SlideShare a Scribd company logo
1 of 46
Presentation on Majid
Sarani
Presented by :
Group: 13
Roll: 1723051, 1723052, 1723053,
1723054, 1723059
Course Title : Landscape Design
Course No : BECM 3208
Topic : Problem Identification of the landscape of
Majid Sarani Road, Khulna
 Majid Sarani is located in Khulna,
Bangladesh.
 Majid Sarani has a length of 1.26
km.
 The annual average temperature on
this site is 26.3 °C (79.3 °F) &
annual average rainfall is 1,809.4
millimeters (71.24 in)
Short description of Majid Sarani Road, Khulna
Major Problems on Majid Sarani Road :
 Damage Road
 Improper Drainage System
 Lidless Drain & Manhole
 Under Construction Buildings Beside
The Road
 Lack of Parking System
 Illegal Sidewalk Occupation
 Unplanned Connecting Road
Damage Road
At several point, the road is highly damaged and unfit to be in use.
Reason behind this problem
 Low quality materials
 Unawareness of traffic rules
 Corruption
Solutions
 Using proper materials
 Construct in layers
 Designing for worst case scenario
 Regular maintenance
Improper Drainage System
Improper drainage system causes waterlogging on the road.
Reason behind this problem
 Over and above disposal of solid waste into the drains
and drainage paths are accounted for the prime causes
of blockage in drainage system and water logging
 Inadequate drainage sections
 Absence of inlets and outlets
 Lack of proper maintenance of existing drainage system
Solutions
 Using impermeable materials
 Installing under path drainage system
 The existing drains and also those will be constructed
shall have to cleaned at regular interval
 Maintenance and cleaning of drains shall have to done at
least once in every year specially before starting of
monsoon season
Lidless Drain & Manhole
Lidless drains in several places occurs bad odor and
sometimes accidents too.
Reason behind this problem
 Theft of manhole covers due to the lack of monitoring
of the road safety
 For cleaning purpose
Solutions
 Cover the manholes & strict rules for stealing those.
 Regular maintenance
Under Construction Buildings Beside The Road
Some buildings that are currently being constructed beside the road without providing any
safety. That may causes accident and public harm.
Reason behind this problem
 Ignorance to the basic rules of construction safety by
the companies.
 Unawareness about the danger that can happen from it
Solutions
 Maintain strict rules about safety materials so that all
construction companies must follow
 Using safety net
 Using modern instruments
 Using skilled workers
Lack of Parking System
Cars are parked on the road which causes the road to be narrowed and occurs traffic jam in peak
hours.
Reason behind this problem
 Lack of proper planning
 Insufficient space
 Tendency of breaking rules
Solutions
 Properly utilize the space on the road
side.
 90° car parking
Illegal occupancy of sidewalk by parking,
hawkers obstruct the movement of
pedestrian and often causes traffic jam
Illegal Sidewalk Occupation
Reason behind this problem
 Unplanned parking
 Hawker/ Illegal small shop
Solutions
 Eviction of the hawker/ small shop
 Make appropriate arrangement for parking
There are several roads connected with the
main road which are unplanned and those cause
traffic jam, road crossing problem and
unwanted accidents too.
Unplanned Connecting Road
Reason behind this problem
 Narrow connecting point
 Absence of traffic signal system
 Absence of road/ over head crossing
 Vehicle parking
Solutions
 Setting up the signal system
 Make appropriate arrangement for
parking
 Build up over head / road crossing
Presentation on Majid
Sarani
Presented by :
Group: 13
Roll: 1723051, 1723052, 1723053,
1723054, 1723059
Course Title : Landscape Design
Course No : BECM 3208
Topic : Case Study on Various Streets
Champs-Élysées
Avenue
Paris, France
Information
• Champs-Élysées Avenue
• The name is French for the Elysian Field, the place for
dead heroes in Greek Mythology
• From Place La de la Concorde to Arc de Triomphe
• 8th Arrondissement in northwestern Paris,France
• 1.91 Km Long, 70m (230ft) Wide
• 8 Lane Highway
Speciality
• Popular tourist spot
• Two major public squire at both end
• Consists many shopping mall
• Avg. 64000 vehicles pass through per day
• Foot traffic average 100000 people
Zoning
Vehicle road
Cycle lane
Parking
Vegetation
Pedestrian walkway
Vegetation
Pedestrian walkway
Problems & Re-Design
• Air pollution from the estimated 3,000 vehicles per hour
• Since 2016, the avenue has been closed to motor traffic on the
first Sunday of every month
• It is announced that the city would transform the Champs-
Élysées into an "extraordinary garden"
• Vision 2030 has taken to create more pedestrian space, and
create "tunnels of trees" for improved air quality
• The plans are meant to make the avenue more "ecological,
desirable and inclusive"
Walkway and Crossing
• 2 lane of walkway each side
