SlideShare une entreprise Scribd logo
1  sur  50
Télécharger pour lire hors ligne
#Better Everyday
1
JSW Steel Coated
Products Ltd,Kalmeshwar
33rd Chapter Convention on Quality Concepts by QCFI
Nagpur Chapter
Kaizen Group
Kaizen Group
“UDAAN”
By Mechanical
Department
PROJECT THEME RUBBER MILL SAFETY IMPROVEMENTY
KAIZEN PROJECT TITLE SAFETY PROVISION IN RUBBER MILL & AUTOCLAVE UNIT
Project completed Date 30.8.2022
NO. OF MEETINGS 9
ATTENDANCE 94%
PERIODICITY OF MEETINGS THRICE MONTHLY
Team Charter
3
Team Leader
Mahesh Werulkar
Member
Niraj Vithalkar
Facilitator
Mr.Gajanan Ghughal
Member
G.N.BAWANE
Presence Across Key Infrastructure Sectors
4
STEEL
INFRASTRUCTURE
CEMENT
FOUNDATION
GLOBAL BUSINESS SOLUTION
POWER
VISION PURPOSE VALUES
Vision, Purpose and Values
6
JSW Steel – Awards
7
JSW SALEM WON DEMING AWARD -2019
8
JSW Steel – Awards
Prime
Minister’s
Trophy by
Ministry of
Steel for the
year 2012-
13.
Porter Prize f
or Creating
Shared Value,
Leveraging
Unique
Activities -
Weathering
the Iron Ore
crisis 2015
National
Sustainabili
ty
Award: 1st
Prize by
IIM for the
year 2017
Steel
Minister’s
Trophy for
the year
2014-15
and 2015-
16
JSW Steel - At A Glance In India
Steel making capacity of 22 MTPA
9 manufacturing facilities in India
VASIND / TARAPUR
DOLVI
VIJAYANAGAR
KALMESHWAR
SALEM
Integrated Steel Plant Downstream Plant
Slabs
Cold Rolled
CA,GL
Coated
Products
Long
Products
HRPO
Coils
Hot Rolled
Plates
HR Coils HSM
Plates
India’s largest
Steel
manufacturer
SALAV
6
0.30
1999
0.33 0.35
2004 2011
0.41
2014 2017
0.65
2019
0.68
12
CAPACITY RAMP –UP
(MTPA)
2022
1.00
0.72
2021
Acquisition by JSW
Galvanizing 1 - 1984
Color Coating -1988
Galvanizing 2 - 2003
Galvalume 1 - 2007
Color Coating 2 – 2013
Color Coating 3 - 2021
Financial Year
YEAR
MTPA
Milestones of Kalmeshwar
0757: Shop Floor Mantra For Continuous Improvement
11
Our project is based on
eliminating UNSAFE
condition
Selection of problems
Definition of problems-
Measurement of the data on Problem-
Analysis of the problem for root causes-
Implementation of the Solution
Gain from the solution
Control /Follow Up
Step 1: Selection of the Problem
13
LIST OF VARIOUS PROBLEMS IDENTIFIED AT RUBBER MILL
SL NO PROBLEMS CATG. TYPE
1 Vulcanizer roll trolley rusting A
2 Vulcanizer trolley in/out required 4-5 manpower A
3 Overhead crane derail from track B
4 1060 mm Dia. roll cannot be lifted by crane C
5 B32 lathe gear worn out ,slow speed of operation C
6 B32 lathe machine bed worn-out A
7 Rubber mixing mill unsafe condition A
8 Mixing mill side guide worn-out A
9 Vulcanizer door gasket groove damaged chances of leakage C
10 Volcanizer lower steam pressure leads to improper curing B
11 Improper chemical composition of rubber C
12 Emergency braking system at rubber mill A
13 Cloth wrapping inside rmixing mill A
14 Oil lubrication problem in rubber mill B
15 Rubber cutting knife of lower quality B
16 Error in weighing scale B
17 Rubber area working hand gloves not good A
18 Improper arrangement of chemical oil removal from tank A
CATEGORY TYPE:
A: Problems which
can be solved
by our QC team
B: Cross functional
projects
C: Management
help
A
B
C
Step 1 : Selection of problems – ABC analysis
14
9
5
4
0
1
2
3
4
5
6
7
8
9
10
A B C
Frequency
Category
Step 1 : Selection of problems
15
All Unsolved Problems in A category Studied
A' Category Problems
Sr. No Problems Cat. Type
1 Vulcanize roll trolley rusting A
2 Vulcanize trolley in/out required 4-5 manpower A
3
1060 mm Dia. roll cannot be lifted by crane
A
4 Rubber mixing mill unsafe condition A
5 Mixing mill side guide worn-out A
6
Emergency braking system at rubber mill A
7 Cloth wrapping inside rmixing mill A
8 Rubber area working hand gloves not good A
9 Improper arrangement of chemical oil removal from tank A
Step 1 : Selection of problems Through Severity & No of occurrence
16
Data collection for A category problems
Sr. No Problems Sevirity
No of
occrance
(RPN)
1 Vulcanizer roll trolly rusting 3 2 6
2
Vulcanizer trolly in/out required 4-5
manpower
3 2 6
3 B32 lathe machine bed wornout 3 2 6
4 Rubber mixing mill unsafe condition 4 5 20
5 Mixing mill side guide wornout 4 2 8
6
Emergency braking system at rubber
mill
4 4 16
7 Cloth wrapping inside rmixing mill 4 4 16
8
Rubber area working hand gloves
not good
3 2 6
9
Improper arrangement of chemical
oil removal from tank
3 2 6
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
5
10
15
20
25
No of occrance Cu %
Useful many
Vital few
Selection of problems
Definition of problems
Measurement of the data on Problem
Analysis of the problem for root causes
Implementation of the Solution
Gain from the solution
Control /Follow Up
18
Step 2 : Definition of Problem
PROCESS DESCRIPTION OF JSW STEEL COATED PRODUCTS LTD. KALMESHWAR
Utilities : Rubber mill provides
rubber coating on used rolls for CPL,
GAL1,2 ,CGL 2lines
19
Step 2 : Definition of Problem
RUBBER MILLAREA
RUBBER MILL
CPL
MILL
CGL 2
GAL 1 & 2
CCL 1,2
CCL 3
CRS 1,2,3
BOILER
 Rubber mill provides rubber rolls to these lines
20
Step 2 : Definition of Problem
PROCESS DESCRIPTION OF RUBBER MIXING MILL
Old roll
threading on
lathe
Adhesive
pasting on
roll
Turning of
rubber roll
on lathe m/c
Coting rubber
strip from
extruder
machine
Tension strip
packing on
lathe
Vulcanizing
of Rubber roll
Rubber
Mixing
Mill
Step 2 : Definition of Problem
Rubber mixing mill:
