 2015 checklist
Iso 9001 2015 checklistIso 9001 2015 checklist
Iso 9001 2015 checklist
 
Quality audit plan
Quality audit planQuality audit plan
Quality audit plan
 
Internal auditchecklistiso9001 2015
Internal auditchecklistiso9001 2015Internal auditchecklistiso9001 2015
Internal auditchecklistiso9001 2015
 
Presentasi Danang W
Presentasi Danang WPresentasi Danang W
Presentasi Danang W
 
Developing Effective Standard Operating Procedures
Developing Effective Standard Operating Procedures Developing Effective Standard Operating Procedures
Developing Effective Standard Operating Procedures
 
QMS importance in Pharma companies
QMS importance in Pharma companiesQMS importance in Pharma companies
QMS importance in Pharma companies
 
I Q5 2 Training
I Q5 2 TrainingI Q5 2 Training
I Q5 2 Training
 
QUALITY AUDITS
QUALITY AUDITSQUALITY AUDITS
QUALITY AUDITS
 
Project on sop part 2
Project on sop part 2Project on sop part 2
Project on sop part 2
 
Standard operating procedure
Standard operating procedure  Standard operating procedure
Standard operating procedure
 
Audit and regulatory compliance
Audit  and  regulatory complianceAudit  and  regulatory compliance
Audit and regulatory compliance
 
7 Questions to Ask When Auditing Your Customer Success Processes
7 Questions to Ask When Auditing Your Customer Success Processes 7 Questions to Ask When Auditing Your Customer Success Processes
7 Questions to Ask When Auditing Your Customer Success Processes
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
Quality Management System Qmspowerpoint
Quality Management System QmspowerpointQuality Management System Qmspowerpoint
Quality Management System Qmspowerpoint
 
QMS in Manufacturing Industries
QMS in Manufacturing IndustriesQMS in Manufacturing Industries
QMS in Manufacturing Industries
 

En vedette

Beneficios de la mecanización de despachos de auditoría
Beneficios de la mecanización de despachos de auditoríaBeneficios de la mecanización de despachos de auditoría
Beneficios de la mecanización de despachos de auditoríaEsteban Uyarra Encalado
 
ISQC 1 training for smp's
ISQC 1 training for smp'sISQC 1 training for smp's
ISQC 1 training for smp'sRansford Armah
 
11 introducción normas internacionales de la calidad iso
11 introducción normas internacionales de la calidad iso11 introducción normas internacionales de la calidad iso
11 introducción normas internacionales de la calidad iso0329MARIAPAULA
 
Presentación audiQ, software para el control de calidad en firmas de auditoría
Presentación audiQ, software para el control de calidad en firmas de auditoríaPresentación audiQ, software para el control de calidad en firmas de auditoría
Presentación audiQ, software para el control de calidad en firmas de auditoríaAudinfor
 
Mapa conceptual de de normas internacionales de calidad
Mapa conceptual de de normas internacionales de calidadMapa conceptual de de normas internacionales de calidad
Mapa conceptual de de normas internacionales de calidad91angeles
 
Control de Calidad. Elemento estructural en los servicios de auditoria
Control de Calidad. Elemento estructural en los servicios de auditoriaControl de Calidad. Elemento estructural en los servicios de auditoria
Control de Calidad. Elemento estructural en los servicios de auditoriaCastañeda Mejía & Asociados
 
Sistemas y Normas Internacionales de Calidad
Sistemas y Normas Internacionales de CalidadSistemas y Normas Internacionales de Calidad
Sistemas y Normas Internacionales de CalidadEGLISMERCEDES18
 
Qué son los ISA/NIA, cómo han evolucionado y cuál es su estado actual
Qué son los ISA/NIA, cómo han evolucionado y cuál es su estado actualQué son los ISA/NIA, cómo han evolucionado y cuál es su estado actual
Qué son los ISA/NIA, cómo han evolucionado y cuál es su estado actualSamuel A. Mantilla
 