• Broad walkway
• Separated from main road by vegetation
• Setting arrangement is installed in walkway
zone
• Lighting feature is added between the
walkway lane
Lighting
Feature
Walkway and Crossing[Cont.]
• Setting arrangement is installed in walkway
zone
• Traffic signal system is used in every crossing
• Zebra Crossing is used
• Space for cycle crossing alongside zebra
crossing
Transport
• Avg. 64000 vehicles pass through per day
• Paris Metro Line runs under the Champs-Élysées
• 4 metro station nearby the road
• This heavy traffic is controlled by advance traffic
system
Metro Station
Entry
Metro Station
Drainage System
• Underground Drainage System is used
Potential Issues
• High rent is causing the loss of its small businesses and thus the street’s original identity
• The street requires constant maintenance to keep the corridor safe and clean
• Crossing wide, heavy trafficked roads is challenging for pedestrians
• The outdoor dining and kiosks on the sidewalk sometimes block the pedestrian flow
Orchard Road
Singapore
About
• Orchard Road
• Named from nutmeg, pepper and fruit
orchards or the plantations that the road
once led to
• Central Area, Singapore
• 2.5 km long
Speciality
• Famous Shopping HUB in Singapore
• Tourist Spot
• Famous street in South East Asia
• Consists over 20 shopping malls
Zoning
Vehicle road
Parking
Vegetation and setting
Arrangement
Pedestrian walkway
Walkway
• Broad sidewalks
• Well constructed
• Setting Arrangement is installed
Drainage
• Underground drainage is used
• The Stamford Diversion Canal (SDC) and Stamford
Detention Tank (SDT) is aimed to keep the roads flood-
free
• This detention tank has a capacity of 38000 cubic m
storage
Fig.: STD
Fig.: Deep Sewer
Drainage System Mechanism
Transport
• Orchard road can be accessed via three main stops on the
Singapore MRT Network
• Buses of several companies provided access to Orchard
Road
• Bus stop positions are marked on the last lane of the road
Fig.: Bus Stops
Fig.: MRT Map
Slovenska Street
Ljubljana City, Slovenia
Street Name: Slovenska Cesta in Ljubljana
Location: Ljubljana, Slovenia
Area: 14000 m2
Renovation Completion Date: 2015
Architect: Dekleva Gregorič arhitekti, Katušič
Kocbek arhitekti, Sadar + Vuga, Scapelab, Studio
Krištof
 The New Slovenska Street project is based on cutting-edge
concepts in public space design.
 The former four-lane road was transformed into the central
city avenue.
Information
 The main street of the city is the Slovenska
which crosses the city in the north-south
direction.
 Two pairs of large bus stations are placed on
the street
Specification
 It is also the stage for many important events in
the city, such as the marathon and the annual
cycling race, various demonstrations, and the
record-breaking square dance of the city's high-
school graduates.
Zoning
Vehicle road
Pedestrian walkway
Bus stoppage
Vegetation
Cycle lane
 The street is divided in
to tree sections, with a
concrete road surface
and paved pedestrian
area.
 Through narrowing of
the roadway there is
now more space for
pedestrians, cyclists
and restaurant and bar
gardens.
Section View of The Road
Problems & Renovation
 It was a busy four-lane road with
the large volume of pedestrian and
bus traffic
 A car-oriented traffic road
 Vegetation was low
 No safety & space for pedestrian
 From car-oriented, the road is transformed into
a space which gives priority to public transport,
pedestrians and cyclists
 By placing two pairs of large bus stations the
street truly becomes a central transport hub for
public transport
 The complete arrangement ties the fragmented
area together into a uniform space with a
prominently green character.
Problems &
Renovation
Pedestrian Area
 Through narrowing of the roadway there is now
more space for pedestrians, cyclists and
restaurant and bar gardens
 The urban furniture of the street encourages
people to stop and rest in the space
 Despite the large volume of pedestrian and bus
traffic it is designed as a “shared space”, a space,
where users participate equally, and height
differences are reduced to a minimum.
Transport System
 By designing a space which promotes
sustainable mobility and public transport in the
very center, the city has made a key step in it's
transport policy
 The absence of personal motor traffic allows for
the expansion of programs and the creation of
a space with its own character.
 This allows for an optimized bus transportation
service
Vegetation & Drainage System
• A new tree line of manna ash trees was planted
on the eastern side of the street, which is lit by
the afternoon sun.
• The manna ash trees are resistant to the urban
environment, and will adorn the space with
white flowers in the spring and bright yellow
foliage in the fall.
• Drainage system is connected with the vegetation
as it is established within the tree plantation
system.
Case study on Majid Sarani & various streets