There is a chance of crush injury while mixing the
different component of rubber.
Rubber
Mixing Mill
Mixing
Rolls
Unsafe condition at
Rubber Mill
Safety
Production
Cloths may stuck at rotating parts of
machine
Fatal accident while feeding rubber with
hand
Loss of production of rubber mill &
accordinlgy GAL 1&2 CCL 1,2,3
High MTTR of mixing machine
Damage to mixing rollers
22
Step 2 : Impact of Problem
TO PROVIDE PADDLE BRAKE.
TO REDUCE UNSAFE ACT & CONDITION AT RUBBER MILL
TO PROVIDE MACHINE GUARDING & SAFETY BAR AT MIXING ROLLLERS
TO PROVIDE BUSH BUTTON EMERGENCY SWITCH
“TO ELIMINATE UNSAFE CONDITION AT RUBBER
MILL”
Step 2 : Objectives
23
TO PROVIDE SAFETY LOCK AT VULCANISER DOOR
Start Date of Project
2
June
2022
Target Date of Project
30
Aug
2022
Coordinator : Narendra Kumar
Facilitator : Gajanan Ghugal
Team Mechnova
1. Mahesh Werulkar(Leader)
2. Niraj Vitthalkar
3. G N Banve
Kaizen Name: UDAAN Tittle : Safety Provision at Rubber Mill &Autoclave Unit
24
Step 2 : Schedule Gantt Chart
Sl no Activities/No of weeks 1 2 3 4 5 6 7 8 9 10 11 12 REMARKS
1 Selection of problem
2 Definition of problem
3 Measurement of the problem
4 Analysis of the problem for root cause
5 Implementation of the problem
6 Gain from the problem
7 Control /Follow Up
Selection of problems
Definition of problems
Measurement of the data on Problem
Analysis of the problem for root causes
Implementation of the Solution
Gain from the solution
Control /Follow Up
Step 3 : Measurement of the data on Problem
26
9
12
10
8
11
0
2
4
6
8
10
12
14
Jan/22 Feb/22 Mar/22 Apr/22 May/22
NO.OF
OBSERVATION
MONTH
SO observation for Rubber Mill
10
11
10
7
9
0
2
4
6
8
10
12
Jan/22 Feb/22 Mar/22 Apr/22 May/22
No
of
Near
miss
MONTH
Near miss occurred Rubber Mill
4W 1 H
Analysis
What
Where
How
Which
When
What is the problem
Unsafe condition at
mixing roller
When does it happened
While feeding rubber
to mixing mill
Where is the problem
At rubber mixing
mill
Which agency
affected
Rubber mill
How to Reduce it
By Providing Guarding and
emergency braking system
Step 3 : Analysis of the problem by 4W and 1H Technique
27
Selection of problems
Definition of problems
Measurement of the data on Problem
Analysis of the problem for root causes
Implementation of the Solution
Gain from the solution
Control /Follow Up
Step 3 : Analysis of problem for root causes
29
Sr No Probable Causes
1 Cloth stuck at rollers
2 Palm/ fingers may stuck at nipping point in rollers
3 Delay in operation of OFF switch
4 Slippery arear around mixing rollers
5 Angle of feeding the raw material
6 Output Rubber cutting
7 Improper position of operator
8 Required PPE’s not used
9 Unskilled operator
10 Emergency braking system not working
11 Speed of machine is very high
12 Improper guarding of rollers/nipping point
13 MOC of rubber mixing mill
14 Operator palm/fingers can stuck between rollers
Causes are studied
with Ishikawa
Diagram
Unsafe working
condition at Rubber
Mixing Mill
Step 4 : Fishbone diagram
Dr. K. Ishikawa
30
Improper position of operator
Required PPE’s not used
Unskilled operator
MAN
Emergency braking system not
working
Improper guarding of
rollers/nipping point
MACHINE
Speed of machine is very high
Chemical composition of rubber
MOC of rubber mixing mill
MATERIAL METHOD
Improper way of rubber feeding
Operator palm/fingers can stuck between
rollers
31
Step 4 : Validation of the causes
Sr No Probable Causes Validation results Judgement
1 Cloth stuck at rollers
Valid cause
2 Palm/ fingers may stuck at nipping point in rollers
Valid cause
3 Delay in operation of OFF switch Not Valid
4
Slippery arear around mixing rollers Not Valid
5 Angle of feeding the raw material Valid cause
6 Output Rubber cutting
Not Valid
7 Improper position of operator Not Valid
8 Required PPE’s not used
Not Valid
9 Unskilled operator Not Valid
10 Emergency braking system not working Valid cause
11 Speed of machine is very high Not Valid
12 Improper guarding of rollers/nipping point Valid cause
13 MOC of rubber mixing mill Not Valid
14 Operator palm/fingers can stuck between rollers Valid cause
32
Step 4 : List of Valid Causes
Sr No Probable Causes Solution
1 Cloth stuck at rollers
Tight uniform and safetyguard
2
Palm/ fingers maystuck at nipping point in
rollers
SafetyGuard to be provided
5 Angle of feeding the raw material
Support bar required to feed the raw
material
10
Emergencybraking system are awayfrom
working area
Emergrybreakaing system to be provided at
hand/feet diatance.
12 Improper guarding of rollers/nipping point
14 Operator palm/fingers can stuck between rollers
Proper Guard to be provided at mixing
roller meshing points
Selection of problems
Definition of problems
Measurement of the data on Problem
Analysis of the problem for root causes
Implementation of the Solution
Gain from the solution
Control /Follow Up
34
Step 5 : PDCA Cycle for Implementation
• Trial taken by feeding
rubber in mixing rollers
& applying hand or
peddle brakes
• No unsafe condition
observed while working on
Mill.
• Install Nip guard
• Provide safety bar
• Install emergency push
button
• Install peddle operated
brake system
• Take appropriate actions
to eliminate Unsafe
condition
PLAN DO
CHECK
ACT
Step 5 : Validation of Results
Sevirity
No of
occrance
(RPN) Sevirity
No of
occrance
(RPN)
1 Cloth stuck at rollers 4 5 20 2 3 6
2
Palm/ fingers maystuck at nipping
