Agenda
Trends in Today's Market
Datacenter Strategy Development
Design Principals
Facilities Build-out and IT Implementation
Operations Management
Case Studies
5
Rack Density Increasing
28x2U Servers
2kW Heat Load
42x1U Servers
6kW Heat Load
6 BladeCenters
24kW Heat Load
6 BladeCenters
30kW Heat Load
Source: Emerson Network Power/Liebert
2000 2002 2005 2008
9
Datacenter Trends
Datacenter Consolidation will bring down operating costs
The cost of operating power for servers will surpass the cost
to buy them in the next 5 years
More customers will adopt thin clients
More applications will run outside the datacenter
(Software as a Service, Social Networking)
Datacenter Automation crawls ahead
I/O and memory bottlenecks will be the next capacity
problem to solve for
Modular datacenter design
10
Datacenter
Strategy, Design and
Build Offerings
How Sun can help you
create the datacenter of the future:
11
Datacenter Infrastructure Services
Lifecycle Services for the Datacenter
IT Business Strategy Consulting
Eco Policy/Social Resp. Legislative, DRAvailability/Agility/TTM
Open Work Consulting
Long-term planning
Refresh or Replace
Technology options
Sourcing strategies
Site Selection & Site Acquisition
Design Services
Lifecycle Planning
Building Information Modeling
Build, Commission, Move, Populate
Datacenter Strategy Datacenter Design & Build
Application Modernization
Infrastructure Modernization
Eco Consulting & Assessments
Consolidation Services
Migration Services
Virtualization Services
Managed & Remote Operations
Virtualization Best Practices
Datacenter Modernization Datacenter Optimization Datacenter Operations
12
Linking IT Benefits to Business BenefitsTheBusiness
TheTechnology
Mergers & Acquisitions
Competitiveness
Customer Satisfaction
Financial & Legal
Agility & Continuity
Prospect Deeper & Wider
Reliability
Do More with Less
Service Level Agreements
Low Complexity
Security
Low Power
Sun
Datacenter
Consulting
Services
13
Sun can help bridge
facilities and IT requirements
Datacenter
Strategy Consulting
14
The Opportunity
Cut Energy
Costs in Half
Increase
Utilization
Levels to as
High as 85%
Improve Space
Efficiency
by 2x
17
Sun Innovation:
Recent Advancements in Datacenter Design
Actions speak louder than words
18
Strategy:
Addresses Evolving, Heterogenous IT
Virtualization and Datacenter Management
Solutions that span from the desktop to the datacenter
Energy Efficient
Open and actionable solutions for energy-efficient computing
Security and Privacy
Systemic security: built in – not bolted on
Utility Services Delivered on the Web
Hosting solutions for non mission-critical applications
Tier Analysis
Design is based on an evaluation of application needs
Design for
Business
Continuity
Optimize
Current
Facilities
Manage Total
Asset Lifecycle
Securely
Make the
Business
More Agile
Sun
Solutions
Consolidate for
Simplicity and
Savings
19
Strategy: Addresses IT Solutions
IT savings can be addressed in many different ways.
RelativeEffort
Relative Payback
Application/Business
Process Redesign
Consolidation/
Virtualization
Technology
Refresh
Re-commission/
Optimize
26
Aligns organizations and stakeholders to create
a Technical Infrastructure Plan
Defines incentives and funding needed to execute on
the plan
Uses modelling and simulation to prioritize projects
and enhance decision making
Datacenter Strategy Service: Summary
27
Datacenter Design
28
IT equipment ± 57%
Cooling equipment ± 34%
Power distribution loss ± 7%
Lighting / other ± 2%
Source: The Green Grid
Individual Datacenters can vary substantially
Where does the power go?
Design: The Pod Architecture
A group of racks or benches with a common hot or cold aisle used as a
building block to simplify datacenter design for power, cooling, & cabling
Vendor independent,
slab or raised floor, flexible,
scalable, high density
34
Sun will customize a design to your requirements
Best Practices
Align Facilities, IT & Engineering: Partnering nets significant short term