More Related Content

What's hot

Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa Sonali Shah
 
Theory Of Urban Design - Mental Map ,Serial Vision
Theory Of Urban Design - Mental Map ,Serial VisionTheory Of Urban Design - Mental Map ,Serial Vision
Theory Of Urban Design - Mental Map ,Serial VisionBimenpreet Kaur
 
Central Bus Station, Vadodara
Central Bus Station, VadodaraCentral Bus Station, Vadodara
Central Bus Station, VadodaraMridul Bhandari
 
all-housings-by-laurie baker a true architect of kerala
all-housings-by-laurie baker a true architect of kerala all-housings-by-laurie baker a true architect of kerala
all-housings-by-laurie baker a true architect of kerala Bharatiya Vidya Bhavan
 
Architecture and Planning of jaipur
Architecture and Planning of jaipurArchitecture and Planning of jaipur
Architecture and Planning of jaipursaumyakohli
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case studyAr. Prerna Chouhan
 
CHENNAI CITY -URBAN SPRAWL
CHENNAI CITY -URBAN  SPRAWL CHENNAI CITY -URBAN  SPRAWL
CHENNAI CITY -URBAN SPRAWL Manju Arjunan
 
CEPT UNIVERSITY PPT
CEPT UNIVERSITY PPTCEPT UNIVERSITY PPT
CEPT UNIVERSITY PPTSai Vineeth
 
Housing design n standards
Housing design n standardsHousing design n standards
Housing design n standardsJoshuaL3
 
Amanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAmanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAjinkya Randive
 
Architectural skills development centre
Architectural skills development centreArchitectural skills development centre
Architectural skills development centrePrachi Gupta
 
Public Realm In Cities
Public Realm In CitiesPublic Realm In Cities
Public Realm In CitiesUday Yadav
 
Soria y mata
Soria y mataSoria y mata
Soria y mataAyaz Khan
 
Ahmedabad bus rapid transit system
Ahmedabad bus rapid transit systemAhmedabad bus rapid transit system
Ahmedabad bus rapid transit systemFagner Glinski
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showkiranightly
 

What's hot (20)

Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa
 
Report
ReportReport
Report
 
Theory Of Urban Design - Mental Map ,Serial Vision
Theory Of Urban Design - Mental Map ,Serial VisionTheory Of Urban Design - Mental Map ,Serial Vision
Theory Of Urban Design - Mental Map ,Serial Vision
 
Central Bus Station, Vadodara
Central Bus Station, VadodaraCentral Bus Station, Vadodara
Central Bus Station, Vadodara
 
Site analysis
Site analysisSite analysis
Site analysis
 
all-housings-by-laurie baker a true architect of kerala
all-housings-by-laurie baker a true architect of kerala all-housings-by-laurie baker a true architect of kerala
all-housings-by-laurie baker a true architect of kerala
 
Architecture and Planning of jaipur
Architecture and Planning of jaipurArchitecture and Planning of jaipur
Architecture and Planning of jaipur
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case study
 
Radburn
RadburnRadburn
Radburn
 
CHENNAI CITY -URBAN SPRAWL
CHENNAI CITY -URBAN  SPRAWL CHENNAI CITY -URBAN  SPRAWL
CHENNAI CITY -URBAN SPRAWL
 
CASE STUDY-LANDSCAPE
CASE STUDY-LANDSCAPECASE STUDY-LANDSCAPE
CASE STUDY-LANDSCAPE
 
cannaught place
cannaught place cannaught place
cannaught place
 
CEPT UNIVERSITY PPT
CEPT UNIVERSITY PPTCEPT UNIVERSITY PPT
CEPT UNIVERSITY PPT
 
Housing design n standards
Housing design n standardsHousing design n standards
Housing design n standards
 
Amanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAmanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case Study
 