point in rollers
4 4 16 2 2 4
3 Angle of feeding the raw material 4 4 16 2 2 4
4
Emergencybraking system are away
from working area
4 3 12 2 2 4
5
Improper guarding of rollers/nipping
point
5 5 25 2 3 6
6
Operator palm/fingers can stuck
between rollers
5 5 25 3 2 6
Before Modification After Modification
Problems
Sr. No
BEFORE AFTER
Step 5 : Implementation of the Solution
 Nip Guard Arrangement For Mixing Rollers
Step 5 : Implementation of the Solution
 Nip Guard Arrangement For Mixing Rollers
BEFORE AFTER
Step 5 : Implementation of the Solution
 Emergency Brake Switch at Rubber Mixing Machine
BEFORE AFTER
Step 5 : Implementation of the Solution
 Safety Bar Rubber Mixing Machine
BEFORE AFTER
Step 5 : Implementation of the Solution
 Safety lock-Vulcanizer Door
Safety Lock
Sling locking
to bolts
Step 5 : Implementation of the Solution
 Safety lock-Vulcanizer Door
Adjustable toggle
Broken Bolt
Selection of problems
Definition of problems
Measurement of the data on Problem
Analysis of the problem for root causes
Implementation of the solution
Gain from the solution
Control /Follow Up
Step 6 : Comparative study before and after
Kaizen Implement
43
Sr no Before After
1
Clothe wrapping possibility due non availability of
the safety bar
Safety bar is provide from both the operating ends
2 No paddle operated braking system
Both operator side, given paddle operated braking arrangement
for emergency stoppage within after of influence.
3 ON/OFF switch was at JB
On both operator sides, right hand side push button given for
emergency braking
4 Angle feeding was not proper
By providing the safety bar, hand supported on the bar and easy to
feed the raw material.
5 Nip guard absent
Nip guard provided above the mixing rollers to avoid hand
contact.
6
Production of Rubber Mixing Mill reduced due to
safety factor
Rubber Mill Production increases by 5 Kg/Hr
Step 6 :Tangible benefits/Cost Saving
044
Saving Calculation
SR.No Particulars Uom Value Total Saving
1 Productivity Loss Kg 5 30,000 / Day
2 Project Cost Rs 20000/-
Major saving in terms of Human Life
Mutual understanding
Self confidence
Enhancement in
computer skill
Enriched knowledge
Enhanced problem
solving capability
Enhanced presentation
skills
Unsafe condition eliminated
Near miss and Unsafe SO
reduced
Step 6: Intangible benefits
45
Selection of problems
Definition of problems
Measurement of the data on Problem
Analysis of the problem for root causes
Implementation of the solution
Gain from the solution
Control /Follow Up
Control and follow up
Step 7 :
Rubber mixing mill:
There is a chance of crush injury while mixing the different component of rubber. Before the audit ,only one
hand operated mill stopping was given which is found not enough to avoid possible crush injury. So as per
the plant head suggestions three different arrangement provided on the machine to avoid possible hazards.
1. Hand pull emergency brake provide for immediate stopping rotating rollers. (Old arrangement)
2. Safety bar is provide from both the operating ends which will avoid possible contact of cloth with the
rotating rollers. (Newly installed)
3. Both operator side, given paddle operated braking arrangement for emergency stoppage. (Newly
installed).
4. On both operator sides, right hand side push button given for emergency braking. (Newly installed )
5. Hand pull emergency brake provide for immediate stopping rotating rollers. (New installed )
6. Nip guard provided above the mixing rollers to avoid hand contact.
Step 7 : Revision of Work Instruction
48
JSW STEEL COATED PRODUCTS
LIMITED,KALMESHWAR No.: 50-03-01
DEPARTMENT: RUBBER MILL
SECTION : RUBBER MIXING MILL ISSUE: 04: REV.: 01
WORK INSTRUCTION FOR RUBBER MILL
OPERATORS Date: 10.01.2022
JSW STEEL COATED PRODUCTS
LIMITED,KALMESHWAR No.:50-03-01
DEPARTMENT: RUBBER MILL
SECTION : RUBBER MIXING MILL ISSUE: 04: REV.: 02
WORK INSTRUCTION FOR RUBBER MILL
OPERATORS Date:30.8.22
BEFORE AFTER
1. TITLE : Work Instructions for rubber mill Operators.
2. PURPOSE : Rubber mixing at mixing mill
3. SCOPE : Proper mixing of rubber & cutting rubber strips
1. TITLE : Work Instructions for rubber mill Operators.
2. PURPOSE : Rubber mixing at mixing mill
3 SCOPE : Post treatment section to Finish Dryer
.
5. RESPONSIBILITY : Operator,Line In charge.
6. TOOLS & GUAGES : Cutting knife for rubber
7. WORK INSTRUCTIONS:
A. Operators and associates should use mandatory PPE while working on
mixing mill
B. Apply emergency brake (hand operated) in case of emergency
5. RESPONSIBILITY : Operator, Line In charge.
6. TOOLS & GUAGES : Cutting knife for rubber
7. WORK INSTRUCTIONS:
A. Operators and associates should use mandatory PPE while working on mixing mill
B. Apply emergency brake (hand/peddle operated) in case of emergency
C. Feed the rubber from top side of Nip guard to avoid unsafe condition
49
LIST OF VARIOUS PROBLEMS IDENTIFIED AT RUBBER MILL
Sr.No PROBLEMS CATG.TYPE
1 Vulcanizer roll trolley rusting A
2 Vulcanized trolley in/out required 4-5 manpower A
3 B32 lathe machine bed worn out A
4 Mixing mill side guide worn out A
5 Emergency braking system at rubber mill A
6 Cloth wrapping inside rmixing mill A
7 Rubber area working hand gloves not good A
8 Improper arrangement of chemical oil removal from tank A
Step 7 : Future project
THANK YOU
Delivering Growth in Challenging Times
61
22 MTPA