& long term savings
Design your DC and purchase your IT equipment based on Total Cost of
Ownership (TCO)
Hardware Replacement: Apply new solutions and extend the life of your DC
Simplify Datacenter Design: Pod concept is flexible and easy to right-size
Measure power usage: Visibility gives you power to control
Replace outdated rules of thumb: Raised floors, tight humidity control
Employ liquid cooling for computers and racks
Optimize cooling, air handling
Specify efficient UPS systems and IT power supplies
35
Facilities
Build-Out and
IT Implementation
36
Sun Project Management
Develops a project timeline
Define roles and responsibilities for all of the players
Identify all partners that are needed
Identify the skill sets needed
Addresses all the project management aspects
of an engagement
39
“We are pleased to continue partnering
with Sun to offer datacenter
professional services which support
a new standard of operational
excellence for Sun’s customers.”
John DiPippo
Senior Vice President
APC
40
Implementation and Relocation Assistance
Expertise to help maintain flexibility and control during change
Pre-move computer
equipment audit
and site survey
De-installation
Packaging
Transportation
Re-installation and
diagnostics
Transportation insurance
Asset swap
Standby rental
equipment
Business assurance
Disposal and recovery
41
Operations
Management
42
Sun Operations Management
Flexible payment structures with
no up front capital costs
Improved operational efficiency
of existing infrastructure
Intelligent Power Monitoring
Ability to include secure off-site hosting
for full infrastructure options
Sun as your single point of accountability
Focus on core business initiatives while
Sun takes care of your day-to-day
operational needs
Right mix of onsite and remote management services
Sun provides the options to enable
our customers to plan and deliver on
their multi-sourcing strategies with
improved operational efficiencies and
increased service levels
*Innovative leasing options available on request
43
Case Studies
44
Datacenter Demonstration Case Study
Sun participated in Study
Initiative Improved Operations Best Practice State of the Art
Datacenter Site Infrastructure Projects
Datacenter Cooling
Datacenter Airflow Management XX
Free Cooling in Large Scale Datacenters X XX
Datacenter Cooling Optimization X
High Efficiency Chilled Water Systems X
Modular Cooling Systems XX XXX
Wireless Sensor Network Adaptive Cooling X
Datacenter Power Distribution
High Efficiency Power Transformation XX
High Voltage AC Power X
High Efficiency Stand-by Power Systems XX
IT Infrastructure Projects
Consolidation and Optimization
IT Computing Resource Optimization X X
IT Consolidation and Virtualization X X
Server Power Characterization & Modeling X
45
Sun’s Internal Challenge
Facilities is Sun's second largest expense
Real estate, utility, tax, & support costs
20+ years of organic growth
New products, reorgs, acquisitions
Lack of design standards and control of implementations for global technical
infrastructure
Duplication & inefficiencies
Multi-Billion dollar IT/R&D Technical Infrastructure Portfolio
1.3 million ft2
(120k m2
) of Eng & IT space globally (as of 02/2008)
1,533 individual rooms
IT Space = 8% of the portfolio (160k ft2
/ 15k m2
– 365 rooms)
Engineering = 92% of the portfolio (1.14M ft2
/ 106k m2
– 1168 rooms)
46
Corporate Drive to Reduce Costs
Spotlight: Santa Clara, CA - 2007
Shed 1.8M ft2
(167k m2
) of real estate
Compress 202k ft2
(18.8k m2
) of datacenters space into < 80k ft2
(7,400 m2
) of new
datacenter space in Santa Clara
Project included every major business unit in Sun
12 month project duration (complete by 06/30/2007)
Approach
Phase I: Move 84k ft2
(7,800 m2
) of datacenters into existing space
Phase II: Compress & build < 80k ft2
(7,400 m2
) of next generation datacenter space
in 12 months
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build