Architectural skills development centre
Architectural skills development centreArchitectural skills development centre
Architectural skills development centre
 
Public Realm In Cities
Public Realm In CitiesPublic Realm In Cities
Public Realm In Cities
 
Soria y mata
Soria y mataSoria y mata
Soria y mata
 
Ahmedabad bus rapid transit system
Ahmedabad bus rapid transit systemAhmedabad bus rapid transit system
Ahmedabad bus rapid transit system
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
 

Similar to Case study on Majid Sarani & various streets

Energy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesEnergy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesTiE Bangalore
 
Anmol hoon roads
Anmol hoon roadsAnmol hoon roads
Anmol hoon roadsAnmol Hoon
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition surveyapu roy
 
Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoSJ Ohi
 
Brad Strader - downtown transportation
Brad Strader - downtown transportationBrad Strader - downtown transportation
Brad Strader - downtown transportationsenecasuccess
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyTim Pheby
 
Redesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, WarangalRedesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, Warangalshrikrishna kesharwani
 
Paul Froggatt - KWR presentation
Paul Froggatt - KWR presentationPaul Froggatt - KWR presentation
Paul Froggatt - KWR presentationJumpingJaq
 
L8 issues for people living in urban areas in rich countries traffic
L8 issues for people living in urban areas in rich countries   trafficL8 issues for people living in urban areas in rich countries   traffic
L8 issues for people living in urban areas in rich countries traffictudorgeog
 
Task 9 Kajang Local Plan For Sustainable Development (a133921)
Task 9    Kajang Local Plan For Sustainable Development (a133921)Task 9    Kajang Local Plan For Sustainable Development (a133921)
Task 9 Kajang Local Plan For Sustainable Development (a133921)izham27
 
BRTS Delhi transportation
BRTS Delhi transportation BRTS Delhi transportation
BRTS Delhi transportation Tanzil Faraz
 
Analysis and key findings
Analysis and key findingsAnalysis and key findings
Analysis and key findingsIsha Kirti
 

Similar to Case study on Majid Sarani & various streets (20)

Energy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesEnergy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building Envelopes
 
Anmol hoon roads
Anmol hoon roadsAnmol hoon roads
Anmol hoon roads
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition survey
 
Presentration 2
Presentration 2Presentration 2
Presentration 2
 
Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: Chicago
 
Urban redevelopment
Urban redevelopmentUrban redevelopment
Urban redevelopment
 
Brad Strader - downtown transportation
Brad Strader - downtown transportationBrad Strader - downtown transportation
Brad Strader - downtown transportation
 
Complete Streets in Large Urban Counties
Complete Streets in Large Urban CountiesComplete Streets in Large Urban Counties
Complete Streets in Large Urban Counties
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
 
GW-Codman-all
GW-Codman-allGW-Codman-all
GW-Codman-all
 
Redesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, WarangalRedesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, Warangal
 
Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street  Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street
 
Bhubaneswar Street Design Guidelines
Bhubaneswar Street Design GuidelinesBhubaneswar Street Design Guidelines
Bhubaneswar Street Design Guidelines
 
Paul Froggatt - KWR presentation
Paul Froggatt - KWR presentationPaul Froggatt - KWR presentation
Paul Froggatt - KWR presentation
 
L8 issues for people living in urban areas in rich countries traffic
L8 issues for people living in urban areas in rich countries   trafficL8 issues for people living in urban areas in rich countries   traffic
L8 issues for people living in urban areas in rich countries traffic
 
Nehru place - Case Study
Nehru place - Case StudyNehru place - Case Study
Nehru place - Case Study
 
Task 9 Kajang Local Plan For Sustainable Development (a133921)
Task 9    Kajang Local Plan For Sustainable Development (a133921)Task 9    Kajang Local Plan For Sustainable Development (a133921)
Task 9 Kajang Local Plan For Sustainable Development (a133921)
 
BRTS Delhi transportation
BRTS Delhi transportation BRTS Delhi transportation
BRTS Delhi transportation
 
Analysis and key findings
Analysis and key findingsAnalysis and key findings
Analysis and key findings
 