Contenu connexe

Tendances

Design for assembly methods
Design for assembly methodsDesign for assembly methods
Design for assembly methodsaman1312
 
PPT on fully study about DIE CASTING by M.M.RAFIK.
PPT on fully study about DIE CASTING by M.M.RAFIK.PPT on fully study about DIE CASTING by M.M.RAFIK.
PPT on fully study about DIE CASTING by M.M.RAFIK.M.M. RAFIK
 
presentation on lathe machine
presentation on lathe machinepresentation on lathe machine
presentation on lathe machinekashyap8960
 
Heat Treatment Processes
Heat Treatment ProcessesHeat Treatment Processes
Heat Treatment ProcessesHimanshu Verma
 
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...Sumit Kumar
 
WELDING JOINTS AND POSITIONS.pptx
WELDING JOINTS AND POSITIONS.pptxWELDING JOINTS AND POSITIONS.pptx
WELDING JOINTS AND POSITIONS.pptxMaxwell Owusu
 
Hot Rolling And cold rolling process
Hot Rolling And cold rolling processHot Rolling And cold rolling process
Hot Rolling And cold rolling processDhyey Shukla
 
The Assembly Line and Mass Production Presentation
The Assembly Line and Mass Production PresentationThe Assembly Line and Mass Production Presentation
The Assembly Line and Mass Production Presentationerinlord
 
ppt on Forging process
ppt on Forging processppt on Forging process
ppt on Forging processRAHUL DAS
 
Modular fixtures for inspection in CMM
Modular fixtures for inspection in CMMModular fixtures for inspection in CMM
Modular fixtures for inspection in CMMSuresh Lal
 
ppt on Sheet metal process
ppt on Sheet metal processppt on Sheet metal process
ppt on Sheet metal processsumant99
 

Tendances (20)

Rolling of the metals
Rolling of the metalsRolling of the metals
Rolling of the metals
 
Unit 3-METAL FORMING PROCESSES
Unit 3-METAL FORMING PROCESSESUnit 3-METAL FORMING PROCESSES
Unit 3-METAL FORMING PROCESSES
 
Shell molding process
Shell molding processShell molding process
Shell molding process
 
Design for assembly methods
Design for assembly methodsDesign for assembly methods
Design for assembly methods
 
PPT on fully study about DIE CASTING by M.M.RAFIK.
PPT on fully study about DIE CASTING by M.M.RAFIK.PPT on fully study about DIE CASTING by M.M.RAFIK.
PPT on fully study about DIE CASTING by M.M.RAFIK.
 
presentation on lathe machine
presentation on lathe machinepresentation on lathe machine
presentation on lathe machine
 
Heat Treatment Processes
Heat Treatment ProcessesHeat Treatment Processes
Heat Treatment Processes
 
Casting
CastingCasting
Casting
 
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
 
WELDING JOINTS AND POSITIONS.pptx
WELDING JOINTS AND POSITIONS.pptxWELDING JOINTS AND POSITIONS.pptx
WELDING JOINTS AND POSITIONS.pptx
 
Mechanical assembly
Mechanical assembly Mechanical assembly
Mechanical assembly
 
Hot Rolling And cold rolling process
Hot Rolling And cold rolling processHot Rolling And cold rolling process
Hot Rolling And cold rolling process
 
Induction furnaces
Induction furnacesInduction furnaces
Induction furnaces
 
WRM & BM
WRM & BMWRM & BM
WRM & BM
 
The Assembly Line and Mass Production Presentation
The Assembly Line and Mass Production PresentationThe Assembly Line and Mass Production Presentation
The Assembly Line and Mass Production Presentation
 
Casting technique
Casting techniqueCasting technique
Casting technique
 
ppt on Forging process
ppt on Forging processppt on Forging process
ppt on Forging process
 
Casting Defects And Remedies
Casting Defects And RemediesCasting Defects And Remedies
Casting Defects And Remedies
 
Modular fixtures for inspection in CMM
Modular fixtures for inspection in CMMModular fixtures for inspection in CMM
Modular fixtures for inspection in CMM
 
ppt on Sheet metal process
ppt on Sheet metal processppt on Sheet metal process
ppt on Sheet metal process
 

Similaire à JSW KAIZEN Udan.pptx

QC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPE
QC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPEQC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPE
QC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPERAVI PAL SINGH
 
Buland Soch final 15-01-2023 NCQC Final.pptx
Buland Soch final 15-01-2023 NCQC Final.pptxBuland Soch final 15-01-2023 NCQC Final.pptx
Buland Soch final 15-01-2023 NCQC Final.pptxPradeepYadav206298
 
Arjun_Lam. wastage-NHC-April-2014 (5)
Arjun_Lam. wastage-NHC-April-2014 (5)Arjun_Lam. wastage-NHC-April-2014 (5)
Arjun_Lam. wastage-NHC-April-2014 (5)Amita Srivastava
 
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBGVVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBGIndrani7
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013Aamer Pathan
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfMizan Rahman
 
Project Presentation PQM
Project Presentation PQMProject Presentation PQM
Project Presentation PQMSaif Ul Islam
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - ProgressIssa Alshaikh
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaDr. Bikram Jit Singh
 
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 aRV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 aRushikesh Patil
 
Project report of (biodiesel extraction from waste plastic)
Project report of (biodiesel extraction from waste plastic)Project report of (biodiesel extraction from waste plastic)
Project report of (biodiesel extraction from waste plastic)Self employed
 
2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.pptShivaguru Venkatraman
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfMizan Rahman
 

Similaire à JSW KAIZEN Udan.pptx (20)

Case study
Case studyCase study
Case study
 
Coining QCC R1.pptx
Coining QCC R1.pptxCoining QCC R1.pptx
Coining QCC R1.pptx
 
QC_SPARK.pptx
QC_SPARK.pptxQC_SPARK.pptx
QC_SPARK.pptx
 
QC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPE
QC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPEQC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPE
QC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPE
 
Buland Soch final 15-01-2023 NCQC Final.pptx
Buland Soch final 15-01-2023 NCQC Final.pptxBuland Soch final 15-01-2023 NCQC Final.pptx
Buland Soch final 15-01-2023 NCQC Final.pptx
 