More Related Content

What's hot

Top 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaTop 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaInternap
 
Data center presentation toi -28022013
Data center presentation   toi -28022013Data center presentation   toi -28022013
Data center presentation toi -28022013Sanjay Belulkar
 
Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification Ali Mirfallah
 
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...Maria Demitras
 
Datacenter best practices design and implementation
Datacenter best practices design and implementationDatacenter best practices design and implementation
Datacenter best practices design and implementationAnton An
 
Importance of data centers
Importance of data centersImportance of data centers
Importance of data centersTyrone Systems
 
Data Center Tiers Explained
Data Center Tiers ExplainedData Center Tiers Explained
Data Center Tiers ExplainedData Cave
 
Data center design 2
Data center design 2Data center design 2
Data center design 2Aditya Gupta
 
Simplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSimplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSchneider Electric
 
Data center proposal
Data center proposalData center proposal
Data center proposalMuhammad Ahad
 
Data center engineering operations
Data center engineering operationsData center engineering operations
Data center engineering operationsJagbir Sangwan
 
Gaining Data Center Cooling Efficiency Through Airflow Management
Gaining Data Center Cooling Efficiency Through Airflow ManagementGaining Data Center Cooling Efficiency Through Airflow Management
Gaining Data Center Cooling Efficiency Through Airflow ManagementUpsite Technologies
 
Data Center Efficiency Workshop 2016
Data Center Efficiency Workshop 2016Data Center Efficiency Workshop 2016
Data Center Efficiency Workshop 2016stexxe
 
Data center power infrastructure
Data center power infrastructureData center power infrastructure
Data center power infrastructureLivin Jose
 
Data Center Infrastructure Management(DCIM)
Data Center Infrastructure Management(DCIM)Data Center Infrastructure Management(DCIM)
Data Center Infrastructure Management(DCIM)MD. IFTEKARUL ALAM
 
POWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTERPOWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTERvivekprajapatiankur
 

What's hot (20)

Top 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaTop 10 Data Center Success Criteria
Top 10 Data Center Success Criteria
 
Data center presentation toi -28022013
Data center presentation   toi -28022013Data center presentation   toi -28022013
Data center presentation toi -28022013
 
Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification
 
Data center
Data centerData center
Data center
 
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
 
Datacenter best practices design and implementation
Datacenter best practices design and implementationDatacenter best practices design and implementation
Datacenter best practices design and implementation
 
Importance of data centers
Importance of data centersImportance of data centers
Importance of data centers
 
Data Center Tiers Explained
Data Center Tiers ExplainedData Center Tiers Explained
Data Center Tiers Explained
 
Datacenter overview
Datacenter overviewDatacenter overview
Datacenter overview
 
Data center design 2
Data center design 2Data center design 2
Data center design 2
 
Simplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSimplifying Data Center Design/ Build
Simplifying Data Center Design/ Build
 
Modular Data Center Design
Modular Data Center DesignModular Data Center Design
Modular Data Center Design
 
Data center proposal
Data center proposalData center proposal
Data center proposal
 
DATA CENTER
DATA CENTER DATA CENTER
DATA CENTER
 
Data center engineering operations
Data center engineering operationsData center engineering operations
Data center engineering operations
 
Gaining Data Center Cooling Efficiency Through Airflow Management
Gaining Data Center Cooling Efficiency Through Airflow ManagementGaining Data Center Cooling Efficiency Through Airflow Management
Gaining Data Center Cooling Efficiency Through Airflow Management
 
Data Center Efficiency Workshop 2016
Data Center Efficiency Workshop 2016Data Center Efficiency Workshop 2016
Data Center Efficiency Workshop 2016
 
Data center power infrastructure
Data center power infrastructureData center power infrastructure
Data center power infrastructure
 
Data Center Infrastructure Management(DCIM)
Data Center Infrastructure Management(DCIM)Data Center Infrastructure Management(DCIM)
Data Center Infrastructure Management(DCIM)
 
POWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTERPOWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTER
 

Similar to Datacenter Strategy, Design, and Build

Improvements in Data Center Management
Improvements in Data Center ManagementImprovements in Data Center Management
Improvements in Data Center ManagementScottMadden, Inc.
 