SITCE_v10
SITCE_v10SITCE_v10
SITCE_v10
 

Recently uploaded

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

Case study on Majid Sarani & various streets

  • 1. Presentation on Majid Sarani Presented by : Group: 13 Roll: 1723051, 1723052, 1723053, 1723054, 1723059 Course Title : Landscape Design Course No : BECM 3208 Topic : Problem Identification of the landscape of Majid Sarani Road, Khulna
  • 2.  Majid Sarani is located in Khulna, Bangladesh.  Majid Sarani has a length of 1.26 km.  The annual average temperature on this site is 26.3 °C (79.3 °F) & annual average rainfall is 1,809.4 millimeters (71.24 in) Short description of Majid Sarani Road, Khulna
  • 3. Major Problems on Majid Sarani Road :  Damage Road  Improper Drainage System  Lidless Drain & Manhole  Under Construction Buildings Beside The Road  Lack of Parking System  Illegal Sidewalk Occupation  Unplanned Connecting Road
  • 4. Damage Road At several point, the road is highly damaged and unfit to be in use.
  • 5. Reason behind this problem  Low quality materials  Unawareness of traffic rules  Corruption Solutions  Using proper materials  Construct in layers  Designing for worst case scenario  Regular maintenance
  • 6. Improper Drainage System Improper drainage system causes waterlogging on the road.
  • 7. Reason behind this problem  Over and above disposal of solid waste into the drains and drainage paths are accounted for the prime causes of blockage in drainage system and water logging  Inadequate drainage sections  Absence of inlets and outlets  Lack of proper maintenance of existing drainage system Solutions  Using impermeable materials  Installing under path drainage system  The existing drains and also those will be constructed shall have to cleaned at regular interval  Maintenance and cleaning of drains shall have to done at least once in every year specially before starting of monsoon season
  • 8. Lidless Drain & Manhole Lidless drains in several places occurs bad odor and sometimes accidents too. Reason behind this problem  Theft of manhole covers due to the lack of monitoring of the road safety  For cleaning purpose Solutions  Cover the manholes & strict rules for stealing those.  Regular maintenance
  • 9. Under Construction Buildings Beside The Road Some buildings that are currently being constructed beside the road without providing any safety. That may causes accident and public harm. Reason behind this problem  Ignorance to the basic rules of construction safety by the companies.  Unawareness about the danger that can happen from it Solutions  Maintain strict rules about safety materials so that all construction companies must follow  Using safety net  Using modern instruments  Using skilled workers
  • 10. Lack of Parking System Cars are parked on the road which causes the road to be narrowed and occurs traffic jam in peak hours.
  • 11. Reason behind this problem  Lack of proper planning  Insufficient space  Tendency of breaking rules Solutions  Properly utilize the space on the road side.  90° car parking
  • 12.
  • 13. Illegal occupancy of sidewalk by parking, hawkers obstruct the movement of pedestrian and often causes traffic jam Illegal Sidewalk Occupation
  • 14. Reason behind this problem  Unplanned parking  Hawker/ Illegal small shop Solutions  Eviction of the hawker/ small shop  Make appropriate arrangement for parking
  • 15. There are several roads connected with the main road which are unplanned and those cause traffic jam, road crossing problem and unwanted accidents too. Unplanned Connecting Road
  • 16.
  • 17. Reason behind this problem  Narrow connecting point  Absence of traffic signal system  Absence of road/ over head crossing  Vehicle parking Solutions  Setting up the signal system  Make appropriate arrangement for parking  Build up over head / road crossing
  • 18. Presentation on Majid Sarani Presented by : Group: 13 Roll: 1723051, 1723052, 1723053, 1723054, 1723059 Course Title : Landscape Design Course No : BECM 3208 Topic : Case Study on Various Streets
  • 20. Information • Champs-Élysées Avenue • The name is French for the Elysian Field, the place for dead heroes in Greek Mythology • From Place La de la Concorde to Arc de Triomphe • 8th Arrondissement in northwestern Paris,France • 1.91 Km Long, 70m (230ft) Wide • 8 Lane Highway
  • 21. Speciality • Popular tourist spot • Two major public squire at both end • Consists many shopping mall • Avg. 64000 vehicles pass through per day • Foot traffic average 100000 people
  • 22. Zoning Vehicle road Cycle lane Parking Vegetation Pedestrian walkway Vegetation Pedestrian walkway
  • 23. Problems & Re-Design • Air pollution from the estimated 3,000 vehicles per hour • Since 2016, the avenue has been closed to motor traffic on the first Sunday of every month • It is announced that the city would transform the Champs- Élysées into an "extraordinary garden" • Vision 2030 has taken to create more pedestrian space, and create "tunnels of trees" for improved air quality • The plans are meant to make the avenue more "ecological, desirable and inclusive"