Arjun_Lam. wastage-NHC-April-2014 (5)
Arjun_Lam. wastage-NHC-April-2014 (5)Arjun_Lam. wastage-NHC-April-2014 (5)
Arjun_Lam. wastage-NHC-April-2014 (5)
 
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBGVVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
 
QC Story for MYB - VAMSI KRISHNA
QC Story for MYB - VAMSI KRISHNAQC Story for MYB - VAMSI KRISHNA
QC Story for MYB - VAMSI KRISHNA
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
 
Qc team sunrise
Qc team sunriseQc team sunrise
Qc team sunrise
 
Project Presentation PQM
Project Presentation PQMProject Presentation PQM
Project Presentation PQM
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in india
 
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 aRV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
RV3 KOEL Quality Issue- SRF Action... Plan 14 08 15 a
 
Project report of (biodiesel extraction from waste plastic)
Project report of (biodiesel extraction from waste plastic)Project report of (biodiesel extraction from waste plastic)
Project report of (biodiesel extraction from waste plastic)
 
2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt
 
Full Report
Full ReportFull Report
Full Report
 
QC story- Battery mounting
QC story- Battery mountingQC story- Battery mounting
QC story- Battery mounting
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
 

Plus de MAHESH WERULKAR

project management HBR.pdf
project management HBR.pdfproject management HBR.pdf
project management HBR.pdfMAHESH WERULKAR
 
Presentation Skills Band 3.pdf
Presentation Skills Band 3.pdfPresentation Skills Band 3.pdf
Presentation Skills Band 3.pdfMAHESH WERULKAR
 
Curriculum_4746_1142.pdf
Curriculum_4746_1142.pdfCurriculum_4746_1142.pdf
Curriculum_4746_1142.pdfMAHESH WERULKAR
 
Curriculum_4746_1147.pdf
Curriculum_4746_1147.pdfCurriculum_4746_1147.pdf
Curriculum_4746_1147.pdfMAHESH WERULKAR
 
Curriculum_4746_1150.pdf
Curriculum_4746_1150.pdfCurriculum_4746_1150.pdf
Curriculum_4746_1150.pdfMAHESH WERULKAR
 
PROpel _ Your Annual Learning Initiative.pdf
PROpel _ Your Annual Learning Initiative.pdfPROpel _ Your Annual Learning Initiative.pdf
PROpel _ Your Annual Learning Initiative.pdfMAHESH WERULKAR
 
Basics of Sales Order Management in Supply Chain Management
Basics of Sales Order Management in Supply Chain ManagementBasics of Sales Order Management in Supply Chain Management
Basics of Sales Order Management in Supply Chain ManagementMAHESH WERULKAR
 
TUV india internal auditor certificate
TUV india internal auditor certificateTUV india internal auditor certificate
TUV india internal auditor certificateMAHESH WERULKAR
 

Plus de MAHESH WERULKAR (20)

project management HBR.pdf
project management HBR.pdfproject management HBR.pdf
project management HBR.pdf
 
ISHRAE..pdf
ISHRAE..pdfISHRAE..pdf
ISHRAE..pdf
 
elementary drg C.pdf
elementary drg C.pdfelementary drg C.pdf
elementary drg C.pdf
 
Presentation Skills Band 3.pdf
Presentation Skills Band 3.pdfPresentation Skills Band 3.pdf
Presentation Skills Band 3.pdf
 
RESUME.pdf
RESUME.pdfRESUME.pdf
RESUME.pdf
 
Curriculum_4746_1142.pdf
Curriculum_4746_1142.pdfCurriculum_4746_1142.pdf
Curriculum_4746_1142.pdf
 
Curriculum_4746_552.pdf
Curriculum_4746_552.pdfCurriculum_4746_552.pdf
Curriculum_4746_552.pdf
 
Curriculum_4746_1147.pdf
Curriculum_4746_1147.pdfCurriculum_4746_1147.pdf
Curriculum_4746_1147.pdf
 
Curriculum_4746_216.pdf
Curriculum_4746_216.pdfCurriculum_4746_216.pdf
Curriculum_4746_216.pdf
 
Curriculum_4746_350.pdf
Curriculum_4746_350.pdfCurriculum_4746_350.pdf
Curriculum_4746_350.pdf
 
Curriculum_4746_93.pdf
Curriculum_4746_93.pdfCurriculum_4746_93.pdf
Curriculum_4746_93.pdf
 
Curriculum_4746_349.pdf
Curriculum_4746_349.pdfCurriculum_4746_349.pdf
Curriculum_4746_349.pdf
 
Curriculum_4746_223.pdf
Curriculum_4746_223.pdfCurriculum_4746_223.pdf
Curriculum_4746_223.pdf
 
Curriculum_4746_205.pdf
Curriculum_4746_205.pdfCurriculum_4746_205.pdf
Curriculum_4746_205.pdf
 
Curriculum_4746_1150.pdf
Curriculum_4746_1150.pdfCurriculum_4746_1150.pdf
Curriculum_4746_1150.pdf
 
PROpel _ Your Annual Learning Initiative.pdf
PROpel _ Your Annual Learning Initiative.pdfPROpel _ Your Annual Learning Initiative.pdf
PROpel _ Your Annual Learning Initiative.pdf
 
SAP MM.pdf
SAP MM.pdfSAP MM.pdf
SAP MM.pdf
 
Basics of Sales Order Management in Supply Chain Management
Basics of Sales Order Management in Supply Chain ManagementBasics of Sales Order Management in Supply Chain Management
Basics of Sales Order Management in Supply Chain Management
 
ICQCC 2021
ICQCC 2021ICQCC 2021
ICQCC 2021
 
TUV india internal auditor certificate
TUV india internal auditor certificateTUV india internal auditor certificate
TUV india internal auditor certificate
 

Dernier

Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...IJAEMSJORNAL
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...Amil baba
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 
Introduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxIntroduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxPavan Mohan Neelamraju
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Machine Learning 5G Federated Learning.pdf
Machine Learning 5G Federated Learning.pdfMachine Learning 5G Federated Learning.pdf
Machine Learning 5G Federated Learning.pdfadeyimikaipaye
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...arifengg7
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...shreenathji26
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackinghadarpinhas1
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...KrishnaveniKrishnara1
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studydhruvamdhruvil123
 
10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptx10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptxAdityaGoogle
 