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...IBMAsean
 
MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1blewington
 
Datacenter Efficiency: Building for High Density
Datacenter Efficiency: Building for High DensityDatacenter Efficiency: Building for High Density
Datacenter Efficiency: Building for High DensityChristopher Kelley
 
The Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data CentersThe Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data CentersSchneider Electric
 
Give Your Organization Better, Faster Insights & Answers with High Performanc...
Give Your Organization Better, Faster Insights & Answers with High Performanc...Give Your Organization Better, Faster Insights & Answers with High Performanc...
Give Your Organization Better, Faster Insights & Answers with High Performanc...Dell World
 
The Digital Data Center: Connect, Aggregate, Analyze and Act
The Digital Data Center: Connect, Aggregate, Analyze and ActThe Digital Data Center: Connect, Aggregate, Analyze and Act
The Digital Data Center: Connect, Aggregate, Analyze and ActTony DeSpirito
 
Accelerating Cloud Services - Intel
Accelerating Cloud Services - IntelAccelerating Cloud Services - Intel
Accelerating Cloud Services - IntelAmazon Web Services
 
Competitive Strategies Benchmarking in Datacenter Infra Industry
Competitive Strategies Benchmarking in Datacenter Infra IndustryCompetitive Strategies Benchmarking in Datacenter Infra Industry
Competitive Strategies Benchmarking in Datacenter Infra IndustryAmit Singh
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centrepaul_mathews
 
Mt19 Integrated systems as a foundation of the Software Defined Datacentre
Mt19 Integrated systems as a foundation of the Software Defined DatacentreMt19 Integrated systems as a foundation of the Software Defined Datacentre
Mt19 Integrated systems as a foundation of the Software Defined DatacentreDell EMC World
 
Data Protection Picture Book
Data Protection Picture BookData Protection Picture Book
Data Protection Picture BookJeremy Boss
 
Cisco Energy Management - Short
Cisco Energy Management - ShortCisco Energy Management - Short
Cisco Energy Management - ShortPaul Weight
 
Big Data, Physics, and the Industrial Internet: How Modeling & Analytics are ...
Big Data, Physics, and the Industrial Internet: How Modeling & Analytics are ...Big Data, Physics, and the Industrial Internet: How Modeling & Analytics are ...
Big Data, Physics, and the Industrial Internet: How Modeling & Analytics are ...mattdenesuk
 
Schneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXTSchneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXTAniket Patange
 
IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & Wieck
IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & WieckIBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & Wieck
IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & WieckIBM Events
 

Similar to Datacenter Strategy, Design, and Build (20)

introduction to it sustainability
introduction to it  sustainabilityintroduction to it  sustainability
introduction to it sustainability
 
Improvements in Data Center Management
Improvements in Data Center ManagementImprovements in Data Center Management
Improvements in Data Center Management
 
What Makes Software Green?
What Makes Software Green?What Makes Software Green?
What Makes Software Green?
 
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
 
MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1
 
Datacenter Efficiency: Building for High Density
Datacenter Efficiency: Building for High DensityDatacenter Efficiency: Building for High Density
Datacenter Efficiency: Building for High Density
 
The Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data CentersThe Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data Centers
 
Give Your Organization Better, Faster Insights & Answers with High Performanc...
Give Your Organization Better, Faster Insights & Answers with High Performanc...Give Your Organization Better, Faster Insights & Answers with High Performanc...
Give Your Organization Better, Faster Insights & Answers with High Performanc...
 