Información General sobre Normas Internacionales de Auditoria
Información General sobre Normas Internacionales de AuditoriaInformación General sobre Normas Internacionales de Auditoria
Información General sobre Normas Internacionales de AuditoriaCastañeda Mejía & Asociados
 

En vedette (12)

Charla zaragoza control calidad
Charla zaragoza control calidadCharla zaragoza control calidad
Charla zaragoza control calidad
 
Beneficios de la mecanización de despachos de auditoría
Beneficios de la mecanización de despachos de auditoríaBeneficios de la mecanización de despachos de auditoría
Beneficios de la mecanización de despachos de auditoría
 
ISQC 1 training for smp's
ISQC 1 training for smp'sISQC 1 training for smp's
ISQC 1 training for smp's
 
11 introducción normas internacionales de la calidad iso
11 introducción normas internacionales de la calidad iso11 introducción normas internacionales de la calidad iso
11 introducción normas internacionales de la calidad iso
 
Presentación audiQ, software para el control de calidad en firmas de auditoría
Presentación audiQ, software para el control de calidad en firmas de auditoríaPresentación audiQ, software para el control de calidad en firmas de auditoría
Presentación audiQ, software para el control de calidad en firmas de auditoría
 
Articulo partida doble julio nicc1
Articulo partida doble julio nicc1Articulo partida doble julio nicc1
Articulo partida doble julio nicc1
 
Mapa conceptual de de normas internacionales de calidad
Mapa conceptual de de normas internacionales de calidadMapa conceptual de de normas internacionales de calidad
Mapa conceptual de de normas internacionales de calidad
 
Control de Calidad. Elemento estructural en los servicios de auditoria
Control de Calidad. Elemento estructural en los servicios de auditoriaControl de Calidad. Elemento estructural en los servicios de auditoria
Control de Calidad. Elemento estructural en los servicios de auditoria
 
Sistemas y Normas Internacionales de Calidad
Sistemas y Normas Internacionales de CalidadSistemas y Normas Internacionales de Calidad
Sistemas y Normas Internacionales de Calidad
 
Qué son los ISA/NIA, cómo han evolucionado y cuál es su estado actual
Qué son los ISA/NIA, cómo han evolucionado y cuál es su estado actualQué son los ISA/NIA, cómo han evolucionado y cuál es su estado actual
Qué son los ISA/NIA, cómo han evolucionado y cuál es su estado actual
 
Información General sobre Normas Internacionales de Auditoria
Información General sobre Normas Internacionales de AuditoriaInformación General sobre Normas Internacionales de Auditoria
Información General sobre Normas Internacionales de Auditoria
 
Exposicion nicc 1, nia 200, 210 y 220
Exposicion nicc 1, nia 200, 210 y 220Exposicion nicc 1, nia 200, 210 y 220
Exposicion nicc 1, nia 200, 210 y 220
 

Similaire à Tips developing isqc1 [repaired]

AUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptxAUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptxMohamed Fazil M
 
What is Validation and why do RTOs need to complete the Process?
What is Validation and why do RTOs need to complete the Process?What is Validation and why do RTOs need to complete the Process?
What is Validation and why do RTOs need to complete the Process?Skynet Education
 
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIPISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIPDian Hermawan
 
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIPISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIPDian Hermawan
 
Audit Check List
Audit Check ListAudit Check List
Audit Check Listspschandel
 
Business management 1 A
Business management 1 A Business management 1 A
Business management 1 A Yasmina Rayeh
 
Adoption of the pics guide to gmp pe009 13
Adoption of the pics guide to gmp pe009 13Adoption of the pics guide to gmp pe009 13
Adoption of the pics guide to gmp pe009 13TGA Australia
 
standard operating procedue ppt
standard operating procedue pptstandard operating procedue ppt
standard operating procedue pptShakil Mirza
 