Dernier (20)

Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 
Introduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxIntroduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptx
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
Machine Learning 5G Federated Learning.pdf
Machine Learning 5G Federated Learning.pdfMachine Learning 5G Federated Learning.pdf
Machine Learning 5G Federated Learning.pdf
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
ASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductosASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductos
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and tracking
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain study
 
10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptx10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptx
 

JSW KAIZEN Udan.pptx

  • 1. #Better Everyday 1 JSW Steel Coated Products Ltd,Kalmeshwar 33rd Chapter Convention on Quality Concepts by QCFI Nagpur Chapter Kaizen Group
  • 3. PROJECT THEME RUBBER MILL SAFETY IMPROVEMENTY KAIZEN PROJECT TITLE SAFETY PROVISION IN RUBBER MILL & AUTOCLAVE UNIT Project completed Date 30.8.2022 NO. OF MEETINGS 9 ATTENDANCE 94% PERIODICITY OF MEETINGS THRICE MONTHLY Team Charter 3 Team Leader Mahesh Werulkar Member Niraj Vithalkar Facilitator Mr.Gajanan Ghughal Member G.N.BAWANE
  • 4. Presence Across Key Infrastructure Sectors 4 STEEL INFRASTRUCTURE CEMENT FOUNDATION GLOBAL BUSINESS SOLUTION POWER
  • 5. VISION PURPOSE VALUES Vision, Purpose and Values
  • 7. 7 JSW SALEM WON DEMING AWARD -2019
  • 8. 8 JSW Steel – Awards Prime Minister’s Trophy by Ministry of Steel for the year 2012- 13. Porter Prize f or Creating Shared Value, Leveraging Unique Activities - Weathering the Iron Ore crisis 2015 National Sustainabili ty Award: 1st Prize by IIM for the year 2017 Steel Minister’s Trophy for the year 2014-15 and 2015- 16
  • 9. JSW Steel - At A Glance In India Steel making capacity of 22 MTPA 9 manufacturing facilities in India VASIND / TARAPUR DOLVI VIJAYANAGAR KALMESHWAR SALEM Integrated Steel Plant Downstream Plant Slabs Cold Rolled CA,GL Coated Products Long Products HRPO Coils Hot Rolled Plates HR Coils HSM Plates India’s largest Steel manufacturer SALAV 6
  • 10. 0.30 1999 0.33 0.35 2004 2011 0.41 2014 2017 0.65 2019 0.68 12 CAPACITY RAMP –UP (MTPA) 2022 1.00 0.72 2021 Acquisition by JSW Galvanizing 1 - 1984 Color Coating -1988 Galvanizing 2 - 2003 Galvalume 1 - 2007 Color Coating 2 – 2013 Color Coating 3 - 2021 Financial Year YEAR MTPA Milestones of Kalmeshwar
  • 11. 0757: Shop Floor Mantra For Continuous Improvement 11 Our project is based on eliminating UNSAFE condition
  • 12. Selection of problems Definition of problems- Measurement of the data on Problem- Analysis of the problem for root causes- Implementation of the Solution Gain from the solution Control /Follow Up
  • 13. Step 1: Selection of the Problem 13 LIST OF VARIOUS PROBLEMS IDENTIFIED AT RUBBER MILL SL NO PROBLEMS CATG. TYPE 1 Vulcanizer roll trolley rusting A 2 Vulcanizer trolley in/out required 4-5 manpower A 3 Overhead crane derail from track B 4 1060 mm Dia. roll cannot be lifted by crane C 5 B32 lathe gear worn out ,slow speed of operation C 6 B32 lathe machine bed worn-out A 7 Rubber mixing mill unsafe condition A 8 Mixing mill side guide worn-out A 9 Vulcanizer door gasket groove damaged chances of leakage C 10 Volcanizer lower steam pressure leads to improper curing B 11 Improper chemical composition of rubber C 12 Emergency braking system at rubber mill A 13 Cloth wrapping inside rmixing mill A 14 Oil lubrication problem in rubber mill B 15 Rubber cutting knife of lower quality B 16 Error in weighing scale B 17 Rubber area working hand gloves not good A 18 Improper arrangement of chemical oil removal from tank A CATEGORY TYPE: A: Problems which can be solved by our QC team B: Cross functional projects C: Management help
  • 14. A B C Step 1 : Selection of problems – ABC analysis 14 9 5 4 0 1 2 3 4 5 6 7 8 9 10 A B C Frequency Category
  • 15. Step 1 : Selection of problems 15 All Unsolved Problems in A category Studied A' Category Problems Sr. No Problems Cat. Type 1 Vulcanize roll trolley rusting A 2 Vulcanize trolley in/out required 4-5 manpower A 3 1060 mm Dia. roll cannot be lifted by crane A 4 Rubber mixing mill unsafe condition A 5 Mixing mill side guide worn-out A 6 Emergency braking system at rubber mill A 7 Cloth wrapping inside rmixing mill A 8 Rubber area working hand gloves not good A 9 Improper arrangement of chemical oil removal from tank A
  • 16. Step 1 : Selection of problems Through Severity & No of occurrence 16 Data collection for A category problems Sr. No Problems Sevirity No of occrance (RPN) 1 Vulcanizer roll trolly rusting 3 2 6 2 Vulcanizer trolly in/out required 4-5 manpower 3 2 6 3 B32 lathe machine bed wornout 3 2 6 4 Rubber mixing mill unsafe condition 4 5 20 5 Mixing mill side guide wornout 4 2 8 6 Emergency braking system at rubber mill 4 4 16 7 Cloth wrapping inside rmixing mill 4 4 16 8 Rubber area working hand gloves not good 3 2 6 9 Improper arrangement of chemical oil removal from tank 3 2 6 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0 5 10 15 20 25 No of occrance Cu % Useful many Vital few
  • 17. Selection of problems Definition of problems Measurement of the data on Problem Analysis of the problem for root causes Implementation of the Solution Gain from the solution Control /Follow Up
  • 18. 18 Step 2 : Definition of Problem PROCESS DESCRIPTION OF JSW STEEL COATED PRODUCTS LTD. KALMESHWAR Utilities : Rubber mill provides rubber coating on used rolls for CPL, GAL1,2 ,CGL 2lines