  • 24. Walkway and Crossing • 2 lane of walkway each side • Broad walkway • Separated from main road by vegetation • Setting arrangement is installed in walkway zone • Lighting feature is added between the walkway lane Lighting Feature
  • 25. Walkway and Crossing[Cont.] • Setting arrangement is installed in walkway zone • Traffic signal system is used in every crossing • Zebra Crossing is used • Space for cycle crossing alongside zebra crossing
  • 26. Transport • Avg. 64000 vehicles pass through per day • Paris Metro Line runs under the Champs-Élysées • 4 metro station nearby the road • This heavy traffic is controlled by advance traffic system Metro Station Entry Metro Station Drainage System • Underground Drainage System is used
  • 27. Potential Issues • High rent is causing the loss of its small businesses and thus the street’s original identity • The street requires constant maintenance to keep the corridor safe and clean • Crossing wide, heavy trafficked roads is challenging for pedestrians • The outdoor dining and kiosks on the sidewalk sometimes block the pedestrian flow
  • 29. About • Orchard Road • Named from nutmeg, pepper and fruit orchards or the plantations that the road once led to • Central Area, Singapore • 2.5 km long
  • 30. Speciality • Famous Shopping HUB in Singapore • Tourist Spot • Famous street in South East Asia • Consists over 20 shopping malls
  • 31. Zoning Vehicle road Parking Vegetation and setting Arrangement Pedestrian walkway
  • 32. Walkway • Broad sidewalks • Well constructed • Setting Arrangement is installed
  • 33. Drainage • Underground drainage is used • The Stamford Diversion Canal (SDC) and Stamford Detention Tank (SDT) is aimed to keep the roads flood- free • This detention tank has a capacity of 38000 cubic m storage Fig.: STD Fig.: Deep Sewer
  • 35. Transport • Orchard road can be accessed via three main stops on the Singapore MRT Network • Buses of several companies provided access to Orchard Road • Bus stop positions are marked on the last lane of the road Fig.: Bus Stops Fig.: MRT Map
  • 37. Street Name: Slovenska Cesta in Ljubljana Location: Ljubljana, Slovenia Area: 14000 m2 Renovation Completion Date: 2015 Architect: Dekleva Gregorič arhitekti, Katušič Kocbek arhitekti, Sadar + Vuga, Scapelab, Studio Krištof  The New Slovenska Street project is based on cutting-edge concepts in public space design.  The former four-lane road was transformed into the central city avenue. Information
  • 38.  The main street of the city is the Slovenska which crosses the city in the north-south direction.  Two pairs of large bus stations are placed on the street Specification  It is also the stage for many important events in the city, such as the marathon and the annual cycling race, various demonstrations, and the record-breaking square dance of the city's high- school graduates.
  • 39. Zoning Vehicle road Pedestrian walkway Bus stoppage Vegetation Cycle lane  The street is divided in to tree sections, with a concrete road surface and paved pedestrian area.  Through narrowing of the roadway there is now more space for pedestrians, cyclists and restaurant and bar gardens.
  • 40. Section View of The Road
  • 41. Problems & Renovation  It was a busy four-lane road with the large volume of pedestrian and bus traffic  A car-oriented traffic road  Vegetation was low  No safety & space for pedestrian
  • 42.  From car-oriented, the road is transformed into a space which gives priority to public transport, pedestrians and cyclists  By placing two pairs of large bus stations the street truly becomes a central transport hub for public transport  The complete arrangement ties the fragmented area together into a uniform space with a prominently green character. Problems & Renovation
  • 43. Pedestrian Area  Through narrowing of the roadway there is now more space for pedestrians, cyclists and restaurant and bar gardens  The urban furniture of the street encourages people to stop and rest in the space  Despite the large volume of pedestrian and bus traffic it is designed as a “shared space”, a space, where users participate equally, and height differences are reduced to a minimum.
  • 44. Transport System  By designing a space which promotes sustainable mobility and public transport in the very center, the city has made a key step in it's transport policy  The absence of personal motor traffic allows for the expansion of programs and the creation of a space with its own character.  This allows for an optimized bus transportation service
  • 45. Vegetation & Drainage System • A new tree line of manna ash trees was planted on the eastern side of the street, which is lit by the afternoon sun. • The manna ash trees are resistant to the urban environment, and will adorn the space with white flowers in the spring and bright yellow foliage in the fall. • Drainage system is connected with the vegetation as it is established within the tree plantation system.