Iso 9001 quality manual example
Iso 9001 quality manual exampleIso 9001 quality manual example
Iso 9001 quality manual examplejohnfabianski333
 
Iso 9001 internal audit tips
Iso 9001 internal audit tipsIso 9001 internal audit tips
Iso 9001 internal audit tipsBaptist Molai
 
NQA ISO 9001 Implementation Guide
NQA ISO 9001 Implementation GuideNQA ISO 9001 Implementation Guide
NQA ISO 9001 Implementation GuideNQA
 
Requirements Engineering: A Good Practice Guide
Requirements Engineering: A Good Practice GuideRequirements Engineering: A Good Practice Guide
Requirements Engineering: A Good Practice GuideIan Sommerville
 
NQA - ISO 9001 Implementation Guide
NQA - ISO 9001 Implementation GuideNQA - ISO 9001 Implementation Guide
NQA - ISO 9001 Implementation GuideNA Putra
 
5 Errors To Avoid When Implementing Iso 13485
5 Errors To Avoid When Implementing Iso 134855 Errors To Avoid When Implementing Iso 13485
5 Errors To Avoid When Implementing Iso 13485MedTech Review, LLC
 
US5620 A3 2012002052 FS
US5620 A3 2012002052 FSUS5620 A3 2012002052 FS
US5620 A3 2012002052 FSPhillip Jonker
 

Similaire à Tips developing isqc1 [repaired] (20)

IEMA ISO14001 - External Auditors viewpoint
IEMA ISO14001 - External Auditors viewpoint IEMA ISO14001 - External Auditors viewpoint
IEMA ISO14001 - External Auditors viewpoint
 
4 iso 9001 2000 standard
4 iso 9001 2000 standard4 iso 9001 2000 standard
4 iso 9001 2000 standard
 
AUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptxAUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptx
 
What is Validation and why do RTOs need to complete the Process?
What is Validation and why do RTOs need to complete the Process?What is Validation and why do RTOs need to complete the Process?
What is Validation and why do RTOs need to complete the Process?
 
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIPISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
 
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIPISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
ISO 9000 AND TOTAL QUALITY MANAGEMENT: THE RELATIONSHIP
 
Quality Assurance
Quality AssuranceQuality Assurance
Quality Assurance
 
Audit Check List
Audit Check ListAudit Check List
Audit Check List
 
Business management 1 A
Business management 1 A Business management 1 A
Business management 1 A
 
Adoption of the pics guide to gmp pe009 13
Adoption of the pics guide to gmp pe009 13Adoption of the pics guide to gmp pe009 13
Adoption of the pics guide to gmp pe009 13
 
Qms iso 9000
Qms iso 9000Qms iso 9000
Qms iso 9000
 
standard operating procedue ppt
standard operating procedue pptstandard operating procedue ppt
standard operating procedue ppt
 
Iso 9001 quality manual example
Iso 9001 quality manual exampleIso 9001 quality manual example
Iso 9001 quality manual example
 
Iso 9001 internal audit tips
Iso 9001 internal audit tipsIso 9001 internal audit tips
Iso 9001 internal audit tips
 
IFAC-MIA Malaysia quality assurance workshop
IFAC-MIA Malaysia quality assurance workshopIFAC-MIA Malaysia quality assurance workshop
IFAC-MIA Malaysia quality assurance workshop
 
NQA ISO 9001 Implementation Guide
NQA ISO 9001 Implementation GuideNQA ISO 9001 Implementation Guide
NQA ISO 9001 Implementation Guide
 
Requirements Engineering: A Good Practice Guide
Requirements Engineering: A Good Practice GuideRequirements Engineering: A Good Practice Guide
Requirements Engineering: A Good Practice Guide
 
NQA - ISO 9001 Implementation Guide
NQA - ISO 9001 Implementation GuideNQA - ISO 9001 Implementation Guide
NQA - ISO 9001 Implementation Guide
 