The Digital Data Center: Connect, Aggregate, Analyze and Act
The Digital Data Center: Connect, Aggregate, Analyze and ActThe Digital Data Center: Connect, Aggregate, Analyze and Act
The Digital Data Center: Connect, Aggregate, Analyze and Act
 
Accelerating Cloud Services - Intel
Accelerating Cloud Services - IntelAccelerating Cloud Services - Intel
Accelerating Cloud Services - Intel
 
Competitive Strategies Benchmarking in Datacenter Infra Industry
Competitive Strategies Benchmarking in Datacenter Infra IndustryCompetitive Strategies Benchmarking in Datacenter Infra Industry
Competitive Strategies Benchmarking in Datacenter Infra Industry
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
 
Mt19 Integrated systems as a foundation of the Software Defined Datacentre
Mt19 Integrated systems as a foundation of the Software Defined DatacentreMt19 Integrated systems as a foundation of the Software Defined Datacentre
Mt19 Integrated systems as a foundation of the Software Defined Datacentre
 
Data Protection Picture Book
Data Protection Picture BookData Protection Picture Book
Data Protection Picture Book
 
The next wave of GreenIT
The next wave of GreenITThe next wave of GreenIT
The next wave of GreenIT
 
Virtualización para la Eficiencia
Virtualización para la EficienciaVirtualización para la Eficiencia
Virtualización para la Eficiencia
 
Cisco Energy Management - Short
Cisco Energy Management - ShortCisco Energy Management - Short
Cisco Energy Management - Short
 
Big Data, Physics, and the Industrial Internet: How Modeling & Analytics are ...
Big Data, Physics, and the Industrial Internet: How Modeling & Analytics are ...Big Data, Physics, and the Industrial Internet: How Modeling & Analytics are ...
Big Data, Physics, and the Industrial Internet: How Modeling & Analytics are ...
 
Schneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXTSchneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXT
 
IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & Wieck
IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & WieckIBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & Wieck
IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & Wieck
 

More from Christopher Kelley

Intelligent Management of Assets in Large Scale Infrastructures with Cisco Co...
Intelligent Management of Assets in Large Scale Infrastructures with Cisco Co...Intelligent Management of Assets in Large Scale Infrastructures with Cisco Co...
Intelligent Management of Assets in Large Scale Infrastructures with Cisco Co...Christopher Kelley
 
The Benefits of Digitizing Manufacturing
The Benefits of Digitizing ManufacturingThe Benefits of Digitizing Manufacturing
The Benefits of Digitizing ManufacturingChristopher Kelley
 
Designing and Building a Tier 4, 20 MW Datacenter
Designing and Building a Tier 4, 20 MW DatacenterDesigning and Building a Tier 4, 20 MW Datacenter
Designing and Building a Tier 4, 20 MW DatacenterChristopher Kelley
 
The Future of Datacenter Facilities
The Future of Datacenter FacilitiesThe Future of Datacenter Facilities
The Future of Datacenter FacilitiesChristopher Kelley
 
Beyond the Box: Design to Operations
Beyond the Box: Design to OperationsBeyond the Box: Design to Operations
Beyond the Box: Design to OperationsChristopher Kelley
 
Second grade class career day presentation
Second grade class career day presentationSecond grade class career day presentation
Second grade class career day presentationChristopher Kelley
 

More from Christopher Kelley (8)

Intelligent Management of Assets in Large Scale Infrastructures with Cisco Co...
Intelligent Management of Assets in Large Scale Infrastructures with Cisco Co...Intelligent Management of Assets in Large Scale Infrastructures with Cisco Co...
Intelligent Management of Assets in Large Scale Infrastructures with Cisco Co...
 
The Benefits of Digitizing Manufacturing
The Benefits of Digitizing ManufacturingThe Benefits of Digitizing Manufacturing
The Benefits of Digitizing Manufacturing
 
Datacenter Design Phases
Datacenter Design PhasesDatacenter Design Phases
Datacenter Design Phases
 
Designing and Building a Tier 4, 20 MW Datacenter
Designing and Building a Tier 4, 20 MW DatacenterDesigning and Building a Tier 4, 20 MW Datacenter
Designing and Building a Tier 4, 20 MW Datacenter
 
The Future of Datacenter Facilities
The Future of Datacenter FacilitiesThe Future of Datacenter Facilities
The Future of Datacenter Facilities
 
Beyond the Box: Design to Operations
Beyond the Box: Design to OperationsBeyond the Box: Design to Operations
Beyond the Box: Design to Operations
 