  • 19. 19 Step 2 : Definition of Problem RUBBER MILLAREA RUBBER MILL CPL MILL CGL 2 GAL 1 & 2 CCL 1,2 CCL 3 CRS 1,2,3 BOILER  Rubber mill provides rubber rolls to these lines
  • 20. 20 Step 2 : Definition of Problem PROCESS DESCRIPTION OF RUBBER MIXING MILL Old roll threading on lathe Adhesive pasting on roll Turning of rubber roll on lathe m/c Coting rubber strip from extruder machine Tension strip packing on lathe Vulcanizing of Rubber roll Rubber Mixing Mill
  • 21. Step 2 : Definition of Problem Rubber mixing mill: There is a chance of crush injury while mixing the different component of rubber. Rubber Mixing Mill Mixing Rolls
  • 22. Unsafe condition at Rubber Mill Safety Production Cloths may stuck at rotating parts of machine Fatal accident while feeding rubber with hand Loss of production of rubber mill & accordinlgy GAL 1&2 CCL 1,2,3 High MTTR of mixing machine Damage to mixing rollers 22 Step 2 : Impact of Problem
  • 23. TO PROVIDE PADDLE BRAKE. TO REDUCE UNSAFE ACT & CONDITION AT RUBBER MILL TO PROVIDE MACHINE GUARDING & SAFETY BAR AT MIXING ROLLLERS TO PROVIDE BUSH BUTTON EMERGENCY SWITCH “TO ELIMINATE UNSAFE CONDITION AT RUBBER MILL” Step 2 : Objectives 23 TO PROVIDE SAFETY LOCK AT VULCANISER DOOR
  • 24. Start Date of Project 2 June 2022 Target Date of Project 30 Aug 2022 Coordinator : Narendra Kumar Facilitator : Gajanan Ghugal Team Mechnova 1. Mahesh Werulkar(Leader) 2. Niraj Vitthalkar 3. G N Banve Kaizen Name: UDAAN Tittle : Safety Provision at Rubber Mill &Autoclave Unit 24 Step 2 : Schedule Gantt Chart Sl no Activities/No of weeks 1 2 3 4 5 6 7 8 9 10 11 12 REMARKS 1 Selection of problem 2 Definition of problem 3 Measurement of the problem 4 Analysis of the problem for root cause 5 Implementation of the problem 6 Gain from the problem 7 Control /Follow Up
  • 25. Selection of problems Definition of problems Measurement of the data on Problem Analysis of the problem for root causes Implementation of the Solution Gain from the solution Control /Follow Up
  • 26. Step 3 : Measurement of the data on Problem 26 9 12 10 8 11 0 2 4 6 8 10 12 14 Jan/22 Feb/22 Mar/22 Apr/22 May/22 NO.OF OBSERVATION MONTH SO observation for Rubber Mill 10 11 10 7 9 0 2 4 6 8 10 12 Jan/22 Feb/22 Mar/22 Apr/22 May/22 No of Near miss MONTH Near miss occurred Rubber Mill
  • 27. 4W 1 H Analysis What Where How Which When What is the problem Unsafe condition at mixing roller When does it happened While feeding rubber to mixing mill Where is the problem At rubber mixing mill Which agency affected Rubber mill How to Reduce it By Providing Guarding and emergency braking system Step 3 : Analysis of the problem by 4W and 1H Technique 27
  • 28. Selection of problems Definition of problems Measurement of the data on Problem Analysis of the problem for root causes Implementation of the Solution Gain from the solution Control /Follow Up
  • 29. Step 3 : Analysis of problem for root causes 29 Sr No Probable Causes 1 Cloth stuck at rollers 2 Palm/ fingers may stuck at nipping point in rollers 3 Delay in operation of OFF switch 4 Slippery arear around mixing rollers 5 Angle of feeding the raw material 6 Output Rubber cutting 7 Improper position of operator 8 Required PPE’s not used 9 Unskilled operator 10 Emergency braking system not working 11 Speed of machine is very high 12 Improper guarding of rollers/nipping point 13 MOC of rubber mixing mill 14 Operator palm/fingers can stuck between rollers Causes are studied with Ishikawa Diagram
  • 30. Unsafe working condition at Rubber Mixing Mill Step 4 : Fishbone diagram Dr. K. Ishikawa 30 Improper position of operator Required PPE’s not used Unskilled operator MAN Emergency braking system not working Improper guarding of rollers/nipping point MACHINE Speed of machine is very high Chemical composition of rubber MOC of rubber mixing mill MATERIAL METHOD Improper way of rubber feeding Operator palm/fingers can stuck between rollers
  • 31. 31 Step 4 : Validation of the causes Sr No Probable Causes Validation results Judgement 1 Cloth stuck at rollers Valid cause 2 Palm/ fingers may stuck at nipping point in rollers Valid cause 3 Delay in operation of OFF switch Not Valid 4 Slippery arear around mixing rollers Not Valid 5 Angle of feeding the raw material Valid cause 6 Output Rubber cutting Not Valid 7 Improper position of operator Not Valid 8 Required PPE’s not used Not Valid 9 Unskilled operator Not Valid 10 Emergency braking system not working Valid cause 11 Speed of machine is very high Not Valid 12 Improper guarding of rollers/nipping point Valid cause 13 MOC of rubber mixing mill Not Valid 14 Operator palm/fingers can stuck between rollers Valid cause
  • 32. 32 Step 4 : List of Valid Causes Sr No Probable Causes Solution 1 Cloth stuck at rollers Tight uniform and safetyguard 2 Palm/ fingers maystuck at nipping point in rollers SafetyGuard to be provided 5 Angle of feeding the raw material Support bar required to feed the raw material 10 Emergencybraking system are awayfrom working area Emergrybreakaing system to be provided at hand/feet diatance. 12 Improper guarding of rollers/nipping point 14 Operator palm/fingers can stuck between rollers Proper Guard to be provided at mixing roller meshing points
  • 33. Selection of problems Definition of problems Measurement of the data on Problem Analysis of the problem for root causes Implementation of the Solution Gain from the solution Control /Follow Up
  • 34. 34 Step 5 : PDCA Cycle for Implementation • Trial taken by feeding rubber in mixing rollers & applying hand or peddle brakes • No unsafe condition observed while working on Mill. • Install Nip guard • Provide safety bar • Install emergency push button • Install peddle operated brake system • Take appropriate actions to eliminate Unsafe condition PLAN DO CHECK ACT