5 Errors To Avoid When Implementing Iso 13485
5 Errors To Avoid When Implementing Iso 134855 Errors To Avoid When Implementing Iso 13485
5 Errors To Avoid When Implementing Iso 13485
 
US5620 A3 2012002052 FS
US5620 A3 2012002052 FSUS5620 A3 2012002052 FS
US5620 A3 2012002052 FS
 

Plus de gisilowati

Cfa corporate finance chapter3
Cfa corporate finance chapter3Cfa corporate finance chapter3
Cfa corporate finance chapter3gisilowati
 
Cfa corporate finance chapter2
Cfa corporate finance chapter2Cfa corporate finance chapter2
Cfa corporate finance chapter2gisilowati
 
SA 800-820 - revisedx
SA 800-820 - revisedxSA 800-820 - revisedx
SA 800-820 - revisedxgisilowati
 
Kerangka utk Perikatan Asurans - revisedx
Kerangka utk Perikatan Asurans - revisedxKerangka utk Perikatan Asurans - revisedx
Kerangka utk Perikatan Asurans - revisedxgisilowati
 
SA 500 - 580 - revisedx
SA 500 - 580 - revisedxSA 500 - 580 - revisedx
SA 500 - 580 - revisedxgisilowati
 
SA 200 - 265 - revisedx
SA 200 - 265 - revisedxSA 200 - 265 - revisedx
SA 200 - 265 - revisedxgisilowati
 
SA 700 - 720 - revisedx
SA 700 - 720 - revisedxSA 700 - 720 - revisedx
SA 700 - 720 - revisedxgisilowati
 
SA 600 - 620 - revisedx
SA 600 - 620 - revisedxSA 600 - 620 - revisedx
SA 600 - 620 - revisedxgisilowati
 
SA 300 - 450 - Revisi Pak Godangx
SA 300 - 450 - Revisi Pak GodangxSA 300 - 450 - Revisi Pak Godangx
SA 300 - 450 - Revisi Pak Godangxgisilowati
 
Semarang 06 pebr 2012 konvergensi ifrs - kajian penerapan psak tertentu yan...
Semarang 06 pebr 2012   konvergensi ifrs - kajian penerapan psak tertentu yan...Semarang 06 pebr 2012   konvergensi ifrs - kajian penerapan psak tertentu yan...
Semarang 06 pebr 2012 konvergensi ifrs - kajian penerapan psak tertentu yan...gisilowati
 
7 tips for success
7 tips for success7 tips for success
7 tips for successgisilowati
 
Pokok pokok perubahan ad (2012) materi sosialisasi (semarang)
Pokok pokok perubahan ad (2012) materi sosialisasi (semarang)Pokok pokok perubahan ad (2012) materi sosialisasi (semarang)
Pokok pokok perubahan ad (2012) materi sosialisasi (semarang)gisilowati
 
Spm paska uu 5 2011 - surabaya 24 sep2011
Spm paska uu 5 2011 -  surabaya 24 sep2011Spm paska uu 5 2011 -  surabaya 24 sep2011
Spm paska uu 5 2011 - surabaya 24 sep2011gisilowati
 

Plus de gisilowati (13)

Cfa corporate finance chapter3
Cfa corporate finance chapter3Cfa corporate finance chapter3
Cfa corporate finance chapter3
 
Cfa corporate finance chapter2
Cfa corporate finance chapter2Cfa corporate finance chapter2
Cfa corporate finance chapter2
 
SA 800-820 - revisedx
SA 800-820 - revisedxSA 800-820 - revisedx
SA 800-820 - revisedx
 
Kerangka utk Perikatan Asurans - revisedx
Kerangka utk Perikatan Asurans - revisedxKerangka utk Perikatan Asurans - revisedx
Kerangka utk Perikatan Asurans - revisedx
 
SA 500 - 580 - revisedx
SA 500 - 580 - revisedxSA 500 - 580 - revisedx
SA 500 - 580 - revisedx
 