PRACE ETHZ
PRACE ETHZ PRACE ETHZ
PRACE ETHZ
 
Second grade class career day presentation
Second grade class career day presentationSecond grade class career day presentation
Second grade class career day presentation
 

Recently uploaded

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 

Recently uploaded (20)

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 

Datacenter Strategy, Design, and Build

  • 1.
  • 2. 2 Agenda Trends in Today's Market Datacenter Strategy Development Design Principals Facilities Build-out and IT Implementation Operations Management Case Studies
  • 3.
  • 4.
  • 5. 5 Rack Density Increasing 28x2U Servers 2kW Heat Load 42x1U Servers 6kW Heat Load 6 BladeCenters 24kW Heat Load 6 BladeCenters 30kW Heat Load Source: Emerson Network Power/Liebert 2000 2002 2005 2008
  • 6.
  • 7.
  • 8.
  • 9. 9 Datacenter Trends Datacenter Consolidation will bring down operating costs The cost of operating power for servers will surpass the cost to buy them in the next 5 years More customers will adopt thin clients More applications will run outside the datacenter (Software as a Service, Social Networking) Datacenter Automation crawls ahead I/O and memory bottlenecks will be the next capacity problem to solve for Modular datacenter design
  • 10. 10 Datacenter Strategy, Design and Build Offerings How Sun can help you create the datacenter of the future:
  • 11. 11 Datacenter Infrastructure Services Lifecycle Services for the Datacenter IT Business Strategy Consulting Eco Policy/Social Resp. Legislative, DRAvailability/Agility/TTM Open Work Consulting Long-term planning Refresh or Replace Technology options Sourcing strategies Site Selection & Site Acquisition Design Services Lifecycle Planning Building Information Modeling Build, Commission, Move, Populate Datacenter Strategy Datacenter Design & Build Application Modernization Infrastructure Modernization Eco Consulting & Assessments Consolidation Services Migration Services Virtualization Services Managed & Remote Operations Virtualization Best Practices Datacenter Modernization Datacenter Optimization Datacenter Operations
  • 12. 12 Linking IT Benefits to Business BenefitsTheBusiness TheTechnology Mergers & Acquisitions Competitiveness Customer Satisfaction Financial & Legal Agility & Continuity Prospect Deeper & Wider Reliability Do More with Less Service Level Agreements Low Complexity Security Low Power Sun Datacenter Consulting Services
  • 13. 13 Sun can help bridge facilities and IT requirements Datacenter Strategy Consulting
  • 14. 14 The Opportunity Cut Energy Costs in Half Increase Utilization Levels to as High as 85% Improve Space Efficiency by 2x
  • 15.
  • 16.
  • 17. 17 Sun Innovation: Recent Advancements in Datacenter Design Actions speak louder than words
  • 18. 18 Strategy: Addresses Evolving, Heterogenous IT Virtualization and Datacenter Management Solutions that span from the desktop to the datacenter Energy Efficient Open and actionable solutions for energy-efficient computing Security and Privacy Systemic security: built in – not bolted on Utility Services Delivered on the Web Hosting solutions for non mission-critical applications Tier Analysis Design is based on an evaluation of application needs Design for Business Continuity Optimize Current Facilities Manage Total Asset Lifecycle Securely Make the Business More Agile Sun Solutions Consolidate for Simplicity and Savings
  • 19. 19 Strategy: Addresses IT Solutions IT savings can be addressed in many different ways. RelativeEffort Relative Payback Application/Business Process Redesign Consolidation/ Virtualization Technology Refresh Re-commission/ Optimize
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26. 26 Aligns organizations and stakeholders to create a Technical Infrastructure Plan Defines incentives and funding needed to execute on the plan Uses modelling and simulation to prioritize projects and enhance decision making Datacenter Strategy Service: Summary
  • 28. 28 IT equipment ± 57% Cooling equipment ± 34% Power distribution loss ± 7% Lighting / other ± 2% Source: The Green Grid Individual Datacenters can vary substantially Where does the power go?
  • 29.