  • 35. Step 5 : Validation of Results Sevirity No of occrance (RPN) Sevirity No of occrance (RPN) 1 Cloth stuck at rollers 4 5 20 2 3 6 2 Palm/ fingers maystuck at nipping point in rollers 4 4 16 2 2 4 3 Angle of feeding the raw material 4 4 16 2 2 4 4 Emergencybraking system are away from working area 4 3 12 2 2 4 5 Improper guarding of rollers/nipping point 5 5 25 2 3 6 6 Operator palm/fingers can stuck between rollers 5 5 25 3 2 6 Before Modification After Modification Problems Sr. No
  • 36. BEFORE AFTER Step 5 : Implementation of the Solution  Nip Guard Arrangement For Mixing Rollers
  • 37. Step 5 : Implementation of the Solution  Nip Guard Arrangement For Mixing Rollers
  • 38. BEFORE AFTER Step 5 : Implementation of the Solution  Emergency Brake Switch at Rubber Mixing Machine
  • 39. BEFORE AFTER Step 5 : Implementation of the Solution  Safety Bar Rubber Mixing Machine
  • 40. BEFORE AFTER Step 5 : Implementation of the Solution  Safety lock-Vulcanizer Door Safety Lock Sling locking to bolts
  • 41. Step 5 : Implementation of the Solution  Safety lock-Vulcanizer Door Adjustable toggle Broken Bolt
  • 42. Selection of problems Definition of problems Measurement of the data on Problem Analysis of the problem for root causes Implementation of the solution Gain from the solution Control /Follow Up
  • 43. Step 6 : Comparative study before and after Kaizen Implement 43 Sr no Before After 1 Clothe wrapping possibility due non availability of the safety bar Safety bar is provide from both the operating ends 2 No paddle operated braking system Both operator side, given paddle operated braking arrangement for emergency stoppage within after of influence. 3 ON/OFF switch was at JB On both operator sides, right hand side push button given for emergency braking 4 Angle feeding was not proper By providing the safety bar, hand supported on the bar and easy to feed the raw material. 5 Nip guard absent Nip guard provided above the mixing rollers to avoid hand contact. 6 Production of Rubber Mixing Mill reduced due to safety factor Rubber Mill Production increases by 5 Kg/Hr
  • 44. Step 6 :Tangible benefits/Cost Saving 044 Saving Calculation SR.No Particulars Uom Value Total Saving 1 Productivity Loss Kg 5 30,000 / Day 2 Project Cost Rs 20000/- Major saving in terms of Human Life
  • 45. Mutual understanding Self confidence Enhancement in computer skill Enriched knowledge Enhanced problem solving capability Enhanced presentation skills Unsafe condition eliminated Near miss and Unsafe SO reduced Step 6: Intangible benefits 45
  • 46. Selection of problems Definition of problems Measurement of the data on Problem Analysis of the problem for root causes Implementation of the solution Gain from the solution Control /Follow Up
  • 47. Control and follow up Step 7 : Rubber mixing mill: There is a chance of crush injury while mixing the different component of rubber. Before the audit ,only one hand operated mill stopping was given which is found not enough to avoid possible crush injury. So as per the plant head suggestions three different arrangement provided on the machine to avoid possible hazards. 1. Hand pull emergency brake provide for immediate stopping rotating rollers. (Old arrangement) 2. Safety bar is provide from both the operating ends which will avoid possible contact of cloth with the rotating rollers. (Newly installed) 3. Both operator side, given paddle operated braking arrangement for emergency stoppage. (Newly installed). 4. On both operator sides, right hand side push button given for emergency braking. (Newly installed ) 5. Hand pull emergency brake provide for immediate stopping rotating rollers. (New installed ) 6. Nip guard provided above the mixing rollers to avoid hand contact.
  • 48. Step 7 : Revision of Work Instruction 48 JSW STEEL COATED PRODUCTS LIMITED,KALMESHWAR No.: 50-03-01 DEPARTMENT: RUBBER MILL SECTION : RUBBER MIXING MILL ISSUE: 04: REV.: 01 WORK INSTRUCTION FOR RUBBER MILL OPERATORS Date: 10.01.2022 JSW STEEL COATED PRODUCTS LIMITED,KALMESHWAR No.:50-03-01 DEPARTMENT: RUBBER MILL SECTION : RUBBER MIXING MILL ISSUE: 04: REV.: 02 WORK INSTRUCTION FOR RUBBER MILL OPERATORS Date:30.8.22 BEFORE AFTER 1. TITLE : Work Instructions for rubber mill Operators. 2. PURPOSE : Rubber mixing at mixing mill 3. SCOPE : Proper mixing of rubber & cutting rubber strips 1. TITLE : Work Instructions for rubber mill Operators. 2. PURPOSE : Rubber mixing at mixing mill 3 SCOPE : Post treatment section to Finish Dryer . 5. RESPONSIBILITY : Operator,Line In charge. 6. TOOLS & GUAGES : Cutting knife for rubber 7. WORK INSTRUCTIONS: A. Operators and associates should use mandatory PPE while working on mixing mill B. Apply emergency brake (hand operated) in case of emergency 5. RESPONSIBILITY : Operator, Line In charge. 6. TOOLS & GUAGES : Cutting knife for rubber 7. WORK INSTRUCTIONS: A. Operators and associates should use mandatory PPE while working on mixing mill B. Apply emergency brake (hand/peddle operated) in case of emergency C. Feed the rubber from top side of Nip guard to avoid unsafe condition
  • 49. 49 LIST OF VARIOUS PROBLEMS IDENTIFIED AT RUBBER MILL Sr.No PROBLEMS CATG.TYPE 1 Vulcanizer roll trolley rusting A 2 Vulcanized trolley in/out required 4-5 manpower A 3 B32 lathe machine bed worn out A 4 Mixing mill side guide worn out A 5 Emergency braking system at rubber mill A 6 Cloth wrapping inside rmixing mill A 7 Rubber area working hand gloves not good A 8 Improper arrangement of chemical oil removal from tank A Step 7 : Future project
  • 50. THANK YOU Delivering Growth in Challenging Times 61 22 MTPA