SA 200 - 265 - revisedx
SA 200 - 265 - revisedxSA 200 - 265 - revisedx
SA 200 - 265 - revisedx
 
SA 700 - 720 - revisedx
SA 700 - 720 - revisedxSA 700 - 720 - revisedx
SA 700 - 720 - revisedx
 
SA 600 - 620 - revisedx
SA 600 - 620 - revisedxSA 600 - 620 - revisedx
SA 600 - 620 - revisedx
 
SA 300 - 450 - Revisi Pak Godangx
SA 300 - 450 - Revisi Pak GodangxSA 300 - 450 - Revisi Pak Godangx
SA 300 - 450 - Revisi Pak Godangx
 
Semarang 06 pebr 2012 konvergensi ifrs - kajian penerapan psak tertentu yan...
Semarang 06 pebr 2012   konvergensi ifrs - kajian penerapan psak tertentu yan...Semarang 06 pebr 2012   konvergensi ifrs - kajian penerapan psak tertentu yan...
Semarang 06 pebr 2012 konvergensi ifrs - kajian penerapan psak tertentu yan...
 
7 tips for success
7 tips for success7 tips for success
7 tips for success
 
Pokok pokok perubahan ad (2012) materi sosialisasi (semarang)
Pokok pokok perubahan ad (2012) materi sosialisasi (semarang)Pokok pokok perubahan ad (2012) materi sosialisasi (semarang)
Pokok pokok perubahan ad (2012) materi sosialisasi (semarang)
 
Spm paska uu 5 2011 - surabaya 24 sep2011
Spm paska uu 5 2011 -  surabaya 24 sep2011Spm paska uu 5 2011 -  surabaya 24 sep2011
Spm paska uu 5 2011 - surabaya 24 sep2011
 

Dernier

Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 

Dernier (20)

Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 

Tips developing isqc1 [repaired]

  • 1. TIPS IN DEVELOPING SPM Surabaya, 24 September 2011
  • 2. TIP S TIP 1: TAKE TIME TO STUDY THE STANDARD AND REVIEW AVAILABLE SUPPORTING IMPLEMENTATION GUIDANCE TIP 2: COMPARE CURRENT QC SYSTEM WITH ISQC 1 TIP 3: TAILOR THE QC POLICIES AND PROCEDURES TIP 4: ASSESS THE NEED FOR OUTSIDE HELP TIP 5: EDUCATION AND TRAINING
  • 3. TIP 1 : TAKE TIM E TO S TU D Y TH E S TAN D AR D AN D R E VIE W AVAILABLE S U P P O R TIN G IM P LE M E N TATIO N G U ID AN C E ISQC 1 requires those personnel within the firm who are responsible for establishing and maintaining the firm’s system of quality control to have an understanding of the entire text of the standard, including its application and other explanatory material, in order to apply the requirements properly. Without reading the full standard, there is a risk that some requirements will get missed, that the aim and scope of some of the requirements will not be fully understood, or that helpful application guidance will be overlooked.
  • 4. TIP 2: C O M PAR E C U R R E N T Q C S YS TE M WITH IS Q C 1 Does your firm’s current QC system meet all the requirements of ISQC 1? ISQC 1 requires firms to document their QC policies and procedures. These documented policies and procedures may help facilitate a gap analysis against the requirements of the standard by: a) comparing each requirement within the standard to the existing policies and procedures; b) highlighting those requirements not currently met; and c) determining what changes need to be made. Consider also if your firm has had any significant changes in its operations in recent years—for example, it may have started providing a new service or accepting new types of clients—as this too may indicate that the current QC system is in need of updating.
  • 5. TIP 2: C O M PAR E C U R R E N T Q C S YS TE M WITH IS Q C 1 Such a manual could usefully act as a key communication tool between all partners and staff to set expectations and may, therefore, also serve as a framework within which to develop performance evaluation criteria. Revisions or additions of new policies or procedures that are necessary to close any gaps between the current QC system and the requirements of ISQC 1 can then simply be edited or inserted into the manual. In order to be able to demonstrate how the QC policies and procedures meet the requirements of ISQC 1—whether for internal purposes or external inspection purposes—it may be useful to consider cross- referencing directly between the quality control manual and ISQC 1 or preparing a mapping document that compares the two.
  • 6. TIP 3: TAILO R TH E Q C P O LIC IE S AN D PRO C E D U R E S While the elements of a QC system are common to all firms no matter their size, smaller and simpler practices will often have smaller and simpler QC systems. ISQC 1 includes considerations specific to smaller practices in the application and other explanatory material section. For example, smaller firms may employ less formal methods of evaluating the performance of their personnel (see ISQC 1, paragraph A29). ISQC 1 also recognizes that some requirements are not always relevant. For example, sole practitioners with no staff would not require policies and procedures for the assignment of appropriate personnel to the engagement team, for certain review responsibilities, and for the annual communication of the results of monitoring to engagement partners within the firm (see ISQC 1, paragraph A1). ISQC 1 requires firms to document their QC policies and procedures. The standard also acknowledges that, for smaller firms, such documentation may be less formal and less extensive than for larger firms (see ISQC 1, paragraph A3). Firms may also consider adding to their QC policies and procedures through maintaining a wider awareness of good practices, thereby further helping them achieve the overall goal of lasting quality.
  • 7. TIP 4: AS S E S S TH E N E E D F O R O U TS ID E H E LP ISQC 1 acknowledges that smaller firms may have more limited internal resources and, therefore, may need outside help in order to meet the requirements of the standard. The standard identifies four areas where this may be the case—consultation, engagement quality control reviews, monitoring, and dealing with complaints and allegations—and provides guidance for identifying and deploying a suitable external party (see ISQC 1, paragraphs A40, A50, A68, and A72 respectively). The independent monitoring requirement poses a unique challenge to smaller firms and sole practitioners. ISQC 1 requires the inspection of at least one completed engagement for each engagement partner on a cyclical (not necessarily annual) basis and specifically prohibits the use of personnel involved in performing an engagement from also performing an inspection of files for that engagement.
  • 8. TIP 4: AS S E S S TH E N E E D F O R O U TS ID E H E LP For some small firms, these requirements may automatically necessitate an external review or reduce the number of engagements capable of being reviewed internally. In the latter case, consider the application material in the standard (see ISQC 1, paragraphs A64–A67) and focus, ultimately, on deciding whether, as a result of the engagement selection, the monitoring process provides the firm with reasonable assurance that its QC policies and procedures are relevant, adequate, and operating effectively, as required by the standard. Firms may consider making arrangements with other smaller firms or sole proprietors to perform a monitoring inspection of each others’ files. This process need not be time consuming and will likely result in a beneficial sharing of ideas relating to quality improvement and engagement efficiency. Whenever using outside help, take appropriate steps to confirm the external party’s competence, independence, and confidentiality with them, preferably in writing and perhaps as part of a wider written communication setting out the full terms of the arrangement.
  • 9. TIP 5: E D U C ATIO N AN D TR AIN IN G Firm-wide training on ISQC 1 will contribute positively to effective compliance. By providing firm-wide training, firms can deliver a consistent message to all and may use ISQC 1 to help promote the firm’s wider commitment to quality and the use of best practices. Training programs also offer the opportunity to create awareness of any changes that need to be made to firm policies and procedures, along with guid-ance as to what the changes are, how the QC system has been updated, and how to implement the changes. After an initial training session on changes to the QC system, consider follow-up and reinforcement through periodic reminders of personnel’s responsibility to adhere to the firm’s policies and procedures.
  • 10. S U M M ARY Compliance with ISQC 1 provides firms with the opportunity to promote a culture that places quality front and center. In turn, embedding such a culture within the firm will not only help fulfill the objective set out in the standard, but may also contribute to firms’ ability to consistently meet stakeholder expectations.