  • 30. Design: The Pod Architecture A group of racks or benches with a common hot or cold aisle used as a building block to simplify datacenter design for power, cooling, & cabling Vendor independent, slab or raised floor, flexible, scalable, high density
  • 31.
  • 32.
  • 33.
  • 34. 34 Sun will customize a design to your requirements Best Practices Align Facilities, IT & Engineering: Partnering nets significant short term & long term savings Design your DC and purchase your IT equipment based on Total Cost of Ownership (TCO) Hardware Replacement: Apply new solutions and extend the life of your DC Simplify Datacenter Design: Pod concept is flexible and easy to right-size Measure power usage: Visibility gives you power to control Replace outdated rules of thumb: Raised floors, tight humidity control Employ liquid cooling for computers and racks Optimize cooling, air handling Specify efficient UPS systems and IT power supplies
  • 36. 36 Sun Project Management Develops a project timeline Define roles and responsibilities for all of the players Identify all partners that are needed Identify the skill sets needed Addresses all the project management aspects of an engagement
  • 37.
  • 38.
  • 39. 39 “We are pleased to continue partnering with Sun to offer datacenter professional services which support a new standard of operational excellence for Sun’s customers.” John DiPippo Senior Vice President APC
  • 40. 40 Implementation and Relocation Assistance Expertise to help maintain flexibility and control during change Pre-move computer equipment audit and site survey De-installation Packaging Transportation Re-installation and diagnostics Transportation insurance Asset swap Standby rental equipment Business assurance Disposal and recovery
  • 42. 42 Sun Operations Management Flexible payment structures with no up front capital costs Improved operational efficiency of existing infrastructure Intelligent Power Monitoring Ability to include secure off-site hosting for full infrastructure options Sun as your single point of accountability Focus on core business initiatives while Sun takes care of your day-to-day operational needs Right mix of onsite and remote management services Sun provides the options to enable our customers to plan and deliver on their multi-sourcing strategies with improved operational efficiencies and increased service levels *Innovative leasing options available on request
  • 44. 44 Datacenter Demonstration Case Study Sun participated in Study Initiative Improved Operations Best Practice State of the Art Datacenter Site Infrastructure Projects Datacenter Cooling Datacenter Airflow Management XX Free Cooling in Large Scale Datacenters X XX Datacenter Cooling Optimization X High Efficiency Chilled Water Systems X Modular Cooling Systems XX XXX Wireless Sensor Network Adaptive Cooling X Datacenter Power Distribution High Efficiency Power Transformation XX High Voltage AC Power X High Efficiency Stand-by Power Systems XX IT Infrastructure Projects Consolidation and Optimization IT Computing Resource Optimization X X IT Consolidation and Virtualization X X Server Power Characterization & Modeling X
  • 45. 45 Sun’s Internal Challenge Facilities is Sun's second largest expense Real estate, utility, tax, & support costs 20+ years of organic growth New products, reorgs, acquisitions Lack of design standards and control of implementations for global technical infrastructure Duplication & inefficiencies Multi-Billion dollar IT/R&D Technical Infrastructure Portfolio 1.3 million ft2 (120k m2 ) of Eng & IT space globally (as of 02/2008) 1,533 individual rooms IT Space = 8% of the portfolio (160k ft2 / 15k m2 – 365 rooms) Engineering = 92% of the portfolio (1.14M ft2 / 106k m2 – 1168 rooms)
  • 46. 46 Corporate Drive to Reduce Costs Spotlight: Santa Clara, CA - 2007 Shed 1.8M ft2 (167k m2 ) of real estate Compress 202k ft2 (18.8k m2 ) of datacenters space into < 80k ft2 (7,400 m2 ) of new datacenter space in Santa Clara Project included every major business unit in Sun 12 month project duration (complete by 06/30/2007) Approach Phase I: Move 84k ft2 (7,800 m2 ) of datacenters into existing space Phase II: Compress & build < 80k ft2 (7,400 m2 ) of next generation datacenter space in 